Miscellaneous Information / Notes |
INTERIOR FRAMING (MAIN HOUSE). EXTERIOR WALLS |
PAVER DRIVEWAY AND WALKS WINDOWS AND DOORS |
|
|
|
12/7/17 REVIEWED COST BREAK-DOWN LETTER WHICH WAS |
SUBMITTED BY PAUL NEWMAN ON 12/8/17. INCLUDED |
VALUE OF THE GAS AND PLUMBING WORK THAT WAS |
STARTED WITHOUT PERMIT SO THE TOTAL 4XFEE PENALTY |
IS $546.00. CALLED PAUL NEWMAN TO INFORM HIM. RB |
11/28/17 SPOKE WITH PAUL NEWMAN AND ADVISED HIM TO |
SUBMIT A LETTER TO ME STATING THE VALUE OF ONLY |
THE FRAMING, PLUMBING AND GAS, THAT WAS INSTALLED |
PRIOR TO PERMIT ISSUANCE, SO THAT THE 4XFEE |
PENALTY CAN BE BASED ON THE VALUE OF THAT WORK |
INSTEAD OF THE ENTIRE PROJECT VALUATION. |
INSPECTION HOLD WILL BE REMOVED ONCE THE |
4XFEEPENALTY HAS BEEN ADDED TO THIS BUILDING |
PERMIT AND THE GAS PERMIT. RB |
11/17/17 TIM LARGE AND ROBERT BROWN SPOKE WITH THE |
GENERAL CONTRACTOR, PAUL NEWMAN, AND ADVISED HIM |
TO PROVIDE A LETTER STATING THE VALUE OF THE |
PLUMBING AND FRAMING WORK THAT WAS STARTED PRIOR |
TO THE PERMIT BEING ISSUED. THE VALUE WILL BE |
VERIFIED WITH TIM HUNT AND THE 4XFEE PENALTY WILL |
BE BASED ON THAT VALUE. RB |
09/22/17 TALKED TO CONTRACTOR. PERMIT PACKAGE |
UPFRONT IN LARGE PLANS SHELF UNDER "P". JG. |
9/22/17 PLUMB APPROVED SENT TO JL BY GPJ PER SK |
8/29/17 RESUB ADDRESSING DENIED COMMENTS NATALEE |
8/24/17 PAUL RESUB TO ADDRESS DENIED COMMENTS |
SHOLDER |
08/02/17 LEFT MESSAGE ON CONTRACTOR'S VOICE MAIL. |
PLANS IN BACK LARGE PLANS SHELF UNDER "P". JG. |
7/25/17 PLUMB APPROVED RETURN TO R01/GPJ |
7/25/17 ELEC DENIED, RETURN TO R01. JP |