Miscellaneous Information / Notes |
ADDITION, REMODEL CHURCH BATHROOM |
|
|
|
|
3/29/23 ABANDONED PERMIT EXPIRD. LAST |
INSPECTIONDONE ON 7/28/22. CD |
7/23/20215 VENITA P/U PERMIT NSD |
7/22/15 READY IN LARGE B/EMAILED CONTR/CC |
7/22/15: MECHANICAL APPROVED WITH EXCEPTION. |
REVISIONS TO THE APPROVED PLANS FOR THE ITEMS |
LISTED BELOW SHALL BE SUBMITTED, REVIEWED AND |
APPROVED PRIOR TO 1ST INSPECTION. |
|
1) THE MECHANICAL CLOSET LOUVERED DOOR #2 SHALL BE |
OF NON-COMBUSTIBLE MATERIALS: THE DOOR SCHEDULE IS |
INDICATING A WOOD DOOR- REFERENCE SECTIONS 202, |
602, AND 603.1 FBC-10 MECHANICAL. |
2) INDICATE HOW THE O/A DAMPER IS BEING |
CONTROLLED- REFER TO SECTION 503.2.5.4 FBC-10 |
ENERGY CONSERVATION. |
3) THE TOILET EXHAUST FAN FOR BATH-1 SHALL HAVE A |
MINIMUM EXHAUST CAPACITY OF 100 CFM'S PER TABLE |
403.3 FOOTNOTE E. 50 CFM PER TOILET OR URINAL. |
4) PROVIDE TIE DOWN ENGINEERING FOR THE AC |
CONDENSERS- SECTION 301.12 FBC-10 MECHANICAL |
|
|
CHRISTOPHER L. COLE |
MECHANICAL PLANS EXAMINER |
561-805-6719 |
[email protected] |
|
|
7/21/15 CALLED CONTRACTOR, DENIED PLANS ARE FILED |
UNDER "B" LARGE PLANS. JW |
7/17/15- MECH DENIED/SENT TO JW/CC |
7/16/15 RESUB ADDRESSING DENIED COMMENTS NO FEE |
SPALMER |
07/13/2015 PLANS SIGNED OUT NSD |
7/10/15 PLAN REVIEW COMPLETE, APPLICANT NEEDS TO |
RESUBMIT, PLANS IN LARGE DENIED UNDER "B". CP |
6/26/15- MECH DENIED/RETURNED TO C13/CC |
6/10/15 PASSED BY ENG. RETURNED TO C13. KEC |
6/5/15 PASSED BY FIRE PREVENTION, RETURNED TO |
C13.PML |
06/04/2015 RESUB - RETURNED PLANS FROM IMPACT |
FEES. MM |
5/21/15 CUSTOMER SIGNED OUT 1 SET OF NOA. MM |
5/8/15 CUSTOMER SIGNED OUT 1 SET OF PLANS SPALMER |
4/28/15 CONTACTED OWNER VIA EMAIL AT |
[email protected] AND PUT IN LARGE FAILED |
DRAWER. (B) KC |
3/5/15 PASSED BY FIRE PREVENTION WITH COMMENTS, |
RETURNED TO C13.PML |