Miscellaneous Information / Notes |
POOL BARRIER FENCE - ALUMINUM RAIL - REQUIRES |
BUILDING REVIEW |
|
|
|
|
|
|
|
3/21/12 MET WITH JIM TRIMBLE AND DOUG WISE. PERMIT |
APPLICATION IS EXPIRED. JIM WILL SUBMIT A NEW |
PERMIT APPLICATION WITH A SURVEY DRAWING THAT |
SHOWS THE EXISTING SIDE FENCES. JIM WAS TOLD THAT |
THE PERMIT APPLICATION FEES MUST BE PAID FOR THE |
NEW APPLICATION. RB |
2/14/12 HM. ROUTED TO CHUCK JORDEN. |
2/13/12 ROUTED TO HM DESK TO INVESTIGATE SH |
9/30/10 DENIED/CALLED/UNDER 'S' RM |
9/27/10 ROUTED TO BUILDING (RMCD. |
9/21/10 BRM (ENGINEERING) ROUTED TO Z. LMF |
9/2/10 ROUTED TO EFABIAN (ENGINEERING)NEED WPB |
OWNER'S CONSENT SIGN-OFF PRIOR TO Z APPROVAL. |
APPLICATION WAS DOES NOT HAVE ENG. |
APPROVAL/DENIAL. PLEASE ROUTE BACK TO LMF |
(ZONING)WHEN FINISHED. LMF |
8/23/10 1ST RESUB ADDRESSING DENIED COMMENTS NO |
FEE SEW |
8-17-2010 CONTACTED SCREEN BUILDERS/CONTRACTOR TO |
ACCESS EGOV AND PROVIDE ADDITIONAL DOCS REQUIRED |
TO COMPLETE A FULL REVIEW EPF - ENGINEERING |
SERVICES |
FILED UNDER "S" (SMALL) |
8/13/10 ROUTED TO ENGINEERING. LMF |