Miscellaneous Information / Notes |
ALTER & REPAIRS DRYWALL/NEW DOORS/STUCCO/STOOP |
PAVERS/CONCRETE REPAIRS PLUMB/ELEC |
|
|
|
|
12/1/11 CALLED PETER TO P/U CERTIFICATE OF |
COMPLETION. IN CO BOX UNDER "P". RB |
5/20/11 CHANGE OF CONTRACTOR $100 SMH |
5/2/11 CONTRACTOR P/U PERMIT AR |
4/22/11 CALLED CONTRACTOR PLANS READY TO ISSUE, |
OWES FEES, FILED UNDER "C" LARGE PLAN. JW |
4/20/11 ROUTED TO RAK. LMF |
4/20/11 PLANNING AND ZONING: **** PASSED WITH |
PROVISO: THIS PERMIT IS FOR INTERIOR WORK ONLY. |
SEPARATE PERMITS ARE REQUIRED FOR ALL EXTERIOR |
WORK (FOR EXAMPLE, PARKING STRIPPING, DUMPSTER |
ENCLOSURE) PRIOR TO C.O. OR CERTIFICATE OF |
COMPLETION C.O.C. ANY OTHER WORK SUCH AS SIGNAGE, |
MURAL WORK REQUIRES ADDITIONAL PERMITS PRIOR TO |
WORK BEING PERFORMED (WHEN THE APPLICANT IS READY |
TO SUBMIT). LMF |
|
THE PROPOSED PARKING IS BACKING INTO ADJACENT |
PROPERTY, WHICH IS NOT ALLOWED PER ZLDR, SECTION |
94-485(N). IS THERE AN EXISTING RECORDED ACCESS |
AGREEMENT WITH THE ADJACENT PROPERTY OWNER? |
|
RE-SUBMITTAL: A RECORDED ACCESS AGREEMENT IS |
REQUIRED, PRIOR TO THE APPROVAL BY THE PLANNING |
AND ZONING DEPARTMENT. |
|
3/3/11 EMAIL NOTE TO PROPERTY OWNER: THE CURRENT |
RECORDED COPY FOR THE EASEMENT THAT IS SET TO |
EXPIRE IN TWO (2) YEARS OR EARLIER WITH A 90-DAY |
NOTICE, THEN WE WILL APPROVE THE PERMIT WITH THE |
CONDITION THAT IF THE ACCESS EASEMENT AGREEMENT |
EVER EXPIRES OR IS NULLIFIED, THEN THE LAND WILL |
NO LONGER HAVE LEGAL ACCESS FROM 25TH STREET. |
THEREFORE, ACCESS WILL HAVE TO BE PROVIDED FROM |
THE ALLEY TO YOUR PROPERTY. SINCE YOU HAVE ONLY |
ABOUT 20+' OF ACCESS FROM THE ALLEY THAT IS |
CURRENTLY PROPOSED TO HAVE A DUMPSTER ENCLOSURE |
AND PARKING SPACES, THEY WILL ALL HAVE TO BE |
REMOVED SO THAT ADEQUATE ACCESS TO YOUR PROPERTY |
IS MAINTAINED. OTHER ARRANGEMENTS WILL HAVE TO BE |
MADE TO PROVIDE A DUMPSTER ENCLOSURE ON THE |
PROPERTY THAT IS ACCEPTABLE TO THE CITY AT THAT |
TIME. |
|
4/18/11 PASSED WITH PROVISO: SEPARATE PERMIT |
APPLICATION, PLANS AND FEES ARE REQUIRED FOR |
DUMPSTER ENCLOSURE, PARKING, STRIPING, ASPHALT. TO |
BE COMPLETED PRIOR TO C.O. (CERTIFICATE OF |
OCCUPANCY) M GONZALEZ (ENGINEERING) |
|
4/15/11 CLARAROSE REMOVED PLANS FOR EXTERIOR WORK |
AND RESUBMITTED PLANS FOR PERMIT ISSUANCE. RB |
4/15/11 CLARAROSE WAS CALLED AND ASKED TO REMOVE |
THE EXTERIOR WORK FROM THE SCOPE OF THIS PERMIT. |
SO VALUE OF WORK IS BEING REDUCED FROM $142,000 TO |
$122,000. SEPARATE PERMIT APPLICATIONS WILL BE |
SUBMITTED FOR THE PARKING LOT, DUMPSTER ENCLOSURE, |
LANDSCAPING, ETC. RB |
3/31 RROD-SCHEDULED MEETING FOR NEXT THURS 4/7 TO |
SPLIT PERMIT. LMF |
3/2 CONTACTED OWNER/ARCHITECT TO SPLIT PERMIT |
(INTERIOR VS. EXTERIOR WORK) SO HE CAN START ON |
THE INTERIOR WORK. |
2/14/11 RESUB ADDRESSING DENIED COMMENTS NO FEE |
SEW |
1/12/2011 DENIED PLANS FILED UNDER "C" LARGE PLAN |
JW |
01-12-2011 TO JIM WITMER |
10-13-10 1ST RESUB "ADDRESSING CORRECTIONS" WL |
8/10/10 PLANS DENIED CALLED LEFT A MESSAGE WITH |
THE CONTRACTOR. PLANS IN BACK IN BIG BEN (C) HM. |
8/6/10 FAILED "L" * RETURNED TO C-26 ---RAK |
8/5/10 ROUTED TO RAK. LMF |
|
|
|
|
|