Miscellaneous Information / Notes |
INTERIOR BUILDOUT |
|
|
|
|
|
05/29/2009 APPROVED MECHANICAL REVISION THAT WAS |
SUBMITTED ON 05/11/2009 WAS P/U BY MITCH MMILLER |
5/28/09 MECH REV PASSED. CALLED FOR P/U. LEFT |
VOICEMAIL FOR MITCH. SM BIN UNDER "V" RJR |
5/11/09 MECH REV MINOR DUCT (REPAIR) CHANGES $80 |
SEW |
5/6/09 MECH REVISION P/U BY MITCH SLS |
5/4/09 MECH REVISION DENIED. CALLED FOR P/U. LEFT |
MSG FOR MITCH ON CELL PHONE. SM BIN UNDER "V" RJR |
04/20/2009 MECHANICAL REVISION #03 FEES MMILLER |
4/6/09 REVISION # 2 P/U BY EUGENE FRANCAVILLA SLS |
4-6-09 CALLED FOR P/U OF PLMG/MECH REVISIONS |
SUBMITTED 3-19-09 AND TALKED TO EUGENE F. |
INDICATING THE REQUIREMENT FOR THE RECIEPT OR BLUE |
CARD. "V" KSTEVENS. |
3/19/09 PLBG/MECH REVISION #2 $200 SLS |
2/20/09 DAVID P/U ELEC REV DATED 2/13/09 SPALMER |
2/18/09 ELECTRICAL REVISION UNDER "V" (VILLA), |
CALLED DAVID./WRT. |
2/13/09 ELECTRICAL REVISION #1 $140 SLS |
12/15/08 EUGENE P/U PERMIT SPALMER |
12-15-08 CALLED FOR P/U PERMIT/PLANS AND TALKED TO |
GINO INDICATING THAT THE BLUE CARD OR RECIEPT WAS |
REQUIRED. "V-LARGE" KSTEVENS |
12-3-08 2ND RESUB $270 "2ND REV REQUIRED BY |
REVIEWER" WL |
12-3-08 EUGENE FRANCAVILLA PICKUP DENIED PLANS WL |
12/3/08 CALL FOR P/U, W/CORR'S, UNDER(V)**LARGE |
BINNS**LEFT VM MESSAGE FOR EUGENE FRANCAVILLA |
ADARROUGH |
11/19/08 RECEIVED NOC SPALMER |
11/13/2008 1ST RESUB PLANS PLUS APP NO FEE MMILLER |
10/31/08 APP/PLANS P/U BY EUGENE FRANCAVILLA SLS |
10/31/08 CALLED FOR P/U DENIED "V" LARGE BIN MRW |