Permit Number 06100574 Property ID 74434321010160010
Permit Desc BLD-COM Balance Due $0.00
Property Address 401 CLEMATIS ST Status Closed

Permit Plan Reviews Inspections Fees Contractors All
Permit
Permit Information
Application Date 2006-10-17 Operator ssherman
Issued Date 2007-02-21 Operator dpalmer
Master Number   Project Number  
C.O. Number 9903 Operator tmoore
C.O. Issued 2009-09-24
C-404 Type 324 Usage Class NONE
Applied Value 84200000 Units 401475
Calculated Value 0 Contractor ID CGC024813
Property On Permit
Property ID 74434321010160010    
Building Ext.  
Address 401 CLEMATIS ST
City WEST PALM BEACH
State FL
Zip Code 33401
Owner On Permit
Name WEST PALM BEACH COMMUNITY
Address PO BOX 3366
City WEST PALM BEACH Type Public
State FL Zip Code 33402
Miscellaneous Information / Notes
CONSTRUCTION OF CITY HALL, LIBRARY AND MUSEUM WITH
A SIX-LEVEL PARKING GARAGE
 
 
 
 
9-23-09 C.O. ISSUED WITH MAINTENANCE ISSUES
OUTSTANDING, DISCUSSED WITH J.J. AND LISTED. TM
 
9/22/09 PU BY MATT SEW
9/17/09 ELECTRICAL REVISIONS UNDER "C" (LARGE
BINS) 1-LARGE ROLL WITH TWO SETS INSIDE. CALLED
AND SPOKE TO MATT. DV PALMER.
9/3/09 ELEC REV #30B $1460 SEW
8/31/09 MECH REV 14 F/6 SEW
8/21/09 CALLED JJ TO P/U STAMPED STRUCTURAL
SUBMITTAL FOR MAILBOX. RB
8/12/09 RECEIVED NEW TCO LTR WITH CORRECT
INFORMATION GIVEN TO DOUG WISE FEES PAID RECEIPT
ATTACHED TO LETTER SPALMER
8/11/09 SENT EMAIL TO J.J. WOLFE EXPLAINING THE
TCO FEES DUE. OUTSTANDING TCO FEES POSTED. RB
8/11/09 RECEIVED LTR FOR TCO DID NOT KNOW HOW TO
CHARGE THEM LTR GIVEN TO DOUG WISE SPALMER
06/11/2009 DENIED ELECTRICAL REVISION P/U BY BIM
MMILLER
6/10/09 PLANS UNDER "C" (LARGE BINS) CALLED AND
LEFT MESSAGE ON FRANKS CELL VM AND ALSO SPOKE TO
JJ WOLFE. TOLD THEM THEY HAVE A FEE BALANCE
$1,160.00 BEFORE PICKING UP PLANS. DV PALMER.
5/19/09 AMADOU P/U FIRE ALARM DRAWINGS, COPY OF
LETTERS/AMM
5/19/09 FINAL ELECTRIC RECORD DRAWINGS/AMM
5/15/09 CALLED FRANK MELEHAN TO P/U FIRE ALARM
AS-BUILTS. FIRE ALARM PERMIT # 08030488 HAS BEEN
FINALED AND CLOSED. LARGE BINS. 'C'. RB
5/15/09 CALLED JJ WOLFE TO P/U SIGNED COPIES OF
THE LETTERS THAT HE REQUESTED. RB
5/15/09 ELEC SUBMITTAL UNDERWRITERS LAB LETTER FOR
LIGHTNING PROTECTION SYSTEM @ CITY CENTER SEW
05/14/2009 FIRE SUBMITTAL NO FEE MMILLER
5-5-09 AMADOU PICKUP REV 27C (PLUMB DATED 4-2-09)
WL
5-1-09 CALLED FOR P/U OF APPROVED PLMG REVISIONS
SUBMITTED 4-2-09 AND LEFT A MSG ON FRANK M'S VOICE
MAIL INDICATING THE REQUIAREMENT FOR THE RECIEPT
OR BLUE CARD. "C" KSTEVENS.
4/20/09 LETTER SUBMITTED FOR TCO $500 ROUTED TO
KCONRAD SEW
4/20/09 PU BY MATT SEW
4/16/09 REVISIONS UNDER "C" BROWN BINS, ONE ROLL
OF PLANS.CALLED AND SPOKE TO FRANK.REMINDED OF
BLUE CARD. DV PALMER.
 
4/09/09 3RD TCO ISSUED, GAVE TO JJ WOLFE. JDS
4/8/09 LETTER SUBMITTED FOR TCO $500 ROUTED TO
GSMITH SEW
4-8-09 MATT NICHOLS PICKUP BLDG REV (DATED 4-1-09)
WL
4/08/09 CALLED CONTRACTOR AND SPOKE WITH FRANK,
REVISION FILED UNDER "C" SMALL PLAN JW
4/6/09 AMADU P/U REV 24B DATED 2/18/09 SPALMER
4/3/09 CALLED FOR P/U "C" MRW ROLLED PLAN
4-2-09 MATT NICHOLS PICKUP BLDG REV 28A GARAGE AS
BUILT (DATED 3-17-09) WL
4/2/09 PLUMB REV 27C TO 27A $110 SPALMER
4/02/09 CALLED CONTRACTOR REVISIONS FILED UNDER
"C" SMALL PLAN JW
4/1/09 BLDG REV CLARIFICATION OF INTERIOR FINSHES
IN 27A $140 SEW
032/27/2009 APPROVED BLDG APPROVED FIRE THAT WAS
SUBMITTED ON 02/18/2009 P/U BY AMADOU MMILLER
3/27/09 REVISION # 25A FILED UNDER 'C' LARGE BIN
LM
3/26/09 RETURNED REV FEE AFTER INSPECTION WAS
SCHEDULED SPALMER
3/26/09 DELETED FEES PER ROBERT BROWN SO THEY CAN
CALL IN INSPECTION SPALMER
3/25/09 BLDG/ELEC/PLUMBING REV 27A CAFE REVISIONS
SEW
3/18/09 2ND REVISED TCO ISSUED, JDS
3/17/09 BLDG REV $140 SPALMER
3/17/09 MATT P/U ELEC REV 16D SPALMER
3/17/09 ELECTRICAL PLANS AND REVISIONS UNDER "C"
(LARGE BINS) CALLED AND SPOKE TO LISA JACKSON. DV
PALMER
3/16/09 AMADOU P/U STAIR RAILING SHOP DRAWINGS
SPALMER
3/13/09 CALLED CONTRACTOR SHOP DRAWINGS FILED
UNDER "C" LARGE PLAN JW
3/13/09 ELEC REV COORDINATION STUDY 26A #60 $80
SLS
3/10/09 ELEC REV $710 SPALMER
3/10/09 ELECTRICAL SUBMITTAL NO FEE SPALMER
3/10/09 RECEIVED LTR FOR OVERTIME INSPECTION GIVEN
TO ROBERT BROWN INSPECTION FOR THURSDAY & MONDAY
AROUND 7:00 PM SPALMER
3/5/09 REVISED 2ND TCO ISSUED, PUT IN CO BOX UNDER
(C) AT THE FRONT COUNTER JDS
3/4/09 LTR FOR TCO TO JERALD SMITH IN BOX SPALMER
3/2/09 2ND TCO ISSUED JDS
3/2/09 TCO REVISION LETTER GIVEN TO JS.KC
02/27/09 ENG PLAN REVIEWED-PASSED
[email protected]
2/27/09 LETTER SUBMITTED FOR TCO $500 ROUTED TO
KCONRAD SEW
2/19/09 SUBMITTAL ALTERNATE METHODS/MATERIALS NO
FEE SPALMER
2/18/09 BLDG REV ADDRESSING FIRE RATING AND STAIR
OCCUPANCY $680 SEW
2/18/09 ZONING REV ADDRESSING COMMENTS FROM 24A
$200 SEW
2/6/09 BLDG SUBMITTAL APPROVED STAIR RAILING SHOP
DRAWINGS SEW
2/6/09 PU BY MATT SEW
1/30/09 CALLED FOR P/U "C" LARGE BIN MRW
1/30/09 PU BY MATT BLDG SUBMITTAL 1/21 & 1/16 & PU
DATED 1/13/09 SEW
1/30/09 CALLED FRANK, PLANS UNDER "C" (LARGE BINS)
FOR PU. REMINDED OF LUE CARD. DV PALMER.
1/29/09 CALLED FRANK PLANS FILED UNDER "C" SMALL
PLANS JW
1/26/09 ENGINEERING REVIEW- MGONZALEZ PASSED
1/23/09 1ST TCO ISSUED FOR THE 4TH &5TH FLOORS,
MIS PERSONNEL ONLY. IT IS IN THE CO BOX UNDER "C"
JDS
1-22-09 MATT NICHOLS PICKUP BLDG/PLUMB/MECH/FIRE
REV DATED 12-9-09 "REV 20B" WL
1/22/09 CALLED FOR P/U "C" LARGE BIN MRW
1/22/09 LETTER SUBMITTED FOR TCO $500 ROUTED TO
KCONRAD SEW
1/21/09 PLUMBING REV DATED 12/4/08 PU BY MATT SEW
1/21/09 ELEC/PLUMBING REV'S SUBMITTED ON 12/11/08
PU BY MATT SEW
1/21/09 BLDG SUBMITTAL ADDENDUM FOR 1 POLE LIGHT
NO FEE SLS
1-21-09 CALLED FOR P/U OF PLUMBING REVISIONS &
ELECTRICAL/ZONING REVISIONS AND TALKED TO FRANK
INDICATING THAT THE REVISIONS WERE APPROVED BY
PLMG AND ZONING BUT DENIED BY ELECTRIC. ALSO
INDICATED THAT THE REVISIONS SUBMITTED ON 12-11-08
STILL OWE $90.00 AS THERE WERE 12 SHEETS SUBMITTED
AND THAT THE RECIEPT OR BLUE CARD WAS REQUIRED.
"C-LARGE" KSTEVENS
1/16/09 SUBMITTAL PLANTER/SEAT DETAIL SPALMER
1/14/09 MATT NICHOLS P/U FOUNDATIONS FOR NEW
CANOPY DATED 1/7/09 SPALMER
1/14/09 MATT NICHOLS P/U STAIR RAILINGS SUBMITTAL
DATED 1/6/09 SPALMER
1-14-09 CALLED CONTRACTOR SPOKE WITH FRANKS VOICE
MAIL, SUBMITTALS FILED UNDER "C"
1/13/09 BLDG/SIDEWALK REVISION # 56 $380 SLS
01/07/2009 BLDG SUBMITTAL (FOUNDATIONS FOR NEW
CANOPY) MMILLER
1/6/09 BLDG SUBMITTAL STAIR RAILING NO FEE SLS
12/31/2008 DENIED BLDG SUBMITTAL THAT WAS
SUBMITTED 12/09/2008 WAS P/U BY ANDRE MMILLER
12-31-08 CALLED CONTRACTOR PLANS FILED UNDER "C"
SMALL PLANS JW
12/23/08 ELEC REV PU BY ANDRE SEW
12/22/08 ELECTRICAL REVISION FROM 12/11 UNDER "C"
FOR PU. CALLED AND SPOKE TO FRANK. DV PALMER.
12/18/08 BLDG/ELEC/PLBG/FIRE REVISIONS # 55 $860
SLS
12/11/08 ELEC/PLUMBING REV 21B RESPONSE TO COMMENT
ON 21A SEW
12/11/08 ELEC REV 20B RESPONSES TO COMMENT ON REV
20A $80 SEW
12/09/2008 BLDG SUBMITTAL NO FEE (FOUNDATION
REINFORCING FOR SEATWALL) MMILLER
12/09/2008 BLDG PLUMBING & MECHANICAL REVISION #
52 FEES $140.00 MMILLER
12/04/2008 PLUMBING REVISION #051 FEES $110.00
MMILLER
12/04/2008 APPROVED BLDG REVISION THAT WAS
SUBMITTED ON 11/12/2008 IS WAS P/U BY ANDRE
MMILLER
12/3/08 CALL FOR P/U, UNDER(C), SUBMITTAL DATED
11/12/08, **LARGE BINNS** LEFT VM MESSAGE FOR
FRANK MELEHAM ADARROUGH
12-3-08 ANDRE HARRIOTT PICKUP 2 REV 21 A & REV
22-A (DATED 11-5-08) WL
12/2/08 REVISION 21-A FILED UNDER 'C' (LARGE BIN)
LM
11-26-08 ANDRE HARRIOTT PICKUP PLUMB REV
("CA-193R4 DATED 11-5-08) WL
11-25-08 CALLED FOR P/U AND LEFT A MESSAGE ON
FRANK'S VOICE MAIL INDICATING THAT 2 SHEETS WERE
DENIED AND ONE SHEET APPROVED. ALSO INDICATED THAT
THE BLUE CARD OR RECIEPT WAS REQUIRE TO RETRIEVE
THE REVISIONS. "C LARGE" KSTEVENS
1/25/08 REV. #22-A GIVEN TO JIM W. LM
11/17/08 ANDRE P/U REV 20A ADARROUGH
11/15/08 REV 20A CALLED FOR P/U. SPOKE TO FRANK M.
LG BIN UNDER "C" RJR
11/12/2008 BUILDING SUBMITTAL NO FEE (NOVUM CANOPY
SHOP DRAWINGS THE ATACHEMENT HAS CHANGED INCLUDED
ARE THE THREE SETS OF CALCULATIONS) MMILLER
11/12/2008 APPROVED BLDG REVISION & WIND LOAD CALC
THAT WAS SUBMITTED ON 10/28/2008 & THAT WAS
SUBMITTED ON 11/05/2008 P/U BY ANDRE MMILLER
11-12-08 CALLED CONTRACTOR PLANS FILED UNDER "C"
SMALL PLANS JW
11-10-08 ANDRE PICKUP ELEC REV (DATED 11-5-08
"STREET LIGHTING") WL
11/10/08 ANDRE P/U REV DATED 10/20/08 SPALMER
11/8/08 MECH REV 19 CALLED FOR P/U. LEFT MSG FOR
FRANK ON CELL PHONE. LG BIN UNDER "C" RJR
11/5/08 BLDG/ELEC/PLUMBING/MECH REV 21A LIBRARY
CAFE SEW
11/5/08 ELEC REV 16-0 STREET LIGHT WIRING $60 SEW
11/5/08 PLUMBING REV CA-193 R4 COURT YARD DRAINAGE
$80 SEW
11/5/08 BLDG REV 16C REVISED RAILING FOR THE
GARAGE RAMP & STEPS $60 SEW
11/5/08 BLDG REV 22A ADDITION OF PLANTER COURTYARD
GRATES & GARAGE PLANTERS $60 SEW
11-5-08 ANDRE HARRIOTT PICKUP REV (DATED 10-2-08
"COURT YARD LIGHTING" WL
11-04-08 CALLED FOR PICKUP(C) REV DATED OCT 2,
2008 DENIED.
FRANK MELEHAN - LEFT MESSAGE. MJG
 
10-30-08 ANDRE HARRIOTT PICKUP ELEC REV (DATED
10-22-08) WL
1029/08 ELEC REV FROM 10/22 UNDER "C" ()SMALL)FOR
THE CONTRACTOR WHO IS CATALFUMO. CALLED AND SPOKE
TO FRANK. DV PALMER.
10/28/08 ELEC SUBMITTAL WIND LOAD CALCS - BLUE
CARD WAS FILLED OUT SHOWING MEISNER ELECTRIC AS
THE CONTRACTOR SEW
10/24/08 BLDG/ELEC/PLUMBING/MECH REV # 20-A $130
SEW
10/22/08 ELEC REV 225-E LIGHTING & PHOTOMETRICS
FOR 3RD FLOOR LIBRARY $80 SEW
10/22/08 (2) ELEC REV PU BY ANDRE SEW
10/21/08 ELEC REV'S FROM 10/3 AND 10/10 UNDER "C"
(ALRGE BINS) FOR PICK UP. CALLED AND SPOKE TO
FRANK. DV PALMER.
10/20/08 MECH REV #19 $140 SEW
10/10/08 ELEC REV $ SPALMER
10/3/08 ELEC REV $ SPALMER
10-2-08 REV #40 ELEC $210 "REVISED COURT YARD
PLAZA PLANS" WL
9-30-08 ANDRE HARRIOTT PICKUP REV #37 ELEC (DATED
8-21-08) WL
9/30/08 ELECTRICAL REVISIONS FROM 8/21 ARE UNDER
*C* (LARGE BINS) READY FOR PU. CALLED AND SPOKE TO
FRANK AND REMINDED OF BLUE CARD TO PICK UP
PLANS.DV PALMER
9-2-08 LISA JACKSON PICKUP PLUMB REV #39 (DATED
9-22-08) WL
9-29-08 CALLED FOR P/U OF PLMG REVISION AND
PLANTER DETAIL. TALKED TO FRANK AND INDICATED THE
REVISION WAS APPROVED IF CHANGES TO PLANTER DETAIL
APPROVED. (DENIED AT THIS TIME).INDICATED THAT THE
RECIEPT OR BLUE CARD WAS REQUIRED TO RETRIEVE THE
REVISION AND DETAIL. "C - LARGE" KSTEVENS
9-23-08 ANDRE HARRIOTT PICKUP ELEC REV (DATED
8-20-08 CA #225) WL
09/22/2008 PLUMBING REVISION # 39 FEES $ 80.00
MMILLER
9/16/08*** NO REVIEW DONE ON ELECTRICAL PLANS
WHICH WERE SUBMITTED ON AUGUST 21ST. SEE ELEC
NOTES DATED 9/16 PLANS WILL BE OUT FRONT UNDER *C*
IN THE LARGE BINS WAITING FOR NEW REVISED SHEETS.
DV PALMER
 
9-10-08 ANDRE HARRIOTT PICKUP ELEC REV (DATED
9-2-08) WL
9/10/08 ELEC REV FROM 9/2 UNDER "C" (SMALL) FOR
PICK UP. CALLED AND SPOKE TO FRANK, REMINDED OF
BLUE CARD. DV PALMER.
9/4/08 ELEC REV FROM 8/20 OK,CALLED SPOKE TO
FRANK, UNDER "C" (LARGE BINS). DV PALMER.
9/2/08 ELEC REVISION # 38 4TH FLOOR REVISED LTG
PLAN $80 SLS
8-29-08 ROY SALLOUM PICKUP REV #36 PLUMB WL
8-29-08 CALLED FOR P/U OF PLMG REVISIONS SUBMITTED
8-21-8 AND TALKED TO FRANK INDICATING THAT 6
SHEETS WERE APPROVED & 7 SHEETS DENIED AND THAT
THE RECIEPT OR BLUE CARD WAS REQUIRED TO RETRIEVE
THE REVISIONS. "C" KSTEVENS
8-26-08 FRANK MELEHAN PICKUP BLDG SUBMITTAL (DATED
8-20-08..TROPICAL DESIGN CALCS FOR CMU) WL
8-26-08 CALLED CONTRACTOR & SPOKE FRANK'S VOICE
MAIL
PLANS FILED UNDER "C" SMALL PLAN JW
8-21-08 REV #37 ELEC $540 "17B ANSWERS TO CITY
COMMENTS ON 17A (ATS) ALSO INCLUDES ADDED ITEMS AS
INDICATED ON MEINHARDT COMMENT RESPONSE" WL
8-21-08 REV #36 PLUMB $180 "CA#193R2 ANSWERS CITY
COMMENTS ON CA #193R PLUMBING SEE ATTACHED LIST OF
SUBMITTED SHEETS" WL
8-20-08 2 BLDG SUBMITTALS NO FEE #1 SUBMITTAL
"DESIGN CALCS FOR ARCHITECTURAL PRECAST CONCRETE
SIGN ATTACHMENT DETAILSLLBLDG PLAN REVIEWER ASKED
FOR ORIG SIGNATURE OF ENGINEER'" #2 "DESIGN CALCS
FOR PRECAST ATTACHMENT TO CMU "TROPICAL DESIGN"
WL
8-20-08 REV # 35 $70 BLDG "CA #225 5TH FLOOR CITY
HALL LIGHTING & PHOTOMETRICS" WL
08/14/2008 BLDG REVISION #34 FEESS $60.00 MMILLER
8-4-08 MICHELLE DAVIS PICKUP ELEC "WIND LOAD
CALCS" (DATED 7-10-08) WL
8/4/08 BLDG SUBMITTAL PU BY ROY SE3W
08/01/08 CALLED CATALFUMO FILED UNDER "C" SMALL
PLAN JW
08/01/08 CALLED FILED UNDER "M" MEISNER ELEC SMALL
PLANS SPOKE WITH CINDI BELILES JW
7/30/08 PLUMBING REVISION P/U BY ROY. RJR 7/28/08
DESIGN CALCULATIONS FOR ARCHITECTURAL PRECAST
CONCRETE SIGN NO FEE SPALMER
7-18-08 CALLED FOR P/U OF PLUMBING REVISIONS
SUBMITTED 6-17-08. TALKED TO FRANK AND INDICATED
THAT SOME WERE APPROVED AND OTHERS DENIED. ALSO
INDICATED THAT THE BLUE CARD OR RECIEPT WAS
REQUIRED TO RETRIEVE THE REVISIONS. "C-LARGE"
KSTEVENS
7/16/08 PARAPET WALL LIBRARY BARREL VAULT
SUBMITTAL PU BY ROY SEW
7/16/08 CAST STONE ATTACHMENT SUBMITTAL PU BY ROY
SEW
7/11/08 ELEC REV #32 & #33 PU BY ROY SEW
7/10/08 ELEC REV'S FROM 6/20 AND 6/30 DENINED AND
UNDER "C" (LARGE BINS) FOR PICK UP. THESE ARE IN
TWO PACKAGES, ONE LARGE ROLL AND ONE SMALLER
PACKAGE. CALLED AND SPOKE TO FRANK M. DV PALMER.
 
7/10/08 SUBMITTAL WIND LOAD CALCS NO FEE SPALMER
7/3/08 MECH REV PU BY ROY
7/2/08 MECH REV CA-201 CALLED FOR P/U. SPOKE TO
FRANK M. LG BIN UNDER "C" RJR
06/30/2008 ELECTRICAL REVISION # 33 FEES $ 70.00
MMILLER
 
6-30-08 CALLED FILED UNDER "C"SMALL PLAN JW
 
6-26-08 LISA JACKSON PICKUP 3 BLDG SUBMITTALS,
(DATED
5-29-08) (CONNECTOR ROOF ENG, STAIR ROOF ENG, &
CITY CTR GARAGE A ARCHIT PRECAST PLASTER CAPS
WL
06/20/2008 ELECTRICAL REVISION # 32 FEES MMILLER
06/17/2008 PLUMBING REVISION # 31 FEES $250.00
MMILLER
06/16/2008 BLDG SUBMITTAL NO FEE (CAST STONE
ATTACHEMENT TO CMU) MMILLER
06/16/2008 BLDG SUBMITTAL NO FEE (PARAPET WALL
LIBRARY BARREL VAULT) MMILLER
06/10/2008 MECHANICAL REVISION # 30 FEES $120. 00
MMILLER
6-03-08 CALLED CONTRACTOR AND SPOKE WITH FRANK
FILED PLANS UNDER "C' SMALL PLANS JW
06/02/2008 ELECTRICAL REVISION THAT WAS SUBMITTED
ON 05/13/2008 WAS P/U BY FRANK MMILLER
 
6/2/08 ELEC REV FROM 5/13 OK, CALLED FRANK
REMINDED OF BLUE CARD EVEN THOUGH FEES UNDER
TRANSFER. PLANS UNDER "C" (LARGE BINS)FOR PU.DV
PALMER.
 
5-30-08 ROY SALLOUM PICKUP PLUMB REV CLARIFICATION
193 (DATED 5-13-08) WL
5-30-08 CALLED FOR P/U OF PLMG REVISIONS AND
TALKED TO FRANK M. INDICATING THAT SOME REVISION
WERE APPROVED, AND SOME WERE DENIED. ALSO
INDICATED THAT THE RECIEPT OR BLUE CARD WAS
REQUIRED TO RETRIEVE THE REVISIONS. "C-LARGE"
KSTEVENS
5/29/08 THREE (3) BLDG SUBMITTALS (2) FOR ROOF
ENGINEERING CALCS FOR GARAGE A STAIR (1) FOR
DETAILS FOR THE PRECAST CAPS ON GARAGE A NO FEE
SLS
5-13-08 FRANK MELEHAN PICKUP MECH REV 14E, REV #26
BLDG 05-1206.04, & REV #27 "LIBRARY BARREL VAULT"
WL
5/13/08 ELECTRICAL REVISION CLARIFICATION 161 $140
SLS
5/13/08 PLUMBING REVISION CLARIFICATION 193 $210
SLS
5-12-08 CALLED CONTRACTOR FILED UNDER "C" LARGE
PLANS
JW
5/9/08 PU BY ROY SEW
5/7/08 MECH REV 14E. CALLED FOR P/U. SPOKE TO JJ.
ONE LG ROLL IN LG BIN UNDER "C" SUBMITTAL FORM IS
MISSING. RJR
5-6-08 ROY SALLOUM PICKUP ELEC REV (15B)DATED
4-24-08
5/5/08 BLDG REVISION # 27 IBRARY BARREL VAULT
PAPAPET DETAIL $100 SLS
5/5/08 BLDG REVISION # 26 NOA 05-1206.04 SUBMITTED
FOR LOUVER SYSTEM $60 SLS
4/30/08 BLDG/MECH REV #14-E ANSWERS TO COMMENTS
REGARDING #14D LIFE SAFETY & MECH SEW
4/24/08 ELEC REVISION # 15-B $200 SLS
4-21-08 ROY SALLOUM PICKUP MECH PORTION ONLY OF
REV 14D WL
4/20/08 MECH PORTION OF REV 14D SEPARATED FROM
BELOW SUBMITTAL FOR P/U. LEFT MESSAGE FOR FRANK ON
CELL PHONE. LG BIN UNDER "C" RJR
4/17/08 MECH/BLDG REVISION # 14-D $290 # 23 SLS
4/10/08 15A PU BY ROY SALLOUM SEW
4/10/08 ROBERT BROWN CALLED CONTRACTOR PLANS FILED
LOWER BINS JW
4/9/08 BLDG REV 14D ARCHITECTURAL & LIFE SAFETY
SHETS COORDINATED W/LATEST MECH REV SEW
4/9/08 MECH REV PU BY AMADOU SEW
4/8/08 MECH REV 14B AND 14C DENIED. CALLLED FOR
P/U. SPOKE TO AMADU. LG BIN UNDER "C" RJR
3/25/08 ELEC REVISION CA#136 & CA#161 P/U BY ROY
SLS
3/24/08 ELEC REV OK,CALLED AND SPOKE TO FRANK,
UNDER *C* (LARGE BINS ) FOR PU, REMINDED OF BLUE
CARD EVEN AS FEES ARE DONE BY JOURNAL ENTRY. DV
PALMER.
3-18-08 FRANK MELEHAN PICKUP ELEC REV DATED
2-21-08 & ENGINEERING SUBMITTAL DATED 3-13-2008
3/17/08 ELEC REV FROM 2/21 OK,AND UNDER"C" (LARGE
BINS) FOR PU, CALLED AND LEFT MESSAGE ON FRANK'S
VM, REMINDED OF BLUE CARD EVEN AS FEES ARE DONE
THROUGH TRANSFER. DV PALMER.
3/14/08 CALLED FOR P/U PLANS,BIN "C", RVC
 
3/14/08 BLDG/ELEC REV 15A TO LIGHTING &
PHOTOMETRICS SPALMER
3/14/08 ELEC REV $110 SPALMER
3/13/08 MECH REV $200 SPALMER
3/13/08 ENGINEERING SUBMITTAL ALREADY APPROVED
JUST NEEDED ENGINEERING & UTILITY STAMP NO FEE
SLS
03/05/2008 CHARGED CUSTOMER A ELECTRICAL REVISION
FEE THAT WAS SUBMITTED ON 02/21/2008 PER ADRIANNA
MCKENZIE MMILLER
3/3/08 FRANK P/U LANDSCAPE PLANS REVISIONS
SPALMER
2/28/08 - REV. APPROVED, CALLED FRANK TO P/U.
FILED UNDER "(C) - CATALFUMO" **LARGE BIN*** CJH
 
2/21/08 - REV. SENT TO MF - 5TH FLOOR CJH
02/21/2008 ZONING SUBMITTAL NO FEE MMILLER PER
LUIS MARTINEZ (CHEIF PLANS EXAMINER) HOWEVER
EXPLAINEDD TO CUSTOMER THAT ONCE THIS GOES INTO
PLAN REVIEW AND CUSTOMER SEES THAT THIS IS A
REVISION THAT CONTRACTOR WILL BE CHARGED A
REVISION FEE MMILLER
 
02/21/2008 ELECTRICAL SUBMITTAL NO FEE PER LUIS
MARTINEZ (CHEIF PLANS EXAMINER) HOWEVER EXPLAINED
TO CUSTOMER THAT ONCE PLANS EXAMINER REVIEW THE
PLANS AND SEES THAT THIS IS A REVISION THEN
CUSTOMER WILL BE CHARGED A REVISION FEE MMILLER
 
02//21/2008 APPROVED MECHANICAL REVISION & FIRE
REVIISON THAT WAS SUBMITTED ON 02/11/2008 P/U BY
ROY SALLOUM MMILLER
 
02/21/2008 APPROVED P/U BY ROY SALLOUM MECHANICAL
REVISION THAT WAS SUBMITTED ON 01/16/2008
 
02/20/08 RVSD FAO-1 SHEET READY P/U LARGE BIN "C"
MAW
02/16/08 MECH REV 12C AND SMOKE CONTROL RATIONAL
ANALYSIS. CALLED FOR P/U, NO ANSWER. SENT EMAIL TO
FRANK M. LG BIN UNDER "C" RJR
2/8/08 PU BY FRANK SEW
2/5/08 ELEC REV FROM 1/31 OK, UNDER "C" (LARGE
BINS) CALLED AND LEFT MESSAGE ON FRANKS CELL
VM,REMINDED OF BLUE CARD/RECEIPT. DV PALMER
1/31/08 ELEC REV FOR 3RD FLOOR $80 SEW
1/31/08 PU BY ROY SALLOUM SEW
1/30/08 ELEC REV FROM 1/28 UNDER "C" (LARGE BINS)
FOR PU, CALLED AND SPOKE TO FRANK, REMINDED OF
BLUE CARD FOR PU.6:27PM DV PALMER.
1/28/08 ELEC REV $80 SPALMER
1/23/08 ELEC REV OK, CALLED FRANK, UNDER *C* LARGE
BINS FOR PU. DV PALMER.
1/18/08 ENG REV P/U BY FRANK SPALMER
1/17/08 CALLED TO P/U DENIED PLANS, BIN "C", RVC
01/16/2008 ENGINEERING REVISION # 15 FEES $80.00
01/16/2008 ELECTRICAL REVISION # 14 FEES $100.00
MMILLER
01/16/2008 MECHANCIAL REVISION # 13 FEES $100.00
MMILLER
1/4/08 FRANK P/U REV #12/13 DATED 12/14/07
SPALMER
1/2/08 MECH REV 14 AND DUCT SHOP DWGS CALLED FOR
P/U LEFT MSG FOR FRANK M. LG BIN UNDER "C" RJR
1-2-08 FRANK MELEHAN PICKUP ELEC REV WL
1/2/08 CALLED FOR P/U "C" LARGE BIN MRW
12/26/07 ELEC REVISION P/U BY FRANK SLS
12/26/07 2 BLDG SUBMITTALS P/U BY FRANK SLS
12/25/07 ELEC REVSIONS FROM 12/14 OK, CALLED AND
LEFT MESSAGE ON FRANK'S VM. PLANS UNDER "C" (LARGE
BINS) REMINDED OF BLUE CARD. DV PALMER.
12/21/2007 MECHANICAL REVISION # 12 FEES $200.00
MMILLER (REV 14A MECHANICAL DRAWINGS FOR CITY HALL
PROTION OF PROJECT LIBRARY)
12/14/07 REVISION # 12-B RESPONSE TO REVISION 12-A
PLBG MECH & ELEC $350 SLS
12/14/07 REVISION # 13 ELECTRICAL PHOTO METRICS
$310 SLS
12/12/07 BLDG SUBMITTAL SHOP DRAWINGS CITY HALL
MECHANICAL SEW
11-27-07 SCAFFOLDING SHOP DRAWINGS FILED UNDER "C"
SMALL PLANS JW
11/21/07 BLDG SUBMITTAL EAST ELEVATION SCAFFOLDING
NO FEE SLS
11/13/07 REV. #09--3 ROLLSL, 3 BINDERS, AND LOOSE
PLANS, P/U BY ROY AJP
11-13-7 CALLED FOR P/U SPOKE TO TRACY AND
INDICATED THAT THE REVISIONS WERE READY AND THAT
THE RECIEPT OR BLUE CARD IS REQUIRED TO PICK UP
THE REVISIONS. "C-LARGE" KSTEVENS
10/12/2007 BUILDING, ELECTRICAL, PLUMBING, &
MECHANICAL REVISION # 09 FEES $1130.00 MMILLER
9-28-07 CONTACT FRANK SUBMITTALS FILED UNDER "C"
SMALL PLAN JW
9/23/07 BLDG SUBMITTAL SHORING MEZZANINE & STAIR
ROOFS SEW
9/19/07 REV. #11 P/U BY FRANK (4 ROOLS, AND LOOSE
SHEETS) AJP
9/19/07 BLDG/P;LBG REV. #7 P/U BY FRANK AJP 9-19-7
CALLED FOR P/U OF BLDG/PLMG REVISIONS SUBMITTED
8-3-7. LEFT A MESSAGE W/FRANK M. AND INDICATED
REVISION WERE APPROVED & DENIED. ALSO INDICATED HE
NEEDS THE RECIEPT AND/OR BLUE CARD TO RETRIEVE HIS
REVISIONS. "C-LARGE" KSTEVENS
9/17/07 APPROVED BLDG REV. P/U BY FRANK AJP
9-17-07 CALLED FILED UNDER"C"SMALL PLAN JW 8/30/07
PLANS AND COMMENTS FOR REV.'S #8 & 10 (3 LARGE
ROLLS, 3 BINDERS) P/U BY HANK AJP
830-07 CALLED CONTRACTOR SPOKE WITH FRANK FILED
UNDER "C-LARGE PLAN" JW
8/29/07 BLDG SUBMITTAL LIBRARY 5TH LEVEL SHORING
PLANS SEW
8/24/07 TWO REV.'S(STRUCTURAL) P/U BY FRANK AJP
8-17-07 CALLED CONT FILED UNDER "C" JW
08/17/07 PER A MCKENZIE ADD REV FEE AND SEND TO
FINANCE FOR JOURNAL ENTRY FG
08/16/07 CUSTOMER STATED THAT THEY DIDNT HAVE TO
PAY REVISIONS REQUESTED BY CITY- NO FEE? - BLDG -
PLUMB- MECH FG
8/9/07 STRUCTURAL REVISIONS $380 SLS
8/9/07 BLDG SUBMITTAL 3RD FLOOR LIBRARY SHORING
SLS
08/03/2007 BLDG PLUMBING REVISION #07 FEES $210.00
SENT TO ADRIANNAA'S MCKENZIE'S DESK MMILLER
8/1/07 APPROVED BLDG SUBMITTAL LP/U BY FRANK AJP
8-01-07 CALLED FILED UNDER "C" JW
7/26/07 BLDG SUBMITTAL SHORING PLAN 3RD FLOOR SLS
7/24/07 FRANK P/U ROOF DOME BARREL SHOP DRAWINGS
SPALMER
7/24/07 FRANK P/U CORRECTED SIGN REV 9 & 6
SPALMER
7/20/07 CALL FOR P/U, LEFT MESSAGE(C)
**LARGE ROLLS** ADARROUGH
07/16/2007 BLDG SUBMITTAL NO FEE DID NOT GIVE
CUSTOMER BLUE CARD MMILLER
7-11-07 "CITY CTR LIBRARY 2ND FLR POUR #1
TRANSMITTAL #00519" ROUTED TO HAROLD PISKURA WL
7-06-07 CALLED CONTRACTOR FILED UNDER "C" LARGE
PLAN JW
07/02/07 REV #10 60 PAGES NO FEE PER R BROWN FG **
7/2/07 WHEN REVISION # 10 IS CLIENT (CITY)
CHANGES. ADRIANNA TO PROCESS FEES AS JOURNAL
ENTRY. RB **
06/25/07 BLDG SUBMITTAL NO FEE- CITY HALL 7TH
FLOOR SHORING- CITY HALL 7TH FLOOR RE SHORING-
ROUTED TO J WITMER DESK FG
6-16-07 SUSAN STOKES PICKUP PLUMB REV WL
6-15-7 CALLED FOR P/U TALKED TO PATTY K. AND
INDICATED THE PLANS ARE READY FOR P/U AND THAT THE
RECEIPT AND/OR BLUE CARD IS REQUIRED TO RETRIEVE
THE PLANS. "S-LARGE" KSTEVENS
06/08/07 COMMENTS TO REV 9 WHICH ARE ANSWERS TO
REV 6 SUBMITTING TWO COREECTS SETS WITH SIGNATURE
AND ONE SET TO GO IN COPY KEPT BY J WITMER- ONE
COPY OF BAD SET - - SUBMITTAL NO FEE FG
06/08/07 SUBMITTAL NO FEE- ROOF DOME AND BARREL
ROOF SHOP DRAWINGS FG
6-6-07 TRANSMITTAL LTR 5TH FLOOR SHORING
INSPECTION ROUTED DIRECTLY TO H PISKURA WL
06/05/2007 PLUMBING REVISION FEE $ 80.00 MMILLER
6-1-2007 ANDRE HARRIOTT PICKUP REV WL
05/31/07 CITY CENTER 6TH FLOOR SHORING PLANS (CITY
HALL NO FEE FG
5-31-07 CALLED CONTRACTOR LEFT MESSAGE ON THE
ANSWER MACHINE FOR FRANK MELEHON TO PICK UP
REVISIONS WILL BE FILED UNDER THE LOWER BINS JW
 
5-29-07 TRANSMITTAL "LEVEL 5 POUR 2 LTR ROUTED
DIRECTLY H PISKURA" WL
05/22/07 SUBMITTAL NO FEE- CITY HALL 5TH FLOOR
SHORING PLAN FG
5-22-07 SHORING INSPECTION LTR DATED 5-22-07 DECK
5 POUR 1 CITY HALL ROUTED TO HAROLD PISKURA WL
05/10/07 BLDG SUBMITTAL - SHORING LETTERS FOR J
WITMER FG
5-7-07 FRANK MELEHAN PICKUP BLDG SUBMITTAL 2ND FL
POUR 2-3 WL
05-07-07 CALLED FILED **LARGE BINS** "C" JW
05/03/2007 PLANS P/U BY FRANK MMILLER 04/17/07
CALLED FOR PLAN P/U; IN LARGE BIN "C"
MAW
04/06/07 BLDG SUBMITTAL 2ND FL PUR #2-3
SHORING/RESHORING DRAWINGS & CALCS SEW
04/06/07 PU BY FRANK SEW
04-03-07 CALLED FILED UNDER "C" JW
03/28/07 FRANK P/U SHORING PLANS SPALMER
03-28-07 SHORING PLAN CALLED FILED UNDER "C" JW
03/27/07 BLDG SUBMITTAL NO FEE- SHORING- RESHORING
PLANS AND ENGINEERING FG
03/21/07 REVISION 9 RESPONSE TO COMMENTS ON
REVISION 6 (PROVISO)$140 FG
03/21/07 REVISIONS FOR8 RESPONSE TO COMMENTS ON
PERMITTED SET REVISION 5 (PROVISO) $1410 FEE FG
3/21/07 JJ WOLFE P/U REV# 6 (PARKING GARAGE) FOR
CORRECTIONS. RB
3-15-07 REV #2 $160 ELEC/MECH (ROLLED PLANS) WL
3/7/07 SUBMITTAL BOOK UNDER "C" IN LARGE BINS FOR
PU. SENT E-MAIL TO JJ WOLFE. DV PALMER.
02/22/07 REV $480 FEE- BLDG REV AND SHOP DRAWINGS-
MEP REV TO FOLLOW FG
2/22/07 ANDRE P/U SUBMITTALS FROM JIM WITMER
SPALMER
2/12/07 3RD RESUB PLANS/APP $84,250 SLS
02-08-07 PLANS PICKED UP BY AUNDREA JW 01/19/2007
2ND RESUB PLANS PLUS APP MMILLER 1/10/07 J.J. P/U
PLANS/SPECS AND APPLIC.RB 12/15/06 1ST RESUB PLANS
+ APP PT
11/27/06 DEWEY PULLED WHICH PLANS TO BE TAKEN - PU
BY ANA SEW
**11/27/06 PLANS DENIED, CALLED, SPOKE TO ANA FROM
CATALFUMO, TOLD TO BRING RECEIPT. PLEASE SEE
DEWEY, ROBERT OR LUIS FOR WHICH ROLLS ARE TO BE
PICKED UP AND WHICH ROLLS ARE TO BE TAKEN. PLANS
BY LUIS'S OFFICE DOOR. IF THERE ARE ANY QUESTIONS
ON WHICH ROLLS ARE TO BE GIVEN OUT SEE DEWEY OR
ABOVE AS NOTED. DV PALM


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved