Miscellaneous Information / Notes |
SOUTH TOWER,CITY PLACE. NEW 20 STORY, 420 UNIT |
CONDO BUILDING W/PARKING ON 8 FLOORS. 9TH FLR |
POOL |
|
|
|
|
9/11/08 - LANDSCAPE PLAN APPROVED. NAT HEALY P/U. |
~MC |
09/10/2008 ZONING REVISION #61 FEES $90.00 MMILLER |
9-9-08 NAT HEALY PICKUP FIRE SUBMITTAL "SMOKE |
CONTROL PANEL" (DATED 8-25-08) WL |
9/9/08 CALLED FOR P/U "M" MRW |
9/8/08 3RD TCO ISSUED, EXPIRES 15 OCT 08 JDS |
9/5/08 LETTER SUBMITTED FOR 3RD TCO $500 ROUTED TO |
KCONRAD SEW |
8-28-08 NAT HEALY PICKUP SUBMITTAL FOR RAILING |
(DATED 5-27-08) WL |
08/27/2008 RCVD LETTER OF EXTENSION SENT TO NEIL |
MELICK'S DESK MMILLER |
8/27/08 CALLED NAT FOR SUBMITTAL P/U. 'M'. RB |
08/25/2008 FIRE SUBMITTAL ( FIRE ALARM AS-BUILT |
SHOP DRAWINGS FOR REIVEW AND APPROVAL) NO FEE |
MMILLER |
08/25/2008 FIRE SUBMITTAL (GRAPHIC DISPLAY SHOP |
DRAWINGS FOR THE SMOKE CONTROL PANEL FOR REIVEW |
AND APPROVAL) NO FEE MMILLER |
8/14/08 LETTER SUBMITTED FOR TCO $500 ROUTED TO |
KCONRAD SEW |
08/12/08 CALLED FOR CONTROL PANEL P/U; UNDER "M" |
MAW |
08/04/08 FIRE SUBMITTAL NO FEE ( OVERIDE DISPLAY |
FOR THE SOMKE CONTROL PANEL AS REQUESTED BY FIRE |
MARSHALL CARSILO) MMILLER |
8-4-08 NAT HEALY PICKUP PLUMB REV (DATED 7-16-08) |
WL |
7/30/08 REVISED TCO ISSUED JDS |
7/24/08 LETTER SUBMITTED FOR WEEK-NIGHT OVERTIME |
ON MONDAY 7/28/08 & TUESDAY 7/29/08 $300 SEW |
7/17/08 RECEIVED LETTER FOR OVERTIME WEEK-NIGHT |
INSPECTIONS $1200 SLS |
7/16/08 PLUMBING REV ADDRESSING COMMENTS FROM REV |
#7 $60 SEW |
7/16/08 TCO ISSUED FOR INSTALLATION OF FURNITURE |
AND EQUIPMENT ONLY. JDS |
07/08/2008 RCVD LETTER FOR A REQUEST FOR A TCO |
FEES $500.00 SENT TO KEN CONRAD'S DESK MMILLER |
|
06/17/2008 RCVD LETTER FOR A REQUEST FOR AN |
OVERTIME ELECTRICAL & MECHANICAL INSPECTION FES $ |
2400 SENT TO HAROLD MOSER'S DESK & JAKE LEAHY'S |
DESK I (MIRELLE MILLER) MADE A COPY OF THE LETTER |
IN ORDER TO PUT A COPY ON JAKE LEAHY'S DESK |
MMILLER |
|
06/11/2008 RCVD LETTER FOR A REQUEST FOR AN |
OVERTIME INSPECTION SENT TO HAROLD MOSER'S DESK |
MMILLER |
|
6/5/08 LETTER SUBMITTED FOR OVERTIME MECHANICAL |
INSPECTION FOR JUNE 7-13-08 TIMES & HOURS TO BE |
COINCIDED W/HMOSER ROUTED TO HMOSER SEW |
5/27/08 BLDG SUBMITTAL FOR RAILING GAVE CUSTOMER |
BLUE CARD FOR SUBMITTAL SPALMER |
5/27/08 NAT HEALY P/U BLDG REV DATED APRIL 17 |
SPALMER |
5/27/08 NAT HEALY P/U BLDG SUBMITTALS DATED MAY 1 |
SPALMER |
5/24/08 CALLED NAT HEALY FOR REVISION AND |
SUBMITTAL P/U. 'M'. RB |
05/01/2008 BLDG SUBMITTAL (RAILINGS @THE POOL |
DECK)MMILLER |
05/01/2008 BLDG SUBMITTAL (PLEASE REVIEW THE |
INCLUDED SUBMITTAL FOR THE REQUIRED RAILINGS @THE |
BLDG ENTRY HIGHLIGHTED LOCATIONS) NO FEE MMILLER |
4/29/08 LETTER SUBMITTED FOR MECH INSPECTION X (2) |
INSPECTORS ON SATURDAY 5/3/08 $600 ROUTED TO |
HMOSER SEW |
04/17/2008 BLDG REVISION # 59 FEES $ 60.00 |
MMILLER |
4/11/08 BLDG REVISION # 58 EXPANSION JOINT $80 SLS |
4-10-08 NAT HEALY PICKUP REV DATED 1-31-2008 & |
BLDG SUBMITTAL DATED 3-3-2008 "RFG PROD DATA" WL |
4-9-08 CALLED NAT HEALY FOR REVISION AND SUBMITTAL |
P/U. LARGE BINS. 'M'. RB |
4-8-08 NAT HEALY PICKUP ELEC SUBMITTAL DATED |
3-28-08 WL |
4/7/08 PUT OUT FRONT FOR P/U UNDER "M" *LARGE BIN* |
CALLED NAT JL/WL |
4-1-08 NAT HEALY PICKUP MECH REV PG AC-30 WL |
3/31/08 MECH REV PG AC-30 CALLED FOR P/U SPOKE TO |
NAT. SM BIN UNDER "M" RJR |
3-6-08 NAT HEALY PICKUP PLUMB REV DATED 3-6-08 WL |
3-29-08 CALLED FOR P/U TALKED TO NAT L. INDICATING |
THE PLMG REVISIONS WERE APPROVED AND THAT HE NEEDS |
THE RECIEPT OR BLUE CARD TO RETRIEVE THE |
REVISIONS. "M-LARGE" KSTEVENS |
3/28/08 SUBMITTAL ELEC TO JAKE LEAHYS DESK |
SPALMER |
3/28/08 MECH REV $60 SPALMER |
03/26/2008 DENIED ELECTRICAL REVISION THAT WAS |
SUBMITTED ON 03/21/2008 WAS P/U BY NAT MMILLER |
3/26/08 PUT OUT FRONT FOR PICKUP UNDER"M" *LARGE |
BIN**CALLED NAT FOR P/U JL/WL |
3-25-08 NAT HEALY PICKUP 3 MECH REV (DATED |
2-8-08,3-6-08, & 3-17-08) WL |
3/25/08 3 SEPARATE MECH REVS IN ONE ROLL. CALLED |
FOR P/U. SPOKE TO NAT. LG BIN UNDER "M" RJR |
3/21/08 SUBMITTAL FOR ELEC NO FEE TO JAKE LEAHYS |
DESK SPALMER |
3/17/08 MECH REV $60 SPALMER |
3/6/08 PLUMB REV $100 SPALMER |
3/6/08 MECH REV $60 SPALMER |
3-5-08 NAT HEALY PICKUP SUBMITTAL DATED 2-5-08 |
"TCO PLAN" WL |
3/4/08 CALLED NAT HEALY (AND LEFT A MESSAGE) FOR |
P/U OF TCO PLAN. 'M'. RB |
3/3/08 BLDG SUBMITTAL NO FEE SPALMER |
2-25-08 FRANK LOMANNO PICKUP REV #49 |
ELEC/PLUMB/MECH/FIRE "EMER GENERATOR & FUEL TANK" |
DATED 1-29-08 & PLUMBING REV DATED 2-5-08 WL |
2-23-8 CALLED FOR P/U AND LEFT A MSG ON NAT |
HEALY'S VOICE MAIL INDICATING THAT THE REVISIONS |
SUBMITTED JAN. 29TH AND FEB. 5TH WERE READY FOR |
PICK UP AND THAT SOME WERE DENIED AND OTHERS |
APPROVED. INDICATED THAT THE RECIEPT OR BLUE CARD |
WAS REQUIRED TO RETRIEVE THE REVISIONS. "M-LARGE" |
KSTEVENS |
2-19-08 FRANK LOMANNO PICKUP MECH REV DATED 2-5-08 |
WL |
2/16/08 MECH REVS AC-1, AC-4, AC-5, AC-6, AC-7, |
AC-8, AC-19 CALLED FOR P/U. SPOKE TO NAT HEALY. LG |
BIN UNDER "M" RJR |
2-14-08 FRANK LOMANNO PICKUP BLDG SUBMITTAL DATED |
1-11-08 WL |
2/13/08 CALLED NAT FOR FIRESTOP SUBMITTAL P/U. |
'M'. RB |
2/13/08 ENGINEERING LETTER SUBMITTED FOR NEIL |
MELICK NO FEE SLS |
02/07/2008 MECHANICAL REVISION # 53 FEES $70.00 |
MMILLER |
2/7/08 CBAA APPLICATION PU BY FRANK SEW |
2/7/08 ELEC REV PU BY FRANK SEW |
2/5/08 ELEC REV FROM 1/29 OK, UNDER "M" FOR PU, |
CALLED AND LEFT MESSAGE ON NAT'S VM, REMINDED OF |
BLUE CARD. DV PALMER. |
2/5/08 BLDG/ELEC/PLUMBING/MECH SUBMITTAL TCO PLANS |
SEW |
2/5/08 MECH REV MISC ATTACHED DRAWINGS SEW |
2/5/08 PLUMBING REV DRAINS $120 SEW |
1/31/08 BLDG REV #50 ARCHITECTURAL DRAWING $110 |
SEW |
01/29/2008 ELECTRICAL,PLUMBING, & MECHANICAL |
REVISION #49 FEES $110.00 MMILLER |
01/29/2008 MECHANICAL REVISION #48 FEES $80.00 |
MMILLER |
01/29/2008 ELECTRICAL REVISION #47 FEES $60.00 |
MMILLER |
1/11/08 BLDG SUBMITTAL DETAIL 4HR RATED EXPANSION |
JOINT ASSEMBLY IN THE FPL VAULT ROOM SEW |
12-26-07 NAT HEALY PICKUP 2 REV ELEC DATED |
12-11-07, ELEC 11-2-07 & 1 BLDG/ELEC/MECH |
SUBMITTAL "SAUNA & STEAM" DATED 11-2-07 WL |
12/24/07 ELEC REV FROM 11/2 AND 12/11 UNDER "M" |
(LARGE BINS) FOR PU, CALLED AND SPOKE TO NAT |
HEALY. BOTH ARE RUBBER-BANDED TOGETHER. DV PALMER |
12-24-07 FRANK LOMANNO PICKUP {(11 SUBMITTAL & |
REV)..REV #31,37,41,ADDENUM 4 ADD TRUSS VILLA ROOF |
TRUSS DATED 10-23-07,ROOF PROD DATA VENT TILE |
DATED 10-30-07,ARCH LOUVERS DATED 11-9-07,TRASH |
CHUTE DATED 11-9-07,COPPER SPIRE SHOP DRAWINGS |
DATED 11-13-07,PRECASTED SHOP DRAWINGS DATED |
11-15-07, BLDG MECH PIPE BRIDGES ROOF LEVEL DATED |
12-13-07,MECH FASTENERS HOLDING DEAD LOAD CALCS |
DATED 12-13-07} WL |
12/21/07 CALLED NAT TO P/U SUBMITTALS AND |
REVISIONS. LARGE BIN. 'M'. RB |
12/20/2007 DENIED ELECTRICAL PLUMBING REVISION |
ALONG WITH APPROVED FIRE REVISION THAT WAS |
SUBMITTED ON 11/07/2007 WAS P/U BY NAT HEALLY |
MMILLER |
12/20/07 CALLED FOR REVISED PLAN P/U UNDER "M" |
MAW |
12/13/07 BLDG SUBMITTAL MECH FASTENERS HOLDING THE |
DEAD LOAD OF ONE FULL PIECE OF EIFS SEW |
12/13/07 BLDG SUBMITTAL CALCS FOR MECHANICAL PIPE |
BRIDGES @ THE ROOF LEVEL SEW |
12/11/07 ELEC REV $100 SPALMER |
12-7-07 FRANK LOMANNO PICKUP REV #45 MECH WL |
12/7/07 MECH REVS (SEE REVIEW NOTES) CALLED FOR |
P/U. SPOKE TO NAT. LG BIN UNDER "M" RJR |
12/5/07 DENIED EL/PLBG/MECH,APPR. FIRE REV# 39 P/U |
BY NAT HEALY AJP |
12-4-07 CALLED FOR P/U AND TALKED TO NAT |
INDICATING THAT THE REVISIONS WERE DENIED AND THAT |
THE RECIEPT OR BLUE CARD IS REQUIRED TO RETRIEVE |
THE PLANS. "M-LARGE" KSTEVENS |
11/27/2007 MECHANICAL REVISION # 45 FEES $110.00 |
MMILLER |
11/19/07 NAT HEALY P/U STOREFRONT SHOP DRAWING |
SUBMITTAL. RB |
11/16/07 SUBMITTAL FOR STOREFRONT SHOP DRAWINGS. |
RB |
11/15/07 BLDG SUBMITTAL PRECAST SHOP DRAWINGS & |
ENERGY CALCS SEW |
11/13/07 BLDG SUBMITTAL COPPER SPIRE SHOP DRAWINGS |
& CALCS SEW |
11/13/-07 DENIED SUBMITTAL P/U BY FRANK (NAT |
HEALY)AJP |
11/13/07 MOVED TO LARGE PLAN BIN "M" AJP |
11/12/07 E-MAILED MIKE GONZALEZ TO P/U DENIED |
STOREFRONT CALULATION AND SHOP DRAWING SUBMITTAL. |
'M'. RB |
11/9/07 SUBMITTAL TRASH CHUTE NO FEE SPALMER |
11/9/07 SUBMITTAL ARCH LOUVERS NO FEE SPALMER |
11-8-07 REV #44 ELEC/PLUMB $80 "REVISED ELEC & |
PLUMB DRAWINGS" WL |
11/08/07 EL. REV #43 P/U BY FRANK (NAT HEALY) |
AJP |
11/7/07 MOVED TO LARGE PLAN BIN "M" AJP |
11/7/07 CALLED FOR P/U "M" MRW |
11/02/2007 ELECTRICAL REVISION #43 FEES $90.00 |
MMILLER |
|
11/02/2007 BLDG SUBMITTAL NO FEE (PLEASE REVIEW |
THE INCLUDED SAUNA & STEAM ROOM SHOP DRAWINGS AND |
PRODUCT DATA SAUNA & STEAM ROOM IS LOCATED ON/IN |
THE 9TH FLOOR SHOWER/CLUB AREA) MMILLER |
|
10/30/2007 BLDG SUBMITTAL NO FEES (ROOF PRODUCT |
DATA INCLUDING ARE ADDITIONAL FLASHING DETAILS; |
EXPANSION JOINT PRODUCT DATA REVSIED LIGHT WEIGHT |
DRAWINGS, & VENT TILE PRODUCT DATA) MMILLER |
|
10/23/2007 BLDG SUBMITTAL NO FEE (SIGNED & SEALED |
COPIES 0F SHOP DRAWINGS & CALCULATIONS FOR VILLAS |
ROOF TRUES ADDENUM 4 ADD TRUSS 14T17) MMILLER |
10/23/2007 BLDG SUBMITTAL (STOREFRONT SHOP |
DRAWINGS & PRODUCT DATA) NO FEE MMILLER |
10/22/07 APPROVED MECH REV (AC-13 ADRESSING |
PROVISO) P/U BY FRANK (NAT HEALY) AJP |
10/22/07 ELECTRICAL REV $110 FEE- FG |
10/22 MECH REV PG AC-13 CALLED FOR P/U SPOKE TO |
NAT. SM BIN UNDER "M" RJR |
10/19/07 GORDON P/U SUBMITTAL DATE 10/12/07 |
SPALMER |
10/19/07 E-MAILED GORDON FOR SUBMITTAL P/U. 'M'. |
RB |
10/16/07 BLDG REV ARCHETECTURAL DRAWINGS $80 SEW |
10/12/07 BLDG SUBMITTAL #0002-07330-1 ROOF TILE |
(HIGH & LOW DECK) SEW |
10/11/07 SUBMITTAL FOR EIFS PRODUCT DATA.RB |
10/10/07 MECH REV AC-13 ADDRESSING PROVISO $60 |
SPALMER |
10/9/07 APPROVED MECH REV.P/U BY FRANK (NAT HEALY) |
AJP |
10/9/07 MECH REV READY FOR P/U SPOKE TO NAT. LG |
BIN UNDER "M" RJR |
10/09/07 TWO REV.'S TRASH CHUTE AND EL--P/U BY |
FRANK (NAT HEALY) AJP |
10/09/2007 ELECTRICAL SUBMITTAL NO FEE MMILLER |
10/09/2007 ELECTRICAL & PLUMBING REVISION #39 |
FEES |
|
10/7/07 ELEC REV FROM 9/27 OK,UNDER "M" FOR PU, |
CALLED AND LEFT MESSAGE ON NAT'S CELL VM, TOLD TO |
BRING IN BLUE CARD/RECEIPT. DV PALMER. |
|
10/5/07 CALLED AND LEFT MESSAGE FOR MIKE GONZALEZ |
TO P/U SUBMITTALS. 'M'. RB |
10/02/07 TWO APPROVED BLDG REV'S (ONE IS REV #36) |
P/U BY FRANK (NAT HEALY) AJP |
10/1/07 E-MAILED ARTURO TO HAVE NAT P/U REVISIONS. |
LARGE BIN. 'M' |
9/28/07 BLDG SUBMITTAL - REV FROM 9/26/07 DIDN'T |
HAVE THE SIGNED & SEALED SET OF PLANS SEW |
9/27/07 BLDG SUBMITTAL NO FEE SPALMER |
9/27/07 ELEC REV $80 SPALMER |
09/26/2007 BLDG REVISIONS #37 FEES (PLEASE REVIEW |
THE INCLUDED ARCHITECTURAL REVISIONS) $140.00 |
MMILLER |
09/26/2007 BLDG SUBMITTAL( PLEASE SEE THE INCLUDED |
DRAWINGS & CALCUATIONS FOR EXTERIOR FREAMING/DROP |
CIELING BUILDING DEPART COMMENTS ADDRESED) |
DEPARTMENT NO FEE MMILLER |
9/24/07 NINE SUBMITTALS P/U BY FRANK (NAT HEALY) |
AS FOLLOWS:DENIED TRASH CHUTE SHOP DRAWINGS, |
APPROVED PRODUT DATA & SIZES FOR FPL VAULT |
LOUVERS, APPROVED SUBMITTAL # 0004-5170-0, |
APPROVED WASHING SYSTEM SHOP DRAWINGS, APPROVED |
TRUSS DRAWING SUBMITTALS # 0001-05170-1 & |
001-05170-3, APPROVED/DEN. STOREFRONT CALCS, |
DENIED EXTERIOR FRAMING/DROP CEILING SUBMITTAL, |
ARCHITECTURAL DRAWING REV. ( NOT INDICATED IF |
APPR. OR DEN.), AN V ONE SUBMITTAL OF VARIOUS |
REV.S FOR PARKING GARAGE,L LPOOL DECK, WITH |
APPROVALS AND DENIALS AJP |
09/24/2007 BLDG REV #36 FEES $120.00 MMILLER |
9/23/07 CALLED NAT TO P/U REVISIONS AND |
SUBMITTALS. LARGE BIN. 'M'. RB |
9/20/07 ELEC REV #28 PU BY FRANK SEW |
9/20/07 PLUMBING/MECH REV #29 PU BY FRANK SEW |
9-19-7 CALLED FOR P/U. NEEDS RECIEPT/BLUE CARD |
"M-LARGE" MW |
9/10/07 FRANK P/U SUBMITTAL FOR 8/14 8/16 & 8/17 |
SPALMER |
9/10/07 FRANK P/U SUBMITTAL FOR 7/31/07 SPALMER |
9/10/07 FRANK P/U SUBMITTAL FOR 7/27/07 SPALMER |
9/10/07 FRANK P/U 3 SUBMITTALS FOR 7/10/07 |
SPALMER |
9/10/07 FRANK P/U SUBMITTAL FOR 7/2/07 SPALMER |
9/10/07 CALLED NAT TO P/U SUBMITTALS.'M'.RB |
9/5/07 MECH REV ATTACHED REVISED MECH DRAWINGS |
$160 |
SEW |
9/4/07 BLDG REV TRASH CHUTE $60 SPALMER |
08/30/2007 BLDG SUBMITTAL NO FEE (PRODUCT DATA & |
SIZES FOR FPL VAULT LOUVERS) MMILLER |
8/27/07 REVISIONS (GARAGE/POOL DECK) P/U BY FRANK |
(NAT HEALY) AJPP |
08/27/2007 RCVD NOC AGAIN THAT SHOWS IT COVERS THE |
POOL MMILLER |
8/26/07 ELEC REV FROM 7/31 UNDER "M" (SMALL) FOR |
PU,CALLED AND LEFT MESSAGE ON NAT HEALY'S VM, TOLD |
TO BRING IN BLUE CARD. DV PALMER. |
8/26/07 ELEC REV FROM 7/27 UNDER "M" (LARGE BINS) |
FOR PU, CALLED GORDAN SPRINGMYER AND LEFT MESSAGE |
TO BRING IN BLUE CARD. DV PALMER. |
8/24/07 APPROVEDMECH REV P/U BY NAT HEALY AJP |
|
8/24/07 MECH REVS OK. SPOKE TO NAT FOR P/U. LG BIN |
UNDER "M" RJR |
08/24/2007 BLDG SUBMITTAL (SIGNED & SEALED) |
#0004-05170-0 SHOP DRAWINGS & CAL FOR ALTERNATE |
CONNECTION OF METAL TRUSSES TO CONCRETE TIE BEAM @ |
VILLAS) NO FEE MMILLER |
08/21/2007 BLDG SUBMITTAL NO FEE (RAILINGS & |
CALCULATIONS) MMILLER |
**** EXPALINED TO CUSTOMER THAT MECH & PLUMBING & |
ELECTRICAL MAY BE CONSIDERED AS REVISIONS IF THAT |
IS THE CASE THEN THERE WILL BE FEES OWED PRIOR TO |
P/U OF REVISIONS MMILLER****** |
08/21/2007 ELECTRICAL & MECHANICAL & PLUMBING |
SUBMITTAL NO FEES MMILLER |
08/21/2007 BLDG SUBMITTAL ( PLEASE APPROVE THE |
ATTACHED WINDOW WASHING SYSTEMS SHOP DRAWINGS) NO |
FEE MMILLER |
8/20/07 PU BY NAT SEW |
8/18/07 3 MECH REVISIONS IN ONE PACKAGE CALLED FOR |
P/U LEFT MESSAGE FOR NAT. LG BIN UNDER "M" RJR |
08/17/07 BLDG SUBMITTAL NO FEE- SHORING LETERS FOR |
S TOWER AT CITYPLACE HIGH ROOF AREA 12 -ATTN R |
BROWN FG |
08/16/2007 BLDG SUBMITTAL (SHORING LTRS SOUTH |
TOWER @CITYPLACE HIGH ROOF AREA 2 NO FEE MMILLER |
8/14/07 BLDG SUBMITTAL SHORING LETTERS FOR SOUTH |
TOWER HIGH ROOF - AREA 7B SEW |
8/10/07 BLDG SUBMITTAL ROOF TRUSSES NO FEE SLS |
08/03/2007 BLDG REVISION #31 FEES $70.00 MMILLER |
7/31/07 BLDG SUBMITTAL SHORING LETTERS FOR SOUTH |
TOWER HIGH ROOF/AREA 1 SEW |
7/31/07 ELEC/MECH REV $100 SEW |
7/27/07 PLBG & MECH REVISION # 29 $180 SLS |
7/27/07 ELEC REVISION # 28 $200 SLS |
7/27/07 SHORING LETTERS SE HIGH ROOF VILLAS NO FEE |
SLS |
7/24/07 ARCHITECTURAL BLDG REV $240 SPALMER |
7/20/07 BLDG SUBMITTAL STOREFRONT CALCULATIONS & |
SHOP DRAWINGS NO FEE SLS |
7/17/07 MECH REV $170 SEW |
07/10/07 BLDG SUBMITTAL NO FEE- SHOP DRAWINGS & |
CALCS FOR HIGH ROOF SHORING FG |
07/10/07 BLDG SUBMITTA; NO FEE- DRAWINGS AND |
CALCULATIONS FOR EXTERIOR & FRAMING & DROP CEILING |
FG |
7/10/07 BLDG SUBMITTAL SHORING LTR INTERMEDIATE |
ROOF ELEVATION +207'-4" NO FEE SLS |
7/10/07 BLDG SUBMITTAL SHORING LTR ROOF POUR # 2 |
SLS |
7/3/07 BLDG REV VARIOUS CHANGES FOR PARKING LOT & |
POOL DECK SEW |
7/2/07 BLDG SUBMITTAL SHORING LTRS S TOWER ROOF |
POUR #2 SEW |
7/2/07 NAT P/U REV #20 DATED 4/30/07 SPALMER |
7/2/07 CALLED FOR P/U "M" MRW LARGE BIN |
7/2/07 NAT P/U REV DATED 6/7/07 SPALMER |
7/2/07 NAT P/U REV DATED 6/20/07 SPALMER |
7/2/07 NAT P/U 32 SUBMITTALS |
7/2/07 NAT P/U REV DATED 6/21/07 SPALMER |
7/2/07 NAT P/U ELEC REV #21 SPALMER |
7/2/07 ELEC REV FROM 5/17 UNDER "M" FOR PU, SPOKE |
TO NAT. DV PALMER. |
6/30/07 CALLED NAT FOR SUBMITTAL P/U. FILED IN A |
BOX AT LARGE BINS. 'M'. RB |
06/29/07 BLDG SUBMITTALS NO FEE- 3 REVISED |
HANDRAIL AND MISC METASL SUBMITTALS FG |
6/29/07 ELEC REV UNDER "M"(LARGE BINS) FOR |
PU.CALLED SPOKE TO NAT HEALY. DV PALMER. |
06/27/2007 NAT P/U SUBMITTAL (NOA'S AND SHOP |
DRAWINGS FOR STORE FRONT DOORS AND WINDOWS) |
MMILLER |
6/27/07 CALLED NAT FOR SUBMITTAL P/U. LARGE BINS. |
'M'. RB |
6/26/07 BLDG SUBMITTAL SHORING LETTER ROOF POUR #1 |
SEW |
6-25-07 NAT HEALY PICKUP BLDG REV #19 & BLDG REV |
DATED 5-11-07 WL |
6/25/07 CALLED NAT FOR SUBMITTAL AND REVISION P/U. |
LARGE BINS. 'M'. RB |
6/25/07 PU BY NAT SEW |
6/24/07 CALLED NAT FOR SUBMITTAL AND REVISION P/U. |
LARGE BINS. 'M'. RB |
06/22/2007 BLDG SUBMITTAL NO FEE (SHORING FOR |
SOUTH TOWER AT CITY PLACE LEVEL 9 POUR #3 |
06/21/2007 BLDG REVISION # 24 FEES $110.00 (PLEASE |
FIND THE ATTACHED ELECTRICAL DRAWINGS REVISION) |
MMILLER |
06/20/2007 BLDG REVISION # 23 FEES $ 60.00 |
(ATTACHED PLEASE FIND REVISED DETAIL TO ROOF TRUSS |
SHOP DRAWINGS) |
6/19/07 SHORING LTR LEVEL 20 POUR 2 SUBMITTAL NO |
FEE SLS |
6/18/07 NAT P/U 2 REV DATED 3/15/07 SPALMER |
6/16/07 CALLED NAT FOR REVISION P/U. LARGE BINS. |
'M'. RB |
6/14/07 SHORING LTR LEVEL 9 POUR 2 SUBMITTAL NO |
FEE SLS |
6-14-07 NAT HEALY PICKUP MECH SUBMITTAL "LTR IN |
REFERENCE TO A/C CLOSET DESIGN" WL |
6/13/07 MECH SUBMITTAL LETTERS FROM 5/30/07 CALLED |
NAT FOR P/U. SM BIN UNDER "M" RJR |
06/11/07 BLDG SUBMITTAL NO FEE- SHORING LETTER FOR |
S TOWER LEVEL 20 POUR # 1 FG |
06/11/07 BLDG SUBMITTAL NO FEE- SHORING LETTER FOR |
S TOWER LEVEL 20 POUR # 1 FG |
6/7/07 BLDG REV ROOF TRUSS $70 SEW |
6/5/07 MECH SUBMITTAL FROM 5/30 DENIED. CALLED |
CARRIE, LEFT VOICEMAIL FOR P/U. SM BIN UNDER "M" |
RJR |
06/05/2007 BLDG SUBMITTAL NO FEE (SHOP DRAWINGS |
#SS.12 SUBMITTAL #0026-03100-0) MMILLER |
06/05/2007 BLDG SUBMITTAL NO FEE (PLEASE FIND |
ATTACHED THE OSUTH TOWER AT CITY PLACE SHOP |
DRAWINGS & CALCULATIONS FOR INTERMEDIATE ROOF |
LEVEL SHORING/RESHORING SIGNED & SEALED SUBMITTAL |
#0028-03100-0)MMILLER |
06/05/2007 BLDG SUBMITTAL NO FEE (SOUTH TOWER AT |
CITY PLACE LEVEL 19 PUR #2) MMILLER |
06/05/07 BLDG SUBMITTAL NO FEE (SOUTH TOWER AT |
CITY PLACE LEVEL 9-VILLAS) MMILLER |
6/5/07 NAT P/U PLUMB REV DATED 4/19/07 SPALMER |
6-4-7 CALLED FOR P/U LEFT A MESSAGE INFORMED NAT |
HEALY TO BRING A RECIEPT AND/OR THE BLUE CARD FOR |
PICK UP OF THE REVISION LEFT OUT FRONT UNDER "M" |
KSTEVENS |
5/31/07 BLDG SUBMITTAL WINDOW WASHING SYSTEM SHOP |
DRAWINGS SEW |
05/30/2007 MECHANICAL SUBMITTAL NO FEE (REFERENCE |
TO A/C CLOSET DESIGN) |
05/29/2007 BLDG SUBMITTAL NO FEE (SHORING LTRS @ |
CITY PLACE LEVEL 19 POUR #3 |
05/29/2007 BLDG SUBMITTAL NO FEE ( SHORING LTRS @ |
CITY PLACE LEVEL 19 POUR #1) MMILLER |
05/22/2007 BLDG SUBMITTAL NO FEE (SHORING LTRS FOR |
SOUTH TOWER @CITYPLACE LEVEL 18 POUR #2) MMILLER |
05/22/2007 BLDG SUBMITTAL NO FEE (PLEASE APPROVE |
THE ATTACHED ROOF TRUSS SHOP DRAWINGS AND |
CALCULATIONS) MMILLER |
5/17/07 BLDG SUBMITTAL SHORING DRWGS & CALCS FOR |
9TH FLR VILLAS & CABANA ROOF NO FEE ATTN: ROBERT |
BROWN |
SLS |
5/17/07 2 BLDG SUBMITTALS SHORING LETTERS FOR |
LEVEL 18 POUR 1 & POUR 3 NO FEE ATTN: ROBERT BROWN |
SLS |
5/17/07 ELECTRICAL REVISION $200 SLS |
5/11/07 BLDG SUBMITTAL SHOP DRAWINGS FLAME SPREAK |
DATA BLDG ELEVATIONS SEW |
05/10/07 SHORING LETTERS FOR S TOWER IN CITY PL- |
LEVEL 17- POUR 2- ROUTED TO R BROWN FG |
5/9/07 SHORING LETTERS FOR SOUTH TOWER LEVEL 17 |
POUR 3 GIVEN TO ROBERT BROWN NO FEE SLS |
5/9/07 SHORING LETTERS FOR SOUTH TOWER POOL DECK |
NO FEE GIVEN TO ROBERT BROWN NO FEE SLS |
05/03/2007 BLDG SUBMITTAL SHORING LETTERS FOR |
SOUTHTOWER AT CITY PLACE ORIGINALLY SUBMITTED |
01/25/2007 FLOOR #4 POUR #1 MMILLER |
05/03/2007 BLDG SUBMITTAL SHORING LETTERS FOR |
SOUTH AT CITY PLACE LEVEL # 17 POUR #1 TOWER |
MMILLER |
5-2-07 NAT HEALY PICKUP FIRE REV DATED 2-08-07 WL |
5-2-07 BLDG SUBMITTAL SHORING LTRS FOR SOUTH TOWER |
@ CITY PLACE 8TH FL POUR #3 VILLAS WL |
04/30/2007 NAT P/U BLDG SHORING LETTERS (FOR |
GARAGE LEVEL 4 POUR # 1 THAT WAS SUBMITTED ON |
01/25/2007 PLEASE CHECK PROGRESS)MMILLER |
04/30/2007 BLDG, ELECTRICAL, PLUMBING, & |
MECHANICAL REVISION FEES $370.00 MMILLER |
04/30/2007 BLDG SUBMITTAL (SHOP DRAWINGS) PLEASE |
APPROVE THE ATTACHED NOA'S AND SHOP DRAWINGS FOR |
STORE FRONT DOORS & WINDOWS MMILLER |
04/30/2007 BLDG SUBMITTAL # 3 NO FEE MMILLER |
04/30/2007 BLDG SUBMITTAL DESIGN NO.V452 TO BE |
USED WHEN WET AREAS ARE ADJACENT TO A FIRE RATED |
PARTITION MMILLER |
04/30/2007 BLDG REVISION FEES $70.00 (DOOR |
SCHEDULE) MMILLER |
04/30/2007 SHORING LETTERS NO FEE LEVEL 16 POUR # |
2 MMILLER |
04/30/2007 SHORING LETTERS SUBMITTAL NO FEE (FOR |
SOUTH TOWER AT CITY PLACE LEVEL 16 PUR # 3 |
SUBMITTED MMILLER |
04/30/07 REVISED PLANS SP8-SP12 READY; LARGE BIN |
"M" MAW |
04-27-07 CALLED NAT FOR TO P/U UNSEALED SHORING |
LETTER.'M'. JDS |
04/27/07 SUBMITTAL NO FEE- SHORING LETTERS FOR |
SOUTH TOWER-ROUTED TO R BROWN FG |
4/26/07 DUPL BLDG SUBMITTAL (1/25/07) |
SHORING/RESHORING GARAGE LEVEL 4 POUR #1 ROUTED TO |
GSMITH SEW |
4/26/07 BLDG SUBMITTAL SHORING LETTER S TOWER L-16 |
POUR #2 SEW |
4-20-07 NO FEE BLDG SUBMITTAL SHORING LTRS FOR S |
TOWER @ CITY PLACE GARAGE LEVEL #8 POUR #1 "ATTN |
ROBERT BROWN" WL |
4/19/07 PLUMBING REVISION $60 SLS |
4/19/07 NAT P/U MULTIPLE SUBMITTALS SPALMER |
4/18/07 E-MAILED NAT HEALY FOR P/U OF MULTIPLE |
SUBMITTALS. LARGE BINS. 'M'. RB |
4/18/07 BLDG SUBMITTAL SHORING LTR SOUTH TOWER |
LEVEL 16 POUR #1 SEW |
4/13/07 BLDG SUBMITTAL SHORING LTR SOUTH TOWER |
LEVEL 15 POUR #3 SEW |
4/11/07 BLDG SUBMITTAL SHORING LTR SOUTH TOWER |
LEVEL 15 POUR #2 SEW |
4/11/07 BLDG SUBMITTAL SHORING LTR SOUTH TOWER |
LEVEL 7 POUR #3 SEW |
4/11/07 PU BY NAT SEW |
04/10/07 DENIED REV/PLAN READY; P/U UNDER "M" MAW |
04/09/07 SUBMITTAL NO FEE- ROUTE TO R BROWN- 9TH |
FLOOR PARKING GARAGE PT CABLES-SHOP DRAWINGS & |
CALUCALTIONS (3 SIGNED & SEALED) FOR SOUTH TOWER @ |
CITY PLACE FG |
04/06/2007 BLDG SUBMITTAL NO FEE (SHORING LETTERS |
FOR SOUTH TOWER @ CITYPLACE MMILLER |
4/6/07 NAT HEALY P/U TWO SUBMITTALS SHORING & |
CALCULATIONS SPALMER |
4/6/07 CALLED NAT FOR SUBMITTAL P/U.'M'.RB |
4/5/07 ROOF SHORING & CALCULATIONS FOR SOUTH TOWER |
@ CITYPLACE NO FEE GIVEN TO ROBERT B SLS |
4/5/07 SHORING LETTER SUBMITTAL FOR SOUTH TOWER @ |
CITYPLACE NO FEE GIVEN TO ROBERT B SLS |
4/5/07 NAT P/U PLUMB REV SPALMER |
4/4/07 NAT HEALY P/U ONE PLUMB REV SPALMER |
4-4-7 CALLED FOR P/U PLMG REV "M" KSTEVENS |
4-3-7 CALLED FOR P/U PLMG REV "M" KSTEVENS |
4/3/07 PRODUCT INFO/DATA FOR EXT METAL FRAMING |
SUBMITTAL ROUTED TO ROBERT BROWN NO FEE SLS |
4/3/07 SHORING LETTER FOR SOUTH TOWER @ CITYPLACE |
ROUTED TO ROBERT BROWN NO FEE SLS |
04/02/07 BLDG SUBMITTAL NO FEE- SHORING LETTERS |
FOR SOUTH TOWER AT CITY PLACE ROUTED TO R BROWN |
DESK FG |
03/30/07 BLDG SUBMITTAL NO FEE- REVIEW ROOFING |
PACKAGE ROUTED TO R BROWN DESK FG |
03/30/07 BLDG SUBMITTAL -SHORING LETTER FOR S |
TOWER AT CITY PLACE ROUTED TO R BROWN FG |
3/28/07 NAT HEALY P/U MECH REV DATED 3/15/07 |
SPALMER |
3.27.07 MECH REV PG AC-5 CALLED FOR P/U SM BIN |
UNDER 'M' RJR |
03/27/2007 BLDG SUBMITTAL ( SHORING LETTERS)N0 FEE |
MMILLER |
03/27/2007 NAT P/U ELECTIRCAL & FIRE REVISION |
MMILLER |
03/26/07 REVISED SHEET E2 READY; P/U UNDER "M" |
MAW |
03/26/07 FIRE REVSION FEES $70.00 MMILLER 3/23/07 |
NAT HEALY P/U DENIED MECH REV DATED 3/15/07 |
SPALMER |
3.22.07 MECH REVS AC4/AC7 DENIED CALLED FOR P/U SM |
BIN UNDER "M" RJR |
03/22/2007 BLDG SUBMITTAL (SHORING LETTERS NO FEE |
MMILLER |
3/21/07 SHORING LETTERS LEVEL 13 POUR 3 NO FEE |
SLS |
03/21/2007 BLDG SUBMITTAL NO FEE MMILLER |
03/15/2007 BLDG SUBMITTAL NO FEE MMILLER |
03/15/2007 BLDG REVISION FES $ 150.00 MMILLER |
03/15/2007 MECHANICAL REVISON FEES $ 70.00 |
MMILLER |
03/15/2007 PLUMBING REVISION FEES $80.00 MMILLER |
03/15/2006 BLDG REVISION FEES $100.00 MMILLER |
03/15/2007 MECHANICAL REVSION FEES $ 60.00 MMILLER |
03/15/2007 PLUMBING REVISION FEES $ 60.00 MMILLER |
03/15/2007 ELECTRICAL REVISION FEES $ 60.00 |
MMILLER |
03/15/2007 BLDG SUBMITTAL NO FEES MMILLER |
3/14/07 BLDG SUBMITTAL SHORING LTR S TOWER @ CITY |
PLACE SEW |
3/9/07 SUBMITTAL NO FEE- ROUTE TO GERALD SMITH |
DESK FG |
3-8-07 BLDG SUBMITTALS SHORING LTR FOR 12TH FLR |
POUR 3 S TOWER @ CITY PLACE WL |
03/07/2007 BLDG SUBMITTALS NO FEE MMILLER |
3/5/07 4 BLDG SUBMITTALS SHORING LTR 11TH FLR |
PARCEL 1 & 2 SHORING LTR VILLA PARCEL 5 & SHORING |
LTR 12TH FLR POUR 1 NO FEE SLS |
02/22/2007 BLDG SUBMITTAL NO FEE MMILLER |
02/22/2007 BLDG SUBMITTAL NO FEE MMILLER |
2/22/07 3 BLDG SUBMITTALS NO FEE SLS |
2/13/07 2 BLDG SUBMITTALS SHORING/RESHORING |
LETRERS POUR #2 & #3 LEVEL 10 |
2/12/07 CARRIE P/U 15 REV SPALMER SPALMER |
2-11-07 CALLED CARRIE TO P/U REVISION AND |
SUBMITTALS. LARGE BINS.'M'.RB |
2-9-7 CARRIE WOOLBERT PICKUP MECH REV WL |
2/9/07 MECH REV CALLED FOR P/U LG BIN UNDER'M' |
RJR |
2/8/07 (5) BLDG SUBMITTALS/SHORING LTRS FOR |
VILLA/9TH FL SHORING CALS FOR VILLA/9TH FL SHORING |
DRAWINGS FOR VILLA & GARAGE/INTERMEDIATE & HIGH |
ROOF CALS/INTERMEDIATE & HIGH ROOF DRAWINGS PT |
2/8/07 REV/BLDG $110 PT/WL |
2-5-07 (2) BLDG SUBMITTALS DATED 2-5-07 NO FEE WL |
2/2/07 (2) BLDG SUBMITTALS 8THFL SHOP DRAWINGS & |
8THFL CALCULATIONS NO FEE SEW |
01/30/07 BLDG SUBMITTAL NO FEE-PLEASE |
SIGNED/SEALED LETTERS FOR POUR 2 LEVEL 9 FG |
01/30/07 BLDG SUBMITTAL NO FEE-SIGNED/SEALED |
LETTERS FOR POUR 3 LEVEL 9 FG |
01/25/07 BLDG SUBMITTAL- NO FEE ROUTED TO GERALD |
SMITH PER CONTRACTOR- SHORING/ RESHORING GARAGE |
LEVEL 4 POUR- 1 FG |
1/24/07 SUB/BLDG/SHOP DRAWINGS FOR WINDOWS & |
SLIDER PT |
1/24/07 SUB/BLDG/CAL FOR WINDOWS & SLIDER PT |
1/24/07 SUB/BLDG/SHORING PT |
1-24-07 CARRIE WOOLBERT PICKUP 2 REV PLUMB DATED |
1-11-07 & PLUMB DATED 12-18-06 WL |
1-23-7 CALLED FOR P/U (2) "M LARGE" KSTEVENS |
1/19/07 RE-SHORING LTR FOR LEVEL 8 POUR 3 NO FEE |
SEW |
1/16/07 SHORING LETTER FOR VILLAS LEVEL 3 NO FEE |
SLS |
1/16/07 SHORING LETTER FOR TOWER LEVEL 8 NO FEE |
SLS |
1/11/07 BLDG SUBMITTAL NO FEE -SIGNED AND SEALED |
SHORING /RESHORING LETTERS FOR 8TH FLOOR - POUR 1 |
FG |
1/11/07 PLUMBING REV $90 FEE- DELETED TWO TRENCH |
DROPS AT POOL DECK-ADD 1 FLOOR DRAIN AT ENTRY TO |
TOILET AREA FROM POOL FG |
01/08/07 CARRIE P/U 34 SUBMITTALSS FG |
01/08/07 SUBMITTAL NO FEE- SIGNED SEALED LETTERS |
FOR POUR 3 LEVEL 7-ROUTE TO R BROWN FG |
1/7/07 CALLED CARRIE TO P/U SUBMITTALS. LARGE |
BINS.'M'. RB |
01/03/07 BLDG LETTERS NO FEES MMILLER |
01/03/07 BLDG LETTERS SUBMITTALS NO FEES MMILLER |
1/2/07 CARRIE P/U REV DATED 12/15 AND 12/18/06 |
SPALMER |
12/31/06 ELEC REV'S FROM 12/15 AND 12/18 UNDER "M" |
IN LARGE BINS FOR PU. CALLED AND LEFT MESSAGE ON |
CARRIE'S VM AND SENT E-MAIL TO ARTURO. TOLD TO |
BRING IN BLUE CARD/RECEIPT. DV PALMER. |
12/27/06 BLDG SUBMITTAL SHORING/RESHORING LETTER |
LEVEL 7 POUR ONE SEW |
12/22/06 BLDG SUBMITTAL LETTERS FOR LEVEL SIX POUR |
THREE SEW |
12/22/06 BLDG SUBMITTAL LEVEL 2 SHORING/RESHORING |
LETTERS FOR VILLA SEW |
12/19/06 BLDG SUBMITTAL (GARAGE) LETTERS NO FEES |
MMILLER |
12/19/06 BLDG SUBMITTAL LETTERS NO FEES MMILLER |
12/18/06 BLDG REV $220 FEE FG |
12/18/06 ELECTRICAL REV $130 FEE FG |
12/18/06 MECHANICAL REV $70 FEE FG |
12/18/06 MECHANICAL REV $100 FEE FG |
12/18/06 REV $110 FEE- PLUMB FG |
12/15/06 ELECTRICAL REVISION FEES $160.00 MMILLER |
12/14/06 5 BLDG SUBMITTALS CALCS/DRAWINGS FOR 9TH |
FL GARAGE LEVEL 6 POUR #1 CALCS/DRAWINGS FOR 8TH |
FL GARAGE SEW |
12/08/06 BLDG SUBMITTAL NO FEE- POST TENSION |
DRAWINGS FOR FLOORS 3-7 IN THE GARAGE FG |
12/08/06 BLDG SUBMITTAL NO FEE- POST TENSION |
CALCULATIONS FOR FLOORS 3-7 IN PARKING GARAGE FG |
12/08/06 BLDG SUBMITTAL NO FEE- SHORING /RESHORING |
DRAWINGS FOR FIFTH FLOOR POUR 3 IN THE TOWER FG |
12-6-06 (3 BLDG SUBMITTALS) SHORING CALC VILLA & |
GARAGE FLOORS 3-7, SHORING DRAWINGS VILLAS & |
GARAGE FLOORS 3-7, SHORING PLANS FLLORS 11-20 CALC |
PREVIOUSLY SUBMITTED WL |
12/05/06 SUBMITTAL OF BLDG LETTERS MMILLER |
12/04/06 SUBMITTAL SHORING/RESHORE LTRS 5TH FL |
POUR 2 SPALMER |
12/4/06 CARRIE P/U SUBMITTALS SPALMER |
12/3/06 E-MAILED ARTURO FOR EQUIPMENT SPEC BINDER |
PICK UP. LARGE BINS. 'M'. RB |
11/30/06 BLDG SUBMITTAL (LTRS FLR 5 POUR ) NO FEE. |
TA |
11/30/06 BLDG REV TO TRASH CHUTE SEW |
11/21/06 BLDG SUBMITTAL (RESHORING LTRS FOR 4TH FL |
POUR 3) NO FEEE. TA |
11/17/06 3 SUBMITTAL NO FEE POST TENSION DRAWINGS |
4TH - 20TH FLOOR/SHORINGS DRAWINGS FOR THE |
4TH-20TH/ PORT TENSION 4TH-20TH FLOOR FG |
11/16/06 3 BLDG SUBMITTAL PER ROBERT BROWN NO FEES |
MMILLER |
11/13/06 7 BLDG SUBMITTALS PER ROBERT NO FEE SLS |
11/13/06 CARRIE WOOLBERT P/U SUBMITTALS -PER R |
BROWN OK TO RELEASE W/O BLUE CARD FG |
11/12/06 E-MAIL SENT TO CARRIE AND ARTURO FOR |
SUBMITTAL P/U. 'M' LARGE BINS. RB |
11/03/06 SUBMITTAL OF POST TENSION DRAWINGS FOR |
THE GARAGE MMILLER |
11/03/06 SUBMITTAL THREE SETS POST TENSION |
CALATIONS FOR THE GARAGE MMILLER |
11/03/06 SUBMITTAL SEALING SHORING LETTERS FOR POR |
# 3 & LEVEL 3 MMILLER |
11/3/06 CARRIE P/U REV DATED 8/1/06 SPALMER |
10-29-06 E-MAILED ARTURO TO P/U PRODUCT APPROVAL |
BINDERS. 'M'. LARGE BINS. RB |
10-27-06 CARRIE WOLLBERT PICKUP SUBMITTAL DATED |
10-26-06 WL |
10/26/06 REVIEWED DRY-IN PLAN.TO BOX "M".CALLED |
CARRIE FOR PICK-UP.KC |
10/23/06 SUBMITTAL NO FEE- LETTERS FG |
10/16/06 SUBMITTAL SHORING LAYOUT 2ND FL CONCRETE |
BEAMS 10TH-20TH FL/PARTIAL 11TH-20TH F/PARTIAL |
SEW |
10/10/06 SUBMITTAL NO FEE- SIGNED AND SEALED |
LETTERS FOR LEVEL 3 POUR 1 FG |
9/27/06 SHORING LETTERS FOR 2ND FLOOR POUR 3 SLS |
9/20/06 - (5) SUBMITTALS/SHORING LETTERS/FLOOR |
SHORING PLANS & DETAILS/CAST IN PLACE CONCRETE |
FRAMING/SHORING FOR 3RD FL/PTT030 PTT031 PT |
9/19/06 PRODUCT DATA FOR MOISTURE CONTROL |
SUBMITTED NO FEE SLS |
9/8/06 SHORING LETTERS/SOIL BEARING CAPACITY |
LETTERS/DOWEL SURVEY/SLAB MEETING FLOOD ELEVATIONS |
SLS |
9/7/06 TOM P/U PERMIT CARD ONLY SPALMER |
9-6-06 CALLED ARTURO TO P/U PERMIT CARD ONLY. |
PLANS TO BE PROCESSED AT A LATER DATE. 'M'. RB |
8-28-06 PRODUCT APPOVALS & CALCSP/U BY ARTURO PHK |
8/25/06 BLDG SUBMITTAL SHORING DRAWINGS/CALCS SEW |
8/17/06 BLDG SUBMITTAL TO RBROWN SEW |
8/1/06 2ND RESUB PLANS/APP $50 SLS |
7/26/06 PLANS PICKED UP BY ARTURO. DV PALMER. |
7/26/06 E-MAILED ARTURO AND LET HIM KNOW THE PLANS |
ARE READY FOR P/U(M) ADARROUGH |
5/9/06 NOC TURNED IN TODAY SPALMER |
4/27/06 1ST RESUB NO FEE SPALMER |
************************************************ |
************************************************ |
2-20-06 DENIED. CALLED ARTURO FOR P/U. 'M'. RB |
2/21/06 ARTURO P/U DENIED PLANS SPALMER |