Miscellaneous Information / Notes |
NEW 4 STORY LIBRARY & EXISTING OCTAGON BLDG |
TO BE GUTTED & RENOVATED SEE BLDG PROVISO |
|
|
|
|
10/5/09 DENIED LANDSCAPE PLANS FILED UNDER 'T' LM |
10/05/2009 APPROVED LANDSCAPE THAT WAS SUBMITTED |
ON 09/28/2009 WAS P/U BY DOUG MMILLER |
10/1/09 LANDSCAPE SUBMITTAL FILED UNDER 'T' LM |
9-30-09 NO FEE CHGD ROUTED TO KEN CONRAD |
"ELEVATION CERTIFICATE FOR CO" WL |
09/30/09 LANDSCAPE APPROVED & RETURNED TO AV |
09/28/2009 LANDSCAPE SUBMITTAL NO FEE OK PER AV |
(DEPUTY DIRECTOR) (REVISED AS-BUILTS LANDSCAPE |
PALNS AS REQUESTED BY ROBERT KUSSNER) MMILLER |
9/16/09 DENIED LANDSCAPE PLAN NEEDS TO CALL IN AN |
INSPECTION FOR PHASE I. PLANS ON RK DESK SO |
INSPECTION CAN BE DONE. AV |
09/16/2009 APPROVED MECHANICAL REVISION THAT WAS |
SUBMITTED ON 08/24/2009 WAS P/U BY DOUG MMILLER |
09/16/2009 RCVD LETTER OF REQUEST FOR "TCO" FEES $ |
500.00 ROUTED TO KEN CONRAD'S DESK MMILLER |
9/14/09 DENIED CONTRACTOR CALLED FILED UNDER WEITZ |
COMPANY AV |
9/8/2009 CALLED DOUG TO P/U T&B REPORT. REPORT IN |
BOX (T) HM. |
9/2/09 SENT TO JOHN ROACH RAK |
8/26/09 LANDSCAPE REVISION # 100 $110 AS-BUILTS NO |
HISTORICAL APPROVAL PER ROBERT KUSSNER SLS |
8/24/09 BLDG SUBMITTAL TEST/BALANCE REPORTS |
CLARIFICATION ROOF CURB CAP TIE DOWN DETAIL SEW |
8/17/09 PAID $500 PICKED UP TCO SEW |
8/17/09 (4) REVISIONS PU BY DOUG SEW |
8/13/09 ELEC REV'S UNDER "T" (BROWN BINS) FOR PU. |
THERE ARE FOUR REVISION, DATING, 6/11, 6/24, 7/15, |
AND 7/20. CALLED AND SPOKE TO TO DOUG. REMINDED OF |
BLUE CARD. DV PALMER |
8/12/09 LETTER SUBMITTED FOR TCO ROUTED TO KCONRAD |
- WAS ADVISED TO PAY AT TIME OF P/U SEW |
07/29/2009 BLDG SUBMITTAL NO FEE ROUTED TO KEN |
CONRAD'S DESK MMILLER |
7/28/09 LETTER SUBMITTED FOR TCO ROUTED TO KCONRAD |
- HAS NOT PAID YET UNTIL APPROVAL SEW |
07/22/2009 BLDG SUBMITTAL NO FEE ROUTED TO DOUG |
WISE'S DESK MMILLER |
7/20/09 BLDG SUBMITTAL P/U KINSSON SPALMER |
7/20/09 ELEC REV $110 SPALMER |
7/20/09 SHORING LTRS PLACED ON KEN CONRADS DESK |
SPALMER |
7-20-09 CALLED CONTRACTOR AND SPOKE WITH DOUG |
PLANS FILED UNDER "T" SMALL PLAN JW |
07/15/2009 BLDG SUBMITTAL NO FEE (LIGHT POLE & |
FIXTURE PER PREVIOUS SUBMITTAL COMMENTS ATTN: JIM |
WITMER)MMILLER |
07/15/2009 ELECTRICAL REVISION #02 FESS $110.00 |
MMILLER |
7/9/09 BLDG REVISION P/U BY KINSSON SLS |
7-09-09 CALLED CONTRACTOR FILED SUBMITTALS UNDER |
"T" SMALL PLAN JW |
06/29/2009 BLDG REVISION # 101 FEES MMILLER |
**** ADDED REVISION FEES $ 140.00 CUSTOMER PAY |
PRIOR TO P/U MMILLER**** |
06/24/2009 ELECTRICAL REVISION #100 FEES $140.00 |
MMILLER |
6/15/09 KINSSON P/U EAST STAIR RAILINGS SUBMITTAL |
DATED 6/8/09 SPALMER |
6/15/09 KINSSON P/U ALUMINUM RAILING SUBMITTAL |
DATED 5/29/09 SPALMER |
06-15-09 CALLED CONTRACTOR PLANS FILED UNDER "T" |
SMALL PLANS JW |
06/11/2009 APPROVED BLDG ELECTRICAL & MECHANICAL |
THAT WAS SUBMITTED ON 05/13/2009 WAS P/U BY |
KINSSON MMILLER |
06/11/2009 ELECTRICAL REVISION # 100 FEES $170.00 |
MMILLER $170 REV FEE PAID UNDER #0899 ON 6/23/09 |
SEW |
06/11/2009 APPROVED ELECTRICAL THAT WAS SUBMITTED |
ON 05/21/2009 AND APPROVED ELECTRICAL THAT WAS |
SUBMITTED 06/03/2009 WAS P/U BY KINSSON MMILLER |
MMILLER |
6/11/09 ELEC REV'S FROM 5/21 AND 6/3 UNDER "T" |
(LARGE BROWN BINS) FOR PU. CALLED AND LEFT MESSAGE |
ON KINSSON GRACIEN'S VM. REMINDED OF BLUE CARD. DV |
PALMER. |
6/11/09 BLD/MECH/ELEC REV FROM 5/13 PASSED, CALLED |
FOR P/U. LEFT MSG FOR KINSSON. LG BIN UNDER "W" |
RJR |
6/8/09 SUBMITTAL BLDG NO FEE SPALMER |
6/3/09 ELEC REV SHEET E1.01 # 8 PER RFI #182R $80 |
SEW |
6/3/09 PU BY KINSON SEW |
06/02/09 RVSD PLANS READY FOR P/U; LARGE BIN "T" |
MAW |
5/29/09 BLDG SUBMITTAL ALUM RAILING @ BRIDGE SEW |
5/29/09 REV PU BY KINSON SEW |
5/26/09 REV FROM 4/10 LOCATED AND PLACED UNDER "T" |
FOR PU. ( MEDIUM PACKAGE IN BROWN BINS). CALLED |
AND LEFT MESSAGE FOR KINSON, REMINDING OF BLUE |
CARD. DV PALMER. |
5-21-09 REV #99 ELEC $290 "RFI #197 & 199 (FLAT |
SCREEN PANELS & NAC PANEL)" WL |
5-21-09 KINSSON PICKUP PLUMB REV PL.03 (DATED |
5-13-09) WL |
5-20-09 CALLED FOR P/U OF PLMG REVISIONS SUBMITTED |
5-13-09 AND TALKED TO KINSSON G. INDICATING THE |
REQUIREMENT FOR THE RECIEPT OR BLUE CARD. "T" |
KSTEVENS. |
5/13/09 ELEC/MECH REV BASEMENT SMOKE BARRIER $ SEW |
5/13/09 PLUMBING REV P1.03 $80 SEW |
5-1-09 KINSSON G. PICKED UP PLMG REVISION. |
KSTEVENS. |
5-1-09 CALLED FOR P/U OF DENIED PLMG REVISION |
SUBMITTED 3-27-09 AND TALKED TO KINSSON G. |
INDICATING THE REQUIREMENT FOR THE RECIEPT OR BLUE |
CARD. "T-LARGE" KSTEVENS. |
4-29-09 REV #896 $200 "REVISED LOW VOLT DRAWINGS" |
WL |
4-21-09 KINSSON GRACIEN PICKUP ELEC REV (DATED |
3-24-09) WL |
4/21/09 ELEC/MECH REV OK AND DENIED UNDER "T" |
(LARGER BROWN SHELVES) FOR PICK UP. ONE FLAT |
PACKAGE APPROX 12X30". CALLED AND SPOKE TO |
GARCIEN, REMINDED OF BLUE CARD WITH A DATE OF |
3/24. DV PALMER. |
4/14/09 ELEC/FIRE REVISION DATED 3/10/09 P/U BY |
KINSSON GRACIEN SLS |
4/10/09 CALLED FOR P/U "T" ROLLED PLAN MRW |
4/10/09 BLDG SUBMITTAL P/U BY KINSSON GRACIEN SLS |
4/10/09 PLBG/MECH REVISION #95 $260 SLS |
4-01-09 CALLED CONTRACTOR SPOKE WITH KINSSONPLANS |
FILED UNDER "T" SMALL PLAN JW |
3/27/09 PLUMB REV $80 SPALMER |
3/24/09 ELEC/MECH REV $260 SPALMER |
03/17/2009 DENIED/APPROVED PLUMBING REVISIONS THAT |
WERE SUBMITTED ON 02/19/2009 WAS P/U BY KINSSON |
MMILLERR |
3-16-09 CALLED FOR P/U OF PLUMBING REVISIONS |
SUBMITTTED 2-19-09 ONE APPROVED & ONE DENIED AND |
SPOKE TO KINNSON G. INDICATING THE REQUIREMENT FOR |
THE RECIEPT OR BLUE CARD. "T-LARGE" KSTEVENS. |
3-16-09 KINSSON GRACIEN PICKUP 2 SUBMITTALS (1 |
DATED 2-23-09 "STOREFRONT" & 1 DATED 3-11-09 "EAST |
STAIRS" 3) & REV #91 "SIGNED & SEALED RFI'S |
118-169" WL |
3-13-09 CALLED CONTRACTOR (2) SUBMITTALS READY FOR |
PICK UP FILED UNDER "T" LARGE PLAN JW |
3/11/09 KINSSON P/U MECH REV DATED 2/19/09 SPALMER |
3/11/09 BLDG SUBMITTAL EAST STAIRS #3 SHOP |
DRAWINGS NO FEE SPALMER |
3/10/09 ELEC/FIRE $320 SPALMER |
3/5/09 MECH REVISION CALLED FOR P/U. SPOKE TO |
KINSSON. LG BIN UNDER "W" RJR |
2-27-09 KINSSON GRACIEN PICKUP PLUMB REV (DATED |
2-10-09) WL |
02-27-09 CALLED FOR P/U OF APPROVED PLMG REVISION |
SUBMITTED 2-10-09 AND LEFT A MESSAGE ON KENSSON |
G'S VOICE MAIL INDICATING THE REQUIREMENT FOR THE |
RECIEPT OR BLUE CARD. "T" KSTEVENS. |
02/25/2009 BLDG SUBMITTAL NO FEE (EAST ROOF FASCIA |
ENGINEERING) MMILLER |
02/25/2009 BLDG REVISION # 91 FEES $800.00 MMILLER |
2/23/09 BLDG SUBMITTAL REVISED DETAIL SHEET 8&9 |
SEW |
2/19/09 MECHANICAL REV $110 SPALMER |
2/19/09 PLUMBING REV $110 SPALMER |
2/12/09 KINSSON P/U DENIED REV DATED 1/28/09 |
SPALMER |
2-12-09 CALLED FOR P/U OF DENIED/APPROVED PLMG |
REVISION #7 AND LEFT A MSG ON THE VOICE MAIL OF |
KINSSON G. INDICATING THE REQUIREMENT FOR THE |
RECIEPT OR BLUE CARD. "T-LARGE" KSTEVENS. |
2/10/09 PLUMBING REV RFI #159R DRAIN LINES-1 1/2" |
FOR CUPOLA DRAIN PAN $80 SEW |
2/10/09 PU BY KINSON SEW |
2-06-09 CALLED KINSSON AT THE WEITZ CO PLANS FILED |
UNDER "T" LARGE PLAN JW |
2/3/09 BLDG SUBMITTAL STAIR #4 SHOP DRAWINGS SEW |
2/3/09 REV PU BY KINSSON SEW |
2/2/09 REV DATED 1/6/09, READY FOR P/U, |
UNDER(T)**LARGE BINNS**, LEFT VM MESSAGE ADARROUGH |
1-28-09 KINSSON GRACIEN PICKUP REV #15 (12-5-08) |
WL |
1/28/09 REVISION #15 THAT WERE SUBMITTED ON |
12/5/08 |
FILED FOR PICK UP UNDER 'T' (LARGE BIN) LM |
1/28/09 PLUMBING REV #7-STORM PIPING COORDINATION |
SEW |
1-26-09 KINSSON GRACIEN PICKUP 3 BLDG SUBMITTALS |
(DATED 1-6-09 .."STAIR 4 & RAILING SHOP DRAWINGS & |
EAST ROOFS FASCIA" WL |
01-23-09 CALLED CONTRACTOR, SPOKE WITH KINSSON'S |
VOICE MAIL PLANS FILED UNDER "T" LARGE PLAN JW |
01/06/2009 BLDG SUBMITTAL NO FEE (RAILING SHOP |
DRAWINGS) MMILLER |
01/06/2009 BLDG SUBMITTAL NO FEE (STAIR 4 SHOP |
DRAWINGS) MMILLER |
01/06/2009 BLDG SUBMITTAL NO FEE (EAST ROOFS |
FASCIA "CONNECTION DETAILS") MMILLER |
01/06/2009 ELECTRICAL & MECHANICAL REVISION #086 |
FEES $230 MMILLER |
1/5/09 KENSSON P/U 2 REV DATED 12/5/08 SPALMER |
1/5/09 KENSSON P/U REV DATED 12/16/08 SPALMER |
1/5/09 KENSSON P/U REV DATED 11/17/08 SPALMER |
1-02-09 CALLED THE CONTRACTOR PLANS FILED UNDER |
"T" SMALL PLAN, SPOKE WITH KENSSON VOICE MAIL JW |
12/30/08 CALLED FOR PICK-UP SPOKE WITH KINSSON |
PLANS FILED UNDER "T" SMALL PLANS JW |
12/30/08 REVISIONS FROM 11/17 ARE UNDER "T" (LARGE |
BINS) FOR PICK UP.CALLED AND SPOKE TO KINSON AND |
REMINDED OF BLUE CARD. DV PALMER. |
12/22/08 REVISIONS FROM 11/17 ARE UNDER "T" |
WAITING FOR THE ENGINEER TO COME IN AND SIGN, DATE |
AND SEAL PLANS. SEE ELECTRICAL REVIEW DATED 12/17. |
DO NOT RELEASE PLANS. DV PALMER. |
|
|
12/16/08 SUBMITTAL EXTERIOR FRAMING DETAILS NO FEE |
SPALMER |
12/5/08 BLDG/ELEC/PLUMBING/MECH REV CCD #15 SEW |
12/5/08 BLDG SUBMITTAL GLASS HANDRAIL ENGINEERING |
SEW |
12/5/08 BLDG SUBMITTAL LOUVERS AT THE CUPOLA |
EXTERIOR FASTENING DETAILS SEW |
11/17/08 ELEC & FIRE REVISION # 84 $380 SLS |
11-13-08 KINSSON GRACIEN PICKUP (3) BLDG |
SUBMITTALS "CUPOLA"(DATED 10-7-08), RFI RESPONSES |
(DATED 10-29-08) & MOD BIT RFG SYS (DATED 11-4-08) |
WL |
11-12-08 CALLED CONTRACTOR FILED UNDER "T" SMALL |
PLANS SPOKE WITH KINSSON JW |
11-07-08 CALLED CONTRACTOR AND SPOKE WITH KINSSON |
SUBMITTALS FILED UNDER "T" SMALL PLAN JW |
11-4-08 BLDG SUBMITTAL NO FEE CHARGED "MODIFIED |
BITMEN RFG SYS FOR STEEL DECK ROOF AT EAST SIDE OF |
ROTUNDA" WL |
10/29/08 BLDG REV $ SPALMER |
10-24-08 KINSSON GRACIEN PICKUP BLDG/ELEC/FIRE CCD |
# (9-18-08) WL |
10/23/08 CALLED FOR P/U "T" LARGE BIN MRW |
10/7/08 BLDG SUBMITTAL STORE FRONT SHOP DRAWINGS |
NO FEE SPALMER |
9/30/08 KINSSON P/U SHOP DRAWINGS 3RD/4TH FLOOR |
FRAMING SPALMER |
9-30-08 CALLED FILED UNDER"T" SMALL PLANS SPOKE |
WITH |
KINSSON JW |
9/18/08 BLDG REV CCD #14 REVISION INTERIOR & RFI |
CLARIFICATION SEW |
9/18/08 BLDG SUBMITTAL 3RD & 4TH FLOOR STRUCTURAL |
STEEL SHOP DRAWINGS SEW |
9-4-08 KINSSON G PICKUP MECH REV "2 COPIES" (DATED |
8-28-08) WL |
9-4-08 P/F MECH/REV. CALLED KINSSON P/U "T" TG. |
9/2/08 KINSSON P/U SUBMITTAL SPALMER |
8-29-08 SUBMITTAL, CALLED CONTRACTOR AND SPOKE |
WITH |
KINSSON SUBMITTAL IS FILED UNDER "T"**LARGE BIN** |
JW/WL |
8-28-08 MECH/REV. NO FEE TG. |
8/26/08 BLDG SUBMITTAL SHOP DRAWINGS SIGNED & |
SEALED W/CALCS & SHORING DESIGN SEW |
8/26/08 3 BLDG & 1 MECH PU BY KINSSON SEW |
8-25-08 CALLED CONTRACTOR AND SPOKE WITH |
KENSONPLANS FILED UNDER T" LARGE PLANS JW |
8-22-08 CALLED KINSSON TO P/U "T" 'LARGE BEN' |
MECH/REV. NEED TO BE SEALED BY ENGINEER, NO FEE |
WHEN RETURNED TG. |
8-21-08 2 REVISIONS REV #80 MECH $100 "ATTN TOM |
GORDON PER MTG 8-14-08 PLS FIND 3 COPIES OF SIGNED |
SEALED LTR FROM HANSON & REVISION SHEETS |
AC-1,AC-2,AC-3,AC-4,& SHEET M7.03 REVISION 3, REV |
#81 BLDG $380 "PLS FIND SIGNED & SEALED SKETCHES |
FOR RFI RESPONSES NO EXTERIOR CHGS IN SUBMITTED |
RFI SKETCHES" WL |
8-15-8 CALLED FOR P/U PLMG REVISIONS AND LET HIM |
KNOW THE REVISIONS WERE APPROVED AND THAT THE |
RECIEPT OR BLUE CARD WAS REQUIRED TO RETRIEVE THE |
REVISIONS. "T" LARGE KSTEVENS |
8/12/08 BLDG SUBMITTAL STRUCTURAL STEEL SHOP |
DRAWINGS SEW |
8/12/08 BLDG SUBMITTAL EXTERIOR FRAMING SEW |
8/6/08 PLUMBING REV ADDRESSING DENIED COMMENTS $80 |
SEW |
7/28/08 PLUMBING REVISIONS P/U BY KINSSON SLS |
7-24-08 CALLED FOR P/U (3) AND TALKED TO KINSSON |
INDICATING THAT SOME REVISIONS WERE DENIED AND |
SOME APPROVED AND THAT THE RECIEPT OR BLUE CARD |
WAS REQUIRED TO RETRIEVE THE REVISIONS. "T-LARGE" |
KSTEVENS. |
7/23/08 PU BY KINSSON SEW |
8/17/08 CALLED KINSSON TO P/U PLANS, LARGE BIN "W" |
RVC |
7/15/08 PLUMB REV OVER FLOW DRAIN OUTLET $70 |
SPALMER |
7/15/08 PLUMB REV $100 SPALMER |
7/15/08 ENG REV $70 SPALMER |
7-9-08 KINSSON GRACIEN PICKUP BLDG SUBMITTAL |
DATEED (6-30-08) RFI #008 WL |
7-09-08 CALLED COMTRACTOR AND SPOKE WITH KENSSON, |
(2) SUBMITTALS FILED UNDER "T" LARGE PLANS JW |
07/02/2008 APPROVED/DENIAL BLDG ELECTRICAL |
PLUMBING & MECHANICAL REVISION THAT WAS SUBMITTED |
ON 05/29/2008 WAS P/U BY TIFFIANY KERPS MMILLER |
7-2-08 CALLED FOR P/U OF P-M-E REVISIONS AND |
TALKED TO DOUG INDICATING THAT THE E & M REVISION |
PASSED AND THAT 2 P REVISION PASSED, 2 FAILED AND |
THAT THE BLUE CARD OR RECIEPT IS REQUIRED TO |
RETRIEVE THE REVISIONS. "T-LARGE" KSTEVENS |
6/30/08 BLDG SUBMITTAL TYPICAL WINDOW ANCHORING |
SPALMER |
6/27/08 BLDG SUBMITTAL ALUM STOREFRONT & ENTRANCE |
SHOP DRAWINGS & NOA'S SEW |
6-26-08 KINSSON GRACIEN PICKUP 4 BLDG SUBMITTALS, |
(EXTER FRAMING DETAILS DATED 6-16-08, STRUCTURAL |
STEEL TEMP BRACE SHOP DRAWINGS FOR SUPPORT OF |
ROTUNDA BLDG DATED 6-16-08, BLDG ENGINEERING & NOA |
FOR GAF RUB MOD ROOF SYS FOR CONCR DECKS FOR 3 |
STORY ADDIT DATED 6-9-08, BLDG HELICAL PILE REV #3 |
DATED 6-9-08) WL |
6-26-08 CALLED CONTRACTOR AND SPOKE WITH KINSSON |
PLANS FILED UNDER "T" LARGE PLAN JW |
6/16/08 BLDG SUBMITTAL STRUCTURAL STEEL ROTUNDA |
BLDG NO FEE SPALMER |
6/16/08 BLDG SUBMITTAL EXTERIOR FRAMING DETAILS NO |
FEE SPALMER |
6/9/08 BLDG SUBMITTAL ENGINEERING & NOA FOR GAF |
RUBEROID MOD BITUMEN ROOF SYSTEM FOR CONCRETE |
DECKS SEW |
6/9/08 ELEC REV ES.03 $60 SEW |
6/9/08 BLDG REV ADDRESSING DENIED COMMENTS $280 |
SEW |
6/3/08 BLDG REVISIONS DATED 5/29 & 4/16 P/U BY |
KINSSON SLS |
6-03-08 CALLED CONTRACTOR SPOKE WITH DOUG PLANS |
FILED UNDER "T" SMALL PLANS JW |
5/29/08 ELEC/PLUMBING/MECH REV M1.01 P1.01 PL.03 |
P3.05P5.01 E2.01 SEW |
5/29/08 BLDG REV ADDRESSING COMMENTS OF THE UPLIFT |
CAPACITY OF THE HELICAL PIERS BOLT * NEW CONST |
SEW |
5/29/08 PU BY KINSSON SEW |
05/20/08 CALLED FOR PLANS P/U; IN LARGE BIN "W" |
MAW |
05-08-08 DOUG STRATHIE PICKUP BLDG REV BULLETIN #6 |
HELICAL PIER SHOP DRAWINGS WL |
05-07-08 CALLED CONTRACTOR FILED UNDER "T" LARGE |
PLANS |
LEFT MESSAGE ON DUOGS ANSWER MACHINE JW |
04-30-08 CALLED CONTRACTOR AND SPOKE WITH VOICE |
MAIL FOR KINSSON, PLANS FILED UNDER "T" SMALL PLAN |
JW |
04/22/08 BLDG REV FOR PHASE II CLARIFICATIONS $230 |
SPALMER |
04/22/08 BLDG REV BULLETIN #6 HELICAL PIER SHOP |
DRAWINGS $290 SPALMER |
4/16/08 BLDG REV DETAILS & CLARIFICATIONS |
REGARDING CONCRETE RESTORATION $90 SEW |
4/16/08 ELEC/PLUMBING/MECH/FIRE REV PER CITY'S |
REVIEW COMMENTS $520 SEW |
3-11-08 NITA PENNINGTON PICKUP BLDG REV DATED |
2-28-2008 WL |
3-10-08 CALLED CONTRACTOR SPOKE WITH NITA CONCRETE |
REPAIR SKETCHES FILED UNDER "T" SMALL PLAN JW |
2/28/08 BLDG REV ADDL REPAIR DETAILS FOR |
RESTORATION OF EXISTING CONCRETE BEAM $70 SEW |
1-29-08 NITA PENNINGTON PICKUP REV WL |
1-29-08 CALLED FILED UNDER "T"SMALL PLAN JW |
1/9/08 BLDG REV PROJ MANUAL/SKETCHES FOR CONCRETE |
RESTORATION REPAIR DETAILS $310 SPALMER |
1-7-08 NITA PENNINGTON PICKUP REV #63,#64, & #65 |
WL |
01-07-08 CALLED CONTRACTOR SPOKE WITH NITA FILED |
UNDER "T" SMALL PLANS JW |
12/26/2007 BLDG REVISION #65 FEES $60.00 MMILLER |
12/26/2007 BLDG REVISION #64 FEES $ 60.00 MMILLER |
12/26/2007 BLDG REVISION #63 FEES $70.00 MMILLER |
12/3/07 DENIED BLDG REV #61 P/U BY NITA AJP |
11/30/07 DENIED REVISION #58 CALLED FOR P/U |
UNDER(T), LEFT MESSAGE **LARGE BINNS** |
ADARROUGH |
11/5/07 DENIED REVISION (3 ROLLS OF PLANS)P/U BY |
NITA AJP |
11-5-7 CALLED FOR P/U AND LEFT A MESSAGE WITH THE |
SECRETARY. INDICATED THAT THE REVISIONS SUBMITTED |
AUG. 31 07 WERE READY FOR P/U AND THAT SOME WERE |
APPROVED AND OTHERS HAD COMMENTS. TOLD HER THAT |
THE REVIEPT OR BLUE CARD WAS REQUIRED TO RETRIEVE |
THE REVISIONS. "T-LARGE" KSTEVENS |
11/01/07 REVISION ( APPROVED BLDG, DENIED FIREL) |
P/U BY NITA AJP |
11/01/07 CALLED FOR ARCH REV FOR P/U LARGE BIN "W" |
MAW |
10/25/07 APPROVED ENG. REV. P/U BY NITA AJP |
10/16/07 ENG. REV. FILED UNDER 'T' LM |
10/5/07 NEW NOC PROVIDED BY NITA AJP |
10/02/2007 BLDG REV # 58 FEES $ 230.00 MMILLER |
10/01/07 ENG REV $60 SPALMER |
9/18/07 DENNIED ENG.REV. P/U BY NITA PENNINGTON |
AJP |
9/6/07 CALLED 681-4807, THIS IS NOT THEIR PROJECT, |
BIN "T",RVC |
8/31/07 BLDG REV SEW |
8/31/07 ELEC/PLUMBING/MECH/FIRE REV SEW |
8/31/07 ENGINEERING REV $60 SEW |
6/5/07 ALYCE P/U ELEC REV DATED 5/29/07 SPALMER |
6/5/07 ELEC REV OK,CALLED LEFT MESSAGE ON ALYCE'S |
VM/CELL. TOLD TO BRING IN BLUE CARD/RECIEPT. DV |
PALMER. |
5/29/07 ELEC REVISION $80 SLS |
5/21/07 PU BY ELISE SEW |
5-18-07 P MECH/ELEC. REV. LEFT MSG. P/U "T" TG. |
05/01/2007 ELECTRICAL REVISION FEES $80.00 |
(RELOCATION/ADDITION OF VAV AND ASSOCIATED |
DUCTWORK INELECTRICAL ROOMS 2A24,3A16,3828 DUE TO |
EXCESSIVE HEAT FROM THE TRANSFORMERS WHERE DRYWALL |
CEILINGS OCCUR SEE ENGINEERS SKETCHES MMILLER |
3/9/07 ALYCE P/U ELEC REV DATED 1/17/07 SPALMER |
3/9/07 ALYCE P/U BLDG SUBMITTAL DATED 1/25/07 |
SPALMER |
3/9/07 ALYCE P/U REV DATED 1/24/07 SPALMER |
3/9/07 ALYCE P/U REV DATED 1/17/07 SPALMER |
3-6-07 P MECH/REV. CALLED ALYCE P/U "T" TG. |
3-6-7 CALLED FOR P/U "T" KSTEVENS |
2/15/07 ALYCE P/U 2 SUBMITTALS & 1 REV SPALMER |
2/8/07 ELEC SUBMITTAL UNDER "T" FOR PU,CALLED, |
LEFT MESSAGE ON ALYCE;S VM. DV PALMER. |
2-7-07 F MECH/REV. LEFT MSG. P/U "T" TH. |
2-06-07 CALLED FILED UNDER "T" JW |
2/3/07 ELEC REV'S FROM 1/17 OK,CALLED, LEFT |
MESSAGE ON ALYCE'S VM. UNDER "T" (LARGE BINS). DV |
PALMER. |
2/2/07 PARTIAL CERTIFICATE OF OCCUPANCY ISSUED. |
SEE NOTES. HHP |
2/2/07 REINSPECTION FEE $50 SPALMER |
01/31/07 ELECTRICAL SUBMITTAL NO FEE- ROUTED TO D |
PALMER DESK FG |
01/26/07 RECV'D LETTER FOR TCO $500 FEE ROUTED TO |
H PISKURA DESK FG |
01/25/07 RESUBMITTED ORNAMENTAL GLASS RAIL SHOP |
DRAWINGS PER JERALD SMITH FG |
01/25/07 BLDG SUBMITTAL NO FEE- LETTER ROUTED TO H |
PISKURA DESK FG |
1/25/07 ALYSE P/U SUBMITTAL DATED 1/22/07 SPALMER |
01-25-07 CALLED FILED UNDER "T" JW |
01/24/2007 PLUMBING REVISION FEES $ 60.00 MMILLER |
01/22/2007 BLDG SUBMITTAL NO FEES MMILLER |
01/22/2007 ELECTRICAL & MECHANICAL REVISION FEES $ |
60.00 MMILLER |
01/17/07 REV $190 FEE ELECTRICAL CLEANUP FG |
01/17/07 REV $60 FEE- REVISED FLOOR SINKS/DRAINS |
IN JAZZMAN'S FG |
1/10/07 ALYSSE P/U REV SPALMER |
1-3-07 MECH REV CALLED FOR P/U UNDER T PHK |
12/22/06 SUB/LETTER/ATTN NEIL/(PLACED IN DIANE'S |
INBOX) PT |
12/22/06 REV/MECH P/U BY ALYCE PT |
12/22/06 REV/MECH & FIRE P/U BY ALYCE PT |
12/22/06 REVISED PLANS (FIRE COMMAND PANEL)READY |
FOR P/U UNDER "W" MAW/FIRE 12/20/06 CALLED FOR P/U |
PLANS IN BOX T HM. 12-19-06 ALYCE HANNA PICKUP |
FIRE REV DATED 12-4-05 WL |
12/19/06 REVSED PLANS READY FOR P/U UNDER "W" |
MAW |
12/08/06 MECH SUBMITTAL LTR TO NMELICK SPALMER |
12/08/06 MECH SUBMITTAL NO FEE SPALMER |
12/08/06 ALYCE P/U REV DATED 12/05 12/04 SPALMER |
12/7/06 ELEC REV FROM 12/4, 12/5, 12/6 UNDER "T" |
FOR PU, CALLED SPOKE TO ALYCE. (LARGE BINS). DV |
PALEMR. |
12/06/06 SUBMITTAL FIVE PUMP & CONTRLR NO FEE |
SPALMER |
12/05/06 ELECTIRCAL REV $ 100.00 MMILLER |
12/05/06 ALYCE P/U 2 ELEC REV DATED 11/22/06 |
SPALMER |
12/5/06 2- ELEC REV'S FROM 11/22 UNDER "T" FOR PU. |
(SMALL) LEFT MESSAGE ON ALYCE'S VM. DV PALMER. |
12/04/06 MECH SUBMITTAL NO FEE- RETURN AIR PLENUM |
ISSUE -ATTN H MOSER- ALBERTO FERNANDEZ FG 12/04/06 |
BLDG SUBMITTAL NO FEE-GIVEN TO R BROWN |
FG |
12/4/06 FIRE REV $60 FEE- REVISED PUMP SIZE FG |
12/04/06 ELEC REV $70 FEE- SHEET E4.01 REDUCED |
MOTOR SIZE FOR FIRE PUMP FROM 60HP-50HP FG |
12/04/06 ALYCE P/U SUBMITTAL DATED 11/15/06 |
SPALMER |
11/30/06 ELEC SUBMITTIAL FROM 11/15 UNSAT,CALLED |
LEFT MESSAGE FOR ALYCE. DV PALMER. |
11/22/06 ELEC REV ADDED BATTERY BACKUP FOR LTS IN |
ELEC ROOMS SEW |
11/22/06 ELEC REV ADD'L LIGHTING & REVISED BOARD |
ROOM LIGHTING SEW |
11/15/06 ELEC SUBMITTAL ENGINEERS |
APPROVAL/ACKNOWLEDGEMENT OF SYSTEM SEW |
11/15/06 MECH REV $60 SEW |
11/15/06 PU BY ALYCE (2) SEW |
11/14/06 ELEC REV FROM 11/6 WITH THE ELEC REV FROM |
11/3. CALLED AND LEFT A MESSAGE WITH ON ALYCE'S |
VM. TOLD TO BRING IN BLUE CARD RECEIPT FOR EACH. |
UNDER "T"FOR PU. DV PALMER |
11/13/06 ELEC REV'S FROM 11/3 OK, CALLED LEFT |
MESSAGE ON ALYCE'S VM. UNDER "T" FOR PU, DV |
PALMER |
11/6/06 ELEC REVISION $60 SLS |
11/03/06 MECH REV $60.00 MMILLER |
11/03/06 ELEC REV $70.00 MMILLER |
11/03/06 ALYCE P/U REV DATED 10/17/06 SPALMER |
11/03/06 ALYCE P/U REV DATED 9/26/06 SPALMER |
11/3/06 CALLED FOR P/U UNDER T PHK 10/30/06 ALYCE |
P/U REV DATED 10/25/06 SPALMER 10/28/06 ELEC REV |
OK/UNSAT, UNDER "T" FOR PU, CALLED, LEFT MESSAGE |
FOR ALYCE. TOLD TO BRING BLUE CARD. DV PALMER |
10/25/06 ELEC REV $70 SPALMER |
10/23/06 ALYCE P/U ELEC REV DATED 8/18/06 SPALMER |
10/23/06 ALYCE P/U ELEC REV DATED 9/5/06 SPALMER |
10/23/06 ALYCE P/U 2 ELEC REV DATED 9/26/06 |
SPALMER |
10/23/06 ALYCE P/U ELEC REV DATED 10/13/06 |
SPALMER |
10/21/06 ELEC REV OK,CALLED,UNDER "T" (LARGE |
BINS)FOR PU, LEFT MESSAGE ON ALYCE'S VM,TOLD TO |
BRING IN BLUE CARD. DV PALMER. |
10/21/06 SUBMITTED UPDATED RE-RECORD NOC. DVP. |
10/17/06 MECH REV (M6.0INLINE PUMP DETAIL) $60 |
TA |
10/13/06 ELEC REV SEW |
10/05/06 ELEC LTR AND ELEC REV **LARGE BINS** "T" |
FOR PU, CALLED ALYCE FOR PU. DV PALMER |
10-02-06 CALLED FILED UNDER "T" JW |
9/26/06 FIRE REV (REV PIPE ROUTING IN STH STRWL) |
$80 TA |
9/26/06 ELEC REV $100 TA |
9/26/06 BLDG REV (PARTITION CHGS) $90 TA |
9/26/06 ELEC/MECH REV $120 TA |
9/26/06 SUBMITTAL OF ROOF CRICKET DETAILS. NO FEE |
TA |
9/26/06 SUBMITTAL OF ELEC LTR FOR DP NO FEE TA |
9/26/06 ALYCE P/U ELEC REV SPALMER |
9/22/06 ELEC REV'S UNDER "T" (LARGE BINS0 SPOKE TO |
ALYCE, SOME SHEETS OK, SOME NOT. DV PALMER. |
9/12/06 ELEC REV (SITE LGT,MOTORIZED SHDS,PANIC, |
MISC RELOC) $150 TA |
9/12/06 MECH REV (RELOCATED FIREMAN'S PANEL)$60 |
TA |
9/5/06 ONE APPROVED BLDG REV, FIVE APPROVED BLDG |
SUBMITTALS, AND ONE DENIED BLDG SUBMITTAL P/U BY |
ALYCE AJP |
9/5/06 BLDG REV SEW |
8/31/06 MOVED TO SLARGE PLAN BIN "T" AJP |
8-31-06 CALLED FILED UNDER "T" JW |
8/22/06 APPR. P;LUMBING REV. P/;U BY ALYCE AJP |
8-22-6 CALLED FOR P/U PLMG REV "T" KSTEVENS |
8-18-06 BLDG REV # 32 $80 ADDED DUCT ENCLOSURE FOR |
EF-6A REVISED SHEETS A1.04, A1.06, & A1-08 WL |
8-18-06 BLDG REV # 31 $60 NON-RATED CEILING ABOVE |
ELEC PANELS IN ROOM 3416 PARTIAL SHEET A6.06 WL |
8/17/06 BLDG SUBMITTAL NO FEE SLS |
8/17/06 - PLBG REVISION $90 SLS |
8/15/06 EL. REV. AND PLUMBING REV. P/U BY ALYCE |
AJP |
8-15-6 CALLED FOR P/U "T" KSTEVENS |
8/10/06 APPROVED PLUMBING/EL REV. P/U BY ALYCE |
AJP |
8-10-6 CALLED FOR P/U "T" KSTEVENS |
8/2/06 (2) BLDG SUBMITTALS SHOP DRAWINGS SEW |
8/2/06 PLUMBING REV SEW |
7/27/06 ELEC REV FROM 7/25 UNDER "T" FOR |
PU,CALLED. DV PALMER |
7/27/06 SUBMITTIALS FROM 7/25 PICKED UP BY ALYCE. |
DV PALMER |
7/25/06 CALLED FOR P/U PLANS IN BOX T HM. |
7/25/06 ONE SET OF ROLLED PLANS( STEEL TRUSS AND |
STEEL DECK SHOP DRWGS) AND TWO APPROVED EL. REV'S |
P/U BY ALYCE AJP |
7/25/06 BLDG SUBMITTAL NO FEE FG |
7/25/06 ELECTRICAL REV $60 FEE- REVISED ROUTING OF |
COMMUNICATIONS LINES FG |
7/24/03 TWO ELEC REV'S FROM 7/13 ARE IN THE "LARGE |
BINS" UNDER "T" FOR PU. DV PALMER. |
7/13/06 ELEC/PLUMBING/BLDG SUBMITTAL SEW |
7/13/06 ELEC REV LTGING CONTROL/MISC SEW |
7/13/06 ELEC REV FLOOR BAY $100 SEW |
7/13/06 MECH REV $60 SEW |
7/13/06 PU BY ALICEY SEW |
7-10-06 CALLED FILED UNDER "T" LARGE PLAN PICK-UP |
JW |
7-03-06 CALLED FILED UNDER "T" SMALL & LARGE PLAN |
PICK-UP JW |
6/30/06 PU BY TOM SEW |
6/25/06 ELEC REV OK,CALLED,LEFT MESSAGE ON ALYCE |
VM,UNDER"T" FOR PU. DV PALMER |
6/20/06 ELEC REV FOR ADM MACHINES SEW |
6/20/06 MECH REV DUCT WORK FOR SMK DET SEW |
6/20/06 BLDG SUBMITTAL FOR STRUC STEEL & STEEL |
DECK SEW |
6/20/06 BLDG SUBMITTAL FOR STATE/LOCAL PROD |
APPROVALS FOR TRAINOR GLASS CO SEW |
6/20/06 BLDG SUBMITTAL FOR ALUM STAIR SEW |
6/20/06 BLDG SUBMITTAL FOR ENG FRAMING FOR E & Y |
WINDOWS SEW |
6/20/06 PU BY ALYCE SEW |
6-15-06 CALLED FILED UNDER "T" JW |
6/9/06 ALYCE P/U SUBMITTAL FROM 4/17/06 SPALMER |
6/9/06 BLDG SUBMITTAL SEW |
6-1-6 CALLED FOR P/U "T" KSTEVENS |
5/23/06 ELEC/PLUMB/MECH/ FIRE CAULKING SUBMITTALS. |
NO FEE. TA |
5/23/06 BLDG REV & SUB P/U BY ALYCE. TA |
5/14/06 ELEC REV UNSAT,CALLED,UNDER "T" LARGER |
PLANS BIN FOR PU. DVP |
5/9/06 CALLED FOR P/U "T" MRW ON TOP SHELF |
5/5/06 MOVED TO LARGE PLAN BIN "T" AJP |
5/04/06 CALLED FILED UNDER "T" JW |
5/1/06 BLDG SUBMITTALOF SHORING DRAWINS AND |
COMPLIANCE. NO FEE TA |
5/1/06 BLDG SUBMITTAL OF ROOF SHEATHING |
ASSEMBLIES. NO FEE TA |
5/1/06 BLDG SUBMITTAL OF ANCHARAGE CALCULATIONS |
FOR EXTERIOR KEYSTONE. NO FEE TA |
5/1/06 BLDG REV SUBMITTED $230 FEE CHG. TA |
5/1/06 ELEC REV SUBMITTED $130 FEE CHG. TA |
5/1/06 MECH REV SUBMITTED $80 FEE CHG. TA 4/25/06 |
TWO APPROVED REV'S(1 BLDG,1 EL.) P/U BY ALYCE AJP |
4/24/06 ELEC REV OK,CALLED, UNDER "T" (BIG |
PACKAGE) FOR PU. DV PALMER. |
4/20/06 CALLED, FILED UNDER "T" JW |
4/17/06 ELECTRICAL REV $120 FEE FG |
4/17/06 BLDG SUBMITTAL NO FEE ROUTED TO H PISKURA |
DESK FG |
4/17/06 BLDG SUBMITTAL NO FEE FG |
4/17/06 BLDG REV $60 FEE FG |
4/17/06 ELECTRICAL AND PLUMBING REV $100 FEE FG |
4/5/06 ONE PLUMBING/MECH REV., FOUR BLDG |
REV.'S(INCLUDES LETTERS, SHOP DRAWINGS), AND THREE |
EL. REV.'S P/U BY ALYCE |
4-04-06 CALLED FILLED UNDER "T" JW |
4/3/06 THREE ELECTRICAL REV'S, 2 OK, 1 UNSAT, |
UNDER "T" FOR PU (IN LARGER PLANS BIN). CALLED. DV |
PALMER |
3/30/06 PLUMB/MECH REV $60 SPALMER |
3/30/06 ELEC REV $120 SPALMER |
3/30/06 BLDG REV $70 SPALMER |
3/30/06 SUBMITTAL EXT METAL STUD FRAMING ENG SHOP |
DRAWINGS SPALMER |
3/30/06 SUBMITTAL LTRS ELEC NO FEE SPALMER |
3/24/06 PLUMBIN/MECH REV. P/U BY ALYCE AJP 3/23/06 |
PLBG & MECH REV CALLED FOR P/U UNDER "T" MRPERSON |
3/20/06 ELEC. REV. P/U BY CINDY AJP |
3/17/06 ELECV REV FROM 2/15/06,UNSAT UNDER"T" FOR |
PU,CALLED. DV PALMER. |
************************************************** |
************************************************** |
************************************************** |
************************************************** |
************************************************* |
|
11-19-04 3 SETS OF ROLLED PLANS (CONTR |
MISCALCULATED FEES PAID $31968.00 INSTEAD OF |
30%)OK PER L MARTINEZ TO TAKE IN PERMIT APPL WL |
12-30-4 CALLED FOR P/U "BELOW UNDER "B/C" |
KSTEVENS |
1-26-05 LARRY P/U PLANS |
2/10/05 1ST RESUB/NC PLANS + APP PT |
4-4-05 CALLED FOR P/U ON THE BOTTOM SHELF PHK |
5-16-05 LARRY P/U PLANS NF |
5-26-05 2ND RESUB "ROLLED PLANS" WL |
7/1/05 3RD PLAN SUBMITTAL NO FEE DPALMER |
7/26/05 ALYCE P/U PERMIT SPALMER |
8/5/5 REVISION $1120 FEE FG |
8-12-5 REV $80 - KAM |
8-12-5 SUBMITTAL TO HAROLD P - KAM |
8/20/05 SUBMITTALS FILED UNDER "T" JW |
8-22-05 ALLYSE P/U PERMIT NFL |
9-1-05 REV #3 BLDG WL |
9-08-05 CALLED, FILED UNDER "T" JW |
9/9/05 ALYCE P/U REV SPALMER |
9-13-05 REV/CALLED FOR P/U UNDER T |
9/14/05 ALYCE P/U REV SPALMER |
10/4/05 SUBMITTAL NO FEE SPALMER |
10-13-05 REV #4 BLDG WL |
10-14-05 CALLED FILED UNDER "T" JW |
10/21/05 ALYCE P/U PERMITS LMILLER |
11/07/05 BLDG SUBMITTAL GIVEN TO H PISKURA NO FEE |
FG |
11-16-05 CALLED FILED UNDER "T" JW |
11/21/05 RECEIVED SUB NO FEE,SHORING DRAWINGS. LTM |
12-2-05 BLDG SUBMITTAL 3RD FLR SHORING COMPLIANCE |
LTRS WL |
12-2-05 BLDG SHORING DRAWINGS FOR 4TH FLOOR & ROOF |
WL |
12/8/05 SUBMITTAL LOCAL APPR NOA FOR TRAINOR GLASS |
SYSTEMS & SHORING DRAWINGS FOR JIM WITMER SPALMER |
12/28/05 PLANS P/U BY ALYCE AJP |
1/5/06 5TH REVISION $130 FEE. LTM |
1-9-06:4TH FL & ROOF SHORING DRAWINGS FAILED, |
CALLED 4 PU. UNDER T. JAH |
01/20/06 SUBMITTAL NO FEE - 4TH FLOOR SHORING |
COMPLIANCE LETTERS FG |
01/23/06 PLUMBING REV $60 FEE FG |
1/27/06 MECH REV $60 SPALMER |
2-14-06 P MECH. REV. CALLED ALYCE P/U "T" TG. |
2/14/06 ALYCE P/U SUBMITTALS 4TH FL AND ROOF |
SHORING DRAWINGS/ROUTING FOR CHILLED WATER PIPING |
SPALMER |
2-14-06 CHANGE OF CONTRACTOR RFG #04111078 (SUB) |
$50 NFL |
2-14-06 ZELDA P/U PERMIT NFL |
2/15/06 8TH REV ELEC DRAWINGS/PLANS FEE 120.00 |
2-21-6 CALLED FOR P/U PLMB REV "T" KSTEVENS |
2/22/06 CINDY P/U PLUMB REV SPALMER |
3/17/06 BLDG/ELEC REV FEE CHG TA |
03/17/06 ELEC REV FEE TA |
3/17/06 ELEC REV FEE CHG FOR 14 PGS |
3/17/06 MECH REV FEE FOR 4 PAGES TA |