Permit Information - Permit 04111073

Loading permit details...

Permit Information
Permit Number 04111073 Property ID 74434327290000041
Permit Desc BLD-COM Balance Due $0.00
Property Address 300 PEMBROKE PL Status Closed

Permit Plan Reviews Inspections Fees Contractors All
Permit
Permit Information
Application Date 2004-11-19 Operator wlehnhar
Issued Date 2005-07-26 Operator spalmer
Master Number   Project Number  
C.O. Number 9910 Operator kconrad
C.O. Issued 2009-10-15
C-404 Type 326 . Usage Class NONE
Applied Value 10000000 Units 83500
Calculated Value 0 Contractor ID CGC1509819
Property On Permit
Property ID 74434327290000041    
Building Ext.  
Address 300 PEMBROKE PL
City WEST PALM BEACH
State FL
Zip Code 33401
Owner On Permit
Name PALM BEACH ATLANTIC UNIVERSITY INC.
Address PO BOX 24708
City WEST PALM BEACH Type Private
State FL Zip Code 33416-4708
Miscellaneous Information / Notes
NEW 4 STORY LIBRARY & EXISTING OCTAGON BLDG
TO BE GUTTED & RENOVATED SEE BLDG PROVISO
 
 
 
 
10/5/09 DENIED LANDSCAPE PLANS FILED UNDER 'T' LM
10/05/2009 APPROVED LANDSCAPE THAT WAS SUBMITTED
ON 09/28/2009 WAS P/U BY DOUG MMILLER
10/1/09 LANDSCAPE SUBMITTAL FILED UNDER 'T' LM
9-30-09 NO FEE CHGD ROUTED TO KEN CONRAD
"ELEVATION CERTIFICATE FOR CO" WL
09/30/09 LANDSCAPE APPROVED & RETURNED TO AV
09/28/2009 LANDSCAPE SUBMITTAL NO FEE OK PER AV
(DEPUTY DIRECTOR) (REVISED AS-BUILTS LANDSCAPE
PALNS AS REQUESTED BY ROBERT KUSSNER) MMILLER
9/16/09 DENIED LANDSCAPE PLAN NEEDS TO CALL IN AN
INSPECTION FOR PHASE I. PLANS ON RK DESK SO
INSPECTION CAN BE DONE. AV
09/16/2009 APPROVED MECHANICAL REVISION THAT WAS
SUBMITTED ON 08/24/2009 WAS P/U BY DOUG MMILLER
09/16/2009 RCVD LETTER OF REQUEST FOR "TCO" FEES $
500.00 ROUTED TO KEN CONRAD'S DESK MMILLER
9/14/09 DENIED CONTRACTOR CALLED FILED UNDER WEITZ
COMPANY AV
9/8/2009 CALLED DOUG TO P/U T&B REPORT. REPORT IN
BOX (T) HM.
9/2/09 SENT TO JOHN ROACH RAK
8/26/09 LANDSCAPE REVISION # 100 $110 AS-BUILTS NO
HISTORICAL APPROVAL PER ROBERT KUSSNER SLS
8/24/09 BLDG SUBMITTAL TEST/BALANCE REPORTS
CLARIFICATION ROOF CURB CAP TIE DOWN DETAIL SEW
8/17/09 PAID $500 PICKED UP TCO SEW
8/17/09 (4) REVISIONS PU BY DOUG SEW
8/13/09 ELEC REV'S UNDER "T" (BROWN BINS) FOR PU.
THERE ARE FOUR REVISION, DATING, 6/11, 6/24, 7/15,
AND 7/20. CALLED AND SPOKE TO TO DOUG. REMINDED OF
BLUE CARD. DV PALMER
8/12/09 LETTER SUBMITTED FOR TCO ROUTED TO KCONRAD
- WAS ADVISED TO PAY AT TIME OF P/U SEW
07/29/2009 BLDG SUBMITTAL NO FEE ROUTED TO KEN
CONRAD'S DESK MMILLER
7/28/09 LETTER SUBMITTED FOR TCO ROUTED TO KCONRAD
- HAS NOT PAID YET UNTIL APPROVAL SEW
07/22/2009 BLDG SUBMITTAL NO FEE ROUTED TO DOUG
WISE'S DESK MMILLER
7/20/09 BLDG SUBMITTAL P/U KINSSON SPALMER
7/20/09 ELEC REV $110 SPALMER
7/20/09 SHORING LTRS PLACED ON KEN CONRADS DESK
SPALMER
7-20-09 CALLED CONTRACTOR AND SPOKE WITH DOUG
PLANS FILED UNDER "T" SMALL PLAN JW
07/15/2009 BLDG SUBMITTAL NO FEE (LIGHT POLE &
FIXTURE PER PREVIOUS SUBMITTAL COMMENTS ATTN: JIM
WITMER)MMILLER
07/15/2009 ELECTRICAL REVISION #02 FESS $110.00
MMILLER
7/9/09 BLDG REVISION P/U BY KINSSON SLS
7-09-09 CALLED CONTRACTOR FILED SUBMITTALS UNDER
"T" SMALL PLAN JW
06/29/2009 BLDG REVISION # 101 FEES MMILLER
**** ADDED REVISION FEES $ 140.00 CUSTOMER PAY
PRIOR TO P/U MMILLER****
06/24/2009 ELECTRICAL REVISION #100 FEES $140.00
MMILLER
6/15/09 KINSSON P/U EAST STAIR RAILINGS SUBMITTAL
DATED 6/8/09 SPALMER
6/15/09 KINSSON P/U ALUMINUM RAILING SUBMITTAL
DATED 5/29/09 SPALMER
06-15-09 CALLED CONTRACTOR PLANS FILED UNDER "T"
SMALL PLANS JW
06/11/2009 APPROVED BLDG ELECTRICAL & MECHANICAL
THAT WAS SUBMITTED ON 05/13/2009 WAS P/U BY
KINSSON MMILLER
06/11/2009 ELECTRICAL REVISION # 100 FEES $170.00
MMILLER $170 REV FEE PAID UNDER #0899 ON 6/23/09
SEW
06/11/2009 APPROVED ELECTRICAL THAT WAS SUBMITTED
ON 05/21/2009 AND APPROVED ELECTRICAL THAT WAS
SUBMITTED 06/03/2009 WAS P/U BY KINSSON MMILLER
MMILLER
6/11/09 ELEC REV'S FROM 5/21 AND 6/3 UNDER "T"
(LARGE BROWN BINS) FOR PU. CALLED AND LEFT MESSAGE
ON KINSSON GRACIEN'S VM. REMINDED OF BLUE CARD. DV
PALMER.
6/11/09 BLD/MECH/ELEC REV FROM 5/13 PASSED, CALLED
FOR P/U. LEFT MSG FOR KINSSON. LG BIN UNDER "W"
RJR
6/8/09 SUBMITTAL BLDG NO FEE SPALMER
6/3/09 ELEC REV SHEET E1.01 # 8 PER RFI #182R $80
SEW
6/3/09 PU BY KINSON SEW
06/02/09 RVSD PLANS READY FOR P/U; LARGE BIN "T"
MAW
5/29/09 BLDG SUBMITTAL ALUM RAILING @ BRIDGE SEW
5/29/09 REV PU BY KINSON SEW
5/26/09 REV FROM 4/10 LOCATED AND PLACED UNDER "T"
FOR PU. ( MEDIUM PACKAGE IN BROWN BINS). CALLED
AND LEFT MESSAGE FOR KINSON, REMINDING OF BLUE
CARD. DV PALMER.
5-21-09 REV #99 ELEC $290 "RFI #197 & 199 (FLAT
SCREEN PANELS & NAC PANEL)" WL
5-21-09 KINSSON PICKUP PLUMB REV PL.03 (DATED
5-13-09) WL
5-20-09 CALLED FOR P/U OF PLMG REVISIONS SUBMITTED
5-13-09 AND TALKED TO KINSSON G. INDICATING THE
REQUIREMENT FOR THE RECIEPT OR BLUE CARD. "T"
KSTEVENS.
5/13/09 ELEC/MECH REV BASEMENT SMOKE BARRIER $ SEW
5/13/09 PLUMBING REV P1.03 $80 SEW
5-1-09 KINSSON G. PICKED UP PLMG REVISION.
KSTEVENS.
5-1-09 CALLED FOR P/U OF DENIED PLMG REVISION
SUBMITTED 3-27-09 AND TALKED TO KINSSON G.
INDICATING THE REQUIREMENT FOR THE RECIEPT OR BLUE
CARD. "T-LARGE" KSTEVENS.
4-29-09 REV #896 $200 "REVISED LOW VOLT DRAWINGS"
WL
4-21-09 KINSSON GRACIEN PICKUP ELEC REV (DATED
3-24-09) WL
4/21/09 ELEC/MECH REV OK AND DENIED UNDER "T"
(LARGER BROWN SHELVES) FOR PICK UP. ONE FLAT
PACKAGE APPROX 12X30". CALLED AND SPOKE TO
GARCIEN, REMINDED OF BLUE CARD WITH A DATE OF
3/24. DV PALMER.
4/14/09 ELEC/FIRE REVISION DATED 3/10/09 P/U BY
KINSSON GRACIEN SLS
4/10/09 CALLED FOR P/U "T" ROLLED PLAN MRW
4/10/09 BLDG SUBMITTAL P/U BY KINSSON GRACIEN SLS
4/10/09 PLBG/MECH REVISION #95 $260 SLS
4-01-09 CALLED CONTRACTOR SPOKE WITH KINSSONPLANS
FILED UNDER "T" SMALL PLAN JW
3/27/09 PLUMB REV $80 SPALMER
3/24/09 ELEC/MECH REV $260 SPALMER
03/17/2009 DENIED/APPROVED PLUMBING REVISIONS THAT
WERE SUBMITTED ON 02/19/2009 WAS P/U BY KINSSON
MMILLERR
3-16-09 CALLED FOR P/U OF PLUMBING REVISIONS
SUBMITTTED 2-19-09 ONE APPROVED & ONE DENIED AND
SPOKE TO KINNSON G. INDICATING THE REQUIREMENT FOR
THE RECIEPT OR BLUE CARD. "T-LARGE" KSTEVENS.
3-16-09 KINSSON GRACIEN PICKUP 2 SUBMITTALS (1
DATED 2-23-09 "STOREFRONT" & 1 DATED 3-11-09 "EAST
STAIRS" 3) & REV #91 "SIGNED & SEALED RFI'S
118-169" WL
3-13-09 CALLED CONTRACTOR (2) SUBMITTALS READY FOR
PICK UP FILED UNDER "T" LARGE PLAN JW
3/11/09 KINSSON P/U MECH REV DATED 2/19/09 SPALMER
3/11/09 BLDG SUBMITTAL EAST STAIRS #3 SHOP
DRAWINGS NO FEE SPALMER
3/10/09 ELEC/FIRE $320 SPALMER
3/5/09 MECH REVISION CALLED FOR P/U. SPOKE TO
KINSSON. LG BIN UNDER "W" RJR
2-27-09 KINSSON GRACIEN PICKUP PLUMB REV (DATED
2-10-09) WL
02-27-09 CALLED FOR P/U OF APPROVED PLMG REVISION
SUBMITTED 2-10-09 AND LEFT A MESSAGE ON KENSSON
G'S VOICE MAIL INDICATING THE REQUIREMENT FOR THE
RECIEPT OR BLUE CARD. "T" KSTEVENS.
02/25/2009 BLDG SUBMITTAL NO FEE (EAST ROOF FASCIA
ENGINEERING) MMILLER
02/25/2009 BLDG REVISION # 91 FEES $800.00 MMILLER
2/23/09 BLDG SUBMITTAL REVISED DETAIL SHEET 8&9
SEW
2/19/09 MECHANICAL REV $110 SPALMER
2/19/09 PLUMBING REV $110 SPALMER
2/12/09 KINSSON P/U DENIED REV DATED 1/28/09
SPALMER
2-12-09 CALLED FOR P/U OF DENIED/APPROVED PLMG
REVISION #7 AND LEFT A MSG ON THE VOICE MAIL OF
KINSSON G. INDICATING THE REQUIREMENT FOR THE
RECIEPT OR BLUE CARD. "T-LARGE" KSTEVENS.
2/10/09 PLUMBING REV RFI #159R DRAIN LINES-1 1/2"
FOR CUPOLA DRAIN PAN $80 SEW
2/10/09 PU BY KINSON SEW
2-06-09 CALLED KINSSON AT THE WEITZ CO PLANS FILED
UNDER "T" LARGE PLAN JW
2/3/09 BLDG SUBMITTAL STAIR #4 SHOP DRAWINGS SEW
2/3/09 REV PU BY KINSSON SEW
2/2/09 REV DATED 1/6/09, READY FOR P/U,
UNDER(T)**LARGE BINNS**, LEFT VM MESSAGE ADARROUGH
1-28-09 KINSSON GRACIEN PICKUP REV #15 (12-5-08)
WL
1/28/09 REVISION #15 THAT WERE SUBMITTED ON
12/5/08
FILED FOR PICK UP UNDER 'T' (LARGE BIN) LM
1/28/09 PLUMBING REV #7-STORM PIPING COORDINATION
SEW
1-26-09 KINSSON GRACIEN PICKUP 3 BLDG SUBMITTALS
(DATED 1-6-09 .."STAIR 4 & RAILING SHOP DRAWINGS &
EAST ROOFS FASCIA" WL
01-23-09 CALLED CONTRACTOR, SPOKE WITH KINSSON'S
VOICE MAIL PLANS FILED UNDER "T" LARGE PLAN JW
01/06/2009 BLDG SUBMITTAL NO FEE (RAILING SHOP
DRAWINGS) MMILLER
01/06/2009 BLDG SUBMITTAL NO FEE (STAIR 4 SHOP
DRAWINGS) MMILLER
01/06/2009 BLDG SUBMITTAL NO FEE (EAST ROOFS
FASCIA "CONNECTION DETAILS") MMILLER
01/06/2009 ELECTRICAL & MECHANICAL REVISION #086
FEES $230 MMILLER
1/5/09 KENSSON P/U 2 REV DATED 12/5/08 SPALMER
1/5/09 KENSSON P/U REV DATED 12/16/08 SPALMER
1/5/09 KENSSON P/U REV DATED 11/17/08 SPALMER
1-02-09 CALLED THE CONTRACTOR PLANS FILED UNDER
"T" SMALL PLAN, SPOKE WITH KENSSON VOICE MAIL JW
12/30/08 CALLED FOR PICK-UP SPOKE WITH KINSSON
PLANS FILED UNDER "T" SMALL PLANS JW
12/30/08 REVISIONS FROM 11/17 ARE UNDER "T" (LARGE
BINS) FOR PICK UP.CALLED AND SPOKE TO KINSON AND
REMINDED OF BLUE CARD. DV PALMER.
12/22/08 REVISIONS FROM 11/17 ARE UNDER "T"
WAITING FOR THE ENGINEER TO COME IN AND SIGN, DATE
AND SEAL PLANS. SEE ELECTRICAL REVIEW DATED 12/17.
DO NOT RELEASE PLANS. DV PALMER.
 
 
12/16/08 SUBMITTAL EXTERIOR FRAMING DETAILS NO FEE
SPALMER
12/5/08 BLDG/ELEC/PLUMBING/MECH REV CCD #15 SEW
12/5/08 BLDG SUBMITTAL GLASS HANDRAIL ENGINEERING
SEW
12/5/08 BLDG SUBMITTAL LOUVERS AT THE CUPOLA
EXTERIOR FASTENING DETAILS SEW
11/17/08 ELEC & FIRE REVISION # 84 $380 SLS
11-13-08 KINSSON GRACIEN PICKUP (3) BLDG
SUBMITTALS "CUPOLA"(DATED 10-7-08), RFI RESPONSES
(DATED 10-29-08) & MOD BIT RFG SYS (DATED 11-4-08)
WL
11-12-08 CALLED CONTRACTOR FILED UNDER "T" SMALL
PLANS SPOKE WITH KINSSON JW
11-07-08 CALLED CONTRACTOR AND SPOKE WITH KINSSON
SUBMITTALS FILED UNDER "T" SMALL PLAN JW
11-4-08 BLDG SUBMITTAL NO FEE CHARGED "MODIFIED
BITMEN RFG SYS FOR STEEL DECK ROOF AT EAST SIDE OF
ROTUNDA" WL
10/29/08 BLDG REV $ SPALMER
10-24-08 KINSSON GRACIEN PICKUP BLDG/ELEC/FIRE CCD
# (9-18-08) WL
10/23/08 CALLED FOR P/U "T" LARGE BIN MRW
10/7/08 BLDG SUBMITTAL STORE FRONT SHOP DRAWINGS
NO FEE SPALMER
9/30/08 KINSSON P/U SHOP DRAWINGS 3RD/4TH FLOOR
FRAMING SPALMER
9-30-08 CALLED FILED UNDER"T" SMALL PLANS SPOKE
WITH
KINSSON JW
9/18/08 BLDG REV CCD #14 REVISION INTERIOR & RFI
CLARIFICATION SEW
9/18/08 BLDG SUBMITTAL 3RD & 4TH FLOOR STRUCTURAL
STEEL SHOP DRAWINGS SEW
9-4-08 KINSSON G PICKUP MECH REV "2 COPIES" (DATED
8-28-08) WL
9-4-08 P/F MECH/REV. CALLED KINSSON P/U "T" TG.
9/2/08 KINSSON P/U SUBMITTAL SPALMER
8-29-08 SUBMITTAL, CALLED CONTRACTOR AND SPOKE
WITH
KINSSON SUBMITTAL IS FILED UNDER "T"**LARGE BIN**
JW/WL
8-28-08 MECH/REV. NO FEE TG.
8/26/08 BLDG SUBMITTAL SHOP DRAWINGS SIGNED &
SEALED W/CALCS & SHORING DESIGN SEW
8/26/08 3 BLDG & 1 MECH PU BY KINSSON SEW
8-25-08 CALLED CONTRACTOR AND SPOKE WITH
KENSONPLANS FILED UNDER T" LARGE PLANS JW
8-22-08 CALLED KINSSON TO P/U "T" 'LARGE BEN'
MECH/REV. NEED TO BE SEALED BY ENGINEER, NO FEE
WHEN RETURNED TG.
8-21-08 2 REVISIONS REV #80 MECH $100 "ATTN TOM
GORDON PER MTG 8-14-08 PLS FIND 3 COPIES OF SIGNED
SEALED LTR FROM HANSON & REVISION SHEETS
AC-1,AC-2,AC-3,AC-4,& SHEET M7.03 REVISION 3, REV
#81 BLDG $380 "PLS FIND SIGNED & SEALED SKETCHES
FOR RFI RESPONSES NO EXTERIOR CHGS IN SUBMITTED
RFI SKETCHES" WL
8-15-8 CALLED FOR P/U PLMG REVISIONS AND LET HIM
KNOW THE REVISIONS WERE APPROVED AND THAT THE
RECIEPT OR BLUE CARD WAS REQUIRED TO RETRIEVE THE
REVISIONS. "T" LARGE KSTEVENS
8/12/08 BLDG SUBMITTAL STRUCTURAL STEEL SHOP
DRAWINGS SEW
8/12/08 BLDG SUBMITTAL EXTERIOR FRAMING SEW
8/6/08 PLUMBING REV ADDRESSING DENIED COMMENTS $80
SEW
7/28/08 PLUMBING REVISIONS P/U BY KINSSON SLS
7-24-08 CALLED FOR P/U (3) AND TALKED TO KINSSON
INDICATING THAT SOME REVISIONS WERE DENIED AND
SOME APPROVED AND THAT THE RECIEPT OR BLUE CARD
WAS REQUIRED TO RETRIEVE THE REVISIONS. "T-LARGE"
KSTEVENS.
7/23/08 PU BY KINSSON SEW
8/17/08 CALLED KINSSON TO P/U PLANS, LARGE BIN "W"
RVC
7/15/08 PLUMB REV OVER FLOW DRAIN OUTLET $70
SPALMER
7/15/08 PLUMB REV $100 SPALMER
7/15/08 ENG REV $70 SPALMER
7-9-08 KINSSON GRACIEN PICKUP BLDG SUBMITTAL
DATEED (6-30-08) RFI #008 WL
7-09-08 CALLED COMTRACTOR AND SPOKE WITH KENSSON,
(2) SUBMITTALS FILED UNDER "T" LARGE PLANS JW
07/02/2008 APPROVED/DENIAL BLDG ELECTRICAL
PLUMBING & MECHANICAL REVISION THAT WAS SUBMITTED
ON 05/29/2008 WAS P/U BY TIFFIANY KERPS MMILLER
7-2-08 CALLED FOR P/U OF P-M-E REVISIONS AND
TALKED TO DOUG INDICATING THAT THE E & M REVISION
PASSED AND THAT 2 P REVISION PASSED, 2 FAILED AND
THAT THE BLUE CARD OR RECIEPT IS REQUIRED TO
RETRIEVE THE REVISIONS. "T-LARGE" KSTEVENS
6/30/08 BLDG SUBMITTAL TYPICAL WINDOW ANCHORING
SPALMER
6/27/08 BLDG SUBMITTAL ALUM STOREFRONT & ENTRANCE
SHOP DRAWINGS & NOA'S SEW
6-26-08 KINSSON GRACIEN PICKUP 4 BLDG SUBMITTALS,
(EXTER FRAMING DETAILS DATED 6-16-08, STRUCTURAL
STEEL TEMP BRACE SHOP DRAWINGS FOR SUPPORT OF
ROTUNDA BLDG DATED 6-16-08, BLDG ENGINEERING & NOA
FOR GAF RUB MOD ROOF SYS FOR CONCR DECKS FOR 3
STORY ADDIT DATED 6-9-08, BLDG HELICAL PILE REV #3
DATED 6-9-08) WL
6-26-08 CALLED CONTRACTOR AND SPOKE WITH KINSSON
PLANS FILED UNDER "T" LARGE PLAN JW
6/16/08 BLDG SUBMITTAL STRUCTURAL STEEL ROTUNDA
BLDG NO FEE SPALMER
6/16/08 BLDG SUBMITTAL EXTERIOR FRAMING DETAILS NO
FEE SPALMER
6/9/08 BLDG SUBMITTAL ENGINEERING & NOA FOR GAF
RUBEROID MOD BITUMEN ROOF SYSTEM FOR CONCRETE
DECKS SEW
6/9/08 ELEC REV ES.03 $60 SEW
6/9/08 BLDG REV ADDRESSING DENIED COMMENTS $280
SEW
6/3/08 BLDG REVISIONS DATED 5/29 & 4/16 P/U BY
KINSSON SLS
6-03-08 CALLED CONTRACTOR SPOKE WITH DOUG PLANS
FILED UNDER "T" SMALL PLANS JW
5/29/08 ELEC/PLUMBING/MECH REV M1.01 P1.01 PL.03
P3.05P5.01 E2.01 SEW
5/29/08 BLDG REV ADDRESSING COMMENTS OF THE UPLIFT
CAPACITY OF THE HELICAL PIERS BOLT * NEW CONST
SEW
5/29/08 PU BY KINSSON SEW
05/20/08 CALLED FOR PLANS P/U; IN LARGE BIN "W"
MAW
05-08-08 DOUG STRATHIE PICKUP BLDG REV BULLETIN #6
HELICAL PIER SHOP DRAWINGS WL
05-07-08 CALLED CONTRACTOR FILED UNDER "T" LARGE
PLANS
LEFT MESSAGE ON DUOGS ANSWER MACHINE JW
04-30-08 CALLED CONTRACTOR AND SPOKE WITH VOICE
MAIL FOR KINSSON, PLANS FILED UNDER "T" SMALL PLAN
JW
04/22/08 BLDG REV FOR PHASE II CLARIFICATIONS $230
SPALMER
04/22/08 BLDG REV BULLETIN #6 HELICAL PIER SHOP
DRAWINGS $290 SPALMER
4/16/08 BLDG REV DETAILS & CLARIFICATIONS
REGARDING CONCRETE RESTORATION $90 SEW
4/16/08 ELEC/PLUMBING/MECH/FIRE REV PER CITY'S
REVIEW COMMENTS $520 SEW
3-11-08 NITA PENNINGTON PICKUP BLDG REV DATED
2-28-2008 WL
3-10-08 CALLED CONTRACTOR SPOKE WITH NITA CONCRETE
REPAIR SKETCHES FILED UNDER "T" SMALL PLAN JW
2/28/08 BLDG REV ADDL REPAIR DETAILS FOR
RESTORATION OF EXISTING CONCRETE BEAM $70 SEW
1-29-08 NITA PENNINGTON PICKUP REV WL
1-29-08 CALLED FILED UNDER "T"SMALL PLAN JW
1/9/08 BLDG REV PROJ MANUAL/SKETCHES FOR CONCRETE
RESTORATION REPAIR DETAILS $310 SPALMER
1-7-08 NITA PENNINGTON PICKUP REV #63,#64, & #65
WL
01-07-08 CALLED CONTRACTOR SPOKE WITH NITA FILED
UNDER "T" SMALL PLANS JW
12/26/2007 BLDG REVISION #65 FEES $60.00 MMILLER
12/26/2007 BLDG REVISION #64 FEES $ 60.00 MMILLER
12/26/2007 BLDG REVISION #63 FEES $70.00 MMILLER
12/3/07 DENIED BLDG REV #61 P/U BY NITA AJP
11/30/07 DENIED REVISION #58 CALLED FOR P/U
UNDER(T), LEFT MESSAGE **LARGE BINNS**
ADARROUGH
11/5/07 DENIED REVISION (3 ROLLS OF PLANS)P/U BY
NITA AJP
11-5-7 CALLED FOR P/U AND LEFT A MESSAGE WITH THE
SECRETARY. INDICATED THAT THE REVISIONS SUBMITTED
AUG. 31 07 WERE READY FOR P/U AND THAT SOME WERE
APPROVED AND OTHERS HAD COMMENTS. TOLD HER THAT
THE REVIEPT OR BLUE CARD WAS REQUIRED TO RETRIEVE
THE REVISIONS. "T-LARGE" KSTEVENS
11/01/07 REVISION ( APPROVED BLDG, DENIED FIREL)
P/U BY NITA AJP
11/01/07 CALLED FOR ARCH REV FOR P/U LARGE BIN "W"
MAW
10/25/07 APPROVED ENG. REV. P/U BY NITA AJP
10/16/07 ENG. REV. FILED UNDER 'T' LM
10/5/07 NEW NOC PROVIDED BY NITA AJP
10/02/2007 BLDG REV # 58 FEES $ 230.00 MMILLER
10/01/07 ENG REV $60 SPALMER
9/18/07 DENNIED ENG.REV. P/U BY NITA PENNINGTON
AJP
9/6/07 CALLED 681-4807, THIS IS NOT THEIR PROJECT,
BIN "T",RVC
8/31/07 BLDG REV SEW
8/31/07 ELEC/PLUMBING/MECH/FIRE REV SEW
8/31/07 ENGINEERING REV $60 SEW
6/5/07 ALYCE P/U ELEC REV DATED 5/29/07 SPALMER
6/5/07 ELEC REV OK,CALLED LEFT MESSAGE ON ALYCE'S
VM/CELL. TOLD TO BRING IN BLUE CARD/RECIEPT. DV
PALMER.
5/29/07 ELEC REVISION $80 SLS
5/21/07 PU BY ELISE SEW
5-18-07 P MECH/ELEC. REV. LEFT MSG. P/U "T" TG.
05/01/2007 ELECTRICAL REVISION FEES $80.00
(RELOCATION/ADDITION OF VAV AND ASSOCIATED
DUCTWORK INELECTRICAL ROOMS 2A24,3A16,3828 DUE TO
EXCESSIVE HEAT FROM THE TRANSFORMERS WHERE DRYWALL
CEILINGS OCCUR SEE ENGINEERS SKETCHES MMILLER
3/9/07 ALYCE P/U ELEC REV DATED 1/17/07 SPALMER
3/9/07 ALYCE P/U BLDG SUBMITTAL DATED 1/25/07
SPALMER
3/9/07 ALYCE P/U REV DATED 1/24/07 SPALMER
3/9/07 ALYCE P/U REV DATED 1/17/07 SPALMER
3-6-07 P MECH/REV. CALLED ALYCE P/U "T" TG.
3-6-7 CALLED FOR P/U "T" KSTEVENS
2/15/07 ALYCE P/U 2 SUBMITTALS & 1 REV SPALMER
2/8/07 ELEC SUBMITTAL UNDER "T" FOR PU,CALLED,
LEFT MESSAGE ON ALYCE;S VM. DV PALMER.
2-7-07 F MECH/REV. LEFT MSG. P/U "T" TH.
2-06-07 CALLED FILED UNDER "T" JW
2/3/07 ELEC REV'S FROM 1/17 OK,CALLED, LEFT
MESSAGE ON ALYCE'S VM. UNDER "T" (LARGE BINS). DV
PALMER.
2/2/07 PARTIAL CERTIFICATE OF OCCUPANCY ISSUED.
SEE NOTES. HHP
2/2/07 REINSPECTION FEE $50 SPALMER
01/31/07 ELECTRICAL SUBMITTAL NO FEE- ROUTED TO D
PALMER DESK FG
01/26/07 RECV'D LETTER FOR TCO $500 FEE ROUTED TO
H PISKURA DESK FG
01/25/07 RESUBMITTED ORNAMENTAL GLASS RAIL SHOP
DRAWINGS PER JERALD SMITH FG
01/25/07 BLDG SUBMITTAL NO FEE- LETTER ROUTED TO H
PISKURA DESK FG
1/25/07 ALYSE P/U SUBMITTAL DATED 1/22/07 SPALMER
01-25-07 CALLED FILED UNDER "T" JW
01/24/2007 PLUMBING REVISION FEES $ 60.00 MMILLER
01/22/2007 BLDG SUBMITTAL NO FEES MMILLER
01/22/2007 ELECTRICAL & MECHANICAL REVISION FEES $
60.00 MMILLER
01/17/07 REV $190 FEE ELECTRICAL CLEANUP FG
01/17/07 REV $60 FEE- REVISED FLOOR SINKS/DRAINS
IN JAZZMAN'S FG
1/10/07 ALYSSE P/U REV SPALMER
1-3-07 MECH REV CALLED FOR P/U UNDER T PHK
12/22/06 SUB/LETTER/ATTN NEIL/(PLACED IN DIANE'S
INBOX) PT
12/22/06 REV/MECH P/U BY ALYCE PT
12/22/06 REV/MECH & FIRE P/U BY ALYCE PT
12/22/06 REVISED PLANS (FIRE COMMAND PANEL)READY
FOR P/U UNDER "W" MAW/FIRE 12/20/06 CALLED FOR P/U
PLANS IN BOX T HM. 12-19-06 ALYCE HANNA PICKUP
FIRE REV DATED 12-4-05 WL
12/19/06 REVSED PLANS READY FOR P/U UNDER "W"
MAW
12/08/06 MECH SUBMITTAL LTR TO NMELICK SPALMER
12/08/06 MECH SUBMITTAL NO FEE SPALMER
12/08/06 ALYCE P/U REV DATED 12/05 12/04 SPALMER
12/7/06 ELEC REV FROM 12/4, 12/5, 12/6 UNDER "T"
FOR PU, CALLED SPOKE TO ALYCE. (LARGE BINS). DV
PALEMR.
12/06/06 SUBMITTAL FIVE PUMP & CONTRLR NO FEE
SPALMER
12/05/06 ELECTIRCAL REV $ 100.00 MMILLER
12/05/06 ALYCE P/U 2 ELEC REV DATED 11/22/06
SPALMER
12/5/06 2- ELEC REV'S FROM 11/22 UNDER "T" FOR PU.
(SMALL) LEFT MESSAGE ON ALYCE'S VM. DV PALMER.
12/04/06 MECH SUBMITTAL NO FEE- RETURN AIR PLENUM
ISSUE -ATTN H MOSER- ALBERTO FERNANDEZ FG 12/04/06
BLDG SUBMITTAL NO FEE-GIVEN TO R BROWN
FG
12/4/06 FIRE REV $60 FEE- REVISED PUMP SIZE FG
12/04/06 ELEC REV $70 FEE- SHEET E4.01 REDUCED
MOTOR SIZE FOR FIRE PUMP FROM 60HP-50HP FG
12/04/06 ALYCE P/U SUBMITTAL DATED 11/15/06
SPALMER
11/30/06 ELEC SUBMITTIAL FROM 11/15 UNSAT,CALLED
LEFT MESSAGE FOR ALYCE. DV PALMER.
11/22/06 ELEC REV ADDED BATTERY BACKUP FOR LTS IN
ELEC ROOMS SEW
11/22/06 ELEC REV ADD'L LIGHTING & REVISED BOARD
ROOM LIGHTING SEW
11/15/06 ELEC SUBMITTAL ENGINEERS
APPROVAL/ACKNOWLEDGEMENT OF SYSTEM SEW
11/15/06 MECH REV $60 SEW
11/15/06 PU BY ALYCE (2) SEW
11/14/06 ELEC REV FROM 11/6 WITH THE ELEC REV FROM
11/3. CALLED AND LEFT A MESSAGE WITH ON ALYCE'S
VM. TOLD TO BRING IN BLUE CARD RECEIPT FOR EACH.
UNDER "T"FOR PU. DV PALMER
11/13/06 ELEC REV'S FROM 11/3 OK, CALLED LEFT
MESSAGE ON ALYCE'S VM. UNDER "T" FOR PU, DV
PALMER
11/6/06 ELEC REVISION $60 SLS
11/03/06 MECH REV $60.00 MMILLER
11/03/06 ELEC REV $70.00 MMILLER
11/03/06 ALYCE P/U REV DATED 10/17/06 SPALMER
11/03/06 ALYCE P/U REV DATED 9/26/06 SPALMER
11/3/06 CALLED FOR P/U UNDER T PHK 10/30/06 ALYCE
P/U REV DATED 10/25/06 SPALMER 10/28/06 ELEC REV
OK/UNSAT, UNDER "T" FOR PU, CALLED, LEFT MESSAGE
FOR ALYCE. TOLD TO BRING BLUE CARD. DV PALMER
10/25/06 ELEC REV $70 SPALMER
10/23/06 ALYCE P/U ELEC REV DATED 8/18/06 SPALMER
10/23/06 ALYCE P/U ELEC REV DATED 9/5/06 SPALMER
10/23/06 ALYCE P/U 2 ELEC REV DATED 9/26/06
SPALMER
10/23/06 ALYCE P/U ELEC REV DATED 10/13/06
SPALMER
10/21/06 ELEC REV OK,CALLED,UNDER "T" (LARGE
BINS)FOR PU, LEFT MESSAGE ON ALYCE'S VM,TOLD TO
BRING IN BLUE CARD. DV PALMER.
10/21/06 SUBMITTED UPDATED RE-RECORD NOC. DVP.
10/17/06 MECH REV (M6.0INLINE PUMP DETAIL) $60
TA
10/13/06 ELEC REV SEW
10/05/06 ELEC LTR AND ELEC REV **LARGE BINS** "T"
FOR PU, CALLED ALYCE FOR PU. DV PALMER
10-02-06 CALLED FILED UNDER "T" JW
9/26/06 FIRE REV (REV PIPE ROUTING IN STH STRWL)
$80 TA
9/26/06 ELEC REV $100 TA
9/26/06 BLDG REV (PARTITION CHGS) $90 TA
9/26/06 ELEC/MECH REV $120 TA
9/26/06 SUBMITTAL OF ROOF CRICKET DETAILS. NO FEE
TA
9/26/06 SUBMITTAL OF ELEC LTR FOR DP NO FEE TA
9/26/06 ALYCE P/U ELEC REV SPALMER
9/22/06 ELEC REV'S UNDER "T" (LARGE BINS0 SPOKE TO
ALYCE, SOME SHEETS OK, SOME NOT. DV PALMER.
9/12/06 ELEC REV (SITE LGT,MOTORIZED SHDS,PANIC,
MISC RELOC) $150 TA
9/12/06 MECH REV (RELOCATED FIREMAN'S PANEL)$60
TA
9/5/06 ONE APPROVED BLDG REV, FIVE APPROVED BLDG
SUBMITTALS, AND ONE DENIED BLDG SUBMITTAL P/U BY
ALYCE AJP
9/5/06 BLDG REV SEW
8/31/06 MOVED TO SLARGE PLAN BIN "T" AJP
8-31-06 CALLED FILED UNDER "T" JW
8/22/06 APPR. P;LUMBING REV. P/;U BY ALYCE AJP
8-22-6 CALLED FOR P/U PLMG REV "T" KSTEVENS
8-18-06 BLDG REV # 32 $80 ADDED DUCT ENCLOSURE FOR
EF-6A REVISED SHEETS A1.04, A1.06, & A1-08 WL
8-18-06 BLDG REV # 31 $60 NON-RATED CEILING ABOVE
ELEC PANELS IN ROOM 3416 PARTIAL SHEET A6.06 WL
8/17/06 BLDG SUBMITTAL NO FEE SLS
8/17/06 - PLBG REVISION $90 SLS
8/15/06 EL. REV. AND PLUMBING REV. P/U BY ALYCE
AJP
8-15-6 CALLED FOR P/U "T" KSTEVENS
8/10/06 APPROVED PLUMBING/EL REV. P/U BY ALYCE
AJP
8-10-6 CALLED FOR P/U "T" KSTEVENS
8/2/06 (2) BLDG SUBMITTALS SHOP DRAWINGS SEW
8/2/06 PLUMBING REV SEW
7/27/06 ELEC REV FROM 7/25 UNDER "T" FOR
PU,CALLED. DV PALMER
7/27/06 SUBMITTIALS FROM 7/25 PICKED UP BY ALYCE.
DV PALMER
7/25/06 CALLED FOR P/U PLANS IN BOX T HM.
7/25/06 ONE SET OF ROLLED PLANS( STEEL TRUSS AND
STEEL DECK SHOP DRWGS) AND TWO APPROVED EL. REV'S
P/U BY ALYCE AJP
7/25/06 BLDG SUBMITTAL NO FEE FG
7/25/06 ELECTRICAL REV $60 FEE- REVISED ROUTING OF
COMMUNICATIONS LINES FG
7/24/03 TWO ELEC REV'S FROM 7/13 ARE IN THE "LARGE
BINS" UNDER "T" FOR PU. DV PALMER.
7/13/06 ELEC/PLUMBING/BLDG SUBMITTAL SEW
7/13/06 ELEC REV LTGING CONTROL/MISC SEW
7/13/06 ELEC REV FLOOR BAY $100 SEW
7/13/06 MECH REV $60 SEW
7/13/06 PU BY ALICEY SEW
7-10-06 CALLED FILED UNDER "T" LARGE PLAN PICK-UP
JW
7-03-06 CALLED FILED UNDER "T" SMALL & LARGE PLAN
PICK-UP JW
6/30/06 PU BY TOM SEW
6/25/06 ELEC REV OK,CALLED,LEFT MESSAGE ON ALYCE
VM,UNDER"T" FOR PU. DV PALMER
6/20/06 ELEC REV FOR ADM MACHINES SEW
6/20/06 MECH REV DUCT WORK FOR SMK DET SEW
6/20/06 BLDG SUBMITTAL FOR STRUC STEEL & STEEL
DECK SEW
6/20/06 BLDG SUBMITTAL FOR STATE/LOCAL PROD
APPROVALS FOR TRAINOR GLASS CO SEW
6/20/06 BLDG SUBMITTAL FOR ALUM STAIR SEW
6/20/06 BLDG SUBMITTAL FOR ENG FRAMING FOR E & Y
WINDOWS SEW
6/20/06 PU BY ALYCE SEW
6-15-06 CALLED FILED UNDER "T" JW
6/9/06 ALYCE P/U SUBMITTAL FROM 4/17/06 SPALMER
6/9/06 BLDG SUBMITTAL SEW
6-1-6 CALLED FOR P/U "T" KSTEVENS
5/23/06 ELEC/PLUMB/MECH/ FIRE CAULKING SUBMITTALS.
NO FEE. TA
5/23/06 BLDG REV & SUB P/U BY ALYCE. TA
5/14/06 ELEC REV UNSAT,CALLED,UNDER "T" LARGER
PLANS BIN FOR PU. DVP
5/9/06 CALLED FOR P/U "T" MRW ON TOP SHELF
5/5/06 MOVED TO LARGE PLAN BIN "T" AJP
5/04/06 CALLED FILED UNDER "T" JW
5/1/06 BLDG SUBMITTALOF SHORING DRAWINS AND
COMPLIANCE. NO FEE TA
5/1/06 BLDG SUBMITTAL OF ROOF SHEATHING
ASSEMBLIES. NO FEE TA
5/1/06 BLDG SUBMITTAL OF ANCHARAGE CALCULATIONS
FOR EXTERIOR KEYSTONE. NO FEE TA
5/1/06 BLDG REV SUBMITTED $230 FEE CHG. TA
5/1/06 ELEC REV SUBMITTED $130 FEE CHG. TA
5/1/06 MECH REV SUBMITTED $80 FEE CHG. TA 4/25/06
TWO APPROVED REV'S(1 BLDG,1 EL.) P/U BY ALYCE AJP
4/24/06 ELEC REV OK,CALLED, UNDER "T" (BIG
PACKAGE) FOR PU. DV PALMER.
4/20/06 CALLED, FILED UNDER "T" JW
4/17/06 ELECTRICAL REV $120 FEE FG
4/17/06 BLDG SUBMITTAL NO FEE ROUTED TO H PISKURA
DESK FG
4/17/06 BLDG SUBMITTAL NO FEE FG
4/17/06 BLDG REV $60 FEE FG
4/17/06 ELECTRICAL AND PLUMBING REV $100 FEE FG
4/5/06 ONE PLUMBING/MECH REV., FOUR BLDG
REV.'S(INCLUDES LETTERS, SHOP DRAWINGS), AND THREE
EL. REV.'S P/U BY ALYCE
4-04-06 CALLED FILLED UNDER "T" JW
4/3/06 THREE ELECTRICAL REV'S, 2 OK, 1 UNSAT,
UNDER "T" FOR PU (IN LARGER PLANS BIN). CALLED. DV
PALMER
3/30/06 PLUMB/MECH REV $60 SPALMER
3/30/06 ELEC REV $120 SPALMER
3/30/06 BLDG REV $70 SPALMER
3/30/06 SUBMITTAL EXT METAL STUD FRAMING ENG SHOP
DRAWINGS SPALMER
3/30/06 SUBMITTAL LTRS ELEC NO FEE SPALMER
3/24/06 PLUMBIN/MECH REV. P/U BY ALYCE AJP 3/23/06
PLBG & MECH REV CALLED FOR P/U UNDER "T" MRPERSON
3/20/06 ELEC. REV. P/U BY CINDY AJP
3/17/06 ELECV REV FROM 2/15/06,UNSAT UNDER"T" FOR
PU,CALLED. DV PALMER.
**************************************************
**************************************************
**************************************************
**************************************************
*************************************************
 
11-19-04 3 SETS OF ROLLED PLANS (CONTR
MISCALCULATED FEES PAID $31968.00 INSTEAD OF
30%)OK PER L MARTINEZ TO TAKE IN PERMIT APPL WL
12-30-4 CALLED FOR P/U "BELOW UNDER "B/C"
KSTEVENS
1-26-05 LARRY P/U PLANS
2/10/05 1ST RESUB/NC PLANS + APP PT
4-4-05 CALLED FOR P/U ON THE BOTTOM SHELF PHK
5-16-05 LARRY P/U PLANS NF
5-26-05 2ND RESUB "ROLLED PLANS" WL
7/1/05 3RD PLAN SUBMITTAL NO FEE DPALMER
7/26/05 ALYCE P/U PERMIT SPALMER
8/5/5 REVISION $1120 FEE FG
8-12-5 REV $80 - KAM
8-12-5 SUBMITTAL TO HAROLD P - KAM
8/20/05 SUBMITTALS FILED UNDER "T" JW
8-22-05 ALLYSE P/U PERMIT NFL
9-1-05 REV #3 BLDG WL
9-08-05 CALLED, FILED UNDER "T" JW
9/9/05 ALYCE P/U REV SPALMER
9-13-05 REV/CALLED FOR P/U UNDER T
9/14/05 ALYCE P/U REV SPALMER
10/4/05 SUBMITTAL NO FEE SPALMER
10-13-05 REV #4 BLDG WL
10-14-05 CALLED FILED UNDER "T" JW
10/21/05 ALYCE P/U PERMITS LMILLER
11/07/05 BLDG SUBMITTAL GIVEN TO H PISKURA NO FEE
FG
11-16-05 CALLED FILED UNDER "T" JW
11/21/05 RECEIVED SUB NO FEE,SHORING DRAWINGS. LTM
12-2-05 BLDG SUBMITTAL 3RD FLR SHORING COMPLIANCE
LTRS WL
12-2-05 BLDG SHORING DRAWINGS FOR 4TH FLOOR & ROOF
WL
12/8/05 SUBMITTAL LOCAL APPR NOA FOR TRAINOR GLASS
SYSTEMS & SHORING DRAWINGS FOR JIM WITMER SPALMER
12/28/05 PLANS P/U BY ALYCE AJP
1/5/06 5TH REVISION $130 FEE. LTM
1-9-06:4TH FL & ROOF SHORING DRAWINGS FAILED,
CALLED 4 PU. UNDER T. JAH
01/20/06 SUBMITTAL NO FEE - 4TH FLOOR SHORING
COMPLIANCE LETTERS FG
01/23/06 PLUMBING REV $60 FEE FG
1/27/06 MECH REV $60 SPALMER
2-14-06 P MECH. REV. CALLED ALYCE P/U "T" TG.
2/14/06 ALYCE P/U SUBMITTALS 4TH FL AND ROOF
SHORING DRAWINGS/ROUTING FOR CHILLED WATER PIPING
SPALMER
2-14-06 CHANGE OF CONTRACTOR RFG #04111078 (SUB)
$50 NFL
2-14-06 ZELDA P/U PERMIT NFL
2/15/06 8TH REV ELEC DRAWINGS/PLANS FEE 120.00
2-21-6 CALLED FOR P/U PLMB REV "T" KSTEVENS
2/22/06 CINDY P/U PLUMB REV SPALMER
3/17/06 BLDG/ELEC REV FEE CHG TA
03/17/06 ELEC REV FEE TA
3/17/06 ELEC REV FEE CHG FOR 14 PGS
3/17/06 MECH REV FEE FOR 4 PAGES TA