Miscellaneous Information / Notes |
CONSTRUCTION OF A NEW 4 STORY OFFICE BUILDING |
|
9-10-7 CALLED FOR P/U OF PLUMBING REVISION |
(7-17-7). TALKED TO RAY NORDINE. INDICATED |
REVISION DENIED AND THAT THE RECIEPT AND/OR BLUE |
CARD WAS REQUIRED FOR PICK UP."R" KSTEVENS (C.O. |
ISSUED CAN NOT DO A PLAN REVIEW) |
8/23/07 LANDSCAPE REV AND RESTAMP OF MECH. PL;ANS |
P/U BY RAYMOND NORDINE AJP |
8/23/07 TCO P/U BY RAYMOND NORDINE AJP |
8/23/07 TCO ISSUED 1ST FLOOR HHP SEE NOTES |
8/22/07 - REVISION READY, CALLED RAYMOND TO P /U. |
FILED UNDER "R" CJH |
8/21/07 MECH PLANS FOR RESTAMP DENIED. CALLED FOR |
P/U. LEFT MESSAGE FOR RAYMOND. SM BIN UNDER "R" |
RJR |
8/20/07 ZONING REV $60 SPALMER |
8-20-07 TCO LTR & RECEIPT ROUTED TO HAROLD PISKURA |
WL |
08/17/07 DUPLICATE PERMIT AND RESTAMP PLANS $25 |
FEE FG |
8/10/07 BLDG SUBMITTAL LETTER FROM DUNKEL BERGER |
ENGINEERING SEW |
8/10/07 TWO EL REV.'S, ONE FOR FIRST FL, ONE FOR |
2ND, 3RD, AND 4TH FL. P/U BY RAYMOND NORNDINE |
AJP |
8/9/07 TWO ELEC REV'S OK, AND UNDER "R" FOR PU. |
ONE REV IS FROM 7/30, OTHER FROM 8/8. LEFT MESSAGE |
FOR MR. NORDINE, TOLD TO BRING BLUE CARD(S) FOR |
EACH. DV PALMER. |
08/08/07 ELECTRICAL REV $60 FEE FG |
7-30-07 REV #40 ELEC $80 "AS BUILT 1ST FLOOR" WL |
07/25/07 SUBMITTAL TO FRONT DESK.KC |
07/19/07 SUBMITTAL NO FEE- FLA TESTING-ROOF DECK |
TESTED AND TILE FLOORS- ROUTED TO J SMITH DESK |
FG |
07/17/07REV $60 FEE- SKYLIGHT DESIGN WITH PLATFORM |
AND AIR SHAFT IN ELEVATOR HATCHWAY FG |
07/17/07 REV$60 FEE- CHANGE FROM INSTALLED |
DRINKING FOUNTAINS TO FREE STANDING FRESH WATER |
FG |
7/17/07 APPROVED SUBMITTAL P/U BY RAYMOND AJP |
7/14/07 CALLED RAYMOND NORDINE FOR SUBMITTAL |
P/U.'R'. RAB |
07/10/07 SUBMITTAL NO FEE- INFO REQUESTED BY R |
BROWN FG |
7/9/07 PLANS/APP P/U BY RAYMOND SLS |
7/7/07 CALLED RAYMOND NORDINE FOR SUBMITTAL AND |
REVISION P/U. LARGE BINS. 'R'. RAB |
7/2/07 BLDG SUBMITTAL SKYLIGHT & PARRAPET WALL. |
SEW |
6/25/07 ZONING REV BRICKS IN SIDEWALK & SYLVESTER |
PALMS & FLOWER PLANTINGS $60 SEW |
6/25/07 RAYMOND P/U REV DATED 6/7/07 SPALMER |
6/25/07 RAYMOND P/U REV DATED 6/14/07 SPALMER |
6/24/07 CALLED RAYMOND NORDINE TO P/U REVISIONS |
AND SUBMITTALS. LARGE BINS.'R'.RB |
6/14/07 BLDG SUBMITTAL SKYLIGHTS & FIRE DOORS IN |
ELEVATOR SHAFT NO FEE SLS |
6/8/07 - PERMIT READY TO BE PRINTED, NEED |
INSURANCE AND LICENSES, INFORMED RAYMOND. FILED |
UNDER "N" CJH |
6/7/07 RAYMOND NORDINE P/U PLANS SPALMER |
6/7/07 REVSIONS FILED ON 5/22 ARE BEING RELEASED |
TO CONTRACTOR WITHOUT REVIEW PER CONTRACTOR |
REQUEST, NEIL, AND LUIS , FILED UNDER 'R' *LARGE |
BIN* LM |
6/7/08 ZONING (LANDSCAPE) REVISION $60 GIVEN TO |
CHRIS SLS |
05/22/2007 BLDG REVISION #35 FEES $90.00 ( |
SKYLIGHT REVISION FIRE DOORS INELEVATOR SHAFT AIR |
RELASE FOR ELEVATOR SHAFT ARCH SHOWING PARAPET |
CHANGE ALSO COVER IN ELEVATOR SHAT LOCATED |
MMILLER 5/15/07 ELEC REVISION #34 $60 SLS |
5/15/07 RAY P/U SUBMITTAL SPALMER |
5/15/07 CALLED RAY NORDINE TO P/U SUBMITTAL FOR |
ELEVATOR SHAFT ACCESS PANEL, HAVE ARCHITECT |
INCORPORATE AS A REVISION AND THEN RESUBMIT. 'R'. |
RB |
5/9/07 BLDG SUBMITTAL NO FEE ATTN ROBERT BROWN |
SLS |
5-2-07 RAYMOND NORDINE PICKUP ELEC REV WL |
5/1/07 ELEC REV OK,CALLED SPOKE TO RAY NORDINE, |
UNDER "R" FOR PU. DV PALMER. |
5/1/07 RAYMOND NORDINE P/U MECH REV DATED 4/26/07 |
SPALMER |
4/27/07 ELEC REV $60 SPALMER |
4-26-07 RAYMOND NORDINE PICKUP DENIED ELEC REV WL |
4/26/07 ELEC REV UNSAT, CALLED SPOKE TO MR |
NORDINE, UNDER "R" FOR PU. DV PALMER. |
4/24/07 RAYMOND P/U DENIED REV DATED 4/3/07 |
SPALMER |
4/24/07 CALLED RAYMOND NORDINE TO P/U REVISED ROOF |
PLAN. 'R'. RB |
4/23/07 RAYMOND P/U MECH REV DATED 4/20/07 |
SPALMER |
4-23-07 P MECH/REV. CALLED P/U "R" TG. |
04/20/07 REV $100 FEE- ELECTRICAL AS BUILTS FG |
4/20/07 RAYMOND NORDINE BROUGHT IN TWO MORE COPIES |
OF TRUSS SHOP DRAWINGS AS REQUESTED, AND PICKED |
THEM UP AFTER PROCESSING. RB |
4/20/07 RAYMND P/U DENIED PLANS SPALMER |
4/19/07 CALLED R NORDINE TO P/U REVISED |
ARCHITECTURAL SHEETS. ONE FAILED. 'R'. RB |
4/18/07 CALLED R NORDINE TO BRING IN TWO MORE |
COPIES OF TRUSS SHOP DRAWINGS SO THAT THEY CAN BE |
STAMPED FOR CONTRACTOR AND THRESHOLD INSPECTOR |
COPY. FILE COPY ON MY DESK ALREADY STAMPED.RB |
04/18/2007 MECHANICAL REVISION FEES $70.00 |
(AS-BUILT MECHANICAL REVISION 1ST FLOOR) MMILLER |
|
4/11/07 BLDG SUBMITTAL ENGINEER CALCS FOR TRUSSES |
SEW |
04/03/2007 BLDG REVISION (CEILING 1ST FLOOR & |
SKYLIGHT INSTALLATION DETAIL) FEES $ 70.00 |
MMILLER |
04/03/2007 BLDG RVISION ARCHITECTURAL CHANGES |
FLOOR PLAN LAYOUT FOR FIRST FLOOR TENANT SPACE |
MMILLER |
04/03/2007 BLDG REVISION LIFE SAFETY CHANGE OUT TO |
WALL CHANGE P/U BY RAYMOND NORDINE MMILLER |
04/03/2007 RAYMOND NORDINE P/U BLDG REVISION WOOD |
& METAL OVERHANG AND INSTALLED FOAM ARCHITECTURAL |
RETAIL ON PAPRPET WALL MMILLER |
04/03/2007 RAYMOND NORDINE P/U REVISION ROOF |
TRUSSES NO FEE MMILLER |
4-3-07 CALLED R NORDINE FOR REVISION AND SUBMITTAL |
P/U. LARGE BINS. 'R'. RB |
3/28/07 MECH REVISION P/U BY RAYMOND SLS |
3/27/07 MECH REV CALLED FOR P/U SM BIN UNDER "N" |
RJR |
3/26/07 MECH REVISION # 29 $60 SLS |
3-19-07 REV #28 BLDG $80 & NO FEE SUBMITTAL "TRUSS |
DETAILS" WL |
3/13/07 RAY P/U REV DATED 3/8/07 SPALMER |
3/13/07 ELEC REV OK,CALLED,TRIED TO LEAVE |
MESSAGE,BUT VM WAS FULL AND NOT ACCEPTING |
MESSAGES.PLANS UNDER "R' FOR PU. DV PALMER. |
3/8/07 ELEC REVISION $80 SLS |
2-15-07 RAYMOND NORDINE PICKUP REV WL |
2/15/07 ELEC REV OK,CALLED, UNDER "R" FOR PU, |
CALLED, SPOKE TO MR. NORDINE, TOLD TO BRING IN |
BLUE CARD. DV PALMER. |
2/13/07 RAY P/U DENIED REV SPALMER |
2.12.07 MECH REV CALLED FOR P/U **LARGE BINS** N |
RJR |
02/09/2007 BLDG REVISION FEES $ 70.00 MMILLER |
2/7/07 RAYMOND P/U MECH SUBMITTAL SPALMER |
2-6-07 P MECH/SUBMITTAL CALLED RAYMOND P/U "R" |
TG. |
02/05/2007 MECHANICAL SUBMITTAL NO FEE MMILLER |
1/31/07 BLDG REV ARCHITECTURAL CHANGE & FLOOR PLAN |
LAYOUT SEW |
1/31/07 BLDG REV LIFE SAFETY CHANGE DUE TO WALL |
CHANGE $60 SEW |
01/30/2007 PLANS P/U BY MR NORDINE MMILLER |
1/28/07 ELEC REV OK,CALLED, SPOKE TO MR. NORDINE, |
UNDER "R" FOR PU. DV PALMER. |
01/26/2007 MECHANICAL REVISION FEES $ 80.00 |
MMILLER |
1/22/07 ELEC REVISION SUBMITTED $60 SLS |
1/22/07 ELEC REVISION P/U BY RAYMOND SLS |
1/19/07 ELEC REV OK,CALLED,LEFT MESSAGE, TOLD TO |
BRING IN BLUE CARD, UNDER "R" FOR PU. DV PALMER. |
01/11/2007 ELECTRICAL REVISION FEES $ 90.00 |
MMILLER |
01/08/07 PLUMBING SUBMITTAL NO FEES PER PATTY |
KRAUS MMILLER |
12-11-06 RAYMOND NORDINE PICKUP ELEC REV WL |
12/9/06 ELEC REV UNSAT, CALLED SPOKE TO RAY N, |
TOLD TO BRING IN BLUE CARD,UNDER "R" FOR PU. DV |
PALMER. |
12/7/06 ELEC REV ELEVATOR NEEDS SPECIAL TYPE OF |
DISCONNECT $80 SEW |
11/20/06 RAYMOND P/U ELEC REV DATED 11/13/06 |
SPALMER |
11/20/06 ELEC REV OK,CALLED SPOKE TO MR NORDINE, |
UNDER "R" FOR PU. TOLD TO BRING IN BLUE CARD / |
RECIEPT. DV PALMER. |
11/13/06 ELEC REV $60 SEW |
10/23/06 RAYMOND P/U PERMIT SPALMER |
10/21/06 ELEC REV OK, CALLED, LEFT MESSAGE ON |
MR.NORDINE'S VM, UNDER "R", TOLD TO BRING BLUE |
CARD. DV PALMER. |
10/13/06 ELEC REV CHANGE FROM 3-3" CONDUITS TO |
2-4" $70 SEW |
9/1/06 APPROVED REV (BLDG/EL/PLB) P/Y BY RAYMOND |
NORDINE AJP |
8-27-06 CALLED RAY NORDINE TO P/U REVISION. LARGE |
BINS 'R' RB |
7/21/06 ELEC/PLBG REVISION $140 SLS |
6/28/06 RAYMOND P/U 2 DENIED REV SPALMER |
6-25-06 CALLED R NORDINE TO P/U DENIED SKYLIGHT, |
TRUSS, SHUTTER, MECHANICAL AND ELECTRICAL |
REVISIONS. LARGE BINS. 'R'. RB |
6/22/06 BLDG REV SEW |
6/22/06 PU BY RAYMOND SEW |
6-8-06 CALLED R NORDINE TO P/U DENIED SKYLIGHT |
REVISION. 'R'. RB |
6/8/06 RAYMOND P/U REV EFRAIM GARCED SAYS HOLD HAS |
BEEN PAID SPALMER |
6-8-06 DO NOT RETURN THE PROCESSED REVISED PLANS |
TO MR NORDINE UNTIL HE HAS HAD $275.00 ALARM HOLD |
REMOVED BY EFRAIM GARCED. CALLED R NORDINE AGAIN |
ABOUT THIS HOLD.'R'.RB |
6/6/06 BLDG REV $60 SPALMER |
6/2/06 RAYMOND P/U 2 SUBMITTALS SPALMER |
6-1-06 CALLED R NORDINE TO P/U 2 REVISIONS AND PAY |
$275.00 ALARM HOLD PER EFRAIM GARCED .'R'.RB |
5/25/06 BLDG REV $ 60 FEE ROUTED TO R BROWN - FG |
05/25/06 BLDG REV RESUB (RF) $70. TA |
5/15/06 TWO DENIED BLDG REV.'S P/U BY R. NORDINE |
AJP |
5-12-05 CALLED R NORDINE TO P/U 2 REVISIONS.'R'.RB |
4/21/06 BLDG SUBMITTAL PER CUST AT REQ OF CHARLES |
MOCK. NO FEE CHG. EXPLAINED TO CUST IF ADDT'L FEES |
ARE NEEDED PLAN REV WILL ADD. TA |
4/18/06 PLUMB/MECH/ELEC REV & BLDG INFO SEW |
4-14-06 REV #10 BLDG $70 WL |
************************************************** |
************************************************** |
4/7/04 PAID 30% OF FEE $4162.50 BZ239721 PSMITH |
5-14-04 DENIED. CALLED R NORDINE FOR P/U.'R'.RB |
5/17/04 RAYMOND NORDINE P/U DENIED PLANS SPALMER |
6/3/04 1ST RESUB NO FEE SPALMER |
6/4/04 GIVEN TO ANA MARIE TO REVIEW 659-8031 MM |
6-18-04 DENIED. CALLED R NORDINE FOR P/U. 'R'. RB |
6/28/04 2ND RESUB BZ243228 PSMITH |
7/13/04 FAILED BY ANA APONTE MM |
7-27-04 CALLED TO PICK UP, FILED UNDER "R" ALANGE |
7/29/04- P/U PLANS BY RAYMOND NORDINI- JOSH |
8-3-04 3RD RE-SUB $1289.46 BZ 244220 (COPY OF |
PAID |
BZ 244220 INCLUDED) MR NORDINE WAS AFRAID OF MIS- |
PLACING RECEIPT...WE WILL STILL NEED TO SEE ALL |
THE REMAINING RECEIPTS "ROLLED PLANS"+2 PKGS WL |
8-6-04 BUILDING REVIEW COMPLETE SENT TO MICHELLE |
MCLEAN'S DESK FOR ZONING REVIEW. RB |
8/9/04 TO ANA APONTE TO REVIEA 822-1439 MM |
8-17-04 NEEDS $10339.13 FEE + OWNER TO SIGN ENERGY |
CODE FORM. CALLED RAYMOND NORDINE. PLANS WITH RB |
8/18/04 BALANCE $10339.13 BZ245166 SPALMER |
8/18/04 RAYMOND NORDINE P/U PERMIT SPALMER |
9-1-04 BZ 245564 $ 110 REVISION NFL |
9-17-04 CALLED RAYMOND NORDINE FOR REV P/U.'R'.RB |
9/17/04 REVISION P/U BY RAYMOND N DR |
11/8/04 BLDG ELEC PLUMB MECH FIRE REV PSMITH |
12-13-04 FAILED CALL TO P/U UNDER "R" MJACOBS. |
12-15-04 MR NORDINE P/U REV NFL |
12-15-04 SUBMITTED 3RD SET OF PLANS AND MUST |
PRODUCE BZ FOR $470 UPON PICK UP NFL !!!!! |
12/21/04 BLDG SUBMITTAL NO FEE PSMITH |
12/21/04 RECEIPT FOR 11/8/04 SUBMITTED PSMITH |
12-29-04 CALLED FOR P/U UNDER R PHK 12-29-4 PLANS |
PU/RAYMOND N - KAM |
1-5-05 CALLED R NORDINE FOR SUBMITTAL P/U.'R'.RB |
1/20/05 SUBMITTAL THRESHOLD PLAN LM |
2-10-05 CALLED R NORDINE FOR SUBMITTAL P/U.'R'.RB |
2-22-05 RE-SUBMITTAL OF THRESHOLD PLAN AND |
SUBMITTAL OF GRADE BEAM CALCULATION. RB |
2-22-05 GRADE BEAM CALCULATION AND THRESHOLD PLAN |
DENIED. CALLED R. NORDINE FOR P/U. 'R'. RB 3-23-05 |
BLDG SUBMITTAL DATED 3-23-05 & PICKUP THRESHOLD |
SUBMITTAL DATED 2-22-05 WL |
3-31-05 CALLED R. NORDINE TO BRING BACK THE GRADE |
BEAM CALCULATION AND THRESHOLD PLAN FOR REVIEW |
WITH THE SURVEY DRGS SUBMITTED ON 3-23-05. RB |
4/5/05 SUBMITTAL NO FEE SPALMER |
4-5-05 CALLED R NORDINE FOR SUBMITTAL P/U.'R'.RB |
4-5-05 CALLED R. NORDINE TO BRING BACK THE GRADE |
BEAM CALCULATION FOR REVIEW WITH THE SURVEY DRGS |
THAT WERE SUBMITTED ON 3-23-05. RB |
4-8-05 SUBMITTAL (GRADE BEAM CALCS) NO FEE WL |
4-8-05 RAY NORDINE PICKUP SUBMITTAL DATED 4/5/05 |
WL |
4-12-05 CALLED R NORDINE FOR SUBMITTAL P/U.'R'.RB |
5-17-05 2ND CALL TOLD MR NORDINE SUBMITTAL DATED |
4-5-05 IS STILL WAITING FOR PICKUP UNDER "R" WL |
5/24/05 REV/PLUMB $70 PT |
5/24/05 SUB/GRADE BEAM CALCS P/U BY RAYMOND PT |
5-27-05 SUBMITTAL (3 COPIES BLDG) DA |
5-27-05 SUBMITTAL BLDG DA |
5-27-05 1ST REV DA |
6-1-5 CALLED FOR P/U PLMG/REV "R' KSTEVENS |
6/13/05 CALLED, ELEC REV OK, UNDER "R" FOR PU. |
DVP. |
6-17-05 RAYMOND N. P/U DA |
6-30-05 CALLED R NORDINE FOR SUBMITTAL P/U.'R'.RB |
7/1/5 SUBMITTAL & TRUSS DRAWINGS DR |
7/1/05 PLUMBING REV 2PAGES DR |
7/18/5 SUBMITTAL & SHOP DRAWINGS FG |
7/18/5 RAYMOND P/U BLDG SUBMITTAL/LETTERS/DRAWINGS |
FG |
7-22-05 REV MECH DA |
7-25-05 CALLED R NORDINE FOR SUBMITTAL P/U (1 |
DENIED AND 1 STAMPED) .'R'.RB |
7-27-05 MECH REV CALLED FOR P/U UNDER R PHK 7/28/5 |
BLD REV $60 FEE FG |
8-3-5 CALLED FOR P/U PLMG. REV."R" KSTEVENS |
8-11-05 CALLED R NORDINE FOR SUBMTL/REV P/U.'R'.RB |
8/17/05 RAY NORDINE P/U REVISIONS/SUBMITTALS SPALM |
8-30-05 REV #8 BLDG WL |
11/23/05 BLDG REV $120 SPALMER |
2-6-06 CALLED R NORDINE FOR SUBMTL P/U.'R'.RB |
2/7/06 REV. P/U BY MR. NORDINE AJP |
2-22-6 CALLED FOR P/U PLMG REV. "R" KSTEVENS |
2/28/06 RAY P/U REV SPALMER |