Miscellaneous Information / Notes |
149 RESIDENTIAL CONDOS 9 STORIES OVER 2 STORIES OF |
PARKING +/- 240 SPACES - 'THE METROPOLITAN' |
|
|
|
|
|
10/31/06 ROBIN P/U REV DATED 9/8/06 SPALMER |
10/31/06 ROBIN P/U SUBMITTAL DATED 10/19/06 |
SPALMER |
10/31/06 ROBIN P/U SUBMITTAL DATED 10/13/06 |
SPALMER |
10-31-6 CALLED FOR P/U PLMG REV "T" KSTEVENS |
10/28/06 CALLED STEVE TO P/U SUBMITTALS. 'T'. RB |
10/19/06 BLDG SUBMITTAL CALC SHEETS SIGNED & |
SEALED SEW |
10/13/06 SUBMITTAL OF REV SUBMITTED IN JULY |
-RAISED MECH PIPES ADDITIONAL 6' AT METAL RAMPS |
ROUTED TO RB FG |
10/13/06 STEVE BINGER P/U DENIED PLANS FG |
10/11/06 CALLED STEVE FOR DENIED DRAWING SUBMITTAL |
FOR ACCESSIBLE RAMP P/U. 'T'. RB |
10/05/06 PLANS PICKED UP BY ROBIN. DV PALMER. |
10/5/06 ELEC OK, UNDER "T" FOR PU. CALLED SPOKE |
TO STEVE, TOLD TO BRING IN BLUE CARD. DV PALMER |
10/03/06 BLDG SUBMITTAL NO FEE- SHOP DRAWINGS FOR |
THE HC ACCESSIBLE RAMPS INSTALLED AT THE ROOF |
/PAVER TRANSITIONS FG |
9/28/06 3RD TCO ISSUED HHP |
9/28/06 SUBMITTAL REQ LTRS FOR RENEWAL OF TCO $500 |
TA |
9/26/06 REV. P/U BY ROBIN AJP |
9/22/06 ROBIN P/U SUBMITTAL SPALMERZ |
9/22/06 ELEC REV $130 TA |
9/21/06 CALLED FOR P/U T/B REPORTS IN BOX T HM. |
9/8/06 PLBG REVISION $60 SLS |
9/8/06 SECOND TCO P/U BY ROBIN AJP |
9/1/06 MECH REV SEW |
8/28/06 2ND TCO ISSUED HHP |
8-28-06 REQUEST FOR EXTENSION OF TCO GIVEN TO |
HAROLD PISKURA PHK |
8-25-06 MECH REV CALLED FOR P/U UNDER T PHK |
8/24/06 DENIED REV. P/U BY ROBIN AJP |
8/23/06 MOVED TO LARGE PLAN BIN "T" AJP |
8-23-06 CALLED TO PICK UP REV. "T" ALANGE |
8/20/06 CALLED STEVE BINGER TO P/U SUBMITTALS AND |
REVISIONS. LARGE BINS.'T'. RB |
8/18/06 BLDG/MECH REV $70 SEW |
8/15/06 FOR D BOWMAN- SUBMITTAL NO FEE- 3 FINAL |
RESULTS ON TEST AND BALANCE DATED 8/7/06 FOR THE |
METROPLITAN FG |
8/14/06 SUBMITTAL ( FA DEVICE ) P/U BY ROBIN AJP |
8-11-06 MECH SUBMITTAL NO FEE "RESPONSE TO |
CONCERNS BY MECH INSPECTOR (DICK BOWMAN)THAT SOME |
DRYER EXHAUST LENGTHS EXCEED THE LENGTHS |
RECOMMENDED BY THE MANUFACTURER OF THE DRYERS. |
THE UNITS AFFECTED & THE EXHAUST LENGTHS ARE SHOWN |
ON THE ATTACHED SPREADSHEET. REQUESTING APPROVAL |
OF THE INSTALLATIONS" WL |
8/4/06 TCO P/U BY LARRY AJP |
8/3/06 BLDG SUBMITTAL (3) SIGNED LETTERS SEW |
7/31/06 BLDG SUBMITTAL P/U BY ROBIN SLS |
7/31/06 BLDG REVISION $80 SLS |
7/31/06 ORIGINAL S/S DRWGS THAT WERE ALREADY |
SUBMITTED SLS |
7/31/06 SUBMITTAL OF FA DEVICE SLS |
7-28-06 CALLED P/U "T" PES LETTERS FRON ENG. |
7/28/06 TCO P/U BY LARRY AJP |
7/28/06 1ST TCO HHP |
7/27/06 S/S LETTER FROM ENG SUBMITTED GIVEN TO |
PAUL SCHMITZ SLS |
7/26/06 PLUMBING REV. P/U BY LARRY AJP |
7-26-06 CALLED P/U LETTER FOR POOL "T" PES |
7/26/06 PLUMBING/MECH REV. P/U BY ROBIN |
AJ |
P |
7-26-06 CALLED FOR P/U PLMG/MECH REV "T" KSTEVENS |
7/21/06 REQ FOR TCO GIVEN TO KEN. TA |
7/21/06 MECH REVISION $60 SLS |
7/20/06 ZONING REV. (LANDSCAPING) P/U BY ROBIN |
AJP |
7/19/06 APPROVED,CALL FOR P/U, PUT UP FRONT FOR |
P/U (NO NUMBER WAS PROVIDED FOR CONTACT)FOR FILING |
T MM |
|
7/17/06 OVERTIME INSPECTION FEE $ 600 PER H MOSER |
FG |
7/14/06 BLDG SUBMITTAL SEW |
7/14/06 CONTRACTOR SUBMITTED LETTER REQUESTING |
WEEK-END INSPECTION X 2 INSPECTORS ROUTED TO |
HAROLD MOSER SLS |
7/13/06 ROUTED TO DMP, MATTHEW, AMY, ANA FOR |
REVIEW MM |
7/12/06 SUB/MECH PT |
7-10-06 ROBIN WENSYEL PICKUP MECH REV WL |
7-10-06 P MECH/REV. LEFT MSG. P/U "T" TG. |
7/6/06 MECH REV $70 FEE |
7/3/06 ZONING REV $ 100 FEE- FG |
6/30/06 REV PU BY TOM THAT ROBIN FORGOT SEW |
6/30/06 BLDG REV A.03 A.08 A.09 A.10 SEW |
6/30/06 PU BY ROBIN SEW |
6/29/06 PLANS FILED UNDER 'T' LM |
6/25/06 CALLED STEVE BINGER TO P/U SUBMITTALS AND |
REVISIONS. LARGE BINS.'T'. RB |
6/23/06 ELEC/PLBG/MECH REV P/U BY ROBIN SLS |
6/23/06 SUB/TCO PLANS FOR HAROLD PISKURA SLS |
6/23/06 SUB/PLBG SIGNED & SEALED LETTERS SLS |
6/23/06 CALLED FOR P/U "T" MRW IN BIG BIN |
6/19/06 REV/BLD ELEC PLUMB MECH & FIRE P/U BY |
ROBIN PT |
6/19/06 REV/ELEC PLUMB & MECH P/U BY ROBIN PT |
6/19/06 SUB/BLDG SIGNED & SEALED DRAWINGS & |
CALCULATIONS FOR ALUMINUN TRELLIS PT |
6/19/06 CALLED FOR P/U.MECHANICAL ONLEY.BOX T UP |
FRONT HM. |
6/19/06 CALLED FOR P/U.MECHANICAL ONLEY.BOX T UP |
FRONT HM. |
6/16/06 TIM P/U MECH REV SPALMER |
6-16-06 P MECH/REV. CALLED KEITH P/U "T" TG. |
6/12/06 MECH REV $100 SEW |
5/22/06 GIVEN TO DMP 822-1435 MM |
5/12/06 FIRE REV $200. TA |
5/11/06 MECH SUBMITTAL SEW |
5/11/06 BLDG SUBMITTAL SEW |
5/9/06 DENIED BLDG. REV. PLANS/APP P/U BY KEITH |
AJP |
5/9/06 DENIED, CALL FOR P/U FILE T MM |
5/8/06 BLDG REV FEE CHG $100. TA |
************************************************** |
5/4/06 GIVEN TO ANA, DMP, 822-1435(SUBMITTAL) MM |
5/1/06 ELEC/PLUMB/MECH REV FEE $150 TA |
4-27-06 BLDG SUBMITTAL NO FEE A/C CLOSET DOORS WL |
4/21/06 SUBMITTAL NO FEE/ PROPOSED SIDEWALK DETAIL |
ALONG SAPODILLA FG |
4/21/06 SUMITTAL NO FEE/METAL BIFOLD DOORS TO |
REPLACE EXISTING A/C CLOSET DOORS FG |
4/17/06 REV $90 FEE FG |
4/17/06 BLDG REV. P/U BY HANS SEFFER AJP |
4/13/06 CALLED HAN SEFFER FOR SUBMITTAL P/U.'T'.RB |
4/13/06 PLANS P/U BY ROBIN AJP |
4/12/06 CALLED FOR P/U PLANS IN BOX (T) HM |
4/11/06 BLDG/ELEC/PLUMB/MECH REV FEE $490 TA |
************************************************** |
4/6/06 ELEVATOR WARRANTY LETTER AS REQUESTED BY |
BOB TILLEY. SENT TO BOB TILLEY. RB |
4/6/06 SUBMITTAL FIRE/MECH/BLDG. SENT TO FIRE. RB |
3/24/06 SUB/BLDG PT |
3/23/06 BLDG SUBMITTAL NO FEE FG |
3/23/06 PLUMBING AND MECH. REV.'S P/U FOR MASTER |
PERMIT, ELEC REV. LFOR SUBPERMIT # 05070873 AND |
PLUMBING REV FOR SUB # 05070878 P/U BY ROBIN AJP |
3/20/06 SUBMITTAL NO FEE ROUTED TO B TILLEY- FG |
************************************************ |
************************************************ |
OWES BALANCE PAID $37000.00 AT TIME OF SUBMITTAL |
PLUS APPROACH FEE WAS NOT POSTED 5-2-03WL |
PER D RUNNELS ASSIGN ONE APPROACH FEE 5-2-03 WL |
6-20-03 DENIED CALLED RIF (KENCO?) FOR P/U.'R'. RB |
10/29/03 PLANS TAKEN UPSTAIRS TO 5TH FLR TO REVIEW |
BY URBAN DESIGN(ANTHEA). DV PALMER |
10/29/03 RETURNED PLANS FROM URBAN DESIGN.(ANTHEA) |
DV PALMER. |
PLEASE RETURN TO DEAN RE SUBS NFL |
11-21-03 DENIED. CALLED PERMIT RUNR FOR P/U 'T'.RB |
12/01/03 PLANS + APP P/U B MICHELLE PT |
12/03/03 OLD PLANS P/U BY MICHELLE PT |
2-6-4 2ND RESUB-$22050. BZ#236958 - KAM |
10-16-03 CHANGE OF CONTRACTOR BZ 231899 $100 NFL |
2/11/04 PLANS + APP P/U BY MITCH BOCOOK PT |
2-11-04 ALL PLANS AND DOC'S PICKED UP BY MITCH |
NEVER FINISHED REVIEW ALANGE |
2/11/04 PLANS TAKEN W/OUT PAYING FOR RESUB. OWED |
$22,000 + FOR RESUB FEE. NOT PAID. OWES 4X FEE FOR |
SAME COMMENTS PER FS 553.80(2)(B) PLUMB SEE BZ |
FILE UNDER 'T' FOR THE WEITZ CO.BZ # 237242, |
$133,200.00. PER KEN STEVENS. DV PALMER |
3/31/04 GIVEN TO ANTHEA/ANA MARIE TO REVIEW MM |
3/12/04 PLANS RESUBBED, 3RD RESUB NO FEE DUE TO |
REVIEWS NOT BEING COMPLETED. OK PER NEIL MELICK. |
PLANS TAKEN IN BY KAM. DV PALMER. |
4-19-04 DENIED. CALLED BOB STOUT FOR P/U. 'T'. RB |
4/20/04 DENIED APP/PLANS P/U LARRY PSMITH |
6/3/04 4TH RESUB BZ240202 $22,050.00 PLANS + APP |
PT |
6/25/04 PLANS P/U BRUCE/BOB FOR IMPACT FEES PSMITH |
6/25/04 FEES PAID $105560.80 BZ243206 PSMITH |
6/25/04 IMPACT FEES PD SPALMER |
7-23-4 RADON FEES PD $2338.38 BZ#243456 - KAM |
8/26/04 SUBMITTAL SHOP DRAWINGS NO FEE SPALMER |
9-17-04 CALLED FOR 8-26-04 SUBMITTAL P/U.'T'.RB |
9/30/04 BLDG REV $350 BZ246612 SPALMER |
10/12/04 BLD REV P/U BY HANS S DR |
11/02/04 SUBMITTALS NO FEE SPALMER |
11-10-04 CALLED FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
11-16-4 3 BLDG SUBMITTALS TO HAROLD P - KAM |
11-14-4 6 BLDG SUBMITTALS PU/DAVID M - KAM |
11-17-04 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
REVIEW NOTES.'T'.RB |
11/19/04 REV/BLDG PLUMB $100 PT |
11/19/04 SUB/REPAIR GROUT P/U BY DAVID PT |
11/19/04 SUB/EPOXY P/U BY DAVID PT |
11/19/04 SUB/VIBROFLOTATION CERTIFICATION P/U BY |
DAVID PT |
11/19/04 SUB/VIRBROFLOTATION SHOP DRAWINGS P/U BY |
DAVID PT |
11/19/04 SUB/SHEET PILE SHOP DRAWINGS P/U BY DAVID |
PT |
11/19/04 SUB/GROUND LEVEL CONCRETE FORM WORK SHOP |
DRAWINGS P/U BY DAVID PT |
11/19/04 SUB/BLDG N/C PT |
11/24/04 REV PLUMB $80 SPALMER |
11-17-04 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
REVIEW NOTES.'T'.RB |
12-2-4 CALLED FOR P/U OF REV (11-19) "T" KSTEVENS |
12-11-04 PLUMBING REVISION 4 PAGES DR |
12-13-4 4 BLDG SUBMITTALS - NO FEE - KAM |
12-13-4 CALLED FOR P/U "T" KSTEVENS |
12-14-04 DAVID MATTEI PICKUP PLUMB REV WL |
12-15-4 CALLED FOR P/U "T" KSTEVENS (11-24-4 |
REV.) |
12-17-04 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
REVIEW NOTES.'T'.RB |
12/20/04 PLUMB REV $90 PSMITH |
12/20/04 BLDG SUBITTAL PER CONTR NO FEE PSMITH |
12/20/04 (5)BLDG SUB 0006-0009 & FOUNDATION P/U |
DAVID PSMITH |
12/20/04 PLUMB REV P/U SANITARY STORM WATER DAVID |
PSMITH |
12-21-04 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
REVIEW NOTES.'T'.RB |
12-29-4 SUBMITTAL PU/DAVID M - KAM |
12-30-4 3 LTRS TO HAROLD P - KAM |
1-5-05 SUBMITTALS TO H PISKURA'S IN BOX NFL |
1-11-5 CALLED FOR P/U "T" KSTEVENS |
1-11-05 SUBMTTAL TO H PISKURA NFL |
1-11-05 SUBMITTAL NFL |
1-11-05 ROBIN P/U PLUMB REV NFL |
1-13-5 CALLED FOR P/U "T" KSTEVENS |
1/14/05 LETTER TO NEIL MELICK HAND DELIVERED TO |
NEIL DR |
1/14/05 3 LETTERS TO HAROLD P DR |
1/14/05 LETTER ABOUT SANTARY "D" TRAPS TO PAUL S |
DR |
1/14/05 SHOP DRAWINGS DR |
1-18-05 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
REVIEW NOTES.'T'.RB |
|
1-18-05 SUBMITTAL NFL |
1-21-05 SUBMITTALS NFL |
1-21-05 SUBMITTAL OF LETTERS TO NEIL MELICK NFL |
1-24-05 SUBMITTAL NFL |
1-28-05 SUBMITTAL NFL |
2-3-5 4 BLDG/1 ELEC SUBMITTAL - NO FEE - KAM |
2-3-5 SUBMITTAL TO HAROLD P - KAM |
2-3-5 2 SUBMITTALS-LETTERS FROM HAROLD PU/ROBIN - |
KAM |
2-5-05 CALLED P/U "T" PES |
2-5-5 1 SUBMITTAL PU/ROBIN - KAM |
2-8-05 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
REVIEW NOTES.'T'.RB |
2-9-5 2 SUBMITTAL-1 SUBMITTAL TO HAROLD P - KAM |
2-10-05 CALLED DAVID MATTEI FOR SUBMITTAL P/U PER |
REVIEW NOTES.'T'.RB |
02-14-05 CALLED FOR P/U UNDER "T" N MCCRAY |
2-14-05 SUBMITTAL NO FEE WL |
2-14-05 ROBIN WENSYEL PICKUP SUBMITTALS DATED |
2-9-05,2-3-05,1-28-05,1-22-05,1-21-05,1-21-05, & |
1-14-05 WL |
2/17/05 SUBMITTAL FOR HAROLD PISKURA LTRS 2ND LEVL |
POUR 1 SHORING AND RESHORING COMPLIANCE CERT 3 |
SKETCHES OF LOCATION OF POUR SPALMER |
2/17/05 ROBIN P/U 3 SETS OF FIRE ALARM SUBMITTALS |
SPALMER |
2-18-05 CALLED ROBIN FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
2-23-05 ROBIN W PICKUP SUBMITTAL DATED 2-17-05 WL |
2-24-05 4 SUBMITTALS NFL |
3/4/5 ENG LETTER 2ND LEVEL POUR TO FILE DR |
3/4/5 ENG LETTER 3RD LEVEL POUR TO FILE DR |
3/10/05 SUBMITTAL DISP CURING COMP CONCRETE/LTR |
3RD LVL POUR 2 SHORING RESHORING COMPL CERT LOC OF |
POUR/SHOP DRAW FL 2 THRU 7/STEEL STAIR 1 & 3 SHOP |
DRAWINGS |
3/16/05 3RD LEVEL POUR 2 P/U BY ROBIN DR |
3/16/05 SHORING LETTERS FOR HAROLD P DR |
3-21-05 3 LTRS 4TH LEVEL POUR 1 SHORING & |
RE-SHORING COMPLIANCE CERTIFICATE & 3 SKETCHES OF |
LOCATION OF POUR WL WL |
2-18-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
3/24/05 SUBMITTAL STEEL DECKING SHOP DRAWINGS NO |
FEE SPALMER |
3/24/05 LTR TO HAROLD PISKURA 4TH LEVEL POUR NO |
FEE SPALMER |
3/24/05 SUBMITTAL FLAME BAR SHOP DRAWINGS NO FEE |
SPALMER |
3/28/05 ROBIN P/U SUBMITTALS SPALMER |
2-30-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
3-31-05 DAVID P/U PLANS NFL |
4/5/05 SUBMITTAL TO HAROLD PISKURA LTR REGARDING |
5TH LEVEL POUR 2 SHORING AND RESHORING COMPLIANCE |
CERTIFICATE AND 3 SKETCHES OF THE POUR NO FEE |
SPALMER |
4/7/5 REVISION 145 PAGES DR |
4-8-05 CALLED ROBIN FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
4-8-5 SUBMITTAL TO HAROLD P - KAM |
4-8-5 2 SUBMITTAL PU/ROBIN - KAM |
4-12-05 SUBMITTAL FOR BLDG. D.A. D.R. |
4-12-05 SUBMITTAL TO HAROLD P. D.A. D.R. |
4-15-05 SUBMITTALS NFL |
4/15/05 SUBMITTALS TO HAROLD LETTERS FOR POURS |
SPALMER |
4/15/05 ROBIN P/U SUBMITTALS SPALMER |
4-20-05 SUBMITTAL NO FEE - KAM |
4-20-5 SUBMITTAL PU/ROBIN - KAM |
4/22/05 REV PLUMB $190 SPALMER |
4-22-5 BLDG REV $90 - KAM |
4-22-5 SUBMITTAL TO HAROLD P - KAM |
4-24-05 CALLED FOR PU, UNDER "T" REVISION MRA |
4-26-05 DAVID P/U REV NFL |
4-26-05 SUBMITTALS NFL |
4-27-5 2 LTR TO HAROLD P - KAM |
4-27-5 2 BLDG SUBMITTALS - NO FEE - KAM |
4-27-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
5/2/05 SUB/BLDG SHORING & RESHORING PT |
5/2/05 FOLLOWING SUBMITTALS WERE P/U BY |
ROBIN/SHORING & RESHORING FOR 6TH LEVEL/SHORING & |
RESHORING 7TH LEVEL/REVISINED PT CABLE SHOP |
DRAWINGS FLOORS 2 THRU 7/SHORING & RESHORING 5TH |
LEVEL PT |
5-05-05 SUB BLDG LTRS (4 DIFFERENT SETS) DA |
5-6-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
5-11-05 SUB FIRE DA |
5-11-05 SUB BLDG DA |
5-11-05 ROBIN P/U SUB (BLDG LTRS) (7) DA |
5-17-05 ROBIN SUBMIT 3 LTRS REGARDING SHORING & |
RESHORING OF 8TH LEVEL POUR 3, SUBMITTAL FOR 8TH |
FLOOR CONCRETE FORMWORK SHOP DRAWINGS |
0013-03100-0, 3 SETS OF ROOF REINFORCING SHOP DWGS |
002J-03200-0 WL |
5/20/05 SUB/BLDG (ROOF POUR 1 OH SHORING & |
RESHORING) PT |
5-27-05 SUBMITTAL BLDG DA |
6-03-05 FIRE PUMP SUBMITTAL UNDER "T" NMCCRAY |
6/7/5 BLDG SUBMITTAL NO FEE FG/2ND BLDG SUB |
DIFFENERNT PHASE/COMPLIANCE ON ROOF |
6/7/5 SUBMITTAL P/U BY ROBIN FG |
6-15-05 CALLED ROBIN FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
6-16-05 CALLED ROBIN FOR REVISION P/U'T'(LARGE).RB |
6/17/05 REV/BLDG ELEC PLUMB MECH FIRE P/U BY DAVID |
PT |
6/17/05 SUB/BLDG PT |
6/17/05 SUB/PLUMB PT |
6/17/05 SUB/ELEC PT |
6/17/05 REV/ELEC PLUMB MECH $280 PT |
6/17/05 SUB/BLDG P/U BY DAVID PT |
6/17/05 SUB/BLDG (0014031000) P/U BY DAVID PT |
6/17/05 FOLLOWING SUBMITTALS P/U BY DAVID LETTERS |
ON SHORING & RESHORING/ROOF POUR 2/ROOF POUR |
1/ROOF REINFORCING SHOPS DWGS/SHORING & RESHORING |
OF 8TH LEVEL POUR 3/0013031000/8TH LEVEL POUR 2 |
SHORING & RESHORING LETTERS/8TH LEVEL POUR 1 |
SHORING & RESHORING COMPLIANCE CERTIFICATION & 3 |
SKETCHES OF THE POUR/FLOOR TILE COLUMN & MASONRY |
STEEL REINFORCING SHOPS |
002403200/0012031000/0023032000 PT |
6-28-05 3 BLDG SUBMITTALS DATED 6-28-05 SOUTHEAST |
BUCKHOIST RESHORING 0018-03100-0/UPPER ROOF |
FORMWORK 0017-03100-0/FRAMING DRYWALL CAULKING |
BACKING/FIRE TREATED WOOD WL |
6-29-05 SUBMITTAL CALCS DA |
7/7/05 SUB/PLUMB PT - SENT TO HP 8-3-5 KSTEVENS |
7/7/05 FOLLOWING SUBMITTALS RECEIVED/ROOF PLANTER |
WALLS SHOP DRAWINGS 0031032000/PARTIAL STAIR & |
WALL REINFORCING 0030032000/UPPER ROOF SHORING |
PLAN 0019031000/EVALUATION OF THE SIM SPACE AT |
SINGLE HUNG WINDOWS ON THE METROPOLITAN/PT |
7/12/05 PLUMBING PRODUCT APROVAL READY UNDER T JHL |
7-18-05 REV ELEC, BLDG, PLBG DA |
7-18-05 SUBMITTAL BLDG DA |
7-18-05 SUBMITTAL (SPECS) BLDG DA |
7-18-05 NICK P/U SUBMITTAL DA |
7/20/05 CALLED FOR P/U "T" MWENNERGREN |
7-26-05 REV DA |
7-26-05 NICK P/U REV FIRE ALARM SHOP DWGS & |
PRODUCT DATA DA |
7-27-05 CALLED ROBIN FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
8/2/05 CALLED FOR P/U.PLANS IN BOX T HM. |
8-3-5 SUBMITTAL - NO FEE - KAM |
8-3-5 1 BLDG SUBMITTAL PU/ROBIN - KAM |
8-3-5 1 E,P,M,F REVISION PU/ROBIN - KAM |
8-9-05 CALLED DAVID FOR SUBMITTAL P/U PER REVIEW |
NOTES.'T'.RB |
8/10/05 CALLED FOR P/U.MECHANICAL PLANS |
ONLEY.PLANS IN BOX T HM. |
8/10/05 DAVID P/U MECH PLANS SPALMER |
8/10/05 DAVID P/U SUBMITTALS SPALMER |
8/16/05 SUBMITTALS FOR MECH NO FEE SPALMER |
8/17/5 BLDG SUBMITTAL FOR GRATING AT VEHICLE RAMP |
NO FEE FG |
8-22-05 CALLED DAVID FOR REVISION P/U 'T' RB |
8-22-05 CALLED DAVID FOR GRATING SUBMTL P/U 'T' RB |
8-22-05 ROBIN P/U REV ALL PLANS DA |
8-25-05 REV NFL |
8/26/05 CALLED TO P/U PLANS.PLANS IN BOX T HM. |
8-29-05 CALLED DAVID FOR REVISION P/U 'T' RB |
8/30/05 DAVID P/U REV & SUBMITTALS SPALMER |
9-12-05 REV (ELEC, PLBG, MECH, BLDG) DA |
10-4-05 BLDG NO FEE SUBMITTAL "CLARIFICATION OF |
DESIGN LOADS AT TIE COLUMNS WL |
10/7/5 BLDG SUBMITTAL NO FEE FG |
10/21/5 2ND REVISED PLANS THAT WERE MISS PLACED-NO |
FEE -SENT TO R BROWN DESK FG |
11/09/05 BLDG SUBMITTAL NO FEE-POOL/SPA |
REINFORCING STEEL SHOP DRAWINGS FG |
11/16/05 14TH REVISION SUBMITTED LTM |
12-2-05 REV #14 ELEC/PLUMB/MECH WL |
12-2-05 NO FEE PLUMBING SUBMITTAL WL |
12/09/05 MECH REV $150 SPALMER |
12/28/05 ELEC REV $110 SPALMER |
12/29/05 CALLED FOR P/U.PLANS IN BOX T HM. |
12/29/05 REV. P/U BY ROBIN AJP |
01/12/06 SUBMITTAL SHOP DRAWINGS FG |
1-17-06 REV #18 BLDG/MECH WL |
1/18/06 MECH REV $60 SPALMER |
2/1/06 SUB/PLUMB LETTERS FROM YKA CONSULTING DATED |
11/10/05 PT |
2/1/06 SUB/PLUMB LETTERS FROM YKA CONSULTING DATED |
1/6/06 PT |
02/01/06 BLDG SUBMITTAL NO FEE FG |
2/3/06 CALLED FOR P/U PLANS IN BOXT HM. |
2/9/06 GIVEN TO ANA APONTE, DMP 822-1435 MM |
2/14/06 FAILED, RETURNED TO INCOMING FOR FURTHER |
PROCESSING MM |
2/17/06 ROOFTOP CHAIN LINK FENCE SUBMITTAL FAILED |
BY ZONING. CALLED STEVE FOR P/U. 'T'. RB |
2-24-06 ROBIN P/U MECH DRAWINGS/BLD/ZONING NFL |
2-24-06 MECH/ELEC SUBMITTAL NO FEE NFL |
2/27/06 DENIED, BY DMP (AMY), RETURNED TO INCOMING |
FOR FURTHER PROCESSING MM |
3-1-06 MECH REV CALLED FOR P/U UNDER T PHK |
3-8-6 CALLED FOR REV. P/U "T" KSTEVENS |
3-11-06 CALLED ROBIN FOR TWO REVISION P/U 'T'.RB |
3/13/06 TWO AREV.'S P/U BY ROBIN AJP |
3-14-06 B/F SUB,CALLED P/U "T" PES |
3-22-06 DENIED CALLED P/U LETTERS ENG."T" PES |