PALM BEACH ACURA Class B Special Use Permit for a Car Wash Facility in the GC zoning. A pproved by ZBA 3/4/16 with the following conditions: 1. The car wash facility shall operate in association with the car dea lership only. 2. Prior to obtaining building permits for construction of the car was h facility, the applicant must obtain final Informal Site Plan Review (ISPR) approval. 3. Prior to start of construction, Engineering Development approval is required and the final design must meet City codes and standards.