| Miscellaneous Information / Notes |
| 180-EXTENSION-02 |
| EXTENSION #01:TIME EXTENSION 180 DAYS |
| 120-INSTALL 2-1.25 HDPE CONDUIT BY D/B & 4 H/H |
| CONTRACTOR: SOUTHERN ENGINEERING & CONSTRUCTION |
| CO, DENNIS MAKRANCY, 954-741-6188 |
| SUB: ATLANTIC BROADBAN, 954-213-3367 |
| START DATE: 04/10/2023 |
| DURATION: 180 DAYS |
| END DATE: 10/07/2023 |
| FULL FLAG SIDEWALK RESTORATION REQUIRED. FULL WITH |
| OF ALLEYWAY RESTORATION REQURED.R/W & S/W |
| RESTORATION PER CURRENT CITY STD. COPY OF BORE |
| LOGS & AS-BUILTS REQUIRED. LIGHTED BARRICADES |
| REQUIRED IF EQUIPMENT OR DUMPSTER (POD) IS LEFT IN |
| ROADWAY OR PARKING STALL AFTER DARK OR OVER |
| NIGHT.CONTACT: JANICE TARBILL 561-494-1079 OR |
| [email protected] FOR ALL CITY LOCATES. ALL TYPE I |
| BARRICADES TO HAVE BALLASTS OVER BOTTOM RAILS. NO |
| WORK ALLOWED BETWEEN |
| 7:00AM-9:00AM&4:00PM-6:00PM.ALL FOLLOWING |
| INSPECTIONS MUST BE CALLED IN (LISTED ON THE BACK |
| OF THE PERMIT): B800,801,802,803,804,805 PLEASE BE |
| SURE TO FOLLOW THESE SPECIAL CONDITIONS (LISTED ON |
| THE BACK OF THE |
| PERMIT):A,B,C,D,E,F,G,H,I,J,K,L,M600,604,660,661 |