| Miscellaneous Information / Notes |
| 180-INSTALL 424FT OF 1-4" HDPE CONDUIT ALONG 3RD |
| ST FROM QUADRILLE TO N DIXIE HWY. #0W843025N |
| |
| CONTRACTOR: AT&T, FARHAN QAZI, 561-540-9275 |
| SUB: IVY SMITH, CALVIN BRADDY |
| START DATE: 04-14-2020 |
| DURATION: 180 DAYS |
| END DATE: 10-11-2020 |
| BAGGING OF PARKING METERS IS REQUIRED WHEN |
| BLOCKING PARKING STALLS. R/W & S/W RESTORATION PER |
| CURRENT CITY STD. COPY OF BORE LOGS & AS-BUILTS |
| REQUIRED. LIGHTED BARRICADES REQUIRED IF EQUIPMENT |
| OR DUMPSTER (POD) IS LEFT IN ROADWAY OR PARKING |
| STALL AFTER DARK OR OVER NIGHT. CONTACT JANICE |
| TARBILL 561-494-1079 FOR ALL CITY LOCATES. |
| ALL TYPE I BARRICADES TO HAVE BALLASTS OVER BOTTOM |
| RAILS. NO WORK ALLOWED BETWEEN |
| 7:00AM-9:00AM&4:00PM-6:00PM. ALL FOLLOWING |
| INSPECTIONS MUST BE CALLED IN (LISTED ON THE BACK |
| OF THE PERMIT): B800,801,802,803,804,805 |
| PLEASE BE SURE TO FOLLOW THESE SPECIAL CONDITIONS |
| (LISTED ON THE BACK OF THE PERMIT): |
| A,B,C,D,E,F,G,H,I,J,K,L,102-600,602,604,605,660 |