| Miscellaneous Information / Notes |
| BUILD FOUNTAIN |
| |
| |
| |
| 7/21/15 BRUCE P/U PERMIT SPALMER |
| 7/21/15 READY, IN SMALL A, EMAILED APPLICANT. SAK |
| 7/13/15 - PASSED ELECTRICAL REVIEW. SENT TO SAK |
| FOR BLDG. STAMP OF NEW DRAWINGS. MA |
| 7/2/15 RESUB ROUTED TO TLARGE. LEM |
| 07/02/2015 RESUB ADDRESSING DENIED COMMENTS NO FEE |
| NSD |
| 7/1/15 - DENIED/E-MAILED CONTR./PLACED IN SMALL |
| DENIED UNDER "A".TKL. |
| 06/30/15 RESUB ADDRESS DENIED COMMENTS ASM |
| 6/29/15-IN T.LARGE'S OFFICE.TKL. |
| 6/26/15 - ELECTRICAL PROVISO: |
| IN AN EFFORT TO EXPEDITE THE CONTRUCTION OF THIS |
| PROJECT, THE PERMIT WAS ISSUED PENDING AN |
| ELECTRICAL PERMIT. A REVISION TO THESE DRAWINGS, |
| ADDRESSING ALL ELECTRICAL REQUIREMENTS PREVIOUSLY |
| STATED TO BE SUBMITTED AT THE TIME OF ELECTRICAL |
| PERMIT APPLICATION.MA GIVEN TO SAK ALONG W/THE |
| OTHER TWO THAT HAD BEEN TAKEN TO TIM/PLUMBING |
| |
| NOTE- PLUMBING REVIEW HAS FAILED 3 TIMES FOR SAME |
| ITEMS. NEXT RESUBMITTAL SHALL BE CHARGED 4 TIMES |
| PLAN REVIEW FEE PER FL. STATUTE 553.80 (2)(B).TKL. |
| 6/26/15 - PLUMBING DENIED/E-MAILED CONTR./PLACED |
| IN SMALL DENIED UNDER SMALL "A".TKL. |
| 6/25/15 - FAILED ELECTRICAL REVIEW AS NOTED. SENT |
| TO TIM/PLUMBING. MA |
| 6/25/15 RESUB TO MALBARRAN. SAK |
| 6/19/15 IN SMALL "A" FOR ARTESIAN ES |
| 6/19/15 SENT DENY STATUS TO CRYSTAL @ ARTESIAN |
| POOL ES |
| 6/19/15 ZONING SENT TO ES. SG |
| 6/18/15 - FAILED SECOND ELECTRICAL REVIEW. PER SAK |
| DELIVERED TO T LARGE. MA |
| 6/17/15 RESUB, SENT TO ZONING. SAK |
| 5/29/15 TO PLUMBING BOX -ES |
| 5/21/15 ZONING SENT TO ES. SG |