| Miscellaneous Information / Notes |
| NEW COMMERICAL POOL****NEED ELECTRICAL |
| SUB-PERMIT**** |
| |
| |
| |
| 6/30/15 P/U BY BRUCE ASM |
| 6/29/15 - APPROVED/CONTACTED CONTR./PLACED OUT |
| FRONT IN LARGE "A".TKL. |
| 6/29/15 - ****PROVISO*** - THE DISCHARGE OF THE |
| POOL WATER WASTE TO THE SANITARY OR THE THE |
| STORMWATER SYSTEM SHALL BE DECIDED BY THE CITY OF |
| WPB UTILITIES DEPT.WRITTEN APPROVAL SHALL BE |
| REQUIRED FROM UTILITIES FOR FINAL PLUMBING |
| APPROVAL. TKL. |
| 6/26/15 - ELECTRICAL PROVISO: |
| IN AN EFFORT TO EXPEDITE THE CONTRUCTION OF THIS |
| PROJECT, THE PERMIT WAS ISSUED PENDING AN |
| ELECTRICAL PERMIT. A REVISION TO THESE DRAWINGS, |
| ADDRESSING ALL ELECTRICAL REQUIREMENTS PREVIOUSLY |
| STATED TO BE SUBMITTED AT THE TIME OF ELECTRICAL |
| PERMIT APPLICATION. MA RETURNED TO TIM/PLUMBING |
| |
| 6/25/15 - FAILED ELECTRICAL REVIEW AS NOTED. SENT |
| TO TIM/PLUMBING. MA |
| 6/25/15 RESUB TO MALBARRAN. SAK |
| 6/19/15 IN SMALL "A" FOR ARTESIAN ES |
| 6/19/15 SENT DENY STATUS TO CRYSTAL @ ARTESIAN |
| POOL ES |
| 6/19/15 ZONING SENT TO ES. SG |
| 6/18/15 - FAILED SECOND ELECTRICAL REVIEW. PER SAK |
| WALKED TO TL. MA |
| 06/11/2015 RESUB ADDRESSING DENIED COMMENTS NO FEE |
| NSD/ IN POOL BIN/CC |
| 5/8/15 IN SMALL DENIED A, EMAILED |
| 4/29/15 TO PLUMBING BOX - ES |
| 4/21/15 ZONING SENT TO ES. SG |
| |
| 4/17/15 SIGNATURE ON APPLICATION OKAY PER SP. LWL |