| Miscellaneous Information / Notes |
| ADD 2ND FLOOR GUESTHOUSE. INSTALL TRELLIS. |
| FLOOD ZONE A5 (BASE FLOOD ELEV. 7.0') |
| |
| |
| |
| 1-13-09 GREGG POIRIER PICKUP BLDG REV (DATED |
| 1-15-08) WL |
| 12-22-08 TALKED TO GREGG. BUILDING REVISION UNDER |
| "T". JG. |
| 12/15/08 BLDG REVISION # 1 $210 SLS |
| 11-6-08 PER GREG POIRIER LANDSCAPE SUBMITTAL IN |
| PERMIT PKG 08040678 WL |
| 10/16/2008 LANDSCAPE SUBMITTAL NO FEE MMILLER |
| 8/15/08 GREFF P/U PACKAGE JREYES |
| 7-29-08 TALKED TO GREGG. TRUSS PACKAGE UNDER "T". |
| JG. |
| 7-25-08 BLDG SUBMITTAL NO FEE CHGD "SHOW DRAWINGS |
| FOR RED IRON" WL |
| 6-6-08 GREG P/U PERMIT. JG. |
| 6-6-08 MET W/ GREG. IMPACT FEES VERIFIED. ELEC. |
| CONTRACTOR NEEDS TO UPDATE INSURANCE TO PRINT |
| PERMIT. PLANS ON JULIO'S DESK. JG. |
| 5/23/08 BUILDING SUBMITTAL NO IMPACT FEES SLS |
| 5/9/08 PU BY CLAY SEW |
| 5-7-08 LEFT MESSAGE ON GREGG'S CELL. PLANS IN |
| LARGE PLANS SHELF UNDER "W". JG. |
| 5-6-08 MET WITH ARCHITECT. REVISED RASS 117 CALCS |
| WERE SUBMITTED. JG. |
| 5-1-08 MET W/ ARCHITECT. HE PROVIDE REVISED ENERGY |
| CALCULATIONS. JG. |
| 5-1-08 FAXED ENERGY CALCULATIONS WITH COMMENTS TO |
| ARCHITECT. AND TALKED TO HIM. JG. |
| 4-30-08 TALKED TO ARCHITECT (RAFAEL RODRIGUEZ). |
| NEED TO REVISE ENERGY CALCULATIONS. JG. |
| 04/24/2008 1ST RESUB PLANS PLUS APP NO FEE |
| MMILLER |
| 3-26-08 MET W/ ARCHITECT (RAFAEL RODRIGUEZ) TO GO |
| OVER COMMENTS. JG. |
| 3-18-08 GREG POIRIER PICKUP DENIED PLANS WL |
| 3-18-08 LEFT MESSAGE ON CONTRACTOR'S CELL (GREGG). |
| PLANS IN LARG PLANS SHELF UNDER "W". JG. |