| Miscellaneous Information / Notes |
| INSTALL EMERGENCY GENERATOR 100KW CONCRETE PAD |
| GENERATOR PROVISO: |
| |
| |
| |
| |
| 9/17/08 PERMIT P/U SPALMER |
| 09/15/2008 CALLED CUSTOMER NEEDS NOC PERMIT PLUS |
| PLANS READY FOR P/U FILED UNDER "H" MMILLER |
| 9/9/8 TO MM DESK FOR PROCESSING SMH |
| 08/18/2008 4TH RESUB PLANS PLUS APP MMILLER |
| 8/8/08 DAVID P/U PLANS JREYES |
| 08/07/08 CALLED FOR PLANS P/U; IN LARGE BIN "H" |
| MAW |
| 07/14/08 3RD RESUB W/PLANS & APPL $250 SEW |
| 06/10/08 APP/PLANS P/U BY DAVID OSBORNE SLS |
| |
| THE INSTALLED ELEVATION OF THE EQUIPMENTSHALL BE |
| REQUIRED TO BE DETERMINED AND CERTIFIED BY A |
| QUALIFIED SURVEYOR, ENGINEER OR ARCHITECT, AS |
| MEETING AT LEASR THE MINIMUM REQUIRED (BASE FLOOD |
| ELEVATION PLUS SIX INCHES), FOR THE SPECIAL FLOOD |
| HAZARD AREA IN WHICH IT IS INSTALLED. |
| SPECIAL FLOOD ZONE AREA: A0 |
| |
| |
| |
| |
| |
| |
| |
| 5/29/08 PLANS UNDER "H" FOR PU AND CORRECTIONS. |
| (LARGE BINS) CALLED AND SPOKE TO DAVE OSBOURNE, |
| REMINDED OF BLUE CARE TO PICK UP PLANS. DV |
| PALMER. |
| 5/22/08 FEES DUE WITH THE INCREASE OF THE PROJECT |
| VALUE AND 4X FEE ADDED FOR PLAN REVIEW. FEE IS |
| REQUIRED TO BE PAID BEFORE NEXT RESUB. THE 10% |
| RESUB FEE WILL NOT BE DUE.DV PALMER |
| |
| 5/5/08 2ND RESUB PLANS/APP $50 SLS |
| 5-5-08 DAVID OSBORNE PICKUP DENIED PLANS WL |
| 05/02/08 CALLED FOR PLANS P/U; IN LARGE BIN "H" |
| MAW |
| 04/07/08 1ST RESUB PLANS PLUS APP NO FEE MMILLER |
| 04/07/08 DENIED PLANS PLUS APP P/U BY DAVID |
| OSBORNE MMILLER |
| 11/11/07 CALLED FOR P/U LEFT MESSAGE FOR R. |
| HUFFMAN. LG BIN UNDER "H" RJR |