| Miscellaneous Information / Notes |
| CONSTRUCT NEW 1 STORY 27,308 SQ FT BUILDING |
| A-8 FLOOD ZONE 16.5' MINIMUM BASE FLOOD ELE. |
| |
| |
| |
| |
| 12/9/09 4X FEE HOLD REMOVED PER DOUG. HE HAS GIVEN |
| THE OWNER/CONTRACTOR A LETTER WAIVING THE FEE. RB |
| 12/09/2009 RCVD REQUEST FOR A TCO FEES $ 500.00 |
| ROUTED TO KEN CONRAD MMILLER |
| 12/2/09 REV PU BY ROSE TRACKING # 09110418 SEW |
| 11/24/09 ROSE P/U REV DATED 8/13/09 SPALMER |
| 11/10/09 ROSE FOR COMMENTS TO BE ADDRESSED |
| ON-LINE; DENIED PLANS RETAINED IN LARGE BIN "A" |
| MAW |
| 10/20/09 LANDSCAPE OK. FILE SENT TO ES--RAK |
| 10/10/09 ORIGINAL REVISIONS SUBMITTED 8/13 AS 28 |
| SHEETS IS ACTUALLY 47 TOTAL SHEETS AS NEW SHEETS |
| AND REVISED SHEETS WERE ADDED AFTER REVIEWS HAD |
| BEEN DONE. THE NEW TOTAL OF 52 SHEETS WAS REVISED |
| BASED ON THE INCREASED NUMBER OF SHEETS (19) AND |
| ADDITIONAL REVISED PLUMBING SHEETS (5) INSERTED |
| AFTER REVIEWS WAS DONE. ADDTIONAL FEE OF $720 IS |
| DUE. DV PALMER |
| |
| 8/13/09 BLDG/ELEC/PLUMB/MECH REV $890 SPALMER |
| 8/5/09 MECH REV PAGE M1-105 CALLED FOR P/U. SPOKE |
| TO ROSE. SM BIN UNDER "A" RJR |
| 7/28/09 MECH REV $80 SPALMER |
| 7/21/09 MECH REVISION P/U BY ROSE. RJR |
| 7/20/09 ADDED EXPEDITED REVIEW FEE OF $170. SPOKE |
| TO ROSE. RJR |
| 7-16-09 REV #9 $290 MECH "CURRENT SEALED SET " |
| ROUTED DIRECTLY TO R REGUEIRO, ALSO ROUTED |
| EXPEDITED REQUEST FORM TO R REGUEIRO WL |
| 07//14/2009 FFES PAID APPROVED MECHANICAL REVISION |
| THAT WAS SUBMITTED ON 07/14/2009 WAS P/U BY ROSE |
| MMILLER |
| 7/14/09 CIVIL REVISION FOR ZONING FILED UNDER 'A' |
| ES |
| 7/14/09 MECH REVISION CALLED FOR P/U. SPOKE TO |
| ROSE. REVISION FEE OF $260 DUE AT TIME OF P/U. |
| CONTRACTOR WAS NOT GIVEN BLUE CARD AT TIME OF |
| SUBMISSION (SEE PREVIOUS COMMENT BELOW). OK TO |
| GIVE PLANS WITHOUT BLUE CARD. LG BINS UNDER "A" |
| RJR |
| 7/9/09 MECHANICAL REVISION SUBMITTED WITH NO |
| SUBMITTAL FORM OR FEES PAID, ROUTED TO RJR DESK BY |
| DW. RJR |
| 7/7/09 ROSE P/U REV DATED 6/3/09 SPALMER |
| 07/07/09 CALLED FOR PLANS P/U; IN LARGE BIN "A" |
| MAW |
| 07/06/09 LAST REVIEW FOR C-6 FIRE ROUTED TO FIRE |
| JW |
| 06/25/09 ZONING REV ADRESSING COMMENTS $170 SEW |
| 06/09/09 SEE ZONING NOTES - SOME SHEETS PASS AND |
| SOME FAIL THIS REVISION - ES |
| 06-03-09 REV #6 $350 ELEC/PLUMB/ZONING WL |
| 05/29/2009 APPROVED MECHANICAL REVISION THAT WAS |
| SUBMITTED ON 05/27/2009 WAS P/U BY SCOTT MMILLER |
| 05/29/09 MECH REVISION PASSED, CALLED FOR P/U. |
| SPOKE TO SCOTT THOMASON. LG BIN UNDER "A" RJR |
| 05/29/09 MECH REV WHICH WAS SUBMITTED ON 5/12 IS |
| SUPERCEDED BY REVISION SUBMITTED ON 5/27. PER |
| CONTRACTOR REQUEST (SCOTT THOMASON) THE 5/27 PLANS |
| WILL BE REVIEWED IN LIEU OF THE 5/12 PLANS. THE |
| 5/12 PLANS TO BE RETURNED TO CONTR WITHOUT REVIEW. |
| RJR |
| 05/27/09 MECH REV AS BUILTS REFLECT CHANGES DUE TO |
| DESING CONDITIONS $170 SEW |
| 05/12/09 MECH REV $170 SPALMER |
| 05/05/09 MECH REV DENIED. CALLED FOR P/U. SPOKE TO |
| SCOTT. SM BIN UNDER "A" RJR |
| 4/30/09 MECH REV $170 SPALMER |
| 2/23/09 BLDG REV #2 PU BY SCOTT SEW |
| 2/13/09 PU BY THOMAS SEW |
| 2-06-09 CALLED CONTRACTOR LEFT MESSAGE ON VOICE |
| MAIL |
| (MILTON) PLANS FILED UNDER "A" LARGE PLAN JW |
| 1/30/09 BLDG SUBMITTAL STEEL BAR JOIST |
| W/ENGINEERING CALCS SEW |
| 1-27-09 ROSE KENNY PICKUP REV #1 (BLDG, ELEC, |
| PLUMB,MECH,FIRE DATED 12-11-08) WL |
| 1-27-09 CALLED FOR P/U OF REVISIONS SUBMITTED |
| 12-11-08 AND TALKED TO ROSE K. INDICATING THAT |
| SOME REVISIONS WERE APPROVED AND OTHERS DENIED AND |
| REMINDED HER OF THE REQUIREMENT OF THE RECIEPT OR |
| BLUE CARD. "A-LARGE LOWER BINS" KSTEVENS. |
| 01/26/2009 BLDG REVISION #02 FEES $80.00 MMILLER |
| 1/5/09 ROSE P/U SUBMITTAL DATED 12/18/08 SPALMER |
| 1-02-09 CALLED CONTRACTOR RECEIVED VOICE |
| MESSAGEFOR |
| MILTON CARTER SUBMITTAL FILED UNDER "A" SMALL |
| PLANJW |
| 12/26/08 BLDG SUBMITTAL GAVE TO JERALD SLS |
| 12/18/08 SUBMITTAL SHORING DRAWINGS FOR SMALL |
| MEZZANINE NO FEE SPALMER |
| 12/11/08 BLDG/ELEC/PLUMBING/MECH/FIRE REV SEE |
| ATTACHED NARRATIVE SEW |
| 9/11/08 REMOVED 4X FEE AMOUNT ONLY TO PRINT PERMIT |
| AND TO ENABLE INSPECTIONS TO BE CALLED IN. 4X FEE |
| AMT OF $57,200 IS OWED BEFORE CO/AMM |
| 9/11/08 FEES PAID NOC RECD PERMIT ISSUED & PLANS |
| GIVEN TO ROSE SLS |
| 09-09-08 CALLED CONTRACTOR AND SPOKE WITH ROSE, |
| PLANS FILED LOWER BINS READY FOR ISSUANCE,OWES |
| FEES AND NEEDS NOC JW |
| 9/8/08 BLDG SUBMITTAL NO FEE SLS |
| 9-4-08 ROSE KENNEY PICKUP PLANS WL |
| 9/3/08 CALLED FOR P/U "A" FLOOR OF LARGE BIN |
| 8/8/08 ROSE KENNY STOPPED BY AND PAID $5200 RESUB |
| FEE SEW |
| 8/6/08 OWES $5200.00 RESUB FEE. THE BALANCE OF 4X |
| FEE DUE BEFORE CO PER RULING FROM LAW DEPT, |
| MR.BROWN AND MR.MELICK. SPOKE TO ROSE KENNY AND |
| WILL BE IN ON FRIDAY 8/8 TO PAY THE $5200. THE |
| BALANCE OF 4X FEE IS $57,200. DV PALMER. |
| |
| 8-1-08 PLANS/APPL RESUBMITTED FEES PENDING WL |
| ***7/31/08 OK TO ACCEPT RESUBMITTAL WITHOUT 4X FEE |
| OR RESUBMITTAL FEE BUT NO PLAN REVIEW WILL START |
| UNTIL AFTER ROBERT BROWN HAS MET THE CITY ATTORNEY |
| ON 8/6/08 AT 3PM. RB*** |
| |
| 6/12/08 ROSE P/U DENIED PLANS SPALMER |
| ******* |
| 6/12/08 4X FEE ADDED FOR PLAN REVIEW AS REQUIRED |
| PER FLORIDA STATUTES. THE FEE OF $62,400.00 IS |
| REQUIRED TO BE PAID BEFORE PLANS ARE RESUBMITTED. |
| DV PALMER. |
| 6/12/08 PLANS DENIEED AND CALLED FOR PICK UP. |
| PLANS ARE ON FLOOR IN FRONT OF "A" LARGE BINS. |
| 3-LARGE ROLLS, 1-SMALL ROLL AND 1-LARGE BOX OF |
| BOOKS. SPOKE TO ROSE FROM ANDERSON AND MOORE, |
| REMINED OF BLUE CARD TO PICK UP PLANS. DV PALMER. |
| ******* |
| 5/12/08 2ND RESUB PLANS/APP $5200 SLS |
| 4-01-08 HAROLD PISKURS HAS SPOKEN WITH CAPRI, THIS |
| WILL BE A SPECIAL- RESIDENT INSPECTOR PROJECT, |
| PAPERWORK FORTH COMING. JW |
| 2-29-08 ANA FORTEZA PICKUP DENIED PLANS WL/LM |
| NOI REQUIRED, SITE AREA=3.46 ACRES, |
| 02/28/08 CALLED ROSE MCKINNEY FOR DENIED PLANS |
| P/U; 4 ROLLS W/1BOX ON FLOOR IN FRONT OF BOTTOM |
| BIN "A" MAW |
| 1/17/08 1ST RESUB W/PLANS & APPL NO FEE SEW |
| 1/9/08 PLANS WERE SENT OUT AND PICKED UP BY ANNA |
| BEFORE REVIEWS WERE DONE. PLANS/SETS WERE NOT |
| COMPLETE AND PLANS ARE BEING REMOVED TO BE |
| COMPLETED BEFORE REVIEWS COMMENCE. THE SUBMITTED |
| PLANS OF 12/31 WILL NOT COUNT AS 1ST RESUB AND |
| WILL NOT REQUIRE FEES WHEN RE-SUBMITTING. THE DATE |
| THE PLANS COME BACK WILL BE THE NEW DATED IN DATED |
| ORDER. IF THERE ARE ANY QUESTIONS, SEE DEWEY. DV |
| PALMER. |
| |
| 12/31/2007 1ST RESUB PLANS PLUS APP ALONG WITH 3 |
| LARGE ROLLS N FEE MMILLER |
| 9/6/07 PLANS (3 LARGE ROLLS AND LOOSE |
| DOC'S)/APP/COMMENTS P/U BY ROSE AJP |
| 9/5/07 DENIED. CALLED ROSE FOR P/U. LARGE ROLLS. |
| 'A'. RB |