| Miscellaneous Information / Notes |
| CONSTUCTION OF NEW PBC HEALTH DEPT ADMIN BLDG ON |
| 6.94 ACRE SITE-BLDG WILL HAVE 5 FLOORS |
| |
| |
| |
| |
| 7-28-09 ARTHUR NORTON PICKUP REV (PLUMB/MECH AS |
| BUILTS DATED 6-12-09) SEE NOTES WL |
| 7/1/09 REVIEW COMPLETE FORWARDED TO PERMIT |
| COUNTER. FILED UNDER **LARGE BINS** "T". DW |
| 6-26-09 ROUTED TO HMOSER'S DESK PER RBROWN. |
| KSTEVENS. |
| 6/12/09 PLUMBING/MECH REV PER ATTACHED PLANS SEW |
| 6-4-09 ARTHUR NORTON PICKUP 2 REV (CIVIL DATED |
| 4-7-09 & "FINAL REVISIONS DATED 5-8-09) WL |
| 6/3/09 THE BLDG/ELEC/PLUMBING/MECH/ZONING REV |
| "FINAL REVISIONS" WHICH WERE SUBMITTED 5/8/09 ARE |
| PASSED AND READY FOR P/U. SPOKE TO ARTHUR. LG BIN |
| UNDER "M" RJR |
| 6/3/09 REVISED C PAGES SUBMITTED 4/7/09 PASSED, |
| CALLED FOR P/U. SPOKE TO ARTHUR. LG UNDER "M" RJR |
| 05/29/2009 APPROVED ZONING THAT WAS SUBMITTED ON |
| 05/08/2009 WAS P/U BY ARTHUR MMILLER |
| 05/29/2009 RCO P/U BY ARUTHR MMILLER |
| 5/29/09 TCO ISSUED. TO CO BOX, FILED "M".KC |
| 5/27/09 - LANDSCAPE SUBMITTAL APPROVED. CALLED |
| CONTRACTOR FOR P/U. FILED UNDER T. ~MC |
| 5/11/09 PU BY ARTHUR SEW |
| 5/11/09 CALLED CONTRACTOR FOR PICK-UP FILED UNDER |
| "T" SMALL PALN. JW |
| 5/8/09 ZONING SUBMITTAL 3 COPIES OF LETTER FROM |
| LANDSCAPE ARCHITECT FOR PLANTING HT OF TREES @ |
| SIDEWALK SEW |
| 5/8/09 BLDG/ELEC/PLUMBING/MECH/ZONING REV "FINAL |
| REVISIONS" AS ATTACHED PLANS SEW |
| 4/24/09 LETTER SUBMITTED FOR TCO $500 ROUTED TO |
| KCONRAD SEW |
| 4/17/09 BLDG/MECH REV & SUBMITTAL RANGE HOOD $80 |
| SEW |
| 4/17/09 2 ROLLS & 2 PKG PU BY ARTHUR SEW |
| 4/09/09 CALLED AURTHOR NORTON PLANS FILED OUT |
| FRONT READY FOR PICK UP STEEL SHOP DRAWINGS JW |
| 04/09/09 ENG REVIEW N [email protected] |
| 4/7/09 ZONING/FIRE/ENGINEER REV PER ATTACHED SEW |
| 4/7/09 PU BY ARTHUR SEW |
| 4-3-09 CALLED FOR P/U OF LANDSCAPE/IRR REVISIONS |
| SUBMITTED 3-2-09 AND TALKED TO AUTHOR N. |
| INDICATING THE REQUIREMENT FOR THE RECIEPT OR BLUE |
| CARD. "T" KSTEVENS. |
| 3/2/09 LANDSCAPE & IRRIGATION REVISION # 8 $170 |
| SLS |
| 2/17/09 BLDG SUBMITTAL SHOP DRAWINGS FOR |
| STRUCTURAL STEEL AND STAIRS SEW |
| 2/17/09 ELEC REV PU BY ARTHUR SEW |
| 2/4/09 ELEC REV FROM 1/15,1/30 OK, UNDER "T" |
| (LARGE BINS) FOR PU. SPOKE TO ARTHUR NORTON |
| REMINDED OF BLUE CARD. DV PALMER. |
| 2-2-09 ARTHUR NORTON SWAPPED OUT ELEC SHEETS |
| ROUTED TO DEWEY PALMER (SEE NOTES BELOW DATED |
| 1-30-09) WL |
| 1/30/09 SEE ELEC NOTES DATED 1/30. ELEC PLANS ARE |
| NOT TO BE REVIEWED AS NEW ELECTRICAL SHEETS ARE TO |
| BE CHANGED OUT BEFORE REVIEW. PLANS WILL BE UNDER |
| "T" UP FRONT (LARGE BINS) WAITING FOR CHANGES. |
| THIS REQUEST WAS ON 1/27/09DV PALMER. |
| 1-28-09 ARTHUR NORTON PICKUP REV (BLDG, ELEC, ENG, |
| PLUMB, FIRE, DATED 11-21-08) WL |
| 1/27/09 REVISIONS SUBMITTED NOV 21ST ARE UNDER "T" |
| (LARGE BINS)3-ROLLS FOR PICK UP. CALLED AND SPOKE |
| TO ARTHUR NORTON, REMINDED OF BLUE CARD. DV |
| PALMER. |
| 01/23/2009 APPROVED MECHANICAL ELECTRICAL & FIRE |
| REVISION THAT WAS SUBMITTED ON 11/21/2008 WAS P/U |
| BY ARTHUR NORTON MMILLER |
| 01/23/2009 CALLED CUSTOMER APPROVED ELECTRICAL |
| APPROVED MECHANICAL & APPROVED FIRE THAT WAS |
| SUBMTTED ON 11/21/2009 IS READY FOR P/U FILED |
| UNDER "T" MMILLER |
| 1-21-09 REVISIONS SUBMITTED 11-21-08 ARE COMPLETE. |
| WAITING FOR DPALMER TO PROCESS. (PLANS AT |
| MPERSON'S DESK) KSTEVENS |
| 1/21/09 ELEC SUBMITTAL COPIES OF LETTER FROM |
| ENGINEER REGARDING SUPPORTING CEILING LIGHTING |
| FIXTURES IN SUSPENDED CEILINGS SEW |
| 1/15/09 ELEC REV E101 E102 E103 E502 E510 $200 SEW |
| 1-7-09 JOHN GENTILE PICKUP CIVIL DRAWINGS (DATED |
| 11-21-08) WL |
| 01-07-09 FILED UNDER "T" (THE MORGANTI GROUP)IM |
| LARGE BIN - EPF |
| 11/21/08 BLDG/ELEC/PLUMBING/MECH REV OWNER |
| BUILDING CHANGES SEW |
| 11/21/08 BLDG/ELEC/ZONING/ENGINEERING REV SITE & |
| CIVIL DRAWING CHANGES $130 SEW |
| 11/21/08 ELEC REV GENERATOR TANK SIZE CHANGE $90 |
| SEW |
| 11/7/08 PU BY JOHN SEW |
| 11/3/08 CALLED ARTHUR FOR P/U LETTER IN BOX (T) |
| HM. |
| 10-20-08 JOHN GENTILE PICKUP BLDG SUBMITTAL & 3 |
| CERTIFICATION LTRS (DATED 10-15-08) WL |
| 10-17-08 CALLED FOR PICKUP FILED UNDER "T" SMALL |
| JW |
| 10/15/2008 MECHANICAL SUBMITTAL NO FEE (PER |
| REQUEST OF MECHANICAL INSPECTOR HAROLD MOSER |
| SUBMITTED ARE THREE LETTERS FROM ENGINEER |
| REQUARDING ALL AIR HANDLING UNIT COOLING COILS |
| 10/15/2008 BLDG SUBMITTAL NO FEE (THREE |
| CERTIFICATION LETTERS OF THE SHORING INSPECTION) |
| MMILLER |
| 10/15/2008 BLDG SUBMITTAL NO FEE (THREE SETS OF |
| CURTAIN WALL FIREPROOFING SYSTEM NO. CW-D2042 AND |
| SYSTEM NO. WCEJ322P) MMILLER |
| 9-12-08 ARTHUR NORTON PICKUP BLDG SUBMITTAL "FIRE |
| CAULKING" WL |
| 09-09-08 CALLED CONTRACTOR AND SPOKE WITH ARTHUR |
| FILED UNDER "T" SMALL PLAN JW |
| 9/3/08 BLDG SUBMITTAL SHOP DRAWINGS FIRE CAULKING |
| SYSTEMS SEW |
| 8-26-08 ARTHUR NORTON PICKUP (3)BLDG SUBMITTALS |
| DATED 8-12-08 **SEE NOTE DATED 8-12-08 BELOW** WL |
| 8-25-08 CALLED CONTRACTOR AND SPOKE WITH ARTHUR |
| PLANS FILED UNDER *LARGE BINS* "T" JW |
| 8-12-08 (3) BLDG SUBMITTALS "HEAD OF WALL FIRESTOP |
| UL SYS & PRODUCT DATA","FIREPROOFING UL SYS @ BAR |
| JOIST TO BLOCK HEAD OF WALL JOINTS", & "TRIMCO |
| FIRE CAULK & PEENTRATION PRODUCT INFO"..3 SETS |
| **PLEASE CALL ARTHUR FOR PICKUP AT 262-6771** WL |
| 8/11/08 ARTHUR P/U MECH REVISIONS JREYES |
| 8/8/08 MECH REV CALLED FOR P/U. SPOKE TO ARTHUR. |
| SM BIN UNDER "T" RJR |
| 08-08-08 CALLED CONTRACTOR AND FILED REVISION |
| UNDER "T" SMALL PLAN JW |
| 8-7-08 REV # 3 $60 MECH "DRAWING M6.04 CHILLER |
| PLAN & SCHEMATIC REV # 18, DATED 8-6-08 IS |
| SUBMITTTED TO SHOW AS BUILT COND*** PLS CALL PB# |
| 262-6771 ***WHEN READY TO BE PICKED UP. THIS IS |
| NEEDED IMMEDIATELY FOR INSPECTION" WL |
| 8/7/08 ARTHUR P/U BLDG REV DATED 7/16/08 SPALMER |
| 08-01-08 CALLED CONTRACTOR PLANS FILED UNDER "T" |
| SMALL PLANS SPOKE WWITH AARTHUR JW |
| 8/1/08 BLDG REV CHANGE OF ROLLING DOOR PRODUCT |
| APPROVAL $60 SEW |
| 7-9-08 ARTHUR NORTON PICKUP ROOFING SUBMITTAL |
| 9DATED 6-30-08) WL |
| 7-09-08 CALLED SPOKE WITH ARTHUR NORTON ROOFING |
| SUBMITTALS FILED UNDER "T" LARGE PLAN JW |
| 7/1/08 BLDG SUBMITTALS DATED 6/10 & 6/24 P/U BY |
| ARTHUR SLS |
| 6-30-08 REVISIONS FILED UNDER "T" *LARGE BIN*JW/WL |
| 6/30/08 BLDG SUBMITTALS JOHNS MANVILLE ROOFING |
| SUBMITTAL ELASTIZELL LIGHTWIEGHT INSULATING |
| CONCRETE SUBMITTAL FOR SHOP DRAWING REVIEW SEW |
| 6/27/08 ARTHUR P/U REV DATED 6/24/08 SPALMER |
| 6/27/08 - REV #1 APPROVED, CALLED ARTHUR TO P/U. |
| FILED UNDER "T" (THE MORGANTI GROUP). CJH 6-26-08 |
| ARTHUR NORTON PICKUP DUPL PERMIT CARD WL 6/26/08 |
| DUPLICATE CARD $25 SPALMER |
| 6/25/08 - REV. #1 SENT TO AA - 5TH FLOOR CJH |
| 6-24-08 REV #1 ZONING $60 (3 COPIES OF SITE PLAN |
| DRAWING SITE A1.01 SUBMITTED W/LTR FROM ARCHITECTS |
| OFFICE. LOCATION OF FPL TRANSFORM & FUTURE ABOVE |
| GROUND TANK CHGD CAUSING CHILLER YARD TO SHIFT |
| SLIGHTLY & PARK SPOT TO CHG, ALSO ANOTHER DUMPSTER |
| ENCLOSURE WAS ADDED & SERVICE DRIVE AROUND |
| CHILLER) WL |
| 6-24-08 BLDG SUBMITTAL NO FEE CHGD (3 SETS OF |
| JOIST SIGNED & SEALED CALC PKGS. DRQWINGS HAVE |
| ALREADY BEEN APPROVED ON 5-13-08) WL |
| 6/10/08 BLDG SUBMITTAL 3 COPIES OF DRAWING A2.09 |
| TO BE RE-STAMPED PER JWITMER SEW |
| 6/10/08 ROOF BLDG SUBMITTAL & JOIST/DECKING |
| SUBMITTAL PU BY ARTHUR SEW |
| 6-02-08 CALLED CONTRACTOR SPOKE WITH ARTHURS VOICE |
| MAIL 2 SUBMITTALS "T" LARGE PLAN JW |
| 5/13/08 BLDG SUBMITTAL MANVILLE ROOFING NO FEE |
| SPALMER |
| 5/13/08 BLDG SUBMITTAL JOIST & DECKING NO FEE |
| SPALMER |
| 3-31-08 ARTHUR NORTON PICKUP PLANS (PERMIT CARD |
| ALREADY PICKED UP BY JOHN GENTILE) WL |
| 3/28/08 BUILDING PLANS READY FOR P/U CALLED AND |
| LEFT MSG FOR ARTHUR NORTON FILED UNDER "T" LARGE |
| BIN ON THE FLOOR SLS |
| 3-26-08 JOHN GENTILE PICKUP PERMIT CARD ONLY |
| (PLANSON TO BE PICKED UP LATER**SEE BELOW**DEWEY |
| PALMER'S COMMENTS) WL |
| 3/26/08 PERMIT PRINTED AND UNDER "T" (SMALL)FOR |
| PU, SPOKE TO ARTHUR NORTON, WILL BE PICKING UP |
| PERMIT ONLY AS PLANS NEED TO BE PROCESSED FOR PICK |
| UP AT A LATER TIME. WILL BRING IN BLUE CARD TO |
| PICK UP PERMIT AND CONTRACTOR WILL NEED TO KEEP |
| BLUE CARD FOR PICKING UP PLANS ONCE PROCESSED. DV |
| PALMER. |
| |
| 3/17/08 SUBMITTAL FOR JIM WITMER UNITY OF TITLE NO |
| FEE SPALMER |
| 02/28/2008 1ST RESUB PLANS PLUS APP NO FEE |
| MMILLER |
| 2-01-08 ARTHUR NORTON PICKUP DENIED PLANS WL |
| 1-31-08 CALLED FILED LOWER BINS UNDER SPOKE WITH |
| ARTHUR JW |
| 1/15/08 PRECON MTG SATISFIED HHP |
| 1/15/08 EARLY START LETTER HAND DELIVERED BY |
| ARTHUR NORTON TO DIANE F. HHP |
| 12/26/07 SUBMITTAL FOR JIM WITMER NO FEE SPALMER |
| 12/20/07 CHANGE FROM PROJECT TO PERMIT W/SUBS SEW |
| 12/20/07 BLDG SUBMITTAL THRESHOLD INSPECTION |
| AGREEMENT ROUTED TO HPISKURA SEW |
| 10/23/07 4 LARGE ROLLS OF PLANS AND FIVE PACKAGES |
| OF BOOKS AND LOOSE PLANS P/U BY ARTHUR AJP |
| 10-23-07 CALLED FOR P/U AND LEFT A MESSAGE WITH |
| ARTHUR NORTON INDICATING THAT THE PLANS WERE READY |
| TO P/U AND THAT HE NEEDED THE RECIEPT AND/OR BLUE |
| CARD TO RETRIEVE THE PLANS. 4 ROLLS/5 PACKAGES "T |
| - LARGE BINS AT BOTTOM" KSTEVENS |
| 9/4/07 PLANS/APPL W/INDEX (4 LARGE ROLLS & SEVERAL |
| SPECS BOOKS & LOOSE PAGES)SEW |
| 7/25/07 PLANS/APP/COMMENTS(5 LARGE ROLLS AND |
| SEVERAL SPEC. BOKS AND LOOSE PAGES ) P/U BY ARTHUR |
| AJP |
| 07/23/07 CALLED FOR DENIED PLAN/PACKAGE TO BE P/U; |
| #54 ON FLOOR IN FRONT OF LARGE BINS MAW/FIRE |
| 05/10/07 ADDRESSING STOP ROUTED COPY OF APP TO |
| LILY FG |