| Miscellaneous Information / Notes |
| NEW CONSTRUCTION OF 4800SF PREFAB CONCRETABLES |
| "THEATRE VILLAGE BUILDING" ON VACANT SITE |
| |
| |
| |
| |
| |
| |
| 10/19/07 FILED AS BUILT COPY,CALLED ROBLING, HE |
| DOES NOT NEED A COPY, SO WE FILED AS BUILT COPIES |
| IN OUR FILE. |
| |
| 10-13-7 REVISION FROM 8-23-7 SENT BACK TO |
| ENGINEERING AS THEY WERE CIVIL SHEETS. UNABLE TO |
| SIGN ON PLAN REVIEW AS PERMIT IS CLOSED. SENT THE |
| BACKFLOW CERTIFICATION SHEETS TO PLUMBING |
| INSPECTIONS TO FILE OR PASS ON TO THE METER |
| SHOP/BACKFLOW. KSTEVENS |
| 08/27/07 REV $60 FEE- AS BUILTS FG |
| 8-23-07 REV #5 $60 PLUMBING/ENGINEERING "BACKFLOW |
| CERTIFICATION AS-BUILTS (WATER,SEWER, PAVING & |
| DRAINAGE) (1) ENGINEER CERTIFCATE OF COMPLETION |
| WL |
| 8/22/07 HOLLY FROM ROBLING PICKED UP ELEC |
| REVISION, DV PALMER. |
| 8/22/07 ELEC SUBMITTAL OK NO FEE. DVPALMER. |
| 08/14/2007 ELECTRICAL REVISION #04 FEES $60.00 |
| MMILLER |
| 8/13/07 DENIED EL. REV. P/U BY DAMON AJP |
| 7/30/07 ELEC REV ENERGY CALS W/DCA APPROVED |
| STAMPED $60 SEW |
| 7/30/07 PU BY HOLLY SEW |
| 7-20-07 CALLED CONTRACTOR, FILED REVISION UNDER |
| "R" JW |
| 7-17-07 BLDG REV #1 $60 "REV TO SHEET F.1 FOTTING |
| @ STEM WALL AS REQUESTED BY CHUCK WPB BLDG |
| INSPECTOR" WL |
| 07/09/2007 ELECTIRICAL APPROVED/FAILED PLANS THAT |
| WAS REVIEWED BY DV PALMER PU BY HOLLY ROGEAS |
| MMILLER |
| 7/7/07 ELEC REV UNDER "R" FOR PU, SPOKE TO DAMON |
| ROBLING AND TOLD HIM SOME OF THE PLANS FAILED AND |
| SOME WERE OK. DV PALMER. |
| 7/3/07 ELEC REVISION $70 SLS |
| 6/28/07 HOLLY P/U PERMIT SPALMER |
| 6-28-07 CALLED CONTR SPOKE TO ANSWER MACHINE LEFT |
| MESSAGE PLANS WERE LEFT UNDER "R" SMALL PLAN JW |
| 5/15/07 2ND RESUB PLANS/APP $800 SLS |
| 5/14/07 CONTRACTOR PULLED PLANS FROM REVIEW, SEE |
| LETTER LM |
| 3/23/07 1ST RESUB PLANS/APP NO FEE SLS |
| 2-8-07 HOLLY ROJAS PICKUP PLANS WL |
| 02/08/07 CALLED FOR PLAN P/U; IN LARGE BIN "R" MAW |