| Miscellaneous Information / Notes |
| TENANT IMPROVEMENT7TH FLOOR ALONG W/ INSTALLATION |
| OF GENERATOR. FUEL SHUT DOWN REQUIRED PER PLANS. |
| |
| |
| |
| |
| 7/18/07 CERT. OF COPMPLETION P/U BY JONATHAN AJP |
| 6/29/07 JONATHAN P/U ELEC REV DATED 6/28/07 |
| SPALMER |
| 6/29/07 ELEC REV OK,CALLED,SPOKE TO JONATHAN, TOLD |
| TO BRING IN BLUE CARD, AND UNDER "L" FOR PU. DV |
| PALMER |
| 6/28/07 ELEC REVISION $90 AS BUILTS SLS |
| 6/26/07 TCO ISSUED. KC |
| 06/22/2007 OKAY TO ACCEPT LETTER PER HAROLD |
| PISKURA RCVD LETTER REQUESTING TCO FEES $500.00 |
| MMILLER |
| 6/12/07 JONATHAN P/U REV DATED 5/8/07 SPALMER |
| 6/12/07 CALL TO P/U REV. UNDER 'L' MJACOBS. |
| 5-31-07 JONATHAN MANNON PICKUP MECH REV WL |
| 5/31/07 CALLED FOR P/U PLANS IN BOX L HM. |
| 5-31-07 NO FEE SUBMITTAL "SWAP OUT MECH PLANS PER |
| HAROLD MOSER" ROUTED TO HAROLD MOSER WL |
| 5/29/07 MECH REV AS BUILT $60 SEW |
| 5/16/07 JONATHAN P/U MECH REV DATED 5/4/07 |
| SPALMER |
| 5/16/07 MECH REV M1.2 M2.1 M2.2 M2.3 CALLED |
| JONATHAN FOR P/U LG BIN UNDER 'L' RJR |
| 05/08/2007 BLDG, ELECTRICAL, PLUMBING REVISION (A1 |
| A2 A3 A4 MOVED 2 WALLS AND ELEMINATED CABINET E2 |
| E3 E5 ADDED LOW VOLTAGE DROPSAS-BUILT P2 P4 |
| ELMINATED ONE SINK IN CONFERENCE) FEES $140.00 |
| MMILLER |
| 05/04/07 MECHANICAL REV $ 80 FEE- NO EQUIPMENT |
| CHANGED ONLY RELOCATED A FEW UNITS FOR CLEARENCE |
| ISSUES-SOME DUCT WORK CHANGED FOR SAME REASON FG |
| 4/4/07 JONATHAN P/U STRUCTURAL CALCS SPALMER |
| 4/3/07 CALLED MARK FOR STRUCTURAL CALCS AND |
| REINFORCING DETAILS SUBMITTAL P/U.'L'.RB |
| 2/2/07 MARK P/U PERMIT & TURNED IN NOC SPALMER |
| 2/2/07 PLANS UNDER "L"(LARGE BINS)FOR PRINTING, |
| HOWEVER NEEDS TO UPDATE INS INFORMATION FOR THE GC |
| AND THE EC WHICH WAS SIGNED ON. NEEDS NEW RECORDED |
| NOC, RECORDED W/IN THE LAST 90DAYS. CALLED SPOKE |
| TO MARK ANDREWS OF LEIGHTON MCGINN, WAS REQUESTED |
| TO REMOVE PLUMB SUB. TOLD MARK HE NEEDED TO UPDATE |
| ALL THE ABOVE INS INFO AND NEEDED NEW RECORDED |
| NOC. DV PALMER. |
| |
| 1/30/07 SUBMITTAL BROUGHT IN BY MARK NO FEE SLS |
| 1/30/07 CONTRACTOR MARK ANDREWS TO BRING IN |
| SUBMITTALS NO FEE. DV PALMER. |
| 1/27/07 DENIED CALL TO P/U UNDER 'L' MJACOBS |
| 11/28/06 4TH RESUB SEW |
| 11/21/06 PLANS TAKEN OUT OF PLAN REVIEW CYCLE PER |
| JOHNATHAN LM |
| 11/01/06 3RD RESUB $1350 FEE- MADE CORRETIONS PER |
| PLAN REVIEW-ROUTE TO R BROWN DESK FG |
| 10/18/06 JONATHAN P/U DENIED PLANS SPALMER |
| 10/17/06 CALL FOR P/U (LARGE BINS) "L" ADARROUGH |
| 9/13/06 2ND RESUB PLANS + APP PT |
| 8/3/06 PLANS/APP P/U BY JOHN AJP |
| 8-3-6 CALLED FOR P/U "L" LG PLAN KSTEVENS |
| 7/18/06 PERMISSION TO COMMENCE WORK PRIOR TO |
| PERMIT ISSUANCE BY NM.KC |
| 6/20/06 1ST RESUB NO FEE - ADDRESSING PLAN REVIEW |
| COMMENTS FG |
| 4/7/06 PLANS/APP P/U BY MARK AJP |
| 4-6-06 CALLED TO PICK UP "L" ROLL PLAN ALANGE |