| Miscellaneous Information / Notes |
| NEW TIRE KINGDOM - SEE PROVISOS ON PLAN |
| |
| |
| |
| |
| |
| 04/07/2007 CALLED CUSTOMER LEFT MESSAGE NO BLUE |
| CARD NEEDED TO P/U PLANS FILED **LARGE BINS** "N" |
| MMILLER |
| 3/23/07 SURVEY SUBMITTAL P/U BY ROBERT PT |
| 3/22/07 SURVEY SUBMITTAL TO FILE "N".CALLED GC FOR |
| P/U.KC |
| 3/22/7 SURVEY SUBMITTAL TO KCONRAD DESK SMH |
| 3-22-07 MIKE YOHE PICKUP (2) SHOP DRAWINGS DATED |
| 3-9-07 WL |
| 3/20/7 SUBMITTAL (DENSITIES & EL CERT) ROUTED TO |
| KCONRAD DESK SMH |
| 3/16/07 BLDG SUBMITTAL READY FOR P/U CALLED CONT |
| LEFT MSG FILED UNDER "N" SLS |
| 3/16/7 ONE SUBMITTAL TO SLS DESK SMH |
| 3-14-07 ROBERT CAULLETT PICKUP MECH REV WL |
| 3.14.07 MECH REV CALLED FOR P/U SM BIN UNDER 'N' |
| RJR |
| 3/9/07 BLDG SUBMITTAL (2) SHOP DRAWINGS FOR |
| WINDOWS & GLASS THAT WERE NEVER SUBMITTED SEW |
| 3/9/07 BLDG SUBMITTAL REQUESTED INFO FOR CO SEW |
| 3/7/07 MECH REV FOR EQUIP USED & FRESH AIR INTAKE |
| $70 SEW |
| 3/1/07 BILL P/U ELEC REV SPALMER |
| 2/28/7 CORR BLDG REV, ELEC REV OK, CALLED CONTR, |
| BIG BIN 'N' SMH |
| 02/26/07 ELECTRICAL REV $60 FEE- AS BUILTS FROM |
| SURVEY FG |
| 2/26/07 ANDREW P/U PLANS SPALMER |
| 2/24/07 CALLRD FOR P/U PLANS IN BOX N HM. |
| 02/23/2007 SENT TO HAROLD MOSER'S DESK MMILLER PER |
| CUSTOMER REQUEST MMILLER |
| 02/23/2007 MECHANICAL SUBMITTAL EXPLAINED TO |
| CUSTOMER THAT IF THE INFORMATION HE'S SUBMITTING |
| TODAY IS CONSIDERED A REVISION THAN HE WILL BE |
| CHARGED A REVISION FEE MMILLER |
| 02/23/07 ANDREW P/U MECH REV FG |
| 2-21-07 P MECH/REV. CALLED ANDREW P/U "N" TG. |
| 2/16/07 MECH REVISION $60 SLS |
| 2/12/07 ROBERT P/U MECH REV DATED 2/8/07 SPALMER |
| 2/12/07 CALLED FOR P/U PLANS IN BOX N |
| 2/8/07 MECH SUBMITTAL ENERGY CALS REQUESTED ROUTED |
| TO HMOSER SEW |
| 02/06/2007 PRINTED PERMIT (TRIED TO PRINT RCPT) IN |
| ERROR MMILLER |
| 02/06/07 REV $70 FEE- BLDG & ELECTRICAL COMMENTS |
| ADDRESSED FG |
| 1/30/07 BILL P/U SUBMITTAL & RESUB SPALMER |
| 1/30/07 CALL FOR P/U UNDER(N)LARGE BINS ADARROUGH |
| 01/25/2007 CALLED CUSTOMER APPROVED PLANS READY |
| FOR P/U FILED UNDER "N" MMILLER |
| 1-19-07 ANDREW VALDERRAMA PICKUP BLDG REV DATED |
| 1-11-07 & BLDG SUBMITTAL DATED 1-11-07 WL |
| 1/17/7 SUBMITTAL OK, CALLED CONTR, 'N' SMH |
| 1/17/7 REV OK, CALLED CONTR, FEE DUE $60, 'N'SMH |
| 01/11/07 SUBMITTAL NO FEE- LIVE AND DEAD LOAD WERE |
| CHANGED TO MATCH LITON TRUSS DRAWINGS REQUESTED BY |
| SHILL FG |
| 01/11/07 SUBMITTAL NO FEE- TOWER WALL DETAIL |
| REQUESTED BY SHILL FG |
| 01/11/07 SUBMITTAL NO FEE TRUSS SHOP DRAWINGS |
| ROUTE TO S HILL FG |
| 01/11/07 SUBMITTAL NO FEE JOIST DRAWINGS- |
| REQUESTED BY SHILL FG 01/04/07 CORR STEEL SHOPS |
| P/U BY ANDREW MMILLER 1/4/7 CORR STEEL SHOPS, GVAE |
| TO CONTR IN LOBBY SMH |
| 01/04/07 SUBMITTAL CORR STEEL SHOPS PLANS WAS IN |
| LUIS MARTINEZ OFFICE I (MIRELLE MILLER TOOK FROM |
| HIS OFFICE AND INFORMED HIM AND GAVE THIS TO SAM |
| HIIL AS 01/04/07 MMILLER |
| 01/04/07 SUBMITTAL PLUS PLANS P/U BY ANDREW |
| MMILLER |
| 1/2/7 CORR, CALLED CONTR, 'N' |
| SMH 12/27/06 BLDG SUBMITTAL NO FEE - TRUSS SHOP |
| DRAWINGS SEW |
| 12/11/06 BLDG SUBMITTAL NO FEE- STRUCTURAL STEEL |
| SHOP DRAWINGS FG |
| 12/05/06 REV $400 FEE- MINOR ACRH- STRUC- ELEC REV |
| FG |
| 10/31/06 ANDREW P/U REV DATED 10/23/06 SPALMER |
| 10/26/6 REV OK, CALLED CONTR, 'N' SMH |
| 10/23/06 REV $70 FEE FG |
| 8/22/06 DENIED REV. P/U BY BILL AJP |
| 8/18/06 MOVED TO LARG PLALN BIN "N" AJPE |
| 8/18/06 CALL FOR P/U UNDER(N) ADARROUGH |
| 7/10/06 REV/BLDG PLUMB ZONING FIRE & ENG PT |
| 6/26/06 CHANGE OF CONTR $100 SEW |
| 3/24/06 PERMIT P/U BY CURTIS AJP |
| 3/23/6 ISSUED, CALLED CONTR, BIN 'THOMAS & AHL' |
| SMH |
| 3/23/06 BLDG RESUB PER SAMANTHA NO FEE FOR RESUB |
| APPL ATTACHED TA |
| ********************************************* |
| 3/20/06 PLANS/APP. P/U BY CURTIS AJP |
| ********************************************** |
| ********************************************** |
| |
| 8-22-5 CALLED FOR P/U "D" KSTEVENS |
| 8/23/5 APP P/U BY NAT FG |
| 9/6/05 1ST RESUB NO FEE SPALMER |
| 10-17-05 CHANGE OF CONTRACTOR $100 NFL |
| 10-17-05 DENIED CALLED P/U "D" PES |
| 10-17-5 PLANS PU/CURTIS C - KAM |
| 11/10/05 2ND RESUB $ SPALMER |
| 12/14/05 NAT P/U PLANS TO SUBMIT NEEDED IMPACT |
| FEES/ WILL COME BACK AND GO TO #39 ON BOARD PER |
| DVP/L MARTINEX FG |
| 12/15/05 NAT BROUGHT BACK IN APP AND PLANS WILL GO |
| ON COMM BOARD # 39 FG |
| 12/21/05 4X FEE ADDED FOR BUILDING REVIEW. |
| $7851.00 MUST BE PAID BEFORE PLANS CAN BE |
| RESUBMITTED THE 3RD TIME. FS 553.80(2)B) DV PALMER |
| 1-31-5 CALLED FOR P/U "T" KSTEVENS |
| 1/31/06 PLANS/APP. P/U BY NAT AJP |
| 2-16-06 3RD RESUB $654.35 PLUS $7851.00 4X FEE |
| TOTAL $8505.35 RELEASE HOLD COPY OF PAID RECEIPT |
| IN PKG WL |
| 2/23/06 SUBMITTAL FOR H/C SHUTTERS NO FEE PER |
| SAMANTHA SPALMER |
| 2/28/6 SHUTTER PLAN TO NMK DESK SMH |
| 3/16/6 SHUTTER PLAN OK PER RB SMH |
| 3/18/6 CORR, CALLED CONTR L/M, BIN 'THOMAS AHL'SMH |
| ****NO RESUB FEE ON RESUBMITTAL, IMPACT FEES |
| ONLY**** |