| Miscellaneous Information / Notes |
| "THE EDGE" 16 STORY CONDO WITH 307 UNITS. PARKING |
| ON 1- 5TH FLOORS. 6TH FLOOR POOL AND CLUBHOUSE. |
| |
| |
| |
| |
| |
| 3/18/08 PLANS LEFT OUT FRONT MORE THAN 6MONTHS |
| AFTER CONTRACTOR WAS CALLED AND SPOKEN TO TWICE |
| HAVE BEEN DISPOSED OF. DV PALMER. |
| 8/28/07 MOVED TO LARGE PLAN BIN "C" AJP |
| 8-28-7 CALLED FOR P/U OF PLUMBING REVISIONS AND |
| TALKED TO VALERIE MCBRIDE. TOLD HER THAT THE |
| REVIEW CAN NOT BE DONE BECAUSE OF THE "C.O." BUT |
| THE PLANS HAVE BEEN STAMPED FOR COMPLIANCE.ALSO |
| TOLD HER THE GAS REVISION HAS NOT BEEN DONE |
| BECAUSE THE GAS PERMIT WAS CLOSED OUT ON THE 26TH |
| OF JULY. INDICATED THAT THE RECIEPT AND/OR BLUE |
| CARD WAS REQUIRED TO PICK UP THE REVISIONS. |
| "C-LARGE" KSTEVENS |
| 8/27/07 CERT OF OCC. P/U BY MIKE AJP |
| 08/24/07 TCO $500 FEE RECV'D LETTER ROUTED TO H |
| PISKURA DESK W/COPY OF RECIEPT FG |
| 08/14/07 FA3.01 PLAN SHEET READY FOR P/U "C" MAW |
| 07/30/07 FA REVISION SEE 06100810 FOR PAYMENT |
| HISTORY MAW/FIRE |
| 08/09/07 BLDG REVISION $60 SLS |
| 08/09/07 ARCHITECTECT REV.'S PU BY VALERIE AJP |
| 08/05/07 CALLED VALERIE TO P/U ARCHITECTURAL |
| REVISION. LARGE BINS. 'C'. RB |
| 07/30/07 APPROVED EL. REV. P/U BY MIKE AJP |
| 7/27/07 REV. MOVED TO LARGE PLAN BIN "C" AJP |
| 7/27/07 CALLED FOR P/U "C" MRW RESUBMIT UNDER FA |
| PERMIT. 7/27/07 2ND TCO ISSUED.GIVEN TO MIKE |
| SCOTESE.KC 7/20/07 LETTER SUBMITTED FOR TCO $500 |
| ROUTED TO HPISKURA SEW |
| 7/18/07 APPROVED ENG. REV. P/U BY MIKE AJP |
| 7/12/07 MIKE P/U REV DATED 7/6/07 SPALMER |
| 7/11/07 CALLED FOR P/U REVISED DWGS**LARGE BINS** |
| "C", RVC 7/10/07 REVISED TCO ISSUED, SEE NOTES |
| HHP |
| 7/6/07 ENG SUBMITTAL REVIEW NO FEE PER RASIK SLS |
| 7/2/07 MIKE P/U REV DATED 6/20/07 SPALMER |
| 7/2/07 MIKE P/U REV DATED 4/24/07 SPALMER |
| 7/1/07 CALLED (LEFT MESSAGE), AND E-MAILED VALERIE |
| TO P/U REVISION **LARGE BINS** 'C'. RB |
| 6/29/07 CALLED FOR P/U, BIN "C", RVC |
| 6/28/07 CALLED FOR P/U, BIN "C", RVC |
| 6/27/07 TCO ISSUED SEE NOTES HHP |
| 6/27/07 ENGINEERING REV SUBMITTAL (NO FEE PER |
| LMARTINEZ) SEW |
| 06/27/07 MIKE SCOTESE OF THE EDGE INVESTERS PICKED |
| UP THE DENIED PLANS WHILE HE WAS IN THE LOBBY, |
| BIN "C", RVC |
| |
| 06/27/07 ELEC/FIRE ALARM REV $70 FEE- E3.00- |
| FA3.01 FG |
| 6/27/07 BLDG SUBMITTAL PUNCH LIST CREW LOGISTIC |
| PLAN ROUTED TO HPISKURA (PER KCONRAD) SEW |
| 6-27-07 TCO REQUEST TLR DATED 6-27-2007 GAVE |
| INVOICE TO CONTR REPRESENTATIVE ROUTED LTR TO H |
| PISKURA WL |
| 6/27/07 VALERIE P/U 3 ENG LTRS FOR MECH & ELEC REV |
| DATED 6/20/07 SPALMER |
| 6/27/0 VALERIE P/U MECH SUB M2.01/M2.02/M2.08 |
| SPALMER |
| 6/27/07 VALERIE P/U MECH SUBMITTAL EST/BALANCE |
| REPORT DATED 6/26/07/M |
| 6/26/07 CALLED OR P/U ELECTRICAL JL UNDER "C" |
| 6/26/07 MECH REV M2.01, M2.02, M2.08, T&B REPORT, |
| THREE LETTERS FROM ENGINEER. CALLED FOR P/U. SPOKE |
| TO VALERIE. LG BIN UNDER 'C' RJR |
| 6/26/07 MECH SUBMITTAL TEST & BALANCE REPORTS |
| W/ENGINEERS LETTER SEW |
| 6/26/07 MECH REV M2.02 & M2.08 $70 SEW |
| 6-25-07 VALERIE MCBRIDE PICKUP REV #71 "FA2.14" |
| WL |
| 06/25/07 REVISED PLAN READY FOR P/U UNDER "C" MAW |
| 06/25/07 VALERIE P/U MECH REV DATED 6/22/07 |
| SPALMER |
| 06/23/07 MECH REV (2 SUBMITTALS IN ONE PACKAGE) |
| CALLED FOR P/U. SPOKE TO VALERIE. MECH REVS PAGES |
| M0.01, M1.01A, M2.06A, M2.10, M2.14, M4.06, M4.07 |
| M6.01, M6.02, M8.01. LG BIN UNDER "C" RJR |
| 06/22/07 MECH REV #100 FEE- ROUTED TO R REGUIERO |
| FG |
| 06/22/07 MECHANICAL REV $110 FEE-ROUTED TO R |
| REGUIERO FG |
| 06/22/07 ARCH REV $ 230 FEE FG |
| 06/22/07 SUBMITTAL NO FEE - ROUTED TO H MOSER DESK |
| FG |
| 06/21/07 GAS REV $60 FEE- FG |
| 06/21/07 BLAKE P/U ELECTRICAL REV FG |
| 06/21/07 BLAKE P/U PLUMBING REV FG |
| 6/21/07 CALLED FOR P/U CALLED VALERIE JL |
| PUT OUT FRONT UNDER "C" JL |
| 6-21-7 CALLED FOR P/U. TALKED TO LISA HAMILTON AND |
| INDICATED THAT ALL BUT ONE SHEET HAS BEEN |
| APPROVED. THE OTHER SHEET SHALL BE SUBMITTED UNDER |
| THE GAS PERMIT NUMBER. INDICATED THAT THE RECIEPT |
| AND/OR THE BLUE CARD WILL BE REQUIRED TO RETRIEVE |
| THE REVISIONS. "C" KSTEVENS |
| 06/20/07 MECHR SUBMITTAL NO FEE- LETTER REGARDING |
| ELEVATOR MACHINE ROOM A/C SMOKE DETECOR FG |
| 06/20/07 MECHANICAL SUBMITTAL NO FEE- LETTER |
| REGARDING EMERGENCY GENERATOR ROOM FG |
| 06/20/07 SUBMITTAL NO FEE LETTER REGARDING PIPING |
| ON ROOF FG |
| 06/20/07 ELECT REV $60 FEE FG |
| 06/20/07 MECH REV $60 FEE FG |
| 6/20/07 ENGINEER REV $60 FEE FG |
| 06/20/07 ZONING REV $90 FEE- FG |
| 06/20/07 PLUMB REV $80 FEE- FG |
| 6/18/07 BLAKE P/U SUBMITTAL DATED |
| 4/18.5/3.4/24.6/7 SPALMER |
| 6/18/07 BLAKE P/U MECH REV DATED 6/8/07 SPALMER |
| 6/16/07 CALLED VALERIE FOR SUBMITTAL P/U. LARGE |
| BINS. 'C'. RB |
| 6/16/07 MECH REV M1.01A CALLED VALERIE FOR P/U. SM |
| BIN UNDER "C" RJR |
| 6-15-07 VALERIE MCBRIDE PICKUP 2 REVS M2.01 & |
| M2.08, M7-01, M8-01, & T & B REPORT WL |
| 6/15/07 MECH REV M2.01, M2.08, M7.01, M8.01 AND |
| SUBMITTAL (T&B REPORT) 2 ENVELOPES CALLED FOR P/U |
| SPOKE TO VALERIE LG BIN UNDER "C" RJR |
| 6/14/07 PU BY VALERIE SEW |
| 6-14-7 CALLED FOR P/U TALKED TO LISA H. INDICATED |
| THAT SHE NEEDED HER RECIEPT AND OR/BLUE CARD TO |
| PICK UP PLANS IN "C" KSTEVENS. |
| 6/13/07 PU BY BLAKE SEW |
| 6/12/07 PUT ELECTRICAL REVS OUT FRONT 4 SETS FOR |
| P/U CALLED VALERIE UNDER "C" *LARGE BIN* JL |
| 6/12/07 MECH SUBMITTAL T&B REPORT SEW |
| 6/12/07 MECH REV M7.01 M8.01 $70 SEW |
| 06/08/07 MECHANICAL REV $60 FEE- FG |
| 6/7/07 2 MECH REVISIONS 5/18/07 & 5/23/07 P/U BY |
| VALERIE SLS |
| 6/7/07 BLDG SUBMITTALS ROOF COUNTERFLASHING - |
| TRASH CHUTE SHOP DRWGS - STAIR LANDING DETAIL NO |
| FEE SLS |
| 6/7/07 MECH REVISION # 72 $70 SLS |
| 6/7/07 ELEC REVISION # 71 $80 SLS |
| 6/06/07 MECH REVISION SUBMITTED ON 5/18 AND 5/23 |
| COMBINED-PP M0.01, M1.01A, M2.01, M2.02, M2.04, |
| M2.06, M2.06A, M2.07, M2.08, M2.09, M2.10, M2.13, |
| M2.14, M2.14A, M3.01, M3.01A, M3.01B, M3.02, |
| M3.03, M3.04, M3.05, M3.06, M3.07, M3.08, M3.09, |
| M3.10, M3.11, M3.12, M3.13, M3.14, M3.15. M4.01, |
| M4.06, M6.01, M6.02, M7.01. SPOKE WITH LISA FOR |
| P/U. ONE ROLL IN LG BIN UNDER "C" RJR |
| 6/4/07 PU BY BLAKE SEW |
| 6-4-7 CALLED FOR P/U TALKED TO LISA HAMILTON. |
| INDICATED THAT SHE NEEDS TO BRING THE RECIEPT OR |
| THE BLUE CARD AND THAT THE PLANS WILL BE IN THE |
| "C-LARGE" BIN. ALSO INDICATED THAT SHT A1.14 HAS |
| BEEN ROUTED TO ROBT. BROWN FOR REVIEW AS THERE ARE |
| BUILDING REVISIONS AS WELL AS THE PLUMBING |
| REVISION FOR THE UPPER ROOFS AND INDICATED THAT |
| GAS REVISIONS, (SHT P3.15), SHALL BE SUBMITTED |
| UNDER THE GAS PERMIT, NOT THE BLD-COM PERMIT. |
| KSTEVENS |
| 05/30/07 SUBMITTAL NOP FEE- ROUTED TO H MOSER DESK |
| FG |
| 05/30/07 SUBMITTAL NO FEE- LETTER ROUTED TO J |
| LEAHY DESK FG |
| 05/30/07 REV $60 FEE- REVISED SHEET FA2.14 FG |
| 05/25/07 ELECTRICAL REV $150 FEE FG |
| 05/23/07 MECHANICAL REV $170 FEE- FG |
| 5-18-07 REV #67 MECH $410 (7 PKGS BUNDLED |
| TOGETHER) WL |
| 5-18-07 REV #66 PLUMBING $100 WL |
| 5/16/07 ELEC REV E2.5 E3.00 E4.01 E5.02 E5.03 $70 |
| SEW |
| 5/16/07 MECH REV PU BY MIKE SEW |
| 5/16/07 MECH REV PP M2.01, M2.02, M2.08, M2.09, |
| M2.10, M2.14, M3.01, M4.06, M6.01, M6.02 REV6, |
| M6.02 REV7, M7.01 READY FOR P/U CALLED KIM. LG BIN |
| UNDER 'C' RJR |
| 05/10/2007 MECH REVISION # 64 FEES $60.00 ( SHHET |
| M2.10 RESUBMITTED SHEET M6.01 WAS SUBMITTED |
| 05/09/2007 MMILLER |
| 5/9/07 MECH REV M2.01 M2.02 M2.02 M2.08 M2.09 |
| M2.14 M3.01 M4.06 M6.01 M6.02 REV 6 M6.02 REV 7 & |
| M7.01 SEW |
| 5/9/07 PU BY BLAKE SEW |
| 5/9/07 MECH REV: M1.01A M2.04 M2.05 M2.06 M2.06A |
| M2.08 M2.13 M4.05 M5.01 READY FOR P/U CALLED CONTR |
| OFFICE # SEVERAL TIMES, BUSY SIGNAL. LG BIN UNDER |
| 'C' RJR |
| 5-8-07 KIMBERLY BUONO PICKUP MECH REV WL |
| 5/8/07 MECH REV PG SKM-1 ONLY. CALLED FOR P/U SM |
| BIN UNDER 'C' RJR |
| 05/04/07 MECHANICAL REV $160 FEE- FG |
| 05/03/2007 PLUMBING REVISION FEES $ 60.00 |
| (CONDENSATE CHANGE UNITS THAT WERE RELOCATED) |
| MMILLER |
| 05/03/2007 BLDG SUBMITTAL SHOP DRAWINGS ADDED |
| STOREFRONT WINDOW & DOOR MMILLER |
| 04/27/07 KIMBERLY P/U ENGINEERING AND ZONING REV |
| FG |
| 04/27/07 KIMBERLY P/U MECHANICAL SMOKE CONTROL |
| REV FG |
| 04/27/07 KIMBERLY P/U ELECTRICAL/FIRE REV FG |
| 04/27/07 KIMBERLY P/U MECH REV FG |
| 4/27/07 NO ANSWER ON SITE TELEPHONE NUMBER. |
| E-MAILED VALERIE TO P/U ELEVATOR LOBBY REVISION. |
| 'C'. RB |
| 04/26/07 RAG SILENCER SUBMITTAL CALLED FOR P/U LG |
| BIN UNDER "C" RJR |
| 04/25/07 MECH REV M7.01 CALLED FOR P/U *LARGE BIN* |
| "C" RJR |
| 04/24/07 BLDG SUBMITTAL SHOP DRAWINGS/CALCS STAIRS |
| #1 & #2 SEW |
| 04/24/07 BLDG REV 16-0 $60 SEW |
| 04/20/07 MECH REV $60 SPALMER |
| 04/20/07 ELEC REV $60 SPALMER |
| 04/18/07 PLUMBING REV P201A P208 P209 P215 P303 |
| P307 P312 P315 P402 A114 SEW |
| 04/16/07 ELEC REV E101 E201 E206 E208 E215 E401 |
| E501 E503 & E601 SEW |
| 04-16-07 MECH SUBMITTAL "EQUAL" ALTERNATE FOR |
| RUSKIN #GSV RETURN AIR GRILLE SILENCERS WL |
| 04/12/2007 APPROVED PLANS THAT WAS SUBMITTED 04/09 |
| & 4/10 HAS BEEN P/U BY KRISTINE MMILLER |
| 04/12/07 2 SETS MECH REVS READY FOR P.U. SUBMITTED |
| 04/9 AND 4/10. LG BIN UNDER 'C' RJR |
| 04/11/2007 ZONING & ENGINEERING REVISION (CIVIL |
| REVISION TRASH ENCLOSURE FUEL ACCESS ROAD AND |
| GRODES @SOUTH END OF PROPERTY & LANDSCAPE FOR |
| TRASH ENCLOSURE FEES $130.00 MMILLER |
| 04-11-07 MIKE SCOTESE PICKUP BLDG/FIRE REV DATED |
| 02-21-07 BLDG SUBMITTAL DATED 2-9-07 "WINDOW SHOP |
| DRAWINGS", BLDG/FIRE SUBMITTAL DATED 2-21-07 "FIRE |
| RATED EXPANSION JOINT JUDGEMENT FOR CORRIDOR, & |
| BLDG SUBMITTAL EXTERIOR FRAMING DETAILS & CALCS |
| DATED 2-22-07 WL |
| 04/11/07 E-MAILED VALERIE TO P/U SUBMITTALS AND |
| REVISIONS.**LARGE BINS** 'C'.RB |
| 04/10/2007 MECHANICAL REVISION FEES $70.00N RISER |
| DIAGRAMS & EQUIPMENT SCHEDULE) MMILLER |
| 04/10/07 VALERIE P/U MECH REV DATED 4/3/07 SPALMER |
| 04/10/07 MECH REV READY FOR P/U PG M5.04 SUBMITTED |
| 4/3/07 SM BIN UNDER "C" RJR |
| 04/09/2007 MECHANICAL REVISION (FEES $440.00 (MO |
| THRU M8.01) MMILLER |
| 04/5/07 BLAKE P/U PLUMB REV DATED 3/16/07 SPALMER |
| 04/5/07 BLAKE P/U ELEC REV DATED 3/27/07 SPALMER |
| 04/3/07 ELEC REV OK,CALLED, UNDER "C" FOR PU, |
| SPOKE TO LISA H, TOLD TO BRING IN BLUE CARD. DV |
| PALMER. 4-3-7 CALLED FOR P/U PLMG REV "C" |
| KSTEVENS |
| 04/3/07 MECHANICAL REV $60 FEE-SHEET M5.04 |
| FLAMEBOR/DAMPER ASSEMBLY FG |
| 03/28/07 BLAKE P/U MECH REV DATED 3/27/07 SPALMER |
| 03/27/07 MECH REV 3.01 CALLED FOR P/U SM BIN UNDER |
| "C" RJR |
| 03/27/07 ELECTRICAL REV $60 FEE- ADDED ELEVATOR |
| MACHINE ROOM A/C FG |
| 03/27/07 MECHANICAL REV $60 FEE- ROUTED TO R |
| REGUERIO DESK FG |
| 03/27/07 BLAKE P/U PLUMB REV DATED 3/1/07 SPALMER |
| 03/27/07 BLAKE P/U MECH REV DATED 3/23/07 & |
| 03/16/07 SPALMER |
| 03/26/07 MECH REV DATED 3/16 CALLED FOR P/U LG BIN |
| UNDER 'C' RJR |
| 03/23/07 MECHANICAL REV $70 FEE- BLDG DEPT |
| COMMENTS (ATTACHED) FG |
| 03/23/07 BLAKE P/U REV (ENGINEER) CIVIL REVISIONS |
| FG |
| 3/22/07 CALLED DENIED P/U **LARGE BINS** "C", RVC |
| |
| 3/19/07 BLAKE P/U REV DATED 2/14/07 SPALMER |
| 3-16-7 CALLED FOR P/U "C" **LARGE BINS** KSTEVENS |
| 3/7/07 CIVIL REV TRASH ENCLOSURE & FUEL ACCESS RD |
| SEW |
| 3/6/07 BLAKE P/U MECH REV DATED 2/8 2/9 3/1 & 3/5 |
| SPALMER |
| 3/6/07 MECH REVS 4 SEPARATE PACKS FROM 2/8,2/9,3/1 |
| AND 3/5 CALLED FOR P/U LARGE BIN UNDER 'C' RJR |
| 3/5/07 BLAKE P/U SHEET M2.10 OF THE 5 SUBMITTED |
| EARLIER PER RON R SPALMER |
| 3/5/07 MECH REVISION $100 GIVEN TO RON REGUEIRO |
| SLS |
| 3/1/07 PLUMBING REV |
| P201A/202/202A/208/209/210/303/307/312/313/314/401 |
| SEW |
| 3/1/07 MECH REV MC14A/M403/M405/M601 $90 SEW |
| 02/22/07 BLDG SUBMITTAL NO FEE EXTERIOR FRAMING |
| DETAILS AND CALCULATIONS FG |
| 02/22/07 OVERTIME INSPECTION $300 FEE- ROUTED TO |
| INSPECTOR FG |
| 2/21/07 REV TO SHOW SHAFT WALL @ EXPANSION JT/AMM |
| 02/14/07 PLUMBING REV $80 FEE- FG |
| 2/12/07 BLAKE P/U 3 SUBMITTALS SPALMER |
| 2/11/07 CALLED BLAKE FOR SUBMITTAL P/U.'C'.RB |
| 2/9/07 BLDG SUBMITTAL SHOP DRAWINGS SEW |
| 2/9/07 MECH REV CORRECT BACKGROUND $60 SEW |
| 2/9/07 PLUMBING REV COORDINATION SEW |
| 2/8/07 MECH REC ADDED FIRE DAMPERS $80 SEW |
| 02/07/07 BLAKE P/U MECH REV FG |
| 2/6/07 MECH REVS 2 PACKAGES CALLED FOR P/U LARGE |
| BIN UNDER 'C' RJR |
| 2/2/07 (2) BLDG SUBMITTALS ELEV MACHINE RM STAIR |
| SHOP DRAWINGS & SANDSET PAVER UPLIFT TESTS SEW |
| 1/29/07 BLAKE P/U MECH REV SPALMER |
| 1/27/07 CALLED FOR P/U PLANS IN BOX C HM. |
| 1-24-07 BLAKE WAGNER PICKUP 2 MECH REV WL |
| 1/24/07 MECH/ELEC INSP FOR SATURDAY 1/27/07 ROUTED |
| TO HMOSER & JLEAHY $600 SEW |
| 1/24/07 MECH REV SEW |
| 1/23/07 BLAKE P/U PLUMB REV SPALMER |
| 1-23-7 CALLED FOR P/U PLMG REV "C" KSTEVENS |
| 01/22/2007 PLEASE SEE NOTES MMILLER |
| 01/22/2007 MECHANICAL REVISION FEES $ 70.00 |
| MMILLER |
| 1/22/07 BLAKE P/U REV DATED 1/8/07 SPALMER |
| 1/19/07 TWO REVISIONS READY. CALLED CONTR. FOR P/U |
| SMALL BIN UNDER 'C' RJR |
| 1/16/07 SUBMITTAL REQ BY DICK BOWMAN NO FEE SLS |
| 1/12/07 CALLED TO P/U **LARGE BINS** "C", RVC |
| 1/10/07 MECH SUBMITTAL MISSING PAGES SEW |
| 1/10/06 PLBG REVISION $ 80 SLS |
| 1/8/07 BLAKE P/U POOL EQUIP REV & VERT HEAT PUMP |
| REV SPALEMR |
| 1/8/07 BLAKE P/U STRUCTURAL & ARCHITECTURAL REV |
| 11&12 & POUR 16 SPALMER |
| 01/08/07 ENGINEERING REVISION FEES |
| 1/7/07 E-MAILED NATASHA AND VALERIE FOR |
| SUBMITTAL/REVISION P/U. LARGE BINS.'C'. RB |
| 01/06/07 CALLED FOR P/U PLANS IN BOX C HM. |
| 01/02/2007 MECHANICAL REVISION FEES $ 60.00 |
| MMILLER |
| 01/02/2007 MECHANICAL REVISIONS FESS $ 60.00 |
| MMILLER |
| 12/21/06 MECH REV HEAT PUMPS & DUCT WORK LAYOUT |
| SEW |
| 12/18/06 BLDG SUBMITTAL NO FEE- POUR #16 PARKING |
| GARAGE (CLUBHOUSE ROOF)-ROUTED TO K CONRAD DESK |
| FG |
| 12/08/06 BLDG SUBMITTAL NO FEE- EXTERIOR FRAMING |
| COMPONENTS ETC FG |
| 12/07/06 BLAKE P/U DENIED GAS REV DATED 11/17/06 |
| SPALMER |
| 12-06-06 CALLED FOR P/U GAS REG. "C" KSTEVENS |
| 12/05/06 BLAKE P/U BLDG SUBMITTAL DATED 11/17/06 |
| SPALMER |
| 12/05/06 BLAKE P/U BLDG REV DATED 11/14/06 |
| SPALMER |
| 12/05/06 BLAKE P/U MECH REV DATED 11/29/06 |
| SPALMER |
| 12.4.06 MECH REV READY FOR P/U. SMALL BIN UNDER |
| 'C' EMAIL TO NATASHA RJR |
| 12/04/06 BLDG REV $280.00 MMILLER |
| 12/3/06 E-MAILED NATASHA FOR SUBMITTAL/REVISION |
| P/U. 'C'. RB |
| 11/30/06 BLDG REV (STRUCTURAL REV #11 & 12) $130 |
| TA |
| 11/29/06 SUBMITTALL NO FEE- 11TH -16TH FLOOR |
| MECHANICAL PLANS IN RESPONSE TO PROVISOFROM RON |
| REGUERIO DATED 11/21/06 FG |
| 11/27/06 BLAKE P/U REV DATED 11/17/06 SPALMER |
| 11.21.06 MECH REV CALLED FOR P/U LARGE BIN UNDER |
| 'C' RJR |
| 11/17/06 BLDG SUBMITTAL GRAB BAR LOAD TEST RESULTS |
| SEW |
| 11/17/06 PLUMBING SUBMITTAL ADD'L COPIES OF GAS |
| REGULATOR SUBMITTAL SEW |
| 11/17/06 PU BY BLAKE SEW |
| 11/17/06 CALLED NATASHA FOR SUBMITTAL LETTER P/U. |
| 'C'. RB |
| 11/15/06 BLDG SUBMITTAL ARCHITECT LETTER IN |
| RESPONE TO RBROWNS COMMENTS SEW |
| 11/15/06 MECH REV SEW |
| 11/14/06 BLDG REVISION $60 SLS |
| 11/14/06 BLAKE P/U REV DATED 11/13/06 SPALMER |
| 11.13.06 EMAIL TO NATASHA MECH REVISIONS READY FOR |
| P/U LARGE BIN UNDER 'C' RJR |
| 11/13/06 12 REV P/U BY BLAKE FG |
| 11/13/06 SHEET A1-9 P/U BY BLAKE FG |
| 11/13/06 RAISED SHEETE A5-11 P/U BY BLAKE FG |
| 11/10/06 E-MAIL TO NATASHA AND VALERIE TO P/U |
| REVISIONS AND SUBMITTALS.'C' LARGE BINS. RB |
| 11/06/06 KRISTIN P/U MECH SUB 11/01/06 SPALMER |
| 11/6/06 MECH REV (10TH FL) $90 TA |
| 11.4.06 MECH LETTER AND REVISION (ONE ENVELOPE) |
| SMALL BIN UNDER 'C' RJR |
| 11/2/06 SHERRY P/U MECH REV & SHORING LTRS |
| SPALMER |
| 11.1.01 MECH REV DENIED. CALLED FOR P/U **LARGE |
| BINS** 'C' RJR |
| 11/1/06 SHORING LETTERS: NW ANDSW LANTERN ROOF |
| SLABS AT TOWER.TO BOX 'C'.KC |
| 11-1-06 (2 MECH SUBMITTALS) 1 OF SUBMITTALS TO BE |
| ROUTED TO P KRAUSS PER DICK BOWMAN WL |
| 11-1-06 BLAKE WAGNER PICKUP PLUMBING REV DATED |
| 10-27-06 WL |
| 11-01-06 CALLED FOR P/U PLMG REV. "C" KSTEVENS |
| 10-31-06 BLAKE WAGNER PICKUP "POOL HTR SUBMITTAL |
| DATED 8-24-06" WL |
| 10-31-06 CALLED FOR GAS SUBMITTAL P/U "C" |
| KSTEVENS |
| 10/27/06 PLUMBING REV GAS SEW |
| 10/27/06 MECH REV SEW |
| 10/27/06 SHERRY P/U SUBMITTAL DATED 10/04/06 |
| SPALMER |
| 10/27/06 SHERRY P/U MECH REV DATED 10/20/06 |
| SPALMER |
| 10.26.06 MECH REVISIONS CALLED FOR P/U LARGE BIN |
| UNDER "C" RJR |
| 10/26/06 SUBMITTAL OF 5 P/T STRESSING REPORTS |
| SPALMER |
| 10/26/06 SUBMITTAL GRAB BAR LOAD TEST SPALMER |
| 10/26/06 CALLED FOR P/U OF SUBMITTALS IN BOX C |
| HM. |
| 10/25/06 BLAKE P/U SUBMITTAL EPS FOAM DATED |
| 10/18/06 SPALMER |
| 10/25/06 BLAKE P/U SUBMITTAL FIRESTOPPING DATED |
| 9/29/06 SPALMER |
| 10/24/06 CALLED ANDY FOR FIRESTOPPING SUBMITTAL |
| P/U. 'C'. RB |
| 10/22/06 E-MAILED NATASHA FOR EPS FOAM SUBMITTAL |
| P/U. 'C'. RB |
| 10/20/06 MECH REVISION $140 SLS |
| 10/20/06 BLDG REVISION $70 SLS |
| 10/18/06 SUBMITTAL NO FEE- PRODUT DATA FOR RAISED |
| STUCCO /FOAMS THAT SHOW FLAME SPREAD & DEVELOPMENT |
| TO COMPLY WITH CODE-FORWARD TO R BROWN FG |
| 10/18/06 NATASHA P/U REV DATED 10/13/06 SPALMER |
| 10.16.06 MECH REV. CALLED FOR P/U LARGE BIN UNDER |
| 'C' RJR |
| 10/13/06 BLDG SUBMITTAL NO FEE TOWER NORTH WEST |
| LANTERN ROOF SLAB-ROUTED TO K CONRAD FG |
| 10/13/06 REV $110 FEE- MECHANICAL REV SHEETS FG |
| 10/13/06 REV $80 FEE SHEET A1- 9 6TH FLOO AMENITY |
| DECK FG |
| 10/11/06 PLUMB SUBMITTAL OF GAS REGULATOR (NOTE |
| #5F) NO FEE TA |
| 10/4/06 BLAKE P/U REV DATED 9/27/06 SPALMER |
| 10/04/06BLDG SUBMITTAL NO FEE- NOA CHANGED PER K |
| CONRAD FG |
| 10/04/06 MECH SUBMITTAL NO FEE- NEW WIRLPOOL DRYER |
| (MODEL# LEW00509) REQUESTED BY RON REGUEIRO FG |
| 10/4/06 BLDG SUBMITTAL NO FEE- INTERIOR STAIR SHOP |
| DRAWING FG |
| 1.3.06 MECH REV. CALLED FOR P/U **LARGE BINS "C" |
| RJR |
| 10/3/06 SHORING LETTER ON SW LANTERN ROOF SLAB |
| TOWER GIVEN TO KEN CONRAD SLS |
| 9/29/06 BLDG SUBMITTAL (FIRE STOPPING DETAILS) NO |
| FEE TA |
| 9/27/06 SUBMITTAL (MONTIGO MODEL L38DF) NO FEE. TA |
| 9/27/06 BLDG REV (REV BASEBOARD) $60 TA |
| 9/27/06 SUBMITTAL OF CFE'S ARCHITECT'S RESPONSE NO |
| FEE. TA |
| 9-27-06 REV #19 MECH $90 REV FOR 6TH FLOOR UNITS |
| ATTEN ROUTED TO AISHA TO ROUTE TO HAROLD MOSER WL |
| 9/25/06 BLDG REV (WINDOW SHOP DRAWING) $120 TA |
| 9/21/06 NATASHA P/U REV DATED 8/28/06 SPALMER |
| 9/21/06 NATASHA P/U REV DATED 9/13/06 SPALMER |
| 9/21/06 SUBMITTAL OF SE LARTERN ROOF SLAB. NO FEE |
| TA |
| 9/21/06 CALLED FOR P/U PLANS IN BOX C HM. |
| 9/21/06 CALLED FOR P/U PLANS IN BOX C HM. |
| 9/14/06 SUB/BLDG MECHANICAL ROOM ROOF SLAB PT |
| 9/14/06 SUB/BLDG SHORING PT |
| 9-13-06 REV # 17 $80 MECH WL |
| 9-13-06 SHERRY HARRIS PICKUP REV WL |
| 9/12/06 REVISIONS UNDER "C" (LARGE BINS), CALLED |
| KIM FOR PICK UP. DV PALMER |
| 8/31/06 MANY SUBMITTALS P/U BY SHELLY AJP |
| 8/29/06 CALLED ANDY TO P/U MULTIPLE SUBMITTALS |
| (LARGE BINS) 'C'. RB |
| 8/28/06 MECH SUBMITTAL OF TOWER SHORING HIGH ROOF. |
| TA |
| 8/28/06 BLDG SUBMITTAL OF POUR #1 6TH FL STRESSING |
| & REPORTS. NO FEE. TA |
| 8/24/06 BLDG REV SEW |
| 8/24/06 (2) BLDG SUBMITTALS P/T STRESSING/LIFTOFF |
| REPORTS 2ND FLOOR SEW |
| 8/24/06 PLUMBING SUBMITTAL POOL HTR/SPA SEW |
| 8/23/06 TWO MECH. REV.'S P/.U BY BLAKE AJP |
| 8/22/06 CALLED FOR P/U PLANS IN BIG BOX C HM. |
| 8-22-06 NO FEE BLDG SUBMITTAL "TOWER ELEVATOR |
| MACHINE ROOM SLAB**PLEASE GIVE TO KEN CONRAD**WL |
| 8/21/06 TWO REVISIONS--APPPROVED ELECTRICAL AND |
| DENIED PLUMBING-- P/U BY BLAKE AJP |
| 8/21/06 MOVED TO LARGE PLAN BIN "C" AJP |
| 8/20/06 ELEC REV OK,CALLED FOR PU. UNDER |
| "C",(LARGE BINS) DV PALMER |
| 8-19-6 CALLED FOR P/U PLMG REV "C" KSTEVENS |
| 8/18/06 PLUMBING SUBMITTAL TO KSTEVENS SEW |
| 8/17/06 MECH REVISION 6TH FLR GIVEN TO HAROLD |
| MOSER $80 SLS |
| 8/17/06 MECH REVISION 7-10 FLRS GIVEN TO HAROLD |
| MOSER $110 SLS |
| 8/17/06 GARAGE SHORING DETAILS AND HIGH ROOF |
| SHORING GIVEN TO KEN SLS |
| 8/16/06 MECH RV. P/U BY BLAKE AJP |
| 8/16/07 CALLED FOR P/U PLANS IN BOX C HM. |
| 8/16/06 SHORING LETTERS FOR ROOF POUR #2 P/U BY |
| BLAKE AJP |
| 8/15/06 SHORING/FORM LETTER:TOWNHMES-ROOF |
| POUR#2.CALLED G/C FOR P/U.KC |
| 8/15/06 POUR 6- SUBMITTAL NO FEE FG |
| 8/15/06 POUR # 4 SUBMITTAL NO FEE FG |
| 8/15/06 P/T STRESSING REPORTS 4TH FL TOWN HOME |
| POUR # 1 FG |
| 8/15/06 SUBMITTAL NO FEE- TOWN HOME ROOF POUR #2 |
| FG |
| 8/15/06 SUBMITTAL NO FEE- INSTALL TRASH CHUTE FG |
| 8/14/06 ELECTRICAL REV $120 FEE FG |
| 8/10/06 MULTLIPLE SUBMITTALS (SEE ENTRY BELOW BY |
| RB ON 8/6,) P/U BY SHERR, (PERMITTING SOLUTIONS) |
| AJP |
| 8/9/06 MECH REVISION $80 GIVEN TO HAROLD MOSER |
| SLS |
| |
| 8/7/06 SUBMITTAL OF REV TO TOWN HOME ROOF SHORING. |
| NO FEE. TA |
| 8/7/06 SUBMITTAL OF TOWN HOMES ROOF ADVR #1 (NORTH |
| SECTION). NO FEE TA |
| 8/6/06 CALLED BLAKE AND ANDY TO P/U MULTIPLE |
| SUBMITTALS (LARGE BINS) 'C'. RB |
| 8/4/06 ENGINEEERING LETTERS(7) AND ONE APPROVED |
| MECH.; REV. P/U BY BLAKE AJP |
| 8/3/06 CALLED FOR P/U PLANS IN BOX C HM. |
| 8/2/06 SHORING LETTERS/TOWNHOMES LEVEL5-POUR#2.TO |
| INCOMING "C"CONTACTED G/C FOR P/U.KC |
| 8/2/06 SHORING LETTERS/LEVEL 5-POUR#3 GARAGE.TO |
| INCOMING "C".KC |
| 8/2/06 CORRECTED ELEC REV FEES TO #05120685/AMM |
| 8/1/06 SUBMITTAL OF POST TENSION ROOFING CACS. NO |
| FEE. TA |
| 7/28/06 BLDG SUBMITTAL 5TH FL POUR #2 |
| 7/28/06 MECH REVISION GIVEN TO HAROLD M $80 SLS |
| 7/27/06 PLUMBING REVISION $110 SLS |
| 7/27/06 BLDG SUBMITTAL SHORING/RESHORING CALCS SEW |
| 7/25/06 - 8 SUBMITTALS/P/T STRESSING REPORTS 16TH |
| FL/P/T STRESSING & LIFT OFF REPORTS 14TH FL/GARAGE |
| ROOF SHORING/P/T STRESSING & LIFT OFF REPORTS 12TH |
| FL/P/T STRESSING & LIFT OFF REPORTS 10TH FL/P/T |
| STRESSING REPORTS 3RD FL TOWNHOMES/TOWNHOMES 5TH |
| FL/SHORING & TRANSFORMER VAULT PT |
| 7/25/06 SUBMITTAL OF 5TH LVL POUR #3. NO FEE. TA |
| 7/21/06 BLDG SUBMITTAL OF ROOF POUR #2.NO FEE TA |
| 7/21/06 BLDG SUBMITTAL OF SHORING/RESHORING & |
| CALCULATIONS. NO FEE. TA |
| 7/20/06 (2) BLDG LETTER SUBMITTALS 9TH FL & 15TH |
| FL PT LOGS SEW |
| 7/18/06 MECH. REV. P/U BY ALISON AJP |
| 7-18-06 P MECH/REV. LEFT MSG. P/U "C" TG. |
| 7/18/06 BLDG SUB 4TH FL POUR # 2 TOWNHOMES SEW |
| 7/17/06 BLDG SUBMITTAL 16TH FL ROOF POUR # 1 SEW |
| 7/17/06 PU BY CHRISTIN SEW |
| 7/12/06 BLDG SUBMITTAL GARAGE POUR # 2 SEW |
| 7/11/06 MECH REV $ 80 FEE FG |
| 7/11/06 SHORING INSTALLATION-TOWER ROOF LETTERS |
| 4TH LEVEL POUR # 1 LETTERS GIVEN TO KEN CONRAD |
| SLS |
| |
| 7-6-06 MICHAEL JANOWSKI P/U BLDG/ELEC/MECH |
| REVISION. RB |
| 7/6/06 REV READY FOR P/U (C) ADARROUGH |
| 7/6/06 SUB/BLDG 16 FLR POUR #2 LETTERS SLS |
| 6/30/06 SUB/BLDG (TOWNHOMES 3RD FL POUR #2) PT |
| 6/30/06 SUB/BLDG 6TH LEVEL POUR #1/GARAGES PT |
| 6/28/06 BLDG-ELEC-PLUMB-MECH- GENERAL FIELD |
| CHANGES $ 830 FEE FG |
| 6/27/06 1ST FLOOR POUR # 1 FOR KEN CONRAD SLS |
| 6/23/06 3RD FLOOR POUR # 1 FOR KEN CONRAD SLS |
| 6/23/06 SUBMITTAL LETTERS INSP #1 INTERM SLAB IN |
| XFRMR VAULT SEW |
| 6/19/06 SHORING LETTERS SUBMITTED NO FEE SLS |
| 6/16/06 SUBMITTAL OF SHOP DRAWINGS. NO FEE TA |
| 6/15/06 SHORING PLANS TO INCOMING FOR PLAN |
| REVIEW.TOWNHOME 2ND LEVEL SHORING PLAN.KC |
| 6/15/06 SHORING LETTERS:TOWNHOMES POUR#1/2ND |
| FLR,PKG GRG POUR #2/5TH FLOOR,TOWER15TH |
| FLR/POUR#1,TOWER 14TH FLR/POUR#2. CALLED G/C FOR |
| P/U.KC |
| 6/15/06 (8)SUBMITTALS GARAGE-5THFL POUR #3 TOWER |
| 2NDFL POUR #1 TOWNHOUSES LEVEL #2 POUR #2 8THFL |
| POUR #1 TOWER 7THFL POUR #1 TOWER 6THFL POUR #1 |
| TOWER 4THFL POUR #1 TOWER 3RDFL POUR #1 |
| 6/14/06 BLDG SUBMITTAL NO FEE-TOWER 15TH |
| FLOOR-POUR # 1-ROUTE TO K CONRAD DESK FG |
| 6/12/06 KRISTIN P/U POUR LTRS SPALMER |
| 6/9/06 SUBMITTAL GARAGE 5TH LEVEL POUR 2/TOWNHOMES |
| 2ND FL POUR 1/TOWNHOME 2ND LEVEL SHORING NO FEE |
| PLACED IN KEN CONRADS IN BOX SPALMER |
| 6-7-06 SUBMITTAL LTR POUR 2 14TH FLR TOWER (ROUTED |
| TO KEN CONRAD) WL |
| 6/5/06 SUBMITTAL LETTER FOR KEN CONRAD SLS |
| 6/1/06 SHORING LETTERS SUBMITTED NO FEE SLS |
| 5/31/06 SHORING LETTERS FOR GARAGE 4TH |
| FLOOR/POUR#3,12TH FLOOR POUR #2,11TH FLOOR POUR#1 |
| AND 11TH FLOOR POUR#2.TO 'C'INCOMING.CONTACTED G/C |
| FOR P/U.KC |
| 5/26/06 BLDG SUBMITTAL ROUTED TO KEN CONRAD SLS |
| 5/24/06 BLDG SUBITTAL NO FEE ROUTED TO K CONRAD FG |
| 5/22/06 PU BY SHERRY SEW |
| 5/19/06 REVISED SHORING LETTER/10TH FLOOR POUR |
| 2,POUR#4 OF THE PARKING GARAGE SHORING LETTER |
| REVISED INDICATING GRIDLINES,REVISED SHORING |
| LETTER/POUR#5 PARKING GARAGE,PARKING GARAGE |
| SHORING LETTER 4TH FLOOR POUR #1&3RD FLOOR POUR |
| #1.CONTACTED G/C FOR P/U. TO INCOMING 'C'.KC |
| 5/19/06 BLDG SUBMITTAL OF GARAGE 4TH FL POUR #2. |
| NO FEE. TA |
| 5/18/06 BLDG SUBMITTAL 12TH FLOOR SLAB POUR # 1 |
| SEW |
| 5/12/06 BLDG SUBMITTAL GARAGE 4TH FLR POUR # 1 |
| ROUTED TO KEN CONRAD SLS |
| 5/11/06 BLDG SUBMITTAL NO FEE ROUTED TO K CONRAD |
| DESK -LETTERS FG |
| 5/5/06 SHORING LETTER:10TH FLOOR/POUR#2.TO G/C.KC |
| 5/5/06 SHORING LETTER:9TH FLOOR/POUR#2.KC |
| 5/5/06 PARKING GARAGE SHORING LETTER:GRIDLINES PD |
| NORTH TO GRID P24 EAST.POUR #6.CONTACTED G/C FOR |
| P/U.KC |
| 5/5/06 SUBMITTAL NO FEE-TOWER SHORING ROOF ROUTED |
| TO K CONRAD FG |
| 5/5/06 SUBMITTAL NO FEE -GARAGE SHORING POUR-5-6 |
| AND 9 ROUTED TO K CONRAD FG |
| 5/5/06 SUBMITTAL NO FEE -GARAGE RESHORING POUR-5-6 |
| AND 9 ROUTED TO K CONRAD FG |
| 5/5/06 SUBMITTAL NO FEE -GARAGE RESHORING POUR |
| -7-8-10-11-AND 12 ROUTED TO K CONRAD FG |
| 5/5/06 SUBMITTAL NO FEE- GARAGE SHORING POUR-4-5-7 |
| AND 10 ROUTED TO K CONRAD FG |
| 5/5/06 SUBMITTAL NO FEE -GARAGE SHORING POUR-8-11 |
| AND 12 ROUTED TO K CONRAD FG |
| 5/5/06 SUBMITTAL NO FEE- 11TH FLOOR SHORING |
| CLARIFICATION LETTERS FG |
| 5/5/06 SUBMITTAL NO FEE -GARAGE 3RD LEVEL-POUR #4 |
| REVISED LETTER FROM ENGINEER FG |
| 5/5/06 SUBMITTAL NO FEE -GARAGE RESHORING NO FEE |
| FG |
| 5/5/06 SUBMITTAL NO FEE -TOWER ROOF SHORING |
| CALCULATION-FG |
| 5/5/06 SUBMITTAL NO FEE LETTERS FROM JA PAIT WITH |
| GUIDELINES GARAGE-POUR 5 |
| 5/5/06 SUBMITTAL NO FEE FOR K CONRAD 11TH FLOOR |
| POUR #1 FG |
| 5/5/06 REVISED LETTER FROM JIM PAIT WITH ADDED |
| GUIDELINES FOR K CONRAD FG |
| ******************************** |
| 5/3/06 SUBMITTAL NO FEE ROUTED TO K CONRAD FG |
| 5/01/06 SUBMITTAL NO FEE FG |
| 4/28/06 SHORING LETTERS P/U BY SHERRY AJP |
| 4/28/06 GARAGE POUR #4:DENIED.ENG'RG LETTER TO |
| INDICATE GRIDLINES.NOTIFIED G/C.TO "C" BOX.KC |
| 4/27/06 SUBMITTAL NO FEE 10TH FLOOR POUR 2 LTRS TO |
| KEN CONRADS DESK SPALMER |
| 4-26-06 NO FEE SUBMITTAL 3RD FLOOR 2ND POUR LETTER |
| WL |
| 4/21/06 BLDG SUBMITTAL OF 10TH FLOOR POUR 1 SEW |
| 4/20/06 BLDG SUBMITTAL OF GARAGE POUR 7 & 10 |
| SHORING TA |
| 4/20/06 BLDG SUBMITTAL SHORING TOWER 12-16 & ROOF |
| TA |
| 4/19/06 BLDG SUBMITTAL GARAGE 3RD LEVEL POUR1 OR |
| 4TH POUR PLACED IN K CONRAD'S IN BOX SPALMER |
| 4/14/06 BLDG SUBMITTAL 9TH FL 2ND POOR NO FEE TA |
| 4/12/06 BLDG SUB FOR 6TH FL UNIFORM & BONDED NO |
| FEE TA |
| 4/10/06 BLDG SUBMITTAL TOWER SHORING 12TH & 16TH |
| FL FOR KC NO FEE TA |
| 4/6/06 SUBMITTAL LETTER OF 9TH FLOOR POUR 1 SEW |
| 4/5/06 BLDG SUBMITTAL OF POUR LTRS/UNIFORM & |
| BANDED NO FEE TA 4/03/06 NADINE P/U SHORING |
| LETTERS FG |
| 04/03/06 2 BLDG SUBMITTAL NO FEE ROUTED TO K |
| CONRAD/INCOMING FG |
| 3/31/06 SHORING LETTERS:8TH FLOOR/2ND POUR |
| OK.CALLED G/C FOR P/U.TO 'C' BOX.KC |
| 3/30/06 SHORE LETTERS 8TH FLOOR POUR#1 AND GARAGE |
| 2ND FLOOR POUR#2 PU BY SHERRY SEW |
| 3/30/06 POUR LETTER 8TH FLOOR POUR #2 NO FEE |
| ROUTED TO KCONRAD SEW |
| 3/30/06 BLDG REV SEW |
| 3/28/06 SHORING LETTER FOR 8TH FLOOR/POUR#1 AND |
| GARAGE SHORING LETTER FOR 2ND FLOOR/POUR#2 TO BOX |
| "C".CALLED G/C FOR P/U.KC |
| 3/27/06 SUBMITTAL NO FEE GIVEN TO KC TA |
| 3/24/06 ALLISON P/U LETTERS FG |
| 3/24/06 SUBMITTAL NO FEE ROUTED TO K CONRAD FG |
| 3/24/06 SUBMITTAL NO FEE-REQUESTED BY K STEVENS |
| ROUTED TO K STEVENS DESK FG |
| ************************************************* |
| ************************************************* |
| 3/20/06 7TH FLOOR SLAB POUR #2/SHORING LETTER.TO |
| BOX'C'.NOTIFIED G/C FOR P/U.KC |
| 1-11-05 DENIED. CALLED TURNER CONST FOR P/U 'T' RB |
| 1-12-05 JOHN P/U PLANS NFL |
| 1-20-5 CHANGED TO PERMIT STATUS - KAM |
| 2/22/05 SUBMITTAL OF OLD PLAN REVIEW SHEETS OKAY |
| PER DVP NO FEE SPALMER |
| 3/10/05 CHANGE OF CONTR $100 SPALMER |
| 3/10/05 FEES NOT PAID READY TO PRINT "C" SPALMER |
| 3-21-05 CALLED ANNE (PRECIS'N PERM.)FOR P/U 'C'.RB |
| 3/22/05 ANN MITCHELL P/U PLANS MM |
| 5-27-05 1ST RESUB DA |
| 6-9-05 ANN P/U PLANS TO COUNTY FOR IMPACT FEES & |
| ONE SET ON RACK DA/R. BROWN |
| 7/8/05 PLANS RETURNED TO US TODAY FROM PAYING |
| IMPACT FEES NO FEE SPALMER |
| 8-2-05 CALLED ANNE (PRECIS'N PERM.)FOR P/U 'C'.RB |
| 8/8/05 PLANS STORED IN STAPLES OLD OFFICE, |
| TRIPPING HAZARD FOR CLERKS LM |
| 8-15-05 2ND $45,050 RESUB NFL |
| 9-20-05 CALLED SCOTT FOR PERMIT P/U. 'C'. RB |
| 9-20-05 SCOTT LAMBERSON P/U PERMIT. RB |
| 9/23/05 3 SUBMITTALS OF SHOP DRAWINGS & SURVEYS |
| SPALMER |
| 10-3-5 PLUMB REV $60 - KAM |
| 10-5-05 PRODUCT APPROVAL SUBMITTAL NFL |
| 10/07/05 SUBMITTAL NO FEE SPALMER |
| 11/17/05 PLUMB REV $130 SPALMER |
| 12/05/06 2ND REVISION $60 FEE PER ROBERT LTM |
| 12-06-05 CALLED REVISION P/U "C" PES |
| 12/07/05 P/U BY NADINE AJP |
| 12/23/05 BLDG REV $1730 FEE FG |
| 12/30/05 2ND FLOOR SLAB POURING SUBMITTAL NO FEE |
| SPALMER |
| 1/6/06 SUBMITTAL FOAM BOARD SURVEY NO FEE SPALMER |
| 1/11/06 SUBMITTAL BUILDING 2ND POUR/2ND LEVEL |
| SWURAFTIC |
| 01/17/06 ELECTRICAL REV $70 FEE FG |
| 01/17/06 JAKE HAS REVISION |
| PUT OUT FRONT UNDER "P" JL CALLED CONTRACTOR |
| 1/20/06 SUBMITTAL BUILDING 1ST POUR 3RD FLOOR SEW |
| 1/24/06 REV. P/U BY PRATT AJP |
| 1-26-06 3RD FLOOR 2ND POUR SUBMITTAL ROUTED TO A |
| DARROUGH WL |
| 1/31/06 ALLISON P/U LETTERS FOR POUR 2 2ND FLOOR |
| POUR 1 3RD FLOOR |
| 02/02/06 SUBMITTAL NO FEE/ROUTED TO K CONRAD FG |
| 02/08/06 BLDG SUBMITTAL NO FEE ROUTED TO K CONRAD |
| FG |
| 02/08/06 REVIEWED SHORING/POUR LETTERS 4TH |
| FLOOR/2ND POUR/GRIDLINES 1-7.TO "C"BOX.KC |
| 2/13/06 SUBMITTAL NO FEE FG |
| 2/13/06 NADINE P/U SUBMITTAL FG |
| 2/15/06 REV/PLUMB $310.00 PT |
| 2/15/06 SUB/BLDG (5TH FL 1ST POUR) PT |
| 2/16/06 PLUMB REV ON HOLD-CONTRACTOR TO CHANGE OUT |
| SHEETS ADARROUGH |
| 2-19-06 CALLED FOR P/U SUBMITTALS PER NOTES.'C'.RB |
| 2-21-06 SUBMITTAL N/C TO KCONRAD'S DESK NFL |
| 2-21-06 NADINE P/U SUBMITTALS NFL |
| 2/21/06 CONTRACTOR CHANGED OUT PLUMB SHEETS--REV |
| ROUTED TO "PLUMB" IN-BOX ADARROUGH |
| 2/21/06 REVIEWED SHORING/RESHORING LETTERS:5TH |
| FLOOR POUR#2.TO 'C' BOX.KC |
| 2/22/06 SHERRY P/U SUBMITTAL SPALMER |
| 2/22/06 BLDG SUBMITTAL NO FEE TA |
| 2/24/06 BLDG SUBMITTAL NO FEE GIVEN TO RB TA |
| 2/28/06 BLDG/SUBMITTAL LTRS/SHOP DRAWINGS GIVEN TO |
| RB TA |
| 3-2-06 BLDG SUBMITTAL NO FEE 3RD FLOOR TOWER POUR |
| 1 & 2 STRESSING LOGS PLEASE GIVE TO KEN CONRAD WL |
| 3/6/06 SUBMITTAL BLDG FOR KEN CONRAD 6TH FLOOR |
| POUR 2 PLACED IN KEN CONRADS IN BOX SPALMER |
| 3-8-6 CALLED FOR P/U "C" KSTEVENS |
| 3/8/06 ALLISON P/U SUBMITTAL SPALMER |
| 3-11-06 REVISED M,E,FP AND ARCHT PLANS WITH HAROLD |
| MOSER (THE MIKE WENNERGREN) FOR STAMPING THIRD SET |
| BEFORE CALLING FOR P/U. RB |
| 3-13-06 BLDG SUBMITTAL (DRAWNGS) DATED 3-13-06 NO |
| FEE CHARGED WL |
| 3/13/06 BLDG SUBMITTAL (LETTERS) NO FEE FG |
| 3/13/06 CALL FOR P/U 2 ROLLS UNDER(C) ADARROUGH |
| 3/14/06 2 ROLLS & APP. P/U BY SHERRY AJP |
| 3/14/06 2 BLDG SUBMITTAL NO FEE FG |
| 3/15/06 SHORING LETTER FOR 7TH FLOOR/1ST POUR TO |
| "C" BOX.NOTIFIED G/C.KC |
| 3/18/06 BLDG SUBMITTAL GIVEN TO KC TA |