Permit Information - Permit 04110961

Loading permit details...

Permit Information
Permit Number 04110961 Property ID 74434321110000032
Permit Desc BLD-COM Balance Due $0.00
Property Address 300 S AUSTRALIAN AVE Status Closed

Permit Plan Reviews Inspections Fees Contractors All
Permit
Permit Information
Application Date 2004-11-18 Operator msmith
Issued Date 2005-09-20 Operator rbrown
Master Number   Project Number  
C.O. Number 9560 Operator hpiskura
C.O. Issued 2007-08-27
C-404 Type 105 Usage Class NONE
Applied Value 47700589 Units 552725
Calculated Value 0 Contractor ID CGCA08060
Property On Permit
Property ID 74434321110000032    
Building Ext.  
Address 300 S AUSTRALIAN AVE
City WEST PALM BEACH
State FL
Zip Code 33401
Owner On Permit
Name THE EDGE INVESTORS LP
Address 2600 N MILITARY TRAIL # 100
City BOCA RATON Type Private
State FL Zip Code 33431
Miscellaneous Information / Notes
"THE EDGE" 16 STORY CONDO WITH 307 UNITS. PARKING
ON 1- 5TH FLOORS. 6TH FLOOR POOL AND CLUBHOUSE.
 
 
 
 
 
3/18/08 PLANS LEFT OUT FRONT MORE THAN 6MONTHS
AFTER CONTRACTOR WAS CALLED AND SPOKEN TO TWICE
HAVE BEEN DISPOSED OF. DV PALMER.
8/28/07 MOVED TO LARGE PLAN BIN "C" AJP
8-28-7 CALLED FOR P/U OF PLUMBING REVISIONS AND
TALKED TO VALERIE MCBRIDE. TOLD HER THAT THE
REVIEW CAN NOT BE DONE BECAUSE OF THE "C.O." BUT
THE PLANS HAVE BEEN STAMPED FOR COMPLIANCE.ALSO
TOLD HER THE GAS REVISION HAS NOT BEEN DONE
BECAUSE THE GAS PERMIT WAS CLOSED OUT ON THE 26TH
OF JULY. INDICATED THAT THE RECIEPT AND/OR BLUE
CARD WAS REQUIRED TO PICK UP THE REVISIONS.
"C-LARGE" KSTEVENS
8/27/07 CERT OF OCC. P/U BY MIKE AJP
08/24/07 TCO $500 FEE RECV'D LETTER ROUTED TO H
PISKURA DESK W/COPY OF RECIEPT FG
08/14/07 FA3.01 PLAN SHEET READY FOR P/U "C" MAW
07/30/07 FA REVISION SEE 06100810 FOR PAYMENT
HISTORY MAW/FIRE
08/09/07 BLDG REVISION $60 SLS
08/09/07 ARCHITECTECT REV.'S PU BY VALERIE AJP
08/05/07 CALLED VALERIE TO P/U ARCHITECTURAL
REVISION. LARGE BINS. 'C'. RB
07/30/07 APPROVED EL. REV. P/U BY MIKE AJP
7/27/07 REV. MOVED TO LARGE PLAN BIN "C" AJP
7/27/07 CALLED FOR P/U "C" MRW RESUBMIT UNDER FA
PERMIT. 7/27/07 2ND TCO ISSUED.GIVEN TO MIKE
SCOTESE.KC 7/20/07 LETTER SUBMITTED FOR TCO $500
ROUTED TO HPISKURA SEW
7/18/07 APPROVED ENG. REV. P/U BY MIKE AJP
7/12/07 MIKE P/U REV DATED 7/6/07 SPALMER
7/11/07 CALLED FOR P/U REVISED DWGS**LARGE BINS**
"C", RVC 7/10/07 REVISED TCO ISSUED, SEE NOTES
HHP
7/6/07 ENG SUBMITTAL REVIEW NO FEE PER RASIK SLS
7/2/07 MIKE P/U REV DATED 6/20/07 SPALMER
7/2/07 MIKE P/U REV DATED 4/24/07 SPALMER
7/1/07 CALLED (LEFT MESSAGE), AND E-MAILED VALERIE
TO P/U REVISION **LARGE BINS** 'C'. RB
6/29/07 CALLED FOR P/U, BIN "C", RVC
6/28/07 CALLED FOR P/U, BIN "C", RVC
6/27/07 TCO ISSUED SEE NOTES HHP
6/27/07 ENGINEERING REV SUBMITTAL (NO FEE PER
LMARTINEZ) SEW
06/27/07 MIKE SCOTESE OF THE EDGE INVESTERS PICKED
UP THE DENIED PLANS WHILE HE WAS IN THE LOBBY,
BIN "C", RVC
 
06/27/07 ELEC/FIRE ALARM REV $70 FEE- E3.00-
FA3.01 FG
6/27/07 BLDG SUBMITTAL PUNCH LIST CREW LOGISTIC
PLAN ROUTED TO HPISKURA (PER KCONRAD) SEW
6-27-07 TCO REQUEST TLR DATED 6-27-2007 GAVE
INVOICE TO CONTR REPRESENTATIVE ROUTED LTR TO H
PISKURA WL
6/27/07 VALERIE P/U 3 ENG LTRS FOR MECH & ELEC REV
DATED 6/20/07 SPALMER
6/27/0 VALERIE P/U MECH SUB M2.01/M2.02/M2.08
SPALMER
6/27/07 VALERIE P/U MECH SUBMITTAL EST/BALANCE
REPORT DATED 6/26/07/M
6/26/07 CALLED OR P/U ELECTRICAL JL UNDER "C"
6/26/07 MECH REV M2.01, M2.02, M2.08, T&B REPORT,
THREE LETTERS FROM ENGINEER. CALLED FOR P/U. SPOKE
TO VALERIE. LG BIN UNDER 'C' RJR
6/26/07 MECH SUBMITTAL TEST & BALANCE REPORTS
W/ENGINEERS LETTER SEW
6/26/07 MECH REV M2.02 & M2.08 $70 SEW
6-25-07 VALERIE MCBRIDE PICKUP REV #71 "FA2.14"
WL
06/25/07 REVISED PLAN READY FOR P/U UNDER "C" MAW
06/25/07 VALERIE P/U MECH REV DATED 6/22/07
SPALMER
06/23/07 MECH REV (2 SUBMITTALS IN ONE PACKAGE)
CALLED FOR P/U. SPOKE TO VALERIE. MECH REVS PAGES
M0.01, M1.01A, M2.06A, M2.10, M2.14, M4.06, M4.07
M6.01, M6.02, M8.01. LG BIN UNDER "C" RJR
06/22/07 MECH REV #100 FEE- ROUTED TO R REGUIERO
FG
06/22/07 MECHANICAL REV $110 FEE-ROUTED TO R
REGUIERO FG
06/22/07 ARCH REV $ 230 FEE FG
06/22/07 SUBMITTAL NO FEE - ROUTED TO H MOSER DESK
FG
06/21/07 GAS REV $60 FEE- FG
06/21/07 BLAKE P/U ELECTRICAL REV FG
06/21/07 BLAKE P/U PLUMBING REV FG
6/21/07 CALLED FOR P/U CALLED VALERIE JL
PUT OUT FRONT UNDER "C" JL
6-21-7 CALLED FOR P/U. TALKED TO LISA HAMILTON AND
INDICATED THAT ALL BUT ONE SHEET HAS BEEN
APPROVED. THE OTHER SHEET SHALL BE SUBMITTED UNDER
THE GAS PERMIT NUMBER. INDICATED THAT THE RECIEPT
AND/OR THE BLUE CARD WILL BE REQUIRED TO RETRIEVE
THE REVISIONS. "C" KSTEVENS
06/20/07 MECHR SUBMITTAL NO FEE- LETTER REGARDING
ELEVATOR MACHINE ROOM A/C SMOKE DETECOR FG
06/20/07 MECHANICAL SUBMITTAL NO FEE- LETTER
REGARDING EMERGENCY GENERATOR ROOM FG
06/20/07 SUBMITTAL NO FEE LETTER REGARDING PIPING
ON ROOF FG
06/20/07 ELECT REV $60 FEE FG
06/20/07 MECH REV $60 FEE FG
6/20/07 ENGINEER REV $60 FEE FG
06/20/07 ZONING REV $90 FEE- FG
06/20/07 PLUMB REV $80 FEE- FG
6/18/07 BLAKE P/U SUBMITTAL DATED
4/18.5/3.4/24.6/7 SPALMER
6/18/07 BLAKE P/U MECH REV DATED 6/8/07 SPALMER
6/16/07 CALLED VALERIE FOR SUBMITTAL P/U. LARGE
BINS. 'C'. RB
6/16/07 MECH REV M1.01A CALLED VALERIE FOR P/U. SM
BIN UNDER "C" RJR
6-15-07 VALERIE MCBRIDE PICKUP 2 REVS M2.01 &
M2.08, M7-01, M8-01, & T & B REPORT WL
6/15/07 MECH REV M2.01, M2.08, M7.01, M8.01 AND
SUBMITTAL (T&B REPORT) 2 ENVELOPES CALLED FOR P/U
SPOKE TO VALERIE LG BIN UNDER "C" RJR
6/14/07 PU BY VALERIE SEW
6-14-7 CALLED FOR P/U TALKED TO LISA H. INDICATED
THAT SHE NEEDED HER RECIEPT AND OR/BLUE CARD TO
PICK UP PLANS IN "C" KSTEVENS.
6/13/07 PU BY BLAKE SEW
6/12/07 PUT ELECTRICAL REVS OUT FRONT 4 SETS FOR
P/U CALLED VALERIE UNDER "C" *LARGE BIN* JL
6/12/07 MECH SUBMITTAL T&B REPORT SEW
6/12/07 MECH REV M7.01 M8.01 $70 SEW
06/08/07 MECHANICAL REV $60 FEE- FG
6/7/07 2 MECH REVISIONS 5/18/07 & 5/23/07 P/U BY
VALERIE SLS
6/7/07 BLDG SUBMITTALS ROOF COUNTERFLASHING -
TRASH CHUTE SHOP DRWGS - STAIR LANDING DETAIL NO
FEE SLS
6/7/07 MECH REVISION # 72 $70 SLS
6/7/07 ELEC REVISION # 71 $80 SLS
6/06/07 MECH REVISION SUBMITTED ON 5/18 AND 5/23
COMBINED-PP M0.01, M1.01A, M2.01, M2.02, M2.04,
M2.06, M2.06A, M2.07, M2.08, M2.09, M2.10, M2.13,
M2.14, M2.14A, M3.01, M3.01A, M3.01B, M3.02,
M3.03, M3.04, M3.05, M3.06, M3.07, M3.08, M3.09,
M3.10, M3.11, M3.12, M3.13, M3.14, M3.15. M4.01,
M4.06, M6.01, M6.02, M7.01. SPOKE WITH LISA FOR
P/U. ONE ROLL IN LG BIN UNDER "C" RJR
6/4/07 PU BY BLAKE SEW
6-4-7 CALLED FOR P/U TALKED TO LISA HAMILTON.
INDICATED THAT SHE NEEDS TO BRING THE RECIEPT OR
THE BLUE CARD AND THAT THE PLANS WILL BE IN THE
"C-LARGE" BIN. ALSO INDICATED THAT SHT A1.14 HAS
BEEN ROUTED TO ROBT. BROWN FOR REVIEW AS THERE ARE
BUILDING REVISIONS AS WELL AS THE PLUMBING
REVISION FOR THE UPPER ROOFS AND INDICATED THAT
GAS REVISIONS, (SHT P3.15), SHALL BE SUBMITTED
UNDER THE GAS PERMIT, NOT THE BLD-COM PERMIT.
KSTEVENS
05/30/07 SUBMITTAL NOP FEE- ROUTED TO H MOSER DESK
FG
05/30/07 SUBMITTAL NO FEE- LETTER ROUTED TO J
LEAHY DESK FG
05/30/07 REV $60 FEE- REVISED SHEET FA2.14 FG
05/25/07 ELECTRICAL REV $150 FEE FG
05/23/07 MECHANICAL REV $170 FEE- FG
5-18-07 REV #67 MECH $410 (7 PKGS BUNDLED
TOGETHER) WL
5-18-07 REV #66 PLUMBING $100 WL
5/16/07 ELEC REV E2.5 E3.00 E4.01 E5.02 E5.03 $70
SEW
5/16/07 MECH REV PU BY MIKE SEW
5/16/07 MECH REV PP M2.01, M2.02, M2.08, M2.09,
M2.10, M2.14, M3.01, M4.06, M6.01, M6.02 REV6,
M6.02 REV7, M7.01 READY FOR P/U CALLED KIM. LG BIN
UNDER 'C' RJR
05/10/2007 MECH REVISION # 64 FEES $60.00 ( SHHET
M2.10 RESUBMITTED SHEET M6.01 WAS SUBMITTED
05/09/2007 MMILLER
5/9/07 MECH REV M2.01 M2.02 M2.02 M2.08 M2.09
M2.14 M3.01 M4.06 M6.01 M6.02 REV 6 M6.02 REV 7 &
M7.01 SEW
5/9/07 PU BY BLAKE SEW
5/9/07 MECH REV: M1.01A M2.04 M2.05 M2.06 M2.06A
M2.08 M2.13 M4.05 M5.01 READY FOR P/U CALLED CONTR
OFFICE # SEVERAL TIMES, BUSY SIGNAL. LG BIN UNDER
'C' RJR
5-8-07 KIMBERLY BUONO PICKUP MECH REV WL
5/8/07 MECH REV PG SKM-1 ONLY. CALLED FOR P/U SM
BIN UNDER 'C' RJR
05/04/07 MECHANICAL REV $160 FEE- FG
05/03/2007 PLUMBING REVISION FEES $ 60.00
(CONDENSATE CHANGE UNITS THAT WERE RELOCATED)
MMILLER
05/03/2007 BLDG SUBMITTAL SHOP DRAWINGS ADDED
STOREFRONT WINDOW & DOOR MMILLER
04/27/07 KIMBERLY P/U ENGINEERING AND ZONING REV
FG
04/27/07 KIMBERLY P/U MECHANICAL SMOKE CONTROL
REV FG
04/27/07 KIMBERLY P/U ELECTRICAL/FIRE REV FG
04/27/07 KIMBERLY P/U MECH REV FG
4/27/07 NO ANSWER ON SITE TELEPHONE NUMBER.
E-MAILED VALERIE TO P/U ELEVATOR LOBBY REVISION.
'C'. RB
04/26/07 RAG SILENCER SUBMITTAL CALLED FOR P/U LG
BIN UNDER "C" RJR
04/25/07 MECH REV M7.01 CALLED FOR P/U *LARGE BIN*
"C" RJR
04/24/07 BLDG SUBMITTAL SHOP DRAWINGS/CALCS STAIRS
#1 & #2 SEW
04/24/07 BLDG REV 16-0 $60 SEW
04/20/07 MECH REV $60 SPALMER
04/20/07 ELEC REV $60 SPALMER
04/18/07 PLUMBING REV P201A P208 P209 P215 P303
P307 P312 P315 P402 A114 SEW
04/16/07 ELEC REV E101 E201 E206 E208 E215 E401
E501 E503 & E601 SEW
04-16-07 MECH SUBMITTAL "EQUAL" ALTERNATE FOR
RUSKIN #GSV RETURN AIR GRILLE SILENCERS WL
04/12/2007 APPROVED PLANS THAT WAS SUBMITTED 04/09
& 4/10 HAS BEEN P/U BY KRISTINE MMILLER
04/12/07 2 SETS MECH REVS READY FOR P.U. SUBMITTED
04/9 AND 4/10. LG BIN UNDER 'C' RJR
04/11/2007 ZONING & ENGINEERING REVISION (CIVIL
REVISION TRASH ENCLOSURE FUEL ACCESS ROAD AND
GRODES @SOUTH END OF PROPERTY & LANDSCAPE FOR
TRASH ENCLOSURE FEES $130.00 MMILLER
04-11-07 MIKE SCOTESE PICKUP BLDG/FIRE REV DATED
02-21-07 BLDG SUBMITTAL DATED 2-9-07 "WINDOW SHOP
DRAWINGS", BLDG/FIRE SUBMITTAL DATED 2-21-07 "FIRE
RATED EXPANSION JOINT JUDGEMENT FOR CORRIDOR, &
BLDG SUBMITTAL EXTERIOR FRAMING DETAILS & CALCS
DATED 2-22-07 WL
04/11/07 E-MAILED VALERIE TO P/U SUBMITTALS AND
REVISIONS.**LARGE BINS** 'C'.RB
04/10/2007 MECHANICAL REVISION FEES $70.00N RISER
DIAGRAMS & EQUIPMENT SCHEDULE) MMILLER
04/10/07 VALERIE P/U MECH REV DATED 4/3/07 SPALMER
04/10/07 MECH REV READY FOR P/U PG M5.04 SUBMITTED
4/3/07 SM BIN UNDER "C" RJR
04/09/2007 MECHANICAL REVISION (FEES $440.00 (MO
THRU M8.01) MMILLER
04/5/07 BLAKE P/U PLUMB REV DATED 3/16/07 SPALMER
04/5/07 BLAKE P/U ELEC REV DATED 3/27/07 SPALMER
04/3/07 ELEC REV OK,CALLED, UNDER "C" FOR PU,
SPOKE TO LISA H, TOLD TO BRING IN BLUE CARD. DV
PALMER. 4-3-7 CALLED FOR P/U PLMG REV "C"
KSTEVENS
04/3/07 MECHANICAL REV $60 FEE-SHEET M5.04
FLAMEBOR/DAMPER ASSEMBLY FG
03/28/07 BLAKE P/U MECH REV DATED 3/27/07 SPALMER
03/27/07 MECH REV 3.01 CALLED FOR P/U SM BIN UNDER
"C" RJR
03/27/07 ELECTRICAL REV $60 FEE- ADDED ELEVATOR
MACHINE ROOM A/C FG
03/27/07 MECHANICAL REV $60 FEE- ROUTED TO R
REGUERIO DESK FG
03/27/07 BLAKE P/U PLUMB REV DATED 3/1/07 SPALMER
03/27/07 BLAKE P/U MECH REV DATED 3/23/07 &
03/16/07 SPALMER
03/26/07 MECH REV DATED 3/16 CALLED FOR P/U LG BIN
UNDER 'C' RJR
03/23/07 MECHANICAL REV $70 FEE- BLDG DEPT
COMMENTS (ATTACHED) FG
03/23/07 BLAKE P/U REV (ENGINEER) CIVIL REVISIONS
FG
3/22/07 CALLED DENIED P/U **LARGE BINS** "C", RVC
 
3/19/07 BLAKE P/U REV DATED 2/14/07 SPALMER
3-16-7 CALLED FOR P/U "C" **LARGE BINS** KSTEVENS
3/7/07 CIVIL REV TRASH ENCLOSURE & FUEL ACCESS RD
SEW
3/6/07 BLAKE P/U MECH REV DATED 2/8 2/9 3/1 & 3/5
SPALMER
3/6/07 MECH REVS 4 SEPARATE PACKS FROM 2/8,2/9,3/1
AND 3/5 CALLED FOR P/U LARGE BIN UNDER 'C' RJR
3/5/07 BLAKE P/U SHEET M2.10 OF THE 5 SUBMITTED
EARLIER PER RON R SPALMER
3/5/07 MECH REVISION $100 GIVEN TO RON REGUEIRO
SLS
3/1/07 PLUMBING REV
P201A/202/202A/208/209/210/303/307/312/313/314/401
SEW
3/1/07 MECH REV MC14A/M403/M405/M601 $90 SEW
02/22/07 BLDG SUBMITTAL NO FEE EXTERIOR FRAMING
DETAILS AND CALCULATIONS FG
02/22/07 OVERTIME INSPECTION $300 FEE- ROUTED TO
INSPECTOR FG
2/21/07 REV TO SHOW SHAFT WALL @ EXPANSION JT/AMM
02/14/07 PLUMBING REV $80 FEE- FG
2/12/07 BLAKE P/U 3 SUBMITTALS SPALMER
2/11/07 CALLED BLAKE FOR SUBMITTAL P/U.'C'.RB
2/9/07 BLDG SUBMITTAL SHOP DRAWINGS SEW
2/9/07 MECH REV CORRECT BACKGROUND $60 SEW
2/9/07 PLUMBING REV COORDINATION SEW
2/8/07 MECH REC ADDED FIRE DAMPERS $80 SEW
02/07/07 BLAKE P/U MECH REV FG
2/6/07 MECH REVS 2 PACKAGES CALLED FOR P/U LARGE
BIN UNDER 'C' RJR
2/2/07 (2) BLDG SUBMITTALS ELEV MACHINE RM STAIR
SHOP DRAWINGS & SANDSET PAVER UPLIFT TESTS SEW
1/29/07 BLAKE P/U MECH REV SPALMER
1/27/07 CALLED FOR P/U PLANS IN BOX C HM.
1-24-07 BLAKE WAGNER PICKUP 2 MECH REV WL
1/24/07 MECH/ELEC INSP FOR SATURDAY 1/27/07 ROUTED
TO HMOSER & JLEAHY $600 SEW
1/24/07 MECH REV SEW
1/23/07 BLAKE P/U PLUMB REV SPALMER
1-23-7 CALLED FOR P/U PLMG REV "C" KSTEVENS
01/22/2007 PLEASE SEE NOTES MMILLER
01/22/2007 MECHANICAL REVISION FEES $ 70.00
MMILLER
1/22/07 BLAKE P/U REV DATED 1/8/07 SPALMER
1/19/07 TWO REVISIONS READY. CALLED CONTR. FOR P/U
SMALL BIN UNDER 'C' RJR
1/16/07 SUBMITTAL REQ BY DICK BOWMAN NO FEE SLS
1/12/07 CALLED TO P/U **LARGE BINS** "C", RVC
1/10/07 MECH SUBMITTAL MISSING PAGES SEW
1/10/06 PLBG REVISION $ 80 SLS
1/8/07 BLAKE P/U POOL EQUIP REV & VERT HEAT PUMP
REV SPALEMR
1/8/07 BLAKE P/U STRUCTURAL & ARCHITECTURAL REV
11&12 & POUR 16 SPALMER
01/08/07 ENGINEERING REVISION FEES
1/7/07 E-MAILED NATASHA AND VALERIE FOR
SUBMITTAL/REVISION P/U. LARGE BINS.'C'. RB
01/06/07 CALLED FOR P/U PLANS IN BOX C HM.
01/02/2007 MECHANICAL REVISION FEES $ 60.00
MMILLER
01/02/2007 MECHANICAL REVISIONS FESS $ 60.00
MMILLER
12/21/06 MECH REV HEAT PUMPS & DUCT WORK LAYOUT
SEW
12/18/06 BLDG SUBMITTAL NO FEE- POUR #16 PARKING
GARAGE (CLUBHOUSE ROOF)-ROUTED TO K CONRAD DESK
FG
12/08/06 BLDG SUBMITTAL NO FEE- EXTERIOR FRAMING
COMPONENTS ETC FG
12/07/06 BLAKE P/U DENIED GAS REV DATED 11/17/06
SPALMER
12-06-06 CALLED FOR P/U GAS REG. "C" KSTEVENS
12/05/06 BLAKE P/U BLDG SUBMITTAL DATED 11/17/06
SPALMER
12/05/06 BLAKE P/U BLDG REV DATED 11/14/06
SPALMER
12/05/06 BLAKE P/U MECH REV DATED 11/29/06
SPALMER
12.4.06 MECH REV READY FOR P/U. SMALL BIN UNDER
'C' EMAIL TO NATASHA RJR
12/04/06 BLDG REV $280.00 MMILLER
12/3/06 E-MAILED NATASHA FOR SUBMITTAL/REVISION
P/U. 'C'. RB
11/30/06 BLDG REV (STRUCTURAL REV #11 & 12) $130
TA
11/29/06 SUBMITTALL NO FEE- 11TH -16TH FLOOR
MECHANICAL PLANS IN RESPONSE TO PROVISOFROM RON
REGUERIO DATED 11/21/06 FG
11/27/06 BLAKE P/U REV DATED 11/17/06 SPALMER
11.21.06 MECH REV CALLED FOR P/U LARGE BIN UNDER
'C' RJR
11/17/06 BLDG SUBMITTAL GRAB BAR LOAD TEST RESULTS
SEW
11/17/06 PLUMBING SUBMITTAL ADD'L COPIES OF GAS
REGULATOR SUBMITTAL SEW
11/17/06 PU BY BLAKE SEW
11/17/06 CALLED NATASHA FOR SUBMITTAL LETTER P/U.
'C'. RB
11/15/06 BLDG SUBMITTAL ARCHITECT LETTER IN
RESPONE TO RBROWNS COMMENTS SEW
11/15/06 MECH REV SEW
11/14/06 BLDG REVISION $60 SLS
11/14/06 BLAKE P/U REV DATED 11/13/06 SPALMER
11.13.06 EMAIL TO NATASHA MECH REVISIONS READY FOR
P/U LARGE BIN UNDER 'C' RJR
11/13/06 12 REV P/U BY BLAKE FG
11/13/06 SHEET A1-9 P/U BY BLAKE FG
11/13/06 RAISED SHEETE A5-11 P/U BY BLAKE FG
11/10/06 E-MAIL TO NATASHA AND VALERIE TO P/U
REVISIONS AND SUBMITTALS.'C' LARGE BINS. RB
11/06/06 KRISTIN P/U MECH SUB 11/01/06 SPALMER
11/6/06 MECH REV (10TH FL) $90 TA
11.4.06 MECH LETTER AND REVISION (ONE ENVELOPE)
SMALL BIN UNDER 'C' RJR
11/2/06 SHERRY P/U MECH REV & SHORING LTRS
SPALMER
11.1.01 MECH REV DENIED. CALLED FOR P/U **LARGE
BINS** 'C' RJR
11/1/06 SHORING LETTERS: NW ANDSW LANTERN ROOF
SLABS AT TOWER.TO BOX 'C'.KC
11-1-06 (2 MECH SUBMITTALS) 1 OF SUBMITTALS TO BE
ROUTED TO P KRAUSS PER DICK BOWMAN WL
11-1-06 BLAKE WAGNER PICKUP PLUMBING REV DATED
10-27-06 WL
11-01-06 CALLED FOR P/U PLMG REV. "C" KSTEVENS
10-31-06 BLAKE WAGNER PICKUP "POOL HTR SUBMITTAL
DATED 8-24-06" WL
10-31-06 CALLED FOR GAS SUBMITTAL P/U "C"
KSTEVENS
10/27/06 PLUMBING REV GAS SEW
10/27/06 MECH REV SEW
10/27/06 SHERRY P/U SUBMITTAL DATED 10/04/06
SPALMER
10/27/06 SHERRY P/U MECH REV DATED 10/20/06
SPALMER
10.26.06 MECH REVISIONS CALLED FOR P/U LARGE BIN
UNDER "C" RJR
10/26/06 SUBMITTAL OF 5 P/T STRESSING REPORTS
SPALMER
10/26/06 SUBMITTAL GRAB BAR LOAD TEST SPALMER
10/26/06 CALLED FOR P/U OF SUBMITTALS IN BOX C
HM.
10/25/06 BLAKE P/U SUBMITTAL EPS FOAM DATED
10/18/06 SPALMER
10/25/06 BLAKE P/U SUBMITTAL FIRESTOPPING DATED
9/29/06 SPALMER
10/24/06 CALLED ANDY FOR FIRESTOPPING SUBMITTAL
P/U. 'C'. RB
10/22/06 E-MAILED NATASHA FOR EPS FOAM SUBMITTAL
P/U. 'C'. RB
10/20/06 MECH REVISION $140 SLS
10/20/06 BLDG REVISION $70 SLS
10/18/06 SUBMITTAL NO FEE- PRODUT DATA FOR RAISED
STUCCO /FOAMS THAT SHOW FLAME SPREAD & DEVELOPMENT
TO COMPLY WITH CODE-FORWARD TO R BROWN FG
10/18/06 NATASHA P/U REV DATED 10/13/06 SPALMER
10.16.06 MECH REV. CALLED FOR P/U LARGE BIN UNDER
'C' RJR
10/13/06 BLDG SUBMITTAL NO FEE TOWER NORTH WEST
LANTERN ROOF SLAB-ROUTED TO K CONRAD FG
10/13/06 REV $110 FEE- MECHANICAL REV SHEETS FG
10/13/06 REV $80 FEE SHEET A1- 9 6TH FLOO AMENITY
DECK FG
10/11/06 PLUMB SUBMITTAL OF GAS REGULATOR (NOTE
#5F) NO FEE TA
10/4/06 BLAKE P/U REV DATED 9/27/06 SPALMER
10/04/06BLDG SUBMITTAL NO FEE- NOA CHANGED PER K
CONRAD FG
10/04/06 MECH SUBMITTAL NO FEE- NEW WIRLPOOL DRYER
(MODEL# LEW00509) REQUESTED BY RON REGUEIRO FG
10/4/06 BLDG SUBMITTAL NO FEE- INTERIOR STAIR SHOP
DRAWING FG
1.3.06 MECH REV. CALLED FOR P/U **LARGE BINS "C"
RJR
10/3/06 SHORING LETTER ON SW LANTERN ROOF SLAB
TOWER GIVEN TO KEN CONRAD SLS
9/29/06 BLDG SUBMITTAL (FIRE STOPPING DETAILS) NO
FEE TA
9/27/06 SUBMITTAL (MONTIGO MODEL L38DF) NO FEE. TA
9/27/06 BLDG REV (REV BASEBOARD) $60 TA
9/27/06 SUBMITTAL OF CFE'S ARCHITECT'S RESPONSE NO
FEE. TA
9-27-06 REV #19 MECH $90 REV FOR 6TH FLOOR UNITS
ATTEN ROUTED TO AISHA TO ROUTE TO HAROLD MOSER WL
9/25/06 BLDG REV (WINDOW SHOP DRAWING) $120 TA
9/21/06 NATASHA P/U REV DATED 8/28/06 SPALMER
9/21/06 NATASHA P/U REV DATED 9/13/06 SPALMER
9/21/06 SUBMITTAL OF SE LARTERN ROOF SLAB. NO FEE
TA
9/21/06 CALLED FOR P/U PLANS IN BOX C HM.
9/21/06 CALLED FOR P/U PLANS IN BOX C HM.
9/14/06 SUB/BLDG MECHANICAL ROOM ROOF SLAB PT
9/14/06 SUB/BLDG SHORING PT
9-13-06 REV # 17 $80 MECH WL
9-13-06 SHERRY HARRIS PICKUP REV WL
9/12/06 REVISIONS UNDER "C" (LARGE BINS), CALLED
KIM FOR PICK UP. DV PALMER
8/31/06 MANY SUBMITTALS P/U BY SHELLY AJP
8/29/06 CALLED ANDY TO P/U MULTIPLE SUBMITTALS
(LARGE BINS) 'C'. RB
8/28/06 MECH SUBMITTAL OF TOWER SHORING HIGH ROOF.
TA
8/28/06 BLDG SUBMITTAL OF POUR #1 6TH FL STRESSING
& REPORTS. NO FEE. TA
8/24/06 BLDG REV SEW
8/24/06 (2) BLDG SUBMITTALS P/T STRESSING/LIFTOFF
REPORTS 2ND FLOOR SEW
8/24/06 PLUMBING SUBMITTAL POOL HTR/SPA SEW
8/23/06 TWO MECH. REV.'S P/.U BY BLAKE AJP
8/22/06 CALLED FOR P/U PLANS IN BIG BOX C HM.
8-22-06 NO FEE BLDG SUBMITTAL "TOWER ELEVATOR
MACHINE ROOM SLAB**PLEASE GIVE TO KEN CONRAD**WL
8/21/06 TWO REVISIONS--APPPROVED ELECTRICAL AND
DENIED PLUMBING-- P/U BY BLAKE AJP
8/21/06 MOVED TO LARGE PLAN BIN "C" AJP
8/20/06 ELEC REV OK,CALLED FOR PU. UNDER
"C",(LARGE BINS) DV PALMER
8-19-6 CALLED FOR P/U PLMG REV "C" KSTEVENS
8/18/06 PLUMBING SUBMITTAL TO KSTEVENS SEW
8/17/06 MECH REVISION 6TH FLR GIVEN TO HAROLD
MOSER $80 SLS
8/17/06 MECH REVISION 7-10 FLRS GIVEN TO HAROLD
MOSER $110 SLS
8/17/06 GARAGE SHORING DETAILS AND HIGH ROOF
SHORING GIVEN TO KEN SLS
8/16/06 MECH RV. P/U BY BLAKE AJP
8/16/07 CALLED FOR P/U PLANS IN BOX C HM.
8/16/06 SHORING LETTERS FOR ROOF POUR #2 P/U BY
BLAKE AJP
8/15/06 SHORING/FORM LETTER:TOWNHMES-ROOF
POUR#2.CALLED G/C FOR P/U.KC
8/15/06 POUR 6- SUBMITTAL NO FEE FG
8/15/06 POUR # 4 SUBMITTAL NO FEE FG
8/15/06 P/T STRESSING REPORTS 4TH FL TOWN HOME
POUR # 1 FG
8/15/06 SUBMITTAL NO FEE- TOWN HOME ROOF POUR #2
FG
8/15/06 SUBMITTAL NO FEE- INSTALL TRASH CHUTE FG
8/14/06 ELECTRICAL REV $120 FEE FG
8/10/06 MULTLIPLE SUBMITTALS (SEE ENTRY BELOW BY
RB ON 8/6,) P/U BY SHERR, (PERMITTING SOLUTIONS)
AJP
8/9/06 MECH REVISION $80 GIVEN TO HAROLD MOSER
SLS
 
8/7/06 SUBMITTAL OF REV TO TOWN HOME ROOF SHORING.
NO FEE. TA
8/7/06 SUBMITTAL OF TOWN HOMES ROOF ADVR #1 (NORTH
SECTION). NO FEE TA
8/6/06 CALLED BLAKE AND ANDY TO P/U MULTIPLE
SUBMITTALS (LARGE BINS) 'C'. RB
8/4/06 ENGINEEERING LETTERS(7) AND ONE APPROVED
MECH.; REV. P/U BY BLAKE AJP
8/3/06 CALLED FOR P/U PLANS IN BOX C HM.
8/2/06 SHORING LETTERS/TOWNHOMES LEVEL5-POUR#2.TO
INCOMING "C"CONTACTED G/C FOR P/U.KC
8/2/06 SHORING LETTERS/LEVEL 5-POUR#3 GARAGE.TO
INCOMING "C".KC
8/2/06 CORRECTED ELEC REV FEES TO #05120685/AMM
8/1/06 SUBMITTAL OF POST TENSION ROOFING CACS. NO
FEE. TA
7/28/06 BLDG SUBMITTAL 5TH FL POUR #2
7/28/06 MECH REVISION GIVEN TO HAROLD M $80 SLS
7/27/06 PLUMBING REVISION $110 SLS
7/27/06 BLDG SUBMITTAL SHORING/RESHORING CALCS SEW
7/25/06 - 8 SUBMITTALS/P/T STRESSING REPORTS 16TH
FL/P/T STRESSING & LIFT OFF REPORTS 14TH FL/GARAGE
ROOF SHORING/P/T STRESSING & LIFT OFF REPORTS 12TH
FL/P/T STRESSING & LIFT OFF REPORTS 10TH FL/P/T
STRESSING REPORTS 3RD FL TOWNHOMES/TOWNHOMES 5TH
FL/SHORING & TRANSFORMER VAULT PT
7/25/06 SUBMITTAL OF 5TH LVL POUR #3. NO FEE. TA
7/21/06 BLDG SUBMITTAL OF ROOF POUR #2.NO FEE TA
7/21/06 BLDG SUBMITTAL OF SHORING/RESHORING &
CALCULATIONS. NO FEE. TA
7/20/06 (2) BLDG LETTER SUBMITTALS 9TH FL & 15TH
FL PT LOGS SEW
7/18/06 MECH. REV. P/U BY ALISON AJP
7-18-06 P MECH/REV. LEFT MSG. P/U "C" TG.
7/18/06 BLDG SUB 4TH FL POUR # 2 TOWNHOMES SEW
7/17/06 BLDG SUBMITTAL 16TH FL ROOF POUR # 1 SEW
7/17/06 PU BY CHRISTIN SEW
7/12/06 BLDG SUBMITTAL GARAGE POUR # 2 SEW
7/11/06 MECH REV $ 80 FEE FG
7/11/06 SHORING INSTALLATION-TOWER ROOF LETTERS
4TH LEVEL POUR # 1 LETTERS GIVEN TO KEN CONRAD
SLS
 
7-6-06 MICHAEL JANOWSKI P/U BLDG/ELEC/MECH
REVISION. RB
7/6/06 REV READY FOR P/U (C) ADARROUGH
7/6/06 SUB/BLDG 16 FLR POUR #2 LETTERS SLS
6/30/06 SUB/BLDG (TOWNHOMES 3RD FL POUR #2) PT
6/30/06 SUB/BLDG 6TH LEVEL POUR #1/GARAGES PT
6/28/06 BLDG-ELEC-PLUMB-MECH- GENERAL FIELD
CHANGES $ 830 FEE FG
6/27/06 1ST FLOOR POUR # 1 FOR KEN CONRAD SLS
6/23/06 3RD FLOOR POUR # 1 FOR KEN CONRAD SLS
6/23/06 SUBMITTAL LETTERS INSP #1 INTERM SLAB IN
XFRMR VAULT SEW
6/19/06 SHORING LETTERS SUBMITTED NO FEE SLS
6/16/06 SUBMITTAL OF SHOP DRAWINGS. NO FEE TA
6/15/06 SHORING PLANS TO INCOMING FOR PLAN
REVIEW.TOWNHOME 2ND LEVEL SHORING PLAN.KC
6/15/06 SHORING LETTERS:TOWNHOMES POUR#1/2ND
FLR,PKG GRG POUR #2/5TH FLOOR,TOWER15TH
FLR/POUR#1,TOWER 14TH FLR/POUR#2. CALLED G/C FOR
P/U.KC
6/15/06 (8)SUBMITTALS GARAGE-5THFL POUR #3 TOWER
2NDFL POUR #1 TOWNHOUSES LEVEL #2 POUR #2 8THFL
POUR #1 TOWER 7THFL POUR #1 TOWER 6THFL POUR #1
TOWER 4THFL POUR #1 TOWER 3RDFL POUR #1
6/14/06 BLDG SUBMITTAL NO FEE-TOWER 15TH
FLOOR-POUR # 1-ROUTE TO K CONRAD DESK FG
6/12/06 KRISTIN P/U POUR LTRS SPALMER
6/9/06 SUBMITTAL GARAGE 5TH LEVEL POUR 2/TOWNHOMES
2ND FL POUR 1/TOWNHOME 2ND LEVEL SHORING NO FEE
PLACED IN KEN CONRADS IN BOX SPALMER
6-7-06 SUBMITTAL LTR POUR 2 14TH FLR TOWER (ROUTED
TO KEN CONRAD) WL
6/5/06 SUBMITTAL LETTER FOR KEN CONRAD SLS
6/1/06 SHORING LETTERS SUBMITTED NO FEE SLS
5/31/06 SHORING LETTERS FOR GARAGE 4TH
FLOOR/POUR#3,12TH FLOOR POUR #2,11TH FLOOR POUR#1
AND 11TH FLOOR POUR#2.TO 'C'INCOMING.CONTACTED G/C
FOR P/U.KC
5/26/06 BLDG SUBMITTAL ROUTED TO KEN CONRAD SLS
5/24/06 BLDG SUBITTAL NO FEE ROUTED TO K CONRAD FG
5/22/06 PU BY SHERRY SEW
5/19/06 REVISED SHORING LETTER/10TH FLOOR POUR
2,POUR#4 OF THE PARKING GARAGE SHORING LETTER
REVISED INDICATING GRIDLINES,REVISED SHORING
LETTER/POUR#5 PARKING GARAGE,PARKING GARAGE
SHORING LETTER 4TH FLOOR POUR #1&3RD FLOOR POUR
#1.CONTACTED G/C FOR P/U. TO INCOMING 'C'.KC
5/19/06 BLDG SUBMITTAL OF GARAGE 4TH FL POUR #2.
NO FEE. TA
5/18/06 BLDG SUBMITTAL 12TH FLOOR SLAB POUR # 1
SEW
5/12/06 BLDG SUBMITTAL GARAGE 4TH FLR POUR # 1
ROUTED TO KEN CONRAD SLS
5/11/06 BLDG SUBMITTAL NO FEE ROUTED TO K CONRAD
DESK -LETTERS FG
5/5/06 SHORING LETTER:10TH FLOOR/POUR#2.TO G/C.KC
5/5/06 SHORING LETTER:9TH FLOOR/POUR#2.KC
5/5/06 PARKING GARAGE SHORING LETTER:GRIDLINES PD
NORTH TO GRID P24 EAST.POUR #6.CONTACTED G/C FOR
P/U.KC
5/5/06 SUBMITTAL NO FEE-TOWER SHORING ROOF ROUTED
TO K CONRAD FG
5/5/06 SUBMITTAL NO FEE -GARAGE SHORING POUR-5-6
AND 9 ROUTED TO K CONRAD FG
5/5/06 SUBMITTAL NO FEE -GARAGE RESHORING POUR-5-6
AND 9 ROUTED TO K CONRAD FG
5/5/06 SUBMITTAL NO FEE -GARAGE RESHORING POUR
-7-8-10-11-AND 12 ROUTED TO K CONRAD FG
5/5/06 SUBMITTAL NO FEE- GARAGE SHORING POUR-4-5-7
AND 10 ROUTED TO K CONRAD FG
5/5/06 SUBMITTAL NO FEE -GARAGE SHORING POUR-8-11
AND 12 ROUTED TO K CONRAD FG
5/5/06 SUBMITTAL NO FEE- 11TH FLOOR SHORING
CLARIFICATION LETTERS FG
5/5/06 SUBMITTAL NO FEE -GARAGE 3RD LEVEL-POUR #4
REVISED LETTER FROM ENGINEER FG
5/5/06 SUBMITTAL NO FEE -GARAGE RESHORING NO FEE
FG
5/5/06 SUBMITTAL NO FEE -TOWER ROOF SHORING
CALCULATION-FG
5/5/06 SUBMITTAL NO FEE LETTERS FROM JA PAIT WITH
GUIDELINES GARAGE-POUR 5
5/5/06 SUBMITTAL NO FEE FOR K CONRAD 11TH FLOOR
POUR #1 FG
5/5/06 REVISED LETTER FROM JIM PAIT WITH ADDED
GUIDELINES FOR K CONRAD FG
********************************
5/3/06 SUBMITTAL NO FEE ROUTED TO K CONRAD FG
5/01/06 SUBMITTAL NO FEE FG
4/28/06 SHORING LETTERS P/U BY SHERRY AJP
4/28/06 GARAGE POUR #4:DENIED.ENG'RG LETTER TO
INDICATE GRIDLINES.NOTIFIED G/C.TO "C" BOX.KC
4/27/06 SUBMITTAL NO FEE 10TH FLOOR POUR 2 LTRS TO
KEN CONRADS DESK SPALMER
4-26-06 NO FEE SUBMITTAL 3RD FLOOR 2ND POUR LETTER
WL
4/21/06 BLDG SUBMITTAL OF 10TH FLOOR POUR 1 SEW
4/20/06 BLDG SUBMITTAL OF GARAGE POUR 7 & 10
SHORING TA
4/20/06 BLDG SUBMITTAL SHORING TOWER 12-16 & ROOF
TA
4/19/06 BLDG SUBMITTAL GARAGE 3RD LEVEL POUR1 OR
4TH POUR PLACED IN K CONRAD'S IN BOX SPALMER
4/14/06 BLDG SUBMITTAL 9TH FL 2ND POOR NO FEE TA
4/12/06 BLDG SUB FOR 6TH FL UNIFORM & BONDED NO
FEE TA
4/10/06 BLDG SUBMITTAL TOWER SHORING 12TH & 16TH
FL FOR KC NO FEE TA
4/6/06 SUBMITTAL LETTER OF 9TH FLOOR POUR 1 SEW
4/5/06 BLDG SUBMITTAL OF POUR LTRS/UNIFORM &
BANDED NO FEE TA 4/03/06 NADINE P/U SHORING
LETTERS FG
04/03/06 2 BLDG SUBMITTAL NO FEE ROUTED TO K
CONRAD/INCOMING FG
3/31/06 SHORING LETTERS:8TH FLOOR/2ND POUR
OK.CALLED G/C FOR P/U.TO 'C' BOX.KC
3/30/06 SHORE LETTERS 8TH FLOOR POUR#1 AND GARAGE
2ND FLOOR POUR#2 PU BY SHERRY SEW
3/30/06 POUR LETTER 8TH FLOOR POUR #2 NO FEE
ROUTED TO KCONRAD SEW
3/30/06 BLDG REV SEW
3/28/06 SHORING LETTER FOR 8TH FLOOR/POUR#1 AND
GARAGE SHORING LETTER FOR 2ND FLOOR/POUR#2 TO BOX
"C".CALLED G/C FOR P/U.KC
3/27/06 SUBMITTAL NO FEE GIVEN TO KC TA
3/24/06 ALLISON P/U LETTERS FG
3/24/06 SUBMITTAL NO FEE ROUTED TO K CONRAD FG
3/24/06 SUBMITTAL NO FEE-REQUESTED BY K STEVENS
ROUTED TO K STEVENS DESK FG
*************************************************
*************************************************
3/20/06 7TH FLOOR SLAB POUR #2/SHORING LETTER.TO
BOX'C'.NOTIFIED G/C FOR P/U.KC
1-11-05 DENIED. CALLED TURNER CONST FOR P/U 'T' RB
1-12-05 JOHN P/U PLANS NFL
1-20-5 CHANGED TO PERMIT STATUS - KAM
2/22/05 SUBMITTAL OF OLD PLAN REVIEW SHEETS OKAY
PER DVP NO FEE SPALMER
3/10/05 CHANGE OF CONTR $100 SPALMER
3/10/05 FEES NOT PAID READY TO PRINT "C" SPALMER
3-21-05 CALLED ANNE (PRECIS'N PERM.)FOR P/U 'C'.RB
3/22/05 ANN MITCHELL P/U PLANS MM
5-27-05 1ST RESUB DA
6-9-05 ANN P/U PLANS TO COUNTY FOR IMPACT FEES &
ONE SET ON RACK DA/R. BROWN
7/8/05 PLANS RETURNED TO US TODAY FROM PAYING
IMPACT FEES NO FEE SPALMER
8-2-05 CALLED ANNE (PRECIS'N PERM.)FOR P/U 'C'.RB
8/8/05 PLANS STORED IN STAPLES OLD OFFICE,
TRIPPING HAZARD FOR CLERKS LM
8-15-05 2ND $45,050 RESUB NFL
9-20-05 CALLED SCOTT FOR PERMIT P/U. 'C'. RB
9-20-05 SCOTT LAMBERSON P/U PERMIT. RB
9/23/05 3 SUBMITTALS OF SHOP DRAWINGS & SURVEYS
SPALMER
10-3-5 PLUMB REV $60 - KAM
10-5-05 PRODUCT APPROVAL SUBMITTAL NFL
10/07/05 SUBMITTAL NO FEE SPALMER
11/17/05 PLUMB REV $130 SPALMER
12/05/06 2ND REVISION $60 FEE PER ROBERT LTM
12-06-05 CALLED REVISION P/U "C" PES
12/07/05 P/U BY NADINE AJP
12/23/05 BLDG REV $1730 FEE FG
12/30/05 2ND FLOOR SLAB POURING SUBMITTAL NO FEE
SPALMER
1/6/06 SUBMITTAL FOAM BOARD SURVEY NO FEE SPALMER
1/11/06 SUBMITTAL BUILDING 2ND POUR/2ND LEVEL
SWURAFTIC
01/17/06 ELECTRICAL REV $70 FEE FG
01/17/06 JAKE HAS REVISION
PUT OUT FRONT UNDER "P" JL CALLED CONTRACTOR
1/20/06 SUBMITTAL BUILDING 1ST POUR 3RD FLOOR SEW
1/24/06 REV. P/U BY PRATT AJP
1-26-06 3RD FLOOR 2ND POUR SUBMITTAL ROUTED TO A
DARROUGH WL
1/31/06 ALLISON P/U LETTERS FOR POUR 2 2ND FLOOR
POUR 1 3RD FLOOR
02/02/06 SUBMITTAL NO FEE/ROUTED TO K CONRAD FG
02/08/06 BLDG SUBMITTAL NO FEE ROUTED TO K CONRAD
FG
02/08/06 REVIEWED SHORING/POUR LETTERS 4TH
FLOOR/2ND POUR/GRIDLINES 1-7.TO "C"BOX.KC
2/13/06 SUBMITTAL NO FEE FG
2/13/06 NADINE P/U SUBMITTAL FG
2/15/06 REV/PLUMB $310.00 PT
2/15/06 SUB/BLDG (5TH FL 1ST POUR) PT
2/16/06 PLUMB REV ON HOLD-CONTRACTOR TO CHANGE OUT
SHEETS ADARROUGH
2-19-06 CALLED FOR P/U SUBMITTALS PER NOTES.'C'.RB
2-21-06 SUBMITTAL N/C TO KCONRAD'S DESK NFL
2-21-06 NADINE P/U SUBMITTALS NFL
2/21/06 CONTRACTOR CHANGED OUT PLUMB SHEETS--REV
ROUTED TO "PLUMB" IN-BOX ADARROUGH
2/21/06 REVIEWED SHORING/RESHORING LETTERS:5TH
FLOOR POUR#2.TO 'C' BOX.KC
2/22/06 SHERRY P/U SUBMITTAL SPALMER
2/22/06 BLDG SUBMITTAL NO FEE TA
2/24/06 BLDG SUBMITTAL NO FEE GIVEN TO RB TA
2/28/06 BLDG/SUBMITTAL LTRS/SHOP DRAWINGS GIVEN TO
RB TA
3-2-06 BLDG SUBMITTAL NO FEE 3RD FLOOR TOWER POUR
1 & 2 STRESSING LOGS PLEASE GIVE TO KEN CONRAD WL
3/6/06 SUBMITTAL BLDG FOR KEN CONRAD 6TH FLOOR
POUR 2 PLACED IN KEN CONRADS IN BOX SPALMER
3-8-6 CALLED FOR P/U "C" KSTEVENS
3/8/06 ALLISON P/U SUBMITTAL SPALMER
3-11-06 REVISED M,E,FP AND ARCHT PLANS WITH HAROLD
MOSER (THE MIKE WENNERGREN) FOR STAMPING THIRD SET
BEFORE CALLING FOR P/U. RB
3-13-06 BLDG SUBMITTAL (DRAWNGS) DATED 3-13-06 NO
FEE CHARGED WL
3/13/06 BLDG SUBMITTAL (LETTERS) NO FEE FG
3/13/06 CALL FOR P/U 2 ROLLS UNDER(C) ADARROUGH
3/14/06 2 ROLLS & APP. P/U BY SHERRY AJP
3/14/06 2 BLDG SUBMITTAL NO FEE FG
3/15/06 SHORING LETTER FOR 7TH FLOOR/1ST POUR TO
"C" BOX.NOTIFIED G/C.KC
3/18/06 BLDG SUBMITTAL GIVEN TO KC TA


Account Summary | Usage Policy | Privacy Policy