Plan Review Details - Permit 04110961
Plan Review Stops For Permit 04110961
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2004-12-03 Cont ID  
Sent By jhiggins Date 2004-12-03 Time 08:25 Rev Time 0.00
Received By rregueir Date 2007-01-19 Time 14:47 Sent To  
Notes
2004-12-03 00:00:00PRE REPLAT TEMP ADDRESS ASSIGNED

Review Stop B BUILDING (STRUCTURAL)
Rev No 135 Status F Date 2007-07-01 Cont ID  
Sent By rbrown Date 2007-07-01 Time 11:01 Rev Time 0.00
Received By rbrown Date 2007-07-01 Time 11:01 Sent To  
Notes
2007-07-01 12:46:54BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6652
 E-MAIL: [email protected]
  
 ARCHITECTURAL REVISION SUBMITTED 6/22/07.SHEET A8-7
 DENIED PER COMMENT BELOW, ALL OTHER SHEETS WILL BE
 STAMPED, AND ONE COPY RETAINED FOR FILE SET (THE OTHER
 TWO COPIES WILL BE RETURNED TO THE CONTRACTOR).
  
 1) EXPANSION JOINT DETAILS, SHEET A8-7 (NEW SHEET). THE
 DETAILS SHALL STATE THE REQUIRED FIRE RESISTANCE RATING
 AND SPECIFY THE LISTING REFERENCE FOR THE "FBF-W FIRE
 BARRIER".
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO TELEPHONE:
 (561) 805 6652ROBERT BROWN
 E-MAIL: [email protected]
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 134 Status P Date 2007-07-01 Cont ID  
Sent By rbrown Date 2007-07-01 Time 11:00 Rev Time 0.00
Received By rbrown Date 2007-07-01 Time 10:59 Sent To  
Notes
2007-07-01 11:01:27REVSION SUBMITTED 4/24/07 FOR SHEET A6-0 LOBBY LEVEL
 REFLECTED CEILING PLAN

Review Stop B BUILDING (STRUCTURAL)
Rev No 133 Status P Date 2007-06-16 Cont ID  
Sent By rbrown Date 2007-06-16 Time 12:16 Rev Time 0.00
Received By rbrown Date 2007-06-16 Time 12:16 Sent To  
Notes
2007-06-16 12:16:43SUBMITTAL ON 6/7/07 FOR TRASH CHUTE SHOP DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 132 Status P Date 2007-06-16 Cont ID  
Sent By rbrown Date 2007-06-16 Time 12:07 Rev Time 0.00
Received By rbrown Date 2007-06-16 Time 12:07 Sent To  
Notes
2007-06-16 12:08:36SUBMITTAL ON 6/7/07 FOR COUNTERFLASHING

Review Stop B BUILDING (STRUCTURAL)
Rev No 131 Status P Date 2007-06-16 Cont ID  
Sent By rbrown Date 2007-06-16 Time 12:00 Rev Time 0.00
Received By rbrown Date 2007-06-16 Time 12:00 Sent To  
Notes
2007-06-16 12:02:07SUBMITTAL FOR STOREFRONT WINDOW AD-1 AND AD-2 SHOP
 DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 130 Status P Date 2007-06-16 Cont ID  
Sent By rbrown Date 2007-06-16 Time 11:59 Rev Time 0.00
Received By rbrown Date 2007-06-16 Time 11:59 Sent To  
Notes
2007-06-16 12:00:18SUBMITTAL ON 4/24/07 FOR STAIR 1 AND 2 SHOP DRAWINGS
 AND CALCS

Review Stop B BUILDING (STRUCTURAL)
Rev No 129 Status P Date 2007-04-11 Cont ID  
Sent By rbrown Date 2007-04-11 Time 11:00 Rev Time 0.00
Received By rbrown Date 2007-04-11 Time 11:00 Sent To  
Notes
2007-04-11 11:01:26ARCHITECTURAL REVISION SUBMITTED 2/22/07 FOR SHEETS
 A2.1, A2.5, A2.8 AND A8.2

Review Stop B BUILDING (STRUCTURAL)
Rev No 128 Status P Date 2007-04-11 Cont ID  
Sent By rbrown Date 2007-04-11 Time 07:57 Rev Time 0.00
Received By rbrown Date 2007-04-11 Time 07:57 Sent To  
Notes
2007-04-11 07:59:32STRUCTURAL SUBMITTAL ON 2/22/07 FOR SOFFIT AND CORNICE
 LIGHT GAUGE STEEL FRAMING DETAILS AND CALCULATIONS BY
 LCLARK WESTERN DESIGN LLC

Review Stop B BUILDING (STRUCTURAL)
Rev No 127 Status P Date 2007-04-11 Cont ID  
Sent By rbrown Date 2007-04-11 Time 07:28 Rev Time 0.00
Received By rbrown Date 2007-04-11 Time 07:27 Sent To  
Notes
2007-04-11 07:38:36ARCHITECTURAL SUBMITTAL ON 2/21/07 FOR TREMCO ( U.L.
 FF-S-1015) FIRE-RATED FLOOR SLAB EXPANSION JOINT
 INCREASE IN WIDTH FROM 3" MAX. TO 3-3/4" MAX.

Review Stop B BUILDING (STRUCTURAL)
Rev No 126 Status P Date 2007-04-06 Cont ID  
Sent By rbrown Date 2007-04-06 Time 18:12 Rev Time 0.00
Received By rbrown Date 2007-04-06 Time 18:12 Sent To  
Notes
2007-04-06 18:14:04STRUCTURAL SUBMITTAL ON 2/9/07 FOR ADDITIONAL WINDOW
 CALCULATIONS AND SHOP DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 125 Status P Date 2007-02-11 Cont ID  
Sent By rbrown Date 2007-02-11 Time 12:59 Rev Time 0.00
Received By rbrown Date 2007-02-11 Time 12:59 Sent To  
Notes
2007-02-11 13:00:45SUBMITTAL ON 2/2/07 FOR ROOF LEVEL SANDSET PAVER UPLIFT
 TEST REPORT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 124 Status P Date 2007-02-11 Cont ID  
Sent By rbrown Date 2007-02-11 Time 12:45 Rev Time 0.00
Received By rbrown Date 2007-02-11 Time 12:45 Sent To  
Notes
2007-02-11 12:46:08STRUCTURAL SUBMITTAL ON 2/2/07 FOR ELEVATOR MACHINE
 ROOM STAIR SHOP DRAWING.

Review Stop B BUILDING (STRUCTURAL)
Rev No 123 Status F Date 2007-02-11 Cont ID  
Sent By rbrown Date 2007-02-11 Time 11:45 Rev Time 0.00
Received By rbrown Date 2007-02-11 Time 11:45 Sent To  
Notes
2007-02-11 12:29:03BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6652
 E-MAIL: [email protected]
  
 SUBMITTAL ON 12/8/06 (WAS MIS-FILED AND THEN LOCATED ON
 2/6/07) FOR SOFFIT AND CORNICE FRAMING DETAILS AND
 CALCULATIONS BY CLARK WESTERN DESIGN LLC
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
 1) FBC* 117.1WIND SPEED.THE WIND DESIGN CALCULATION
 SHEET STATES "WIND VELOCITY = 130 MPH".THE WIND SPEED
 FOR WEST PALM BEACH IS 140 MPH AND ALL BUILDINGS AND
 COMPONENTS MUST BE DESIGNED FOR THAT WIND SPEED.AMEND
 THE CALCULATIONS AND MAKE ANY NECESSARY CHANGES, TO
 FRAMING DETAILS, THAT RESULT FROM THE CORRECTION.
  
 2) 61G15-23.002(2)FL. ADMIN. CODE.ENGINEER'S
 SIGNATURES.MANY OF THE DOCUMENTS HAVE PHOTOCOPIED
 SIGNATURES FROM MADHU KUKKALA, P.E.THE ONLY ORIGINAL
 SIGNATURES ARE ONE COPY OF DETAIL SHEET
 0806376/LSF-1.0, LSF-1.0, LSF-1.2.ALL THREE COPIES OF
 THE FRAMING CALCULATIONS AND DETAIL SHEET
 0806376/LSF-1.0 HAVE PHOTOCOPIED SIGNATURES.ALL
 COPIES OF EACH DOCUMENT SHALL HAVE ORIGINAL (WET)
 SIGNATURES AND RAISED SEALS.FLORIDA STATUTES 471.025
 F.S. AND 471.023 F.S.
  
 3) 471.023 F.S.CERTIFICATE OF AUTHORIZATION.THE
 CERTIFICATE OF AUTHORIZATION NUMBER (27171) SHALL BE
 PRINTED ON EACH DOCUMENT.THIS MAY BE ADDED TO EACH
 SHEET BY HAND.
 THE TITLE BLOCK FOR ANY SHEET BEARING THE NAME OF AN
 ENGINEER PRACTICING UNDER A FICTITIOUS NAME, A
 CORPORATION, OR A PARTNERSHIP, OFFERING ENGINEERING
 SERVICES, SHALL INCLUDE THE CERTIFICATE OF
 AUTHORIZATION NUMBER. ADD THE NUMBER TO EACH SHEET.
 THIS MAY BE ADDED BY HAND.
  
 4) 61G15-23.002(2)FL. ADMIN. CODE.FRAMING
 CALCULATIONS.MADHU KUKKALA, P.E. SHALL EITHER SIGN
 AND SEAL, AND PRINT LICENSE NUMBER (64287), ON EACH
 SHEET OF THE CALCULATION DOCUMENT OR, ALTERNATIVELY,
 PROVIDE A SIGNED AND SEALED INDEX SHEET THAT LISTS THE
 SHEET NUMBER AND TITLE FOR EACH CALCULATION SHEET.
 DOCUMENTS SHALL BE SIGNED & SEALED BY THE PROFESSIONAL
 ENGINEER AND SHALL INCLUDE EITHER THE NAME, ADDRESS AND
 LICENSE NUMBER OF THE ENGINEER OR, THE NAME AND LICENSE
 NUMBER OF THE ENGINEER AND THE NAME, ADDRESS AND
 CERTIFICATE OF AUTHORIZATION NUMBER OF THE ENGINEERING
 BUSINESS THROUGH WHICH THE ENGINEER IS PRACTICING.
 FLORIDA STATUTES 471.025 F.S. AND 471.023 F.S.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO TELEPHONE:
 (561) 805 6652ROBERT BROWN
 E-MAIL: [email protected]
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 122 Status P Date 2007-01-07 Cont ID  
Sent By rbrown Date 2007-01-07 Time 09:06 Rev Time 0.00
Received By rbrown Date 2007-01-07 Time 09:06 Sent To  
Notes
2007-01-07 09:07:43STRUCTURAL SUBMITTAL ON 12/18/06 FOR CLUBHOUSE ROOF
 SLAB SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 121 Status P Date 2007-01-07 Cont ID  
Sent By rbrown Date 2007-01-07 Time 09:00 Rev Time 0.00
Received By rbrown Date 2007-01-07 Time 09:00 Sent To  
Notes
2007-01-07 09:01:15ARCHITECTURAL REVISION SUBMITTED 12/4/06

Review Stop B BUILDING (STRUCTURAL)
Rev No 120 Status P Date 2007-01-07 Cont ID  
Sent By rbrown Date 2007-01-07 Time 07:30 Rev Time 0.00
Received By rbrown Date 2007-01-07 Time 07:30 Sent To  
Notes
2007-01-07 07:31:08STRUCTURAL REVISION SUBMITTED 11/30/06 FOR RECREATIONAL
 DECK REVISIONS

Review Stop B BUILDING (STRUCTURAL)
Rev No 119 Status P Date 2006-12-03 Cont ID  
Sent By rbrown Date 2006-12-03 Time 18:35 Rev Time 0.00
Received By rbrown Date 2006-12-03 Time 18:35 Sent To  
Notes
2006-12-03 18:36:28ARCHITECTURAL REVISION SUBMITTED 11/14/06 FOR SHEET
 A5-4 WALL CROSS-SECTIONS

Review Stop B BUILDING (STRUCTURAL)
Rev No 118 Status P Date 2006-12-03 Cont ID  
Sent By rbrown Date 2006-12-03 Time 17:51 Rev Time 0.00
Received By rbrown Date 2006-12-03 Time 17:51 Sent To  
Notes
2006-12-03 17:52:42SUBMITTAL ON 11/17/06 FOR GRAB BAR LOAD TEST RESULTS

Review Stop B BUILDING (STRUCTURAL)
Rev No 117 Status P Date 2006-11-17 Cont ID  
Sent By rbrown Date 2006-11-17 Time 11:20 Rev Time 0.00
Received By rbrown Date 2006-11-17 Time 11:20 Sent To  
Notes
2006-11-17 11:23:18SUBMITTAL ON 11/15/06 FOR LETTERS FROM COHEN FREEDMAN
 AND ENCINOSA , AND TREMCO, INC. ABOUT USE OF
 INTUMESCENT ACRYLIC LATEX SEALANT IN THROUGH
 PENETRATION FIRESTOP SYSTEM.

Review Stop B BUILDING (STRUCTURAL)
Rev No 116 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 20:56 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 20:56 Sent To  
Notes
2006-11-10 20:57:28ARCHITECTURAL REVISION SUBMITTED 10/20/06 FOR SHEETS
 A5-11, A5-12

Review Stop B BUILDING (STRUCTURAL)
Rev No 115 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 20:43 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 20:43 Sent To  
Notes
2006-11-10 20:44:31ARCHITECTURAL REVISION SUBMITTED 10/13/06 FOR SHEET
 A1-9

Review Stop B BUILDING (STRUCTURAL)
Rev No 114 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 20:38 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 20:38 Sent To  
Notes
2006-11-10 20:42:29ARCHITECTURAL REVISION SUBMITTED 8/24/06 FOR SHEETS
 A3-1, A4-0, A4-2, A4-3, A4-4, A4-6, A4-7, A8-1

Review Stop B BUILDING (STRUCTURAL)
Rev No 113 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 19:21 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 19:21 Sent To  
Notes
2006-11-10 19:25:50SUBMITTAL ON 10/4/06 FOR STAIR SHOP DRAWINGS.
  
 --IMPORTANT--
 TO EXPEDITE THE REVIEW PROCESS, I HAVE WRITTEN THE
 ENGINEER'S NAME AND LICENSE NUMBER ON THE PLANS AND
 CALCUATIONS.ANY FUTURE SUBMITTALS FROM DANIEL
 MCGINNIS, P.E. MUST INCLUDE, ON EVERY SHEET, ALL OF THE
 INFORMATION LISTED BELOW:
  
 PURSUANT TO 61G15-23.002(2)FL. ADMIN. CODE, PLANS
 SIGNED & SEALED BY A PROFESSIONAL
 ENGINEER SHALL INCLUDE EITHER THE NAME,
 ADDRESS AND LICENSE NUMBER OF THE
 ENGINEER OR, THE NAME AND LICENSE NUMBER
 OF THE ENGINEER AND THE NAME, ADDRESS
 AND CERTIFICATE OF AUTHORIZATION NUMBER
 OF THE ENGINEERING BUSINESS THROUGH
 WHICH THE ENGINEER IS PRACTICING
 (471.025 F.S. AND 471.023 F.S.).

Review Stop B BUILDING (STRUCTURAL)
Rev No 112 Status F Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 18:02 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 18:02 Sent To  
Notes
2006-11-10 18:03:19BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6652
 E-MAIL: [email protected]
  
 ARCHITECTURAL SUBMITTAL ON 9/27/06 FOR ARCHITECT'S MEMO
 IN RESPONSE TO PLAN REVIEW (#95) DATED 9/6/06 ON
 OMISSION OF OVERFLOW SCUPPERS.
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
 1) FBC (PLUMBING) 1107.1OVERFLOW SCUPPERS.THE
 ORIGINAL PLAN REVIEW COMMENT REFERS TO WALL SECTION 4
 ON SHEET A5-4.ON THAT SHEET, THE WALL SECTION MARKER
 IS SHOWN, ON THE ADJACENT "KEY PLAN / PARTIAL
 ELEVATION", TO BE CUTTING THOUGH THE BALCONY, BUT THE
 WALL SECTION SHOWS A 3'-6" WALL, NOT AN "OPEN RAILING".
 IF WALL SECTION 4 ON SHEET A5-4 IS NOT CORRECT, IT MUST
 BE REVISED BEFORE THE PROPOSED OMISSION OF THE SCUPPERS
 CAN BE REVIEWED.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO TELEPHONE:
 (561) 805 6652ROBERT BROWN
 E-MAIL: [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 111 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 17:33 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 17:33 Sent To  
Notes
2006-11-10 17:33:50SUBMITTAL ON 10/26/06 FOR 5TH FLOOR, POUR 1 AND 2
 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 110 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 17:26 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 17:26 Sent To  
Notes
2006-11-10 17:28:23SUBMITTAL ON 10/26/06 FOR 11TH FLOOR, POUR 1 AND 2
 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 109 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 17:19 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 17:19 Sent To  
Notes
2006-11-10 17:20:08SUBMITTAL ON 10/26/06 FOR GARAGE LEVEL 2,
 POUR 2-1, 2-2 AND 2-3 TENDON STRESSING
 LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 108 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 17:10 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 17:10 Sent To  
Notes
2006-11-10 17:11:07SUBMITTAL ON 10/26/06 FOR GARAGE LEVEL 5,
 POUR 5-1, 5-2 AND 5-3 TENDON STRESSING
 LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 107 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 17:03 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 17:03 Sent To  
Notes
2006-11-10 17:04:53SUBMITTAL ON 10/26/06 FOR GARAGE LEVEL 3,
 POUR 3-1, 3-2 AND 3-3 TENDON STRESSING
 LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 106 Status F Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 16:30 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 16:30 Sent To  
Notes
2006-11-10 16:36:33BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6652
 E-MAIL: [email protected]
  
 SUBMITTAL ON 10/26/06 FOR GRAB BAR LOAD TEST RESULTS.
  
 61G15-23.002(2)FL. ADMIN. CODE.
 THE LOAD TEST RESULTS ARE GOOD, BUT THE ENGINEER'S
 SIGNATURES ON THE LETTER AND TEST RESULT SHEETS ARE ALL
 PHOTOCOPIES, AND THE TEST RESULT SHEETS DO NOT HAVE A
 RAISED SEAL.ALL SHEETS SHALL HAVE THE ORIGINAL
 SIGNATURE AND RAISED SEAL OF THE ENGINEER. (471.025
 F.S. AND 471.023 F.S.).
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 105 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 16:22 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 16:22 Sent To  
Notes
2006-11-10 16:23:27SUBMITTAL ON 10/4/06 FOR SARNAFIL SINGLE PLY PVC ROOF
 SYSTEM PRODUCT DATA

Review Stop B BUILDING (STRUCTURAL)
Rev No 104 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 15:55 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 15:55 Sent To  
Notes
2006-11-10 15:56:06SUBMITTAL ON 8/28/06 FOR TOWNHOMES LEVEL
 6, POUR 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 103 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 15:48 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 15:48 Sent To  
Notes
2006-11-10 15:55:29SUBMITTAL ON 8/28/06 FOR TOWNHOMES LEVEL
 6, POUR 1 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 102 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 12:45 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 12:45 Sent To  
Notes
2006-11-10 12:52:18BUILDING PLAN REVIEW
 ******PROVISO*******
 ROBERT BROWN(561) 805 6652
 E-MAIL: [email protected]
  
 REVISION SUBMITTED ON 9/24/06 FOR WINDOW SHOP
 DRAWINGS.
  
 --RESTRICTION--
 THE E.S. WINDOWS SERIES 4000 ALUMINUM SLIDING GLASS
 DOOR SHALL NOT BE USED FOR SLIDING GLASS WINDOW TYPES
 W5.1 OR W6.1.THOSE WINDOW TYPES EXCEED THE MAXIMUM
 HEIGHT AND DESIGN POSITIVE PRESSURE STATED IN THE
 SUBMITTED PRODUCT APPROVALNOA# 04-1117.05.
  
 --RESTRICTION--
 THE SMALL MISSILE IMPACT SMITH MOUNTAIN IMPACT SYSTEMS
 SERIES SMI-175 ALUMINUM WINDOW WALL SYSTEM-S.M.I SYSTEM
 SHALL NOT BE USED FOR POOL AREA STOREFROMT ST-05 OR
 SIDELIGHTS TO STOREFRONT ST-04.THE GLASS PANEL SIZES
 IN THOSE STOREFRONTS EXCEED THE MAXIMUM SIZES STATED IN
 THE SUBMITTED PRODUCT APPROVALNOA# 05-0209.01.
  
 --ADDITIONAL CALCULATION REQUIRED--
 SUBMIT CALCULATIONS FOR THE HORIZONTAL MULLION REQUIRED
 FOR STOREFRONT SF-4

Review Stop B BUILDING (STRUCTURAL)
Rev No 101 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 11:13 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 11:13 Sent To  
Notes
2006-11-10 11:14:25STRUCTURAL SUBMITTAL ON 9/21/06 FOR SOUTH-EAST LANTERN
 ROOF SLAB SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 100 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 11:09 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 11:09 Sent To  
Notes
2006-11-10 11:10:22STRUCTURAL SUBMITTAL ON 9/14/06 FOR MECHANICAL ROOM
 ROOF SLAB SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 99 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 11:07 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 11:07 Sent To  
Notes
2006-11-10 11:09:16STRUCTURAL SUBMITTAL ON 9/14/06 FOR MECHANICAL ROOM
 SHORING PLAN

Review Stop B BUILDING (STRUCTURAL)
Rev No 98 Status P Date 2006-11-10 Cont ID  
Sent By rbrown Date 2006-11-10 Time 11:00 Rev Time 0.00
Received By rbrown Date 2006-11-10 Time 11:00 Sent To  
Notes
2006-11-10 11:02:03STRUCTURAL SUBMITTAL ON 8/28/06 FOR HIGH ROOF SHORING

Review Stop B BUILDING (STRUCTURAL)
Rev No 97 Status P Date 2006-10-25 Cont ID  
Sent By rbrown Date 2006-10-25 Time 09:13 Rev Time 0.00
Received By rbrown Date 2006-10-25 Time 09:13 Sent To  
Notes
2006-10-25 09:14:11FIRE STOPPING SUBMITTAL ON 9/29/06

Review Stop B BUILDING (STRUCTURAL)
Rev No 96 Status F Date 2006-10-22 Cont ID  
Sent By rbrown Date 2006-10-22 Time 15:58 Rev Time 0.00
Received By rbrown Date 2006-10-22 Time 15:58 Sent To  
Notes
2006-10-22 16:27:35BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6652
 E-MAIL: [email protected]
  
 SUBMITTAL ON 10/18/06 FOR PRODUCT DATA ON RAISED
 STUCCO/FOAM ARCHITECTURAL TRIM.
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
 1) FBC TABLE 600 REQUIRES THE MATERIALS USED IN THE
 EXTERIOR NONBEARING WALLS, OF TYPE I BUILDINGS, TO BE
 NONCOMBUSTIBLE.FBC 1404.1.1 GIVES EXCEPTION TO THIS
 ONLY FOR ARCHITECTURAL TRIM NOT MORE THAN 40 FT ABOVE
 GRADE.TO MEET THE FBC 202 DEFINITION OF
 'NONCOMBUSTIBLE', ALL OTHER ARCHITECTURAL TRIM SHALL
 EITHER [1] PASS THE TEST PROCEDURE SET FORTH IN ASTM E
 136, OR [2] HAVE A STRUCTURAL BASE OF NONCOMBUSTIBLE
 MATERIAL (WHICH MUST COMPLY WITH [1]), AND A SURFACING
 NOT MORE THAN 1/8 INCH THICK THAT HAS A FLAMESPREAD
 RATING NOT GREATER THAN 50, WHEN TESTED IN ACCORDANCE
 WITH ASTM E 84.THE SUBMITTED DATA SHOWS THAT THE
 DRYVIT COATING HAS A FLAMESPREAD OF LESS THAN 50, WHEN
 TESTED PER ASTM E 84, BUT THE 'STRUCTURAL BASE' (OR
 FOAMED PLASTIC) HAS NOT BEEN SHOWN TO PASS THE TEST
 PROCEDURE SET FORTH IN ASTM E 136 "TEST METHOD FOR
 BEHAVIOR OF MATERIALS IN A VERTICAL TUBE FURNACE AT 750
 DEGREES C".THE DEFINITION OF NONCOMBUSTIBLE REQUIRES
 THAT THE MATERIAL PASS THIS TEST.PLEASE SUBMIT A TEST
 REPORT TO SHOW THAT THE FOAMED PLASTIC HAS PASSED THE
 ASTM E 136 TEST.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO TELEPHONE:
 (561) 805 6652ROBERT BROWN
 E-MAIL: [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 95 Status F Date 2006-09-06 Cont ID  
Sent By rbrown Date 2006-09-06 Time 20:18 Rev Time 0.00
Received By rbrown Date 2006-09-06 Time 20:18 Sent To  
Notes
2006-09-06 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6652
 E-MAIL: [email protected]
  
 ARCHITECTURAL AND STRUCTURAL REVISION
 SUBMITTED ON 6/28/06 OK EXCEPT REVISED
 SHEETS A4-2 AND A5-4 WHICH ARE DENIED.
 SEE COMMENT BELOW.
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
 1) FBC (PLUMBING) 1107.1OVERFLOW
 SCUPPERS.THE REVISION TO SHEET A4-2
 (WEST ELEVATION) AND SHEET A5-4, DETAIL
 4, SHOWS THE OMISSION OF SECONDARY
 OVERFLOW SCUPPERS FROM THE ROOF AT 11TH
 FLOOR LEVEL.THE SCUPPERS ARE REQUIRED
 IN CASE THE PRIMARY ROOF DRAINS BECOME
 BLOCKED AND ALLOW WATER BUILD-UP.
 SUBMIT AN ALTERNATIVE REVISION OR
 CONSTRUCT TO THE PLAN REVISION ALREADY
 ON FILE.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO
 TELEPHONE: (561) 805 6652ROBERT BROWN
 E-MAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 94 Status P Date 2006-09-05 Cont ID  
Sent By rbrown Date 2006-09-05 Time 20:17 Rev Time 0.00
Received By rbrown Date 2006-09-05 Time 20:17 Sent To  
Notes
2006-09-05 00:00:00ARCHITECTURAL AND STRUCTURAL REVISION
 SUBMITTED ON 6/28/06.EXCEPT REVISED
 SHEETS A4-2 AND A5-4 WHICH ARE DENIED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 93 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 13:30 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 13:30 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/24/06 FOR TOWNHOMES LEVEL
 5, POUR 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 92 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 13:30 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 13:29 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/24/06 FOR TOWNHOMES LEVEL
 2, POUR 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 91 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 13:23 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 13:22 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/22/06 FOR ELEVATOR
 MACHINE ROOM ROOF SHORING LETTERS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 90 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 13:19 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 13:19 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/15/06 FOR REFUSE CHUTE
 SHOP DRAWING.

Review Stop B BUILDING (STRUCTURAL)
Rev No 89 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 13:15 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 13:15 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/17/06 FOR RECREATIONAL
 BUILDING ROOF LEVEL SHORING PLAN.

Review Stop B BUILDING (STRUCTURAL)
Rev No 88 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 13:10 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 13:10 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/17/06 FOR HIGH ROOF
 LEVEL SHORING PLAN.

Review Stop B BUILDING (STRUCTURAL)
Rev No 87 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 13:05 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 13:05 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/15/06 FOR GARAGE LEVEL 4,
 POUR 4-1, 4-2 AND 4-3 TENDON STRESSING
 LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 86 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 12:58 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 12:58 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/15/06 FOR TOWNHOMES LEVEL
 4, POUR 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 85 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 12:52 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 12:52 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/15/06 FOR GARAGE LEVEL 6,
 POUR 6-1, 6-2 AND 6-3 TENDON STRESSING
 LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 84 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 08:07 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 08:07 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/8/06 FOR TOWNHOMES ROOF
 LEVEL SHORING LETTERS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 83 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 08:05 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 08:05 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/08/06 FOR TOWNHOMES ROOF
 SHORING REVISION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 82 Status P Date 2006-08-29 Cont ID  
Sent By rbrown Date 2006-08-29 Time 08:03 Rev Time 0.00
Received By rbrown Date 2006-08-29 Time 08:03 Sent To  
Notes
2006-08-29 00:00:00SUBMITTAL ON 8/1/06 FOR ROOF LEVEL, POUR
 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 81 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 22:05 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 22:05 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/27/06 FOR TOWNHOMES LEVEL
 2 SHORING AND RESHORING PLANS AND
 CALCULATIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 80 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:52 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:52 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/25/06 FOR TRANSFORMER
 VAULT SLAB SHORING PLAN

Review Stop B BUILDING (STRUCTURAL)
Rev No 79 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:46 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:46 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/25/06 FOR TOWNHOME LEVEL
 5, POUR 1 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 78 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:44 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:44 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/25/06 FOR GARAGE ROOF
 SHORING REVISION.

Review Stop B BUILDING (STRUCTURAL)
Rev No 77 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:41 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:41 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/25/06 FOR TOWNHOME LEVEL
 3, POUR 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 76 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:37 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:37 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/25/06 FOR LEVEL 10, POUR
 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 75 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:31 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:31 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/25/06 FOR LEVEL 12, POUR
 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 74 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:26 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:25 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/25/06 FOR LEVEL 14, POUR
 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 73 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:21 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:21 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/25/06 FOR LEVEL 16, POUR
 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 72 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:13 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:13 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/21/06 FOR ROOF LEVEL POUR
 2 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 71 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 21:07 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 21:07 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/21/06 FOR ROOF LEVEL
 SHORING AND RESHORING PLANS AND
 CALCULATIONS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 70 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:39 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:39 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/20/06 FOR LEVEL 15, POUR
 1 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 69 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:37 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:37 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/20/06 FOR LEVEL 9, POUR 1
 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 68 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:38 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:38 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/17/06 FOR LEVEL 16,
 POUR 1 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 67 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:26 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:29 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/15/06 FOR GARAGE LEVEL 6,
 POUR 2 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 66 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:21 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:21 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/11/06 FOR ROOF LEVEL LOAD
 DISTRIBUTION CALCULATIONS TO DETERMINE
 SHORING REQUIREMENT

Review Stop B BUILDING (STRUCTURAL)
Rev No 65 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:18 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:18 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/11/06 FOR TOWNHOME LEVEL
 4, POUR 1 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 64 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:13 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:13 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 7/6/06 FOR LEVEL 16,
 POUR 2 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 63 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:10 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:10 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/15/06 FOR TOWNHOMES LEVEL
 3, POUR 2 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 62 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:06 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:06 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/30/06 FOR GARAGE LEVEL 6,
 POUR 1 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 61 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 20:03 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 20:03 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/27/06 FOR LEVEL 16,
 POUR 1 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 60 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 19:59 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 19:59 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/23/06 FOR TOWNHOMES LEVEL
 3, POUR 1 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 59 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 19:53 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 19:53 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/23/06 FOR INTERMEDIATE
 TRANSFORMER VAULT PERI FLEX SYSTEM SLAB
 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 58 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 19:50 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 19:50 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/19/06 FOR LEVEL 15,
 POUR 2 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 57 Status F Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 19:08 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 19:08 Sent To  
Notes
2006-08-28 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6652
 E-MAIL: [email protected]
  
 SUBMITTAL ON 6/19/06 FOR SLIDING GLASS
 DOOR AND STOREFRONT CALCULATIONS.
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
 1) THE CALCULATION PACKAGE WAS BROUGHT
 IN AS A SUBMITTAL BUT IT INCLUDES
 PRODUCT APPROVALS WHICH ARE DIFFERENT TO
 THOSE IN THE PERMIT SET.IF THE
 INTENTION IS TO CHANGE THE PRODUCTS TO
 BE USED, THE NEW PRODUCT APPROVALS MUST
 BE SEBMITTED AS A REVISION AND THE
 APPROPRIATE $120 (CALCULATED AS $50 +
 $10 PER NEW PRODUCT APPROVAL) REVISION
 FEE PAID.
  
 2) ANY OF NEW PRODUCT APPROVALS THAT
 HAVE STATEWIDE PRODUCT APPRVALS SHALL BE
 SUBMITTED WITH A COPY OF THE STATEWIDE
 PRODUCT APPROVAL COVER SHEET (AVAILABLE
 FROM WWW.FLORIDABUILDING.ORG/
 PR/PR_APP_LST.ASPX
 TO EXPEDITE THIS PROCESS, I HAVE
 PROVIDED ONE COPY OF THE RELEVANT
 STATEWIDE PRODUCT APPROVAL COVER SHEET
 FOR EACH OF THE THREE NEW PRODUCT
 APPROVALS THAT HAVE A STATEWIDE PRODUCT
 APPROVAL.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO
 TELEPHONE: (561) 805 6652ROBERT BROWN
 E-MAIL: [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 56 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 18:08 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 18:08 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/19/06 FOR TOWNHOME
 LEVEL 2 SHORING DRAWING SHEET 501

Review Stop B BUILDING (STRUCTURAL)
Rev No 55 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 18:01 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 18:01 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/15/06 FOR LEVEL 3, POUR 1
 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 54 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 18:01 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 18:00 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/15/06 FOR LEVEL 4, POUR 1
 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 53 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 17:49 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 17:49 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/15/06 FOR LEVEL 6, POUR 1
 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 52 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 17:45 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 17:45 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/15/06 FOR LEVEL 7, POUR 1
 AND 2 TENDON STRESSING LOG AND REPAIR

Review Stop B BUILDING (STRUCTURAL)
Rev No 51 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 17:44 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 07:57 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/15/06 FOR LEVEL 8, POUR 1
 AND 2 TENDON STRESSING LOG AND REPAIR

Review Stop B BUILDING (STRUCTURAL)
Rev No 50 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 07:43 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 07:43 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/15/06 FOR LEVEL 2,
 POUR 2 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 49 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 07:33 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 07:33 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/15/06 FOR LEVEL 2, POUR 1
 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 48 Status P Date 2006-08-28 Cont ID  
Sent By rbrown Date 2006-08-28 Time 07:23 Rev Time 0.00
Received By rbrown Date 2006-08-28 Time 07:23 Sent To  
Notes
2006-08-28 00:00:00SUBMITTAL ON 6/15/06 FOR GARAGE LEVEL 5,
 POUR 3 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 47 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 20:42 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 20:42 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 6/5/06 FOR GARAGE LEVEL 5,
 POUR 1 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 46 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 20:38 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 20:38 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 6/1/06 FOR LEVEL 14, POUR 1
 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 45 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 20:35 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 20:35 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/18/06 FOR GARAGE LEVEL 4,
 POUR 2 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 44 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 20:32 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 20:32 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/18/06 FOR LEVEL 12, POUR
 1 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 43 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 20:27 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 20:26 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/5/06 FOR GARAGE
 RE-SHORING CALCULATIONS

Review Stop B BUILDING (STRUCTURAL)
Rev No 42 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 20:23 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 20:23 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/5/06 FOR ROOF LEVEL
 SHORING CALCULATIONS

Review Stop B BUILDING (STRUCTURAL)
Rev No 41 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 20:18 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 20:18 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/5/06 FOR GARAGE, POUR 8,
 11 AND 12 SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 40 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 20:10 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 20:10 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/5/06 FOR GARAGE, POUR 5,
 6 AND 9 SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 39 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 20:05 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 20:05 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/5/06 FOR GARAGE, POUR 5,
 6 AND 9 SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 38 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 19:54 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 19:54 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/5/06 FOR GARAGE, POUR 7
 AND 10 SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 37 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 19:52 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 19:52 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/5/06 FOR ROOF LEVEL, POUR
 1 SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 36 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 19:46 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 19:46 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/5/06 FOR GARAGE, POUR 4
 SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 35 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 19:40 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 19:40 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 5/1/06 FOR LEVEL 8, POUR 1
 AND 2 TENDON STRESSING LOG

Review Stop B BUILDING (STRUCTURAL)
Rev No 34 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 19:13 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 19:13 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/26/06 FOR GARAGE LEVEL3,
 POUR 2 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 33 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 19:10 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 19:10 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/21/06 FOR LEVEL 10, POUR
 1 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 32 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 19:04 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 19:04 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/20/06 FOR GARAGE LEVEL 4
 AND 5, POUR 7 AND 10 SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 31 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 18:58 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 18:58 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/20/06 FOR LEVELS 12 TO
 16, POUR 1 RE-SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 30 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 18:51 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 18:51 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/10/06 FOR LEVELS 12 TO
 16, POUR 1 SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 29 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 18:47 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 18:47 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/6/06 FOR LEVEL 9, POUR 1
 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 28 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 18:42 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 18:47 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/5/06 FOR LEVEL 5, POUR 1
 AND 2 TENSION LOGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 27 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 18:38 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 18:38 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/5/06 FOR GARAGE LEVEL 2,
 POUR 3 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 26 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 18:35 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 18:35 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/3/06 FOR GARAGE RESHORING
 DRAWINGS, POUR 3

Review Stop B BUILDING (STRUCTURAL)
Rev No 25 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 18:20 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 18:20 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 4/3/06 FOR GARAGE RESHORING
 DRAWINGS, POUR 1

Review Stop B BUILDING (STRUCTURAL)
Rev No 24 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 18:15 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 18:15 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 3/13/06 FOR SHORING
 DRAWINGS AND CALCULATIONS

Review Stop B BUILDING (STRUCTURAL)
Rev No 23 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 17:57 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 17:57 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 3/6/06 FOR LEVEL 6, POUR 2
 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 22 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 17:53 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 17:53 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 3/2/06 FOR LEVEL 3, POUR 1
 AND 2 STRESSIN LOGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 21 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 17:49 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 17:49 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 2/28/06 FOR LEVEL 7 AND 8,
 POUR 1 RESHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 20 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 17:43 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 17:43 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 2/28/06 FOR LEVEL 7, POUR 1
 SHORING DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 19 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 17:37 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 17:37 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 2/28/06 FOR LEVEL 6, POUR 1
 SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 18 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 17:27 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 17:27 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 2/24/06 FOR SHORING
 DRAWINGS

Review Stop B BUILDING (STRUCTURAL)
Rev No 17 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 17:26 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 17:26 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 2/24/06 FOR SHORING DESIGN
 CALCULATIONS

Review Stop B BUILDING (STRUCTURAL)
Rev No 16 Status P Date 2006-08-06 Cont ID  
Sent By rbrown Date 2006-08-06 Time 17:19 Rev Time 0.00
Received By rbrown Date 2006-08-06 Time 17:19 Sent To  
Notes
2006-08-06 00:00:00SUBMITTAL ON 2/22/06 FOR LEVEL 2, POUR 1
 AND 2 STRESSING RECORDS

Review Stop B BUILDING (STRUCTURAL)
Rev No 15 Status P Date 2006-06-17 Cont ID  
Sent By rbrown Date 2006-06-17 Time 22:14 Rev Time 0.00
Received By rbrown Date 2006-06-17 Time 22:14 Sent To  
Notes
2006-06-17 00:00:00ARCHITECTURAL AND STRUCTURAL REVISION
 SUBMITTED 3/30/06 FOR GENERAL
 COORDINATION

Review Stop B BUILDING (STRUCTURAL)
Rev No 14 Status P Date 2007-08-27 Cont ID  
Sent By hpiskura Date 2006-03-15 Time 13:28 Rev Time 0.00
Received By hpiskura Date 2006-03-15 Time 11:18 Sent To  
Notes
2006-03-15 00:00:00POUR/SHORING LETTER FOR POUR NUMBER
 1/7TH FLOOR.

Review Stop B BUILDING (STRUCTURAL)
Rev No 13 Status P Date 2006-03-12 Cont ID  
Sent By rbrown Date 2006-03-12 Time 02:40 Rev Time 0.00
Received By rbrown Date 2006-03-12 Time 02:40 Sent To  
Notes
2006-03-12 00:00:00ARCHITECTURAL REVISION SUBMITTED
 12/23/05 FOR REDUCTION IN STORY HEIGHT
 PLUS ADDITIONAL DETAILS

Review Stop B BUILDING (STRUCTURAL)
Rev No 12 Status P Date 2006-02-19 Cont ID  
Sent By rbrown Date 2006-02-19 Time 18:18 Rev Time 0.00
Received By rbrown Date 2006-02-19 Time 18:18 Sent To  
Notes
2006-02-19 00:00:00STRUCTURAL SUBMITTAL ON 2/15/06 FOR:
 5TH FLOOR SLAB, POUR# 1, SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 11 Status P Date 2006-02-19 Cont ID  
Sent By rbrown Date 2006-02-19 Time 18:15 Rev Time 0.00
Received By rbrown Date 2006-02-19 Time 18:15 Sent To  
Notes
2006-02-19 00:00:00ARCHITECTURAL SUBMITTAL ON 2/13/06 FOR:
  
 COHEN FREEDMAN ENCINOSA LETTER ON 4-HOUR
 RATED CONCRETE BLOCK MASONRY WALLS

Review Stop B BUILDING (STRUCTURAL)
Rev No 10 Status P Date 2006-02-19 Cont ID  
Sent By rbrown Date 2006-02-19 Time 18:14 Rev Time 0.00
Received By rbrown Date 2006-02-19 Time 18:13 Sent To  
Notes
2006-02-19 00:00:00STRUCTURAL SUBMITTAL ON 2/2/06 FOR:
 4TH FLOOR SLAB, POUR# 1, SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 9 Status P Date 2006-02-19 Cont ID  
Sent By rbrown Date 2006-02-19 Time 18:10 Rev Time 0.00
Received By rbrown Date 2006-02-19 Time 18:10 Sent To  
Notes
2006-02-19 00:00:00STRUCTURAL SUBMITTAL ON 1/26/06 FOR:
 3RD FLOOR SLAB, POUR# 2, SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 8 Status P Date 2006-02-19 Cont ID  
Sent By rbrown Date 2006-02-19 Time 18:09 Rev Time 0.00
Received By rbrown Date 2006-02-19 Time 18:09 Sent To  
Notes
2006-02-19 00:00:00STRUCTURAL SUBMITTAL ON 1/11/06 FOR:
 2ND FLOOR SLAB, POUR# 2, SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2006-02-19 Cont ID  
Sent By rbrown Date 2006-02-19 Time 18:06 Rev Time 0.00
Received By rbrown Date 2006-02-19 Time 18:06 Sent To  
Notes
2006-02-19 00:00:00STRUCTURAL SUBMITTAL ON 12/30/05 FOR
 2ND FLOOR SLAB, POUR# 1, SHORING LETTERS

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status P Date 2006-02-19 Cont ID  
Sent By rbrown Date 2006-02-19 Time 18:04 Rev Time 0.00
Received By rbrown Date 2006-02-19 Time 18:04 Sent To  
Notes
2006-02-19 00:00:00STRUCTURAL SUBMITTAL ON 12/30/05 FOR
 DUNKELBERGER SOIL BEARING CAPACITY MEMO

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2005-09-19 Cont ID  
Sent By rbrown Date 2005-09-19 Time 15:29 Rev Time 0.00
Received By rbrown Date 2005-09-19 Time 14:31 Sent To  
Notes
2005-09-19 00:00:00BUILDING PLAN REVIEW
 ******PROVISO*******
 ROBERT BROWN(561) 805 6716
 E-MAIL: [email protected]
  
 -PROVISO-
 WINDOW WALLS: THE WINDOW SHOP DRAWING
 SUBMITTAL SHALL INCLUDE A STRUCTURAL
 MULLION.THE MULLION MUST BE CAPABLE OF
 SPANNING HORIZONTALLY ACROSS THE ENTIRE
 WIDTH OF THE OPENING FOR THOSE WINDOWS
 THAT EXCEED THE MAXIMUM HEIGHT STATED IN
 THE SUBMITTED MIAMI WALL SYSTEMS INC.
 FIXED WINDOW LARGE MISSILE IMPACT SERIES
 101 AND SMALL MISSILE IMPACT SERIES 101
 PRODUCT APPROVAL NOA'S 03-0415.18 AND
 05-0420.01.
  
 -PROVISO-
 SLIDING GLASS DOORS:THE WINDOW/DOOR
 SUBCONTRACTOR SHALL PROVIDE RATIONAL
 ANALYSIS FROM A FLORIDA REGISTERED
 ENGINEER TO JUSTIFY THE USE OF THE
 PROPOSED SLIDING GLASS DOOR IN SIZES
 THAT EXCEED THE MAXIMUM IN THE SUBMITTED
 MIAMI WALL SYSTEMS INC. SERIES 100
 SLIDING GLASS DOOR PRODUCT APPROVAL
 NOA'S 04-0908.02 AND 01-1108.03.
 NOTE: MISSILE IMPACT RATING FOR THESE
 LARGER SIZES CANNOT BE JUSTIFIED BY
 RATIONAL ANALYSIS.MISSILE IMPACT TEST
 RESULTS MUST BE SUBMITTED.
  
 -PROVISO-
 HORIZONTAL SLIDER WINDOWS: IT IS NOTED
 THAT 'CUT-DOWN' SLIDING GLASS DOORS WILL
 BE USED FOR THOSE HORIZONTAL SLIDER
 WINDOWS WHICH EXCEED 6'-6" WIDE X 6'-0"
 HIGH (FOR EXAMPLE W2, W2.1, W3, W3.1,
 W3.2, W4, W4.1, W5, W5.1, W6, W6.1,
 W6.2).
  
 -PROVISO-
 FIXED WINDOWS:THE WINDOW SHOP DRAWING
 SUBMITTAL SHALL INCLUDE A STRUCTURAL
 MULLION.THE MULLION MUST BE CAPABLE OF
 SPANNING HORIZONTALLY ACROSS THE ENTIRE
 WIDTH OF THE OPENING FOR THOSE WINDOWS
 THAT EXCEED THE 6'-0" MAXIMUM HEIGHT
 STATED IN THE SUBMITTED MIAMI WALL
 SYSTEMS INC. SERIES 122 ALUMINUM FIXED
 WINDOW PRODUCT APPROVAL NOA 04-0322.09.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2005-09-02 Cont ID  
Sent By rbrown Date 2005-09-02 Time 20:41 Rev Time 0.00
Received By rbrown Date 2005-08-26 Time 17:56 Sent To  
Notes
2005-08-26 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6716
 E-MAIL: [email protected]
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
 FOR CONSISTENCY, THE FOLLOWING COMMENTS
 ARE NUMBERED AS PER THE BUILDING PLAN
 REVIEW OF 7/29/05:
  
 2) 713.13 F.S.A NOTICE OF COMMENCEMENT
 SHALL BE RECORDED AT PALM BEACH COUNTY
 COURTHOUSE AND A COPY SUBMITTED TO THIS
 OFFICE BEFORE A PERMIT CAN BE ISSUED.
 BLANK FORMS ARE AVAILABLE FROM THIS
 OFFICE.
 NOTE: THE NOTICE OF COMMENCEMENT MUST BE
 RE-RECORDED IF THE DESCRIBED IMPROVEMENT
 OR CONSTRUCTION IS NOT COMMENCED WITHIN
 90 DAYS OF RECORDING.
  
 8) PRODUCT APPROVALS.
 (A) GENERAL: SOME OF THE OPTIONS
 COVERED BY THE SUBMITTED PRODUCT
 APPROVALS MAY NOT BE CODE COMPLIANT IF
 USED FOR THIS PROJECT/LOCATION.FOR
 EACH PRODUCT APPROVAL, THE SHEETS SHALL
 BE MARKED, AS APPROPRIATE, TO IDENTIFY
 WHICH PRODUCT OPTIONS/MATERIALS/SIZES
 ARE TO BE USED AND THE DESIGN PRESSURES.
 THIS COMMENT WAS MADE PREVIOUSLY BUT HAS
 NOT BEEN ADDRESSED.
 (B) ROOF: THE SUBMITTED STATEWIDE
 PRODUCT APPROVAL COVER SHEET FL1579 DOES
 NOT MATCH THE SUBMITTED SARNAFIL SINGLE
 PLY PVC ROOF SYSTEM PRODUCT APPROVAL
 NOA# 02-0603.06.SARNAFIL DOES NOT HAVE
 A STATEWIDE PRODUCT APPROVAL FOR THIS
 PRODUCT AND WOULD HAVE TO SUBMIT AN
 APPLICATION FORM FOR LOCAL PRODUCT
 APPROVAL.
 (C) WINDOW WALLS: SHEET A3-3, THE
 OVERALL HEIGHT OF TOWER FIXED GLASS
 WINDOW SF-4 AND STOREFRONT STF-1, 2, 4,
 5 AND 11 RANGES FROM 12'-0" TO 17'-4".
 THIS EXCEEDS THE MAXIMUM HEIGHT COVERED
 BY THE SUBMITTED MIAMI WALL SYSTEMS INC.
 FIXED WINDOW LARGE MISSILE IMPACT SERIES
 101 AND SMALL MISSILE IMPACT SERIES 101
 PRODUCT APPROVAL NOA'S 03-0415.18 AND
 05-0420.01.SUBMIT A PRODUCT APPROVAL
 FOR A STRUCTURAL MULLION CAPABLE OF
 SPANNING HORIZONTALLY ACROSS THE ENTIRE
 WIDTH OF THE OPENING SO THAT THE WINDOWS
 ARE NOT REQUIRED TO SPAN THE ENTIRE
 HEIGHT OF THE OPENING.
 (D) SLIDING GLASS DOORS:SHEET A3-3,
 THE HEIGHT OF THE SLIDING GLASS DOORS IS
 10'-1" WHICH EXCEEDS THE MAXIMUM HEIGHT
 COVERED BY THE SUBMITTED MIAMI WALL
 SYSTEMS INC. SERIES 100 SLIDING GLASS
 DOOR PRODUCT APPROVAL NOA'S 04-0908.02
 AND 01-1108.03.SUBMIT ALTERNATIVE
 PRODUCT APPROVALS.ALSO, THE FIRST
 FLOOR SLIDING GLASS DOORS HAVE FIXED
 GLASS WINDOWS ABOVE 10'-1" SO A
 STRUCTURAL MULLION CAPABLE OF SPANNING
 HORIZONTALLY ACROSS THE ENTIRE WIDTH OF
 THE OPENING IS REQUIRED. SUBMIT A
 PRODUCT APPROVAL FOR A STRUCTURAL
 MULLION.
 (E) STOREFRONT DOORS:NO PRODUCT
 APPROVAL WAS SUBMITTED.SUBMIT A
 STOREFRONT DOOR PRODUCT APPROVAL.
 (F) ALUMINUM PICKET RAILING SYSTEM:
 THE APPLICATION FOR LOCAL PRODUCT
 APPROVAL TOGETHER WITH THE SUBMITTED
 MIAMI-DADE PRODUCT APPROVAL NOA#
 01-0206.14 HAS BEEN SUBMITTED TO THE
 BUILDING OFFICIAL FOR FINAL
 REVIEW/APPROVAL.
 (H) HOLLOW METAL DOORS: THE DOORS
 COVERED BY THE SUBMITTED CECO DOOR
 PRODUCTS PRODUCT APPROVAL NOA'S
 03-0411.02 AND 03-0411.03 HAVE MAXIMUM
 DESIGN PRESSURES OF +53PSF/-45PSF AND
 +45PSF/-45PSF, WHICH ARE NOT SUFFICIENT
 TO RESIST THE DESIGN PRESSURES STATED IN
 THE SUBMITTED RWDI WIND LOAD REPORT FOR
 THE BUILDING.FOR EXAMPLE THE ROOF
 LEVEL DOORS 120, 121 AND 122 HAVE DESIGN
 PRESSURES OF +85PSF/-95PSF AND THE
 GROUND LEVEL DOORS 03, 05, 06, 09, 11,
 21 AND 26 HAVE DESIGN PRESSURES OF UPTO
 +85PSF/-85PSF.
 (J) HORIZONTAL SLIDER WINDOWS: SHEET
 A3-2, THE SUBMITTED MIAMI WALL SYSTEMS
 INC HORIZONTAL SLIDER WINDOW PRODUCT
 APPROVAL NOA'S 04-1122.02 AND 04-1215.03
 COVER WINDOWS UPTO 6'-6" WIDE X 6'-0"
 HIGH WHICH IS NOT SUFFICIENT FOR SOME OF
 THE SPECIFIED WINDOWS (E.G. W2, W2.1,
 W3, W3.1, W3.2, W4, W4.1, W5, W5.1, W6,
 W6.1, W6.2).SUBMIT A PRODUCT APPROVAL
 FOR WINDOWS SIZED TO MATCH OR EXCEED THE
 SIZES OF THE PROPOSED WINDOWS.
 (K) WHEN ALL OF THE REQUIRED PRODUCT
 APPROVALS HAVE BEEN COLLATED, PLEASE
 ENSURE THAT THEY ARE MARKED UP, AS
 DESCRIBED IN COMMENT 8(A) ABOVE, BEFORE
 RE-SUBMITTAL.
 (L) NO PRODUCT APPROVAL WAS SUBMITTED
 FOR FIXED WINDOWS.WILL THE STOREFRONT
 WINDOW BE USED AS FIXED WINDOWS?IF
 NOT, SUBMIT A SEPARATE PRODUCT APPROVAL
 FOR THE FIXED WINDOWS.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO
 TELEPHONE: (561) 805 6716ROBERT BROWN
 E-MAIL: [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2005-07-29 Cont ID  
Sent By rbrown Date 2005-07-29 Time 17:46 Rev Time 0.00
Received By rbrown Date 2005-07-29 Time 08:25 Sent To  
Notes
2005-07-29 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6716
 E-MAIL: [email protected]
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
 FOR CONSISTENCY, THE FOLLOWING COMMENTS
 ARE NUMBERED AS PER THE BUILDING PLAN
 REVIEW OF 3/21/05:
  
 2) 713.13 F.S. THE NOTICE OF
 COMMENCEMENT SUBMITTED FOR PERMIT#
 04110964 DESRIBES THE WORK AS 'SITE
 IMPROVEMENTS....'BECAUSE THAT
 DESCRIPTION DOES NOT INCLUDE
 CONSTRUCTION OF THE NEW BUILDING, A
 NOTICE OF COMMENCEMENT, DESCRIBING THE
 PROPOSED CONSTRUCTION, WILL HAVE TO BE
 RECORDED. THE NOTICE OF COMMENCEMENT
 SHALL BE RECORDED AT PALM BEACH COUNTY
 COURTHOUSE AND A COPY SUBMITTED TO THIS
 OFFICE BEFORE A PERMIT CAN BE ISSUED.
 BLANK FORMS ARE AVAILABLE FROM THIS
 OFFICE.
 NOTE: THE NOTICE OF COMMENCEMENT MUST BE
 RE-RECORDED IF THE DESCRIBED IMPROVEMENT
 OR CONSTRUCTION IS NOT COMMENCED WITHIN
 90 DAYS OF RECORDING.
  
 8) PRODUCT APPROVALS.
 (A) GENERAL: SOME OF THE OPTIONS
 COVERED BY THE SUBMITTED PRODUCT
 APPROVALS MAY NOT BE CODE COMPLIANT IF
 USED FOR THIS PROJECT/LOCATION.FOR
 EACH PRODUCT APPROVAL, THE SHEETS SHALL
 BE MARKED, AS APPROPRIATE, TO IDENTIFY
 WHICH PRODUCT OPTIONS/MATERIALS/SIZES
 ARE TO BE USED AND THE DESIGN PRESSURES.
 THIS COMMENT WAS MADE PREVIOUSLY BUT HAS
 NOT BEEN ADDRESSED.
 (B) ROOF: THE SUBMITTED STATEWIDE
 PRODUCT APPROVAL COVER SHEET FL1579 DOES
 NOT MATCH THE SUBMITTED SARNAFIL SINGLE
 PLY PVC ROOF SYSTEM PRODUCT APPROVAL
 NOA# 02-0603.06.SARNAFIL DOES NOT HAVE
 A STATEWIDE PRODUCT APPROVAL FOR THIS
 PRODUCT AND WOULD HAVE TO SUBMIT AN
 APPLICATION FORM FOR LOCAL PRODUCT
 APPROVAL.
 (C) WINDOW WALLS: SUBMITTAL OF LOCAL
 PRODUCT APPROVAL APPLICATION FORMS FOR
 MIAMI WALL SYSTEMS INC. FIXED WINDOW
 LARGE MISSILE IMPACT SERIES 101 AND
 SMALL MISSILE IMPACT SERIES 101 IS
 NOTED, BUT THE REFERENCED PRODUCT
 APPROVAL NOA'S (03-0415.18 AND
 05-0420.01) WERE NOT SUBMITTED FOR
 REVIEW.SUBMIT THREE COPIES OF THE
 REFERENCED MIAMI-DADE NOA'S
 (D) SLIDING GLASS DOORS:SUBMITTAL
 OF MIAMI WALL SYSTEMS INC. LETTER DATED
 5/27/05 ABOUT THEIR APPLICATION FOR
 STATEWIDE PRODUCT APPROVAL IS NOTED.
 THE LETTER STATES THAT THEY EXPECT TO
 HAVE STATEWIDE PRODUCT APPROVAL FOR
 THEIR PRODUCTS BY EARLY JULY.AS OF
 JULY 29TH THE ONLY STATEWIDE PRODUCT
 APPROVAL FOR MIAMI WALL SYSTEMS INC. IS
 FOR THEIR S.106 HORIZONTAL SLIDER
 WINDOW.THE LOCAL PRODUCT APPROVAL
 APPLICATION FORMS SUBMITTED FOR THE
 SERIES 100 SLIDING GLASS DOOR REFERENCES
 MIAMI-DADE PRODUCT APPROVAL NOA#
 04-0908.02.THE NOA SUBMITTED IS
 01-0123.02 WHICH WAS REVISED BY THE
 ABOVE-MENTIONED NOA.SUBMIT THREE
 COPIES OF NOA#-0908.02 AS REFERENCED BY
 THE SUBMITTED LOCAL PRODUCT APPROVAL
 APPLICATION FORM.
 (E) STOREFRONT DOORS:SOME OF THE
 DOORS (E.G. DOORS 01,02,43,45,46,47 AND
 87 WERE STATED IN THE PREVIOUS REVIEW TO
 BE LARGER THAN THE 6070 SIZE LIMIT OF
 THE FIREDOOR LLC STOREFRONT DOOR PRODUCT
 APPROVAL PREVIOUSLY SUBMITTED.THAT
 PRODUCT APPROVAL WAS NOT INCLUDED WITH
 THE CURRENT RE-SUBMITTAL AND NO
 REPLACEMENT/ALTERNATIVE WAS PROVIDED.
 SUBMIT A PRODUCT APPROVAL FOR THE
 STOREFRONT DOORS.
 (F) ALUMINUM PICKET RAILING SYSTEM:
 THE APPLICATION FOR LOCAL PRODUCT
 APPROVAL TOGETHER WITH THE SUBMITTED
 MIAMI-DADE PRODUCT APPROVAL NOA#
 01-0206.14 HAS BEEN GIVEN TO LUIS
 MARTINEZ (INTERIM ASSISTANT BUILDING
 OFFICIAL) FOR FINAL REVIEW/APPROVAL.
 (H) HOLLOW METAL DOORS: THE SUBMITTED
 CECO DOOR PRODUCTS LOCAL PRODUCT
 APPROVAL APPLICATION FORM DOES NOT STATE
 THE MANUFACTURER'S REFERENCE OR NOA# TO
 WHICH THE APPLICATION FORM RELATES (ITEM
 #1 ON THE FORM).NEITHER DOES THE FORM
 STATE THE TELEPHONE NO. AND E-MAIL
 ADDRESS OF THE MANUFACTURER'S TECHNICAL
 REPRESENTATIVE OR THE NAME AND E-MAIL
 ADDRESS OF THE THIRD PARTY QUALITY
 ASSURANCE ENTITY'S AUTHORIZED
 REPRESENTATIVE.ALSO, THERE ARE TWO
 DIFFERENT NOA'S (SINGLE DOOR AND DOUBLE
 DOOR) SO A SEPARATE LOCAL PRODUCT
 APPROVAL FORM IS REQUIRED FOR EACH, BUT
 ONLY ONE FORM WAS SUBMITTED.
 (I) DOOR NO. 6 (PUMP ROOM) IS SHOWN
 ON THE NORTH ELEVATION SHEET A4-0 AS A
 S.C. WOOD DOOR.THE SAME DOOR IS LISTED
 ON THE DOOR SCHEDULE SHEET A3-1 AS A
 HOLLOW METAL.AMEND THE PLANS TO
 CLARIFY WHICH IS CORRECT.IF IT IS NOT
 A HOLLOW METAL DOOR COVERED BY THE
 PRODUCT APPROVAL, REFERENCED IN THE
 ABOVE COMMENT 8(H), THEN A SEPARATE
 PRODUCT APPROVAL WILL BE REQUIRED.
 (J) SUBMIT PRODUCT APPROVALS FOR THE
 HORIZONTAL SLIDER WINDOWS SHOWN ON
 WINDOW DETAIL SHEET A3-2.
 (K) WHEN ALL OF THE REQUIRED PRODUCT
 APPROVALS HAVE BEEN COLLATED, PLEASE
 ENSURE THAT THEY ARE MARKED UP, AS
 DESCRIBED IN COMMENT 8(A) ABOVE, BEFORE
 RE-SUBMITTAL.
  
 39) FBC 1015.2GUARDRAIL HEIGHTS ON
 BUILDING ELEVATION SHEETS A4-1, A4-3,
 A4-4, A4-5, A4-6 AND A4-7.THE TOP OF
 THE GUARDRAIL SHOWN AT 2ND FLOOR TO 5TH
 FLOOR PARKING GARAGE LEVELS HAS BEEN
 REVISED SUCH THAT IT IS NOW ONLY 24"
 ABOVE FINISHED FLOOR.THE REQUIRED
 HEIGHT IS 42" ABOVE FINISHED FLOOR.
 AMEND THE PLANS.
  
 40) FBC 1015.3GUARDRAIL OPENINGS ON
 BUILDING ELEVATION SHEETS A4-1, A4-3,
 A4-4, A4-5, A4-6, A4-7 AND DETAIL
 18/A8-0.THE 6"X 6" ALUMINUM GRILLE
 SHOWN AT LANDING LEVELWILL NOT REJECT
 THE PASSAGE OF A 4" SPHERE AS REQUIRED.
 AMEND THE PLANS TO DEMONSTRATE
 COMPLIANCE.
  
 41) FBC 11-4.9.4(2)SHEET A7-0, STAIR
 #2 AT GROUND, 2ND AND 3RD FLOORS AND
 STAIR #3 AT 2ND AND 16TH FLOORS.AT THE
 BOTTOM OF EACH FLIGHT THE HANDRAIL SHALL
 CONINTUE TO SLOPE FOR A DISTANCE EQUAL
 TO THE WIDTH OF ONE TREAD AND THEN
 EXTEND HORIZONTALLY FOR ANOTHER 12".IN
 THIS CASE, THE TOTAL EXTENSION SHOULD BE
 1'-11".ON THE ABOVE-MENTIONED PLANS,
 THE DIMENSION IS SHOWN AS 1'-0", 1'-9"
 OR 1'-10".AMEND THE PLANS.
  
 42) FBC 1007.6.2SHEET A7-0, STAIR #2
 GROUND LEVEL PLAN.PROVIDE A DIMENSION
 FOR THE WIDTH OF THE OPENING BETWEEN
 THE COLUMN AND OPPOSITE WALL AT THE
 RIGHT TURN BETWEEN THE FIRST RISER AND
 THE EXIT DISCHARGE, SO THAT IT CAN BE
 VERIFIED AS NOT LESS THAN THE STAIR
 WIDTH.
  
 43) FBC 1007.3.1THE TOWNHOUSE STAIR
 RISER HEIGHTS ARE SHOWN AS 8".THE
 MAXIMUM RISER HEIGHT ALLOWABLE (FOR A
 STAIR OTHER THAN A SPIRAL STAIR) INSIDE
 A DWELLING UNIT IS 7-3/4".AMEND THE
 PLANS.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL INFO
 TELEPHONE: (561) 805 6716ROBERT BROWN
 E-MAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2005-03-21 Cont ID  
Sent By rbrown Date 2005-03-21 Time 13:44 Rev Time 0.00
Received By rbrown Date 2005-03-18 Time 21:08 Sent To  
Notes
2005-03-18 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6716
 E-MAIL: [email protected]
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
 FOR CONSISTENCY, THE FOLLOWING COMMENTS
 ARE NUMBERED AS PER THE BUILDING PLAN
 REVIEW OF 1/11/05:
  
 2) NOTE THAT THE NOTICE OF
 COMMENCEMENT, IMPACT FEE RECEIPT AND
 SPECIAL INSPECTOR AGREEMENT WILL BE
 REQUIRED BEFORE A PERMIT CAN BE ISSUED.
 ALSO A DECLARATION OF CONDOMINIUM WILL
 BE REQUIRED BEFORE CERTIFICATE OF
 OCCUPANCY.
  
 7) FBC 13-103.1.2BEFORE A BUILDING
 PERMIT CAN BE ISSUED, THE SUBMITTED
 ENERGY CODE COMPLIANCE FORMS SHALL BE
 SIGNED BY THE BUILDING OWNER, THE
 OWNER'S ARCHITECT OR OTHER AUTHORIZED
 AGENT LEGALLY DESIGNATED BY THE OWNER.
  
 8) PRODUCT APPROVALS.THE REQUIRED
 STATEWIDE PRODUCT APPROVAL LISTINGS HAVE
 BEEN PRINTED AND ATTACHED TO ONE OF THE
 THREE SUBMITTED PRODUCT APPROVAL SETS.
 THIS WILL SERVE AS AN EXAMPLE OF WHAT IS
 REQUIRED FOR ALL THREE SETS AND TO
 ADDRESS THE COMMENTS BELOW:
 (A) SOME THE OPTIONS COVERED BY THE
 SUBMITTED PRODUCT APPROVALS MAY NOT BE
 CODE COMPLIANT IF USED FOR THIS
 PROJECT/LOCATION.FOR EACH PRODUCT
 APPROVAL, THESHEETS SHALL BE MARKED,
 AS APPROPRIATE, TO IDENTIFY WHICH
 PRODUCT
 OPTIONS/MATERIALS/SIZES ARE TO BE USED.
 THIS APPLIES ALSO TO THE FLAT ROOFING
 PRODUCT APPROVAL WHICH IS 48 PAGES LONG
 COVERING MANY DIFFERENT SYSTEMS, PLEASE
 SELECT ONE (SEE COMMENT 8B FIRST).
 (B) THE SUBMITTED FIRESTONE PRODUCT
 APPROVAL NOA# 01-0424.04 IS FOR A
 MODIFIED BITUMEN ROOF SYSTEM.THIS DOES
 NOT CORRELATE WITH THE PLANS (SHEETS
 A5-4, A7-2, A7-5 AND A8.1 FOR EXAMPLE)
 WHICH SPECIFY A 4 PLY BUILT UP ROOF
 SYSTEM.SUBMIT AN ALTERNATIVE PRODUCT
 APPROVAL OR AMEND THE PLANS TO SPECIFY A
 A ROOF SYSTEM THAT CORRESPONDS TO THE
 SUBMITTED PRODUCT APPROVAL.
 (C) THE WINDOW WALLS SHOWN ON SHEET
 A3-3HAVE FRAME HEIGHTS OF 15'-5" AND
 17'-4".THESE DIMENSIONS ARE OUTSIDE
 THE SCOPE OF THE SUBMITTED R.C. ALUMINUM
 SERIES FX345 AND HP3060 PRODUCT APPROVAL
 NOA#'S 04-830.02 AND 03-1224.04.SUBMIT
 ALTERNATIVE PRODUCT APPROVALS TO COVER
 THE REQUIRED SIZES OF WINDOW WALL.
 (D) THE SUBMITTED R.C. ALUMINUM
 SLIDING GLASS DOOR PRODUCT APPROVAL NOA#
 02-0222.04 GIVES A MAXIMUM DESIGN
 PRESSURE OF -108.1 PSF FOR A 10'M HIGH
 PANEL OVER 3'-6" WIDE.THIS IS EXCEEDED
 BY THE -115 PSF REQUIRED BY THE RWDI
 WIND TUNNEL REPORT FIG. 5 (PHASE I,
 NORTH ELEVATION, NEGATIVE PRESSURES).
 SUBMIT AN ATERNATIVE PRODUCT APPROVAL
 WITH ADEQUATE ALLOWABLE DESIGN PRESSURE
 FOR THE DOORS IN THIS LOCATION.
 (E) SUBMIT PRODUCT APPROVALS FOR THE
 PARKING GARAGE DOOR #25, AND FOR THE
 STOREFRONT DOORS THAT ARE LARGER THAN
 THE 6070 SIZE LIMIT OF THE SUBMITTED
 FIREDOOR LLC PRODUCT APPROVAL (E.G.
 DOORS 01, 02, 45, 46, 47 AND 87)
 (F) FL. ADMIN CODE RULE 9B-72.A
 SEARCH AT THE DEPT OF COMMUNITY AFFAIRS
 PRODUCT APPROVAL WEBSITE
 WWW.FLORIDABUILDING.ORG/PR/PR_SRCH.ASP
 SHOWS NO MATCHING STATEWIDE PRODUCT
 APPROVAL FOR THE SUBMITTED DIXIE METAL
 PRODUCTS, INC ALUMINUM RAILING SYSTEM
 (PRODUCT APPROVAL NOA# 01-0206.14).IF
 CUSTOM GUARDRAILS ARE USED THEY CAN BE
 ENGINEERED AS SITE SPECIFIC INSTEAD.IF
 A MODULAR SYSTEM (SUCH AS THE ONE
 PROPOSED) IS TO BE USED, THE SYSTEM MUST
 HAVE STATEWIDE OR LOCAL PRODUCT
 APPROVAL.
 NOTE: FL. ADMIN CODE RULE 9B-72 (IN
 EFFECT SINCE OCTOBER 1, 2003) REQUIRES
 THAT PRODUCTS HAVE STATEWIDE, LOCAL OR
 SITE-SPECIFIC PRODUCT APPROVAL.THE
 SUBMITTAL SHOULD INCLUDE THE STATEWIDE
 PRODUCT APPROVAL NUMBER (FL###),
 AVAILABLE FROM THE DEPT OF COMMUNITY
 AFFAIRS PRODUCT APPROVAL WEBSITE
 WWW.FLORIDABUILDING.ORG/PR/PR_SRCH.ASP
 (IF YOU FIND THAT THE QUOTED WEB PAGE IS
 NO LONGER AVAILABLE, PLEASE INFORM THE
 PLAN REVIEWER)
 (G) PRODUCT APPROVAL ADVICE.
 RULE 9B-72 FAC. FOR PRODUCTS WHICH DO
 NOT HAVE STATEWIDE PRODUCT APPROVAL,
 LOCAL PRODUCT APPROVAL CAN BE ACHIEVED
 IF THERE IS A QUALITY ASSURANCE PROGRAM
 IN PLACE WITH A STATE APPROVED QUALITY
 ASSURANCE ENTITY.LOCAL PRODUCT
 APPROVAL WILL ALLOW A PRODUCT TO BE
 USED, IN ACCORDANCE WITH THE TEST
 CRITERIA, THROUGHOUT THE JURISDICTION OF
 WEST PALM BEACH. LOCAL PRODUCT APPROVAL
 APPLICATION FORMS ARE AVAILABLE FROM
 THIS OFFICE. APPROVED QUALITY ASSURANCE
 ENTITIES ARE LISTED ON THE DCA WEBSITE:
 WWW.FLORIDABUILDING.ORG/COMMON/C_ORG_
 REGI_SRCH.ASP (IF YOU FIND THAT THE
 QUOTED WEB PAGE IS NO LONGER AVAILABLE,
 PLEASE INFORM THE PLAN REVIEWER)
  
 12) FBC 411.2.3SHEET S-1.06 SPECIFIES
 WALL TYPE TW-1 AS VEHICLE IMPACT
 GUARDING ALONG GRID P.H. BUT THE WALL
 SCHEDULE ON SHEET S-4.2 DOES NOT SHOW A
 WALL TYPE TW-1.SPECIFY A DIFFERENT
 WALL TYPE OR PROVIDE DETAILS OF WALL
 TYPE TW-1.
  
 16) SHEET A3-1, DOOR SCHEDULE.DOORS
 43, 45 AND 47 ON SHEET A1-9 AND DOOR 121
 ON SHEET A1-13 ARE SHOWN AS DOUBLE
 DOORS, BUT THESE ARE CALLED UP AS SINGLE
 DOORS ON THE DOOR SCHEDULE.ALSO THE
 SUBMITTED LOUVER DOOR PRODUCT APPROVAL
 IS NOT CALLED UP ON THE DOOR SCHEDULE
 FOR ANY EXTERIOR USE APPLICATION.IF NO
 EXTERIOR LOUVER DOORS ARE PROPOSED, THE
 LOUVER DOOR PRODUCT APPROVAL IS NOT
 REQUIRED.PLEASE CLARIFY.
  
 18) FBC 1003.1SHEET A0-3, OCCUPANT
 LOAD.THIS COMMENT HAS NOT BEEN
 PROPERLY ADDRESSED.THE PLANS SHALL
 STATE THE NUMBER OF OCCUPANTS FOR EACH
 SPACE TO FACILITATE VERIFICATION OF
 ADEQUATE EGRESS/EXIT PROVISION.FOR
 EXAMPLE, WHAT IS THE NUMBER OF OCCUPANTS
 IN THE CLUB ROOM, POOL DECK AND SWIMMING
 POOL?
  
 22) FBC 1007.8.1SHEET A7-4, WINDERS.
 THIS COMMENT HAS NOT BEEN PROPERLY
 ADDRESSED.ADDITION OF THE DIMENSION
 FOR TREAD DEPTH AT 12" FROM THE NARROW
 EDGE IS NOTED BUT WINDERS SHALL ALSO
 HAVE A MINIMUM TREAD DEPTH OF 6 INCHES
 AT THE NARROW EDGE.ANNOTATE THE PLAN
 TO DEMONSTRATE COMPLIANCE.
  
 27) FBC 3502SHEET S-0.0 GENERAL NOTES.
 THIS COMMENT HAS NOT BEEN ADDRESSED.
 THE PLAN STILL CITES ACI 318-99
 (REQUIREMENTS FOR STRUCTURAL CONCRETE)
 UNDER THE HEADING 'CODES' AND AGAIN
 UNDER THE HEADING 'THRESHOLD BUILDING
 INSPECTION PLAN'.THE CODE REFERENCED
 VERSION IS ACI 318-02.AMEND THE NOTE.
  
 28) FBC* 105.13.1SHEET S-0.0 THRESHOLD
 BUILDING INSPECTION PLAN.THIS COMMENT
 HAS NOT BEEN PROPERLY ADDRESSED.THE
 INSPECTION PLAN STILL LISTS STRUCTURAL
 PLAN SHEET NUMBERS WHICH ARE NOT
 APPLICABLE TO THIS PROJECT.AMEND THE
 THRESHOLD INSPECTION PLAN.
  
 34) THRESHOLD BUILDING INSPECTOR
 MEETING.PLEASE ARRANGE WITH HAROLD
 PISKURA (INSPECTION SERVICES MANAGER -
 TEL: 561 805 6711), A MEETING INVOLVING
 THE OWNER, THRESHOLD INSPECTOR, JOB
 INSPECTOR, CONTRACTOR AND ENGINEER.
  
 35) FBC 1805.1PILE FOUNDATIONS.THREE
 COPIES OF THE PILE DESIGN REPORT SHALL
 BE SUBMITTED FOR REVIEW.
  
 36) FOR FUTURE RESUBMITTALS/REVISIONS
 PLEASE CLOUD AND NUMBER THE REVISIONS.
  
 37) TO FACILITATE HANDLING AND REVIEW OF
 THE PLANS PLEASE DIVIDE THE
 ARCHITECTURAL, STRUCTURAL, AND MEP PLANS
 INTO SEPARATE ROLLS.
  
 38) TO EXPEDITE REVIEW OF A RESUBMITTAL
 WHICH REQUIRES NEW PLANS IN ORDER TO
 ADDRESS THE ABOVE COMMENTS, THE OLD
 SHEETS SHALL BE REMOVED AND THE NEW
 SHEETS INSERTED.ONE COPY OF EACH OLD
 SHEET SHOULD BE STAPLED/CLIPPED TO THE
 REMAINING OLD SHEETS, TO FORM A SET OF
 'OLD/VOID SHEETS', FOR COMPARISON OF
 REVISIONS WHEN REVIEWING THE RESUBMITTED
 PLANS.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL
 INFO
 TELEPHONE: (561) 805 6716ROBERT
 BROWN
 E-MAIL: [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2005-01-11 Cont ID  
Sent By rbrown Date 2005-01-11 Time 15:45 Rev Time 0.00
Received By rbrown Date 2005-01-05 Time 13:59 Sent To  
Notes
2005-01-05 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
 ROBERT BROWN(561) 805 6716
 E-MAIL: [email protected]
  
 FBC = FLORIDA BUILDING CODE 2001
 FBC*= FLORIDA BUILD'G CODE (CITY AMEND)
 F.S.= FLORIDA (STATE) STATUTE
  
  
 1) WORKING DRAWING REVIEW ONLY.NO
 PERMIT CAN BE ISSUED UNTIL THE PERMIT
 APPLICATION AND FEES ARE SUBMITTED.
  
 2) NOTE THAT THE NOTICE OF
 COMMENCEMENT,
 IMPACT FEE RECEIPT AND SPECIAL
 INSPECTOR
 AGREEMENT WILL BE REQUIRED BEFORE A
 PERMIT CAN BE ISSUED.ALSO A
 DECLARATION OF CONDOMINIUM WILL BE
 REQUIRED BEFORE CERTIFICATE OF
 OCCUPANCY.
  
 3) FBC* 104.2.1.2BUILDING DATA.THE
 BUILDING AREAS, CONSTRUCTION TYPE AND
 OTHER CODE/BUILDING DESIGN CRITERIA
 SHALL BE STATED ON THE PLANS.A
 COMPLETE REVIEW COULD NOT BE CARRIED
 OUT
 WITHOUT THIS INFORMATION AND THE
 FOLLOWING LIST OF COMMENTS IS NOT
 EXHAUSTIVE.
  
 4) FBC* 104.2.4SITE SURVEY.A SIGNED
 AND SEALED SURVEY DRAWING PREPARED BY A
 LICENSED SURVEYOR/MAPPER IS REQUIRED.
 (REF: 472.025(1) FL. STATUTES).UNITY
 OF TITLE AND HORIZONTAL SEPARATION
 REQUIREMENTS CANNOT BE ASSESSED WITHOUT
 A SITE SURVEY.
  
 5) A SEPARATE PERMIT APPLICATION WILL
 BE
 REQUIRED FOR THE SWIMMING POOL AND SPA.
  
 6) FBC* 1804.2.2SHEET S-0, GENERAL
 NOTES - FOUNDATIONS. THE NOTES STATE
 THAT SHALLOW FOUNDATIONS ARE TO BE
 USED,
 "...AS PER ARDAMAN & ASSOCIATES SOIL
 REPORT DATED 10/13/03".THIS DOES NOT
 CORRELATE TO SHEET S-2.1 WHICH SHOWS
 THAT THE STRUCTURE WILL HAVE PILED
 FOUNDATIONS.AMEND SHEET S0.0 TO
 REFERENCE THE CORRECT FOUNDATION TYPE
 AND SOIL REPORT AND SUBMIT THREE COPIES
 OF THE APPROPRIATE SOIL REPORT.
  
 7) FBC 13-103.0ENERGY CODE COMPLIANCE
 SHALL BE DEMONSTRATED BY SUBMITTAL OF
 APPROPRIATE CODE COMPLIANCE FORMS
  
 8) SUBMIT PRODUCT APPROVALS FOR THE
 WINDOWS, STOREFRONTS, EXTERIOR DOORS
 AND ROOFING PRODUCTS.
  
 9) FBC 11-4.1.2(5)(A)SHEET A0-2,
 ACCESSIBLE PARKING.AS 514 PARKING
 SPACES ARE BEING PROVIDED UNDER PHASE
 1,
 11 SPACES ARE REQUIRED TO BE
 ACCESSIBLE.
 THE PLANS CURRENTLY SHOW ONLY 9
 ACCESSIBLE SPACES AND ONLY ONE OF THOSE
 IS LOCATED ON THE GROUND FLOOR.AMEND
 THE PLANS.
  
 10) FBC 11-4-1-2(5)(B)VAN ACCESSIBLE
 PARKING SPACES.TWO OF THE REQUIRED
 ACCESSIBLE SPACES SHALL BE VAN
 ACCESSIBLE WITH AN ADDITIONAL SIGN
 "VAN-ACCESSIBLE" MOUNTED BELOW THE
 ACCESSIBILITY SYMBOL.THE ENTIRE ROUTE
 FROM THESE SPACES TO THE SITE ENTRANCE
 AND EXIT SHALL HAVE A MINIMUM VERTICAL
 CLEARANCE OF 98 INCHES.
  
 11) FBC 11-4.8.2SHEET A1-9, POOL DECK
 AND CLUBHOUSE ACCESSIBILITY RAMPS.
 ANNOTATE THE PLAN TO INCLUDE THE
 FINISHED FLOOR LEVEL OF THE CLUBHOUSE
 AND POOL DECK SO THAT THE SLOPE OF THE
 RAMPS CAN BE CHECKED.
  
 12) FBC 411.2.3SHEETS A1-3, A1-4 AND
 A1-7, VEHICLE IMPACT GUARDRAILS.MIN.
 2FT HIGH IMPACT GUARDRAILS SHALL BE
 SPECIFIED AT THE END OF PARKING SPACES
 AND TRAVEL LANES THAT TERMINATE AT THE
 PERIMETER OF THE STRUCTURE AND AT THE
 END OF PARKING SPACES WERE THE
 DIFFERENCE IN ADJACENT FLOOR ELEVATION
 EXCEEDS 1FT.AMEND THE PLANS/DETAILS
 AND SPECIFY VEHICLE IMPACT GUARDRAILS
 DESIGNED FOR A MINIMUM ULTIMATE
 HORIZONTAL LOAD OF 10,000 LB APPLIED 18
 INCHES ABOVE FLOOR LEVEL.
  
 13) FBC 411.3.2SHEETS A4-4 AND A4-6,
 PARKING GARAGE EXTERIOR WALL.IN ORDER
 FOR THE PARKING GARAGE TO CONSIDERED
 'OPEN', PROVIDE DIMENSIONS AND AREA
 CALCULATIONS FOR THE SOUTH AND EAST
 EXTERIOR WALL OPENING TO SHOW THAT AT
 LEAST 50% OF THE WALL IS 'OPEN'.
  
 14) FBC 412.5SMOKE CONTROL.PROVIDE
 DETAILS FOR THE PROPOSED METHOD OF
 SMOKE
 CONTROL (SEE ALSO MECHANICAL PLAN
 REVIEW
 COMMENT# 12)
  
 15) FBC 601.1SHEET A0-3 TO A0-8, FIRE
 RESISTANCE OF STRUCTURAL ELEMENTS.THE
 'FIRE PROTECTION COMPONENTS' NOTE DOES
 NOT STATE THE DESIGN FIRE RESISTANCE OF
 THE COLUMN, WALL, FLOOR, ROOF STRUCTURE
 ETC NEEDED TO CONFORM TO THE REQUIRED
 CONSTRUCTION TYPE I.AMEND THE PLANS
 OR
 ADD THIS INFORMATION TO STRUCTURAL
 SHEET
 S-0.0
  
 16) FBC 705.1.2SHEET A3-1, THE DOOR
 SCHEDULE IS NOT COMPLETE.REVIEW OF
 THE
 DOORS COULD NOT BE CARRIED OUT.
  
 17) FBC 705.1.2SHEET A0-3, TRASH ROOM
 #2 FIRE RESISTANCE.AMEND THE PLAN TO
 SHOW THE FIRE RESISTANCE OF TRASH ROOM
 #2.
  
 18) FBC 1003.1SHEET A0-3, OCCUPANT
 LOAD.PROVIDE A TABLE WITH A
 FLOOR-BY-FLOOR BREAKDOWN OF ROOM TYPE,
 AREA AND NUMBER OF OCCUPANTS TO
 FACILITATE VERIFICATION OF ADEQUATE
 EGRESS/EXIT PROVISION
  
 19) FBC 1005.6SMOKEPROOF ENCLOSURES.
 IS NATURAL VENTILATION OR STAIR
 PRESSURIZATION PROPOSED?ANNOTATE THE
 PLANS TO CLARIFY.
  
 20) FBC 1007SHEETS A7-0, A7-1 AND
 A7-3.NO DETAILS ARE INCLUDED FOR
 STAIR
 #4 ON THESE SHEETS.PROVIDE DETAILS,
 INCLUDING STAIR WIDTH.
  
 21) FBC 1007.6.3SHEET A7-0, STAIR #3
 WIDTH.AMEND THE PLAN TO SHOW
 DIMENSIONS FOR THE WIDTH OF STAIR #3.
  
 22) FBC 1007.8.1SHEET A7-4, WINDERS
 SHALL HAVE A MINIMUM TREAD DEPTH OF
 6 INCHES.ANNOTATE THE PLAN TO
 DEMONSTRATE COMPLIANCE.
  
 23) FBC 1608.2.1SHEET A8-0, HANDRAIL
 LINE LOAD.THE 'GENERAL NOTES' ARE
 MISSING A NUMERICAL VALUE FOR THE LINE
 LOADING STATED UNDER 'FBC 1608.2.1.2'.
 THE REQUIRED MINIMUM IS 50 PLF.
 CORRECT
 THE NOTE.
  
 24) FBC 1608.2.2SHEET A8-0, GUARDRAIL
 DESIGN STRENGTH REQUIREMENTS ARE
 DIFFERENT TO THOSE FOR HANDRAILS (WHICH
 ARE STATED UNDER 'GENERAL NOTES').
 THE
 GUARDRAIL SHALL BE DESIGNED AND
 CONSTRUCTED FOR A CONCENTRATED LOAD OF
 200 LB APPLIED IN ANY DIRECTION AT THE
 TOP OF THE GUARDRAIL, A CONCENTRATED
 HORIZONTAL LOAD OF 200 LB APPLIED ON A
 1
 SQ FT AREA AT ANY POINT, AND A LINE
 LOAD
 OF 50 PLF APPLIED HORIZONTALLY AT THE
 REQUIRED GUARDRAIL HEIGHT WITH A
 SIMULTANEOUS LINE LOAD OF 100 PLF
 APPLIED VERTICALLY DOWNWARD ON THE TOP
 OF THE GUARDRAIL. THESE LOADS SHALL NOT
 BE APPLIED SIMULTANEOUSLY (UNLESS NOTED
 ABOVE) BUT SHALL BE APPLIED
 INDIVIDUALLY
 TO PRODUCE MAXIMUM STRESS IN EACH OF
 THE
 COMPONENTS OR SUPPORTS.AMEND/ANNOTATE
 THE PLANS.
  
 25) FAIR HOUSING DESIGN MANUAL PAGES
 4.14 AND 4.15.SHEET A3-1 SHALL
 INCLUDE
 DETAILS TO SHOW COMPLIANCE WITH THE
 FAIR
 HOUSING THRESHOLD REQUIREMENTS FOR THE
 SLIDING GLASS DOORS TO THE
 BALCONY/TERRACE.
  
 26) FAIR HOUSING DESIGN MANUAL PAGES
 7.3
 TO 7.30.SHEETS A2.0 TO A2.17 ARE NOT
 COMPLETE.CLEAR FLOOR SPACE IS NOT
 SHOWN AT ALL APPLIANCES AND FIXTURES IN
 ALL UNITS (SEE PLUMBING PLAN REVIEW)
 AMEND THE PLANS.
  
 27) FBC 3502SHEET S-0.0 GENERAL
 NOTES.
 THE PLAN CITES ACI 318-99 (REQUIREMENTS
 FOR STRUCTURAL CONCRETE) UNDER THE
 HEADING 'CODES' AND AGAIN UNDER THE
 HEADING 'THRESHOLD BUILDING INSPECTION
 PLAN'.THE CODE REFERENCED VERSION IS
 ACI 318-02.AMEND THE NOTE.
  
 28) FBC* 105.13.1SHEET S-0.0
 THRESHOLD
 BUILDING INSPECTION PLAN.THE
 INSPECTION PLAN INCLUDES A PROJECT
 DESCRIPTION WHICH IS NOT APPLICABLE TO
 THIS PROJECT AND LISTS SHEET NUMBERS
 WHICH ARE NOT APPLICABLE TO THIS
 PROJECT.AMEND THE THRESHOLD
 INSPECTION
 PLAN.
  
 29) FBC 104.2.1SHEET S-0.0DRAWING
 INDEX.SOME SHEET NUMBERS LISTED ON
 THE
 DRAWING INDEX ARE MISSING FROM THE PLAN
 SET.SOME OF THE FRAMING PLANS ARE NOT
 COMPLETE.A FULL REVIEW COULD NOT BE
 CARRIED OUT.SUBMIT COMPLETED
 STRUCTURAL PLANS.
  
 30) FBC 1606.1SHEETS S-1.00 AND
 S-1.01
 DO NOT SHOW ANY PILE CAPS AT THE SHEAR
 WALL LOCATIONS.SUBMIT COMPLETED
 FOUNDATION PLANS.
  
 31) FBC 1606.1.1SHEET S-0.0WIND
 LOADS.SUBMIT THREE COPIES OF THE RWDI
 WIND TUNNEL TEST REPORT REFERENCED
 UNDER
 THE TITLE 'WIND LOADS".
  
 32) FBC* 104.2.1THE PLANS ARE NOT
 COMPLETE.A FULL REVIEW COULD NOT BE
 CARRIED OUT.THIS MAY RESULT IN
 ADDITIONAL REVIEW COMMENTS WHEN THE
 PLANS ARE RESUBMITTED.
  
 33) TO EXPEDITE REVIEW OF A RESUBMITTAL
 WHICH REQUIRES NEW PLANS IN ORDER TO
 ADDRESS THE ABOVE COMMENTS, THE OLD
 SHEETS SHALL BE REMOVED AND THE NEW
 SHEETS INSERTED.ONE COPY OF EACH OLD
 SHEET SHOULD BE STAPLED/CLIPPED TO THE
 REMAINING OLD SHEETS, TO FORM A SET OF
 'OLD/VOID SHEETS', FOR COMPARISON OF
 REVISIONS WHEN REVIEWING THE
 RESUBMITTED
 PLANS.
  
 **QUOTE PERMIT# ON ALL CORRESPONDENCE**
  
 END OF REVIEW COMMENTS
 THE CODE REFERENCES GIVE ADDITIONAL
 INFO
 TELEPHONE: (561) 805 6716ROBERT
 BROWN
 E-MAIL: [email protected]

Review Stop E ELECTRICAL
Rev No 16 Status P Date 2007-07-13 Cont ID  
Sent By dpalmer Date 2007-07-13 Time 17:32 Rev Time 0.00
Received By dpalmer Date 2007-07-13 Time 17:32 Sent To  
Notes
2007-07-13 17:32:40REVISION FOR E3.00 ONLY

Review Stop E ELECTRICAL
Rev No 15 Status P Date 2007-06-26 Cont ID  
Sent By jleahy Date 2007-06-26 Time 18:58 Rev Time 1.00
Received By jleahy Date 2007-06-26 Time 18:58 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 14 Status P Date 2007-06-21 Cont ID  
Sent By jleahy Date 2007-06-21 Time 10:25 Rev Time 2.00
Received By jleahy Date 2007-06-21 Time 10:25 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 13 Status P Date 2007-06-12 Cont ID  
Sent By jleahy Date 2007-06-12 Time 16:45 Rev Time 0.00
Received By jleahy Date 2007-06-12 Time 16:45 Sent To  
Notes
2007-06-12 16:46:10THIS WAS FOR 4 SETS OF REVISIONSJL

Review Stop E ELECTRICAL
Rev No 12 Status P Date 2007-06-12 Cont ID  
Sent By jleahy Date 2007-06-12 Time 16:45 Rev Time 0.00
Received By jleahy Date 2007-04-26 Time 11:45 Sent To  
Notes
2007-04-26 11:46:23PLANS/ELECTRICAL REVISIONS ROUTED TO JAKE LEAHY AND
 PHIL PETTY FOR REVIEW.

Review Stop E ELECTRICAL
Rev No 11 Status P Date 2007-04-24 Cont ID  
Sent By dpalmer Date 2007-04-24 Time 15:11 Rev Time 0.00
Received By dpalmer Date 2007-04-24 Time 15:11 Sent To FIRE
Notes
2007-04-24 15:12:37ELEVATOR LOBBY REV SKE-007.
 PLACED MISSING CA # ON SHEETS.
 PLANS NEED FIRE STAMP FOR REVISED STROBE.

Review Stop E ELECTRICAL
Rev No 10 Status P Date 2007-04-03 Cont ID  
Sent By dpalmer Date 2007-04-03 Time 14:45 Rev Time 0.00
Received By dpalmer Date 2007-04-03 Time 14:44 Sent To PC
Notes
2007-04-03 14:45:49REV 9 AND 10 FOR E5.02, PLANS STILL NEED TO BE REVISED
 FOR CHANGES.

Review Stop E ELECTRICAL
Rev No 9 Status P Date 2006-08-20 Cont ID  
Sent By dpalmer Date 2006-08-20 Time 14:53 Rev Time 0.00
Received By dpalmer Date 2006-08-20 Time 14:43 Sent To PC
Notes
2006-08-20 00:00:00REV'S 4, 5 AND 6 FOR UNITS.
 CHANGING LT FIXTURES, LOCATIONS OF
 CATV/PHONE BOXES .
  
 CATV / PHONE MEDIA BOXES TO BE VIF. AS
 NO OCP IS PERMITTED IN CLOTHES CLOSETS.
 TYPICAL FOR ALL UNITS.
 240.24D

Review Stop E ELECTRICAL
Rev No 8 Status P Date 2006-08-14 Cont ID  
Sent By dpalmer Date 2006-08-14 Time 09:02 Rev Time 0.00
Received By dpalmer Date 2006-08-11 Time 10:48 Sent To  
Notes
2006-08-14 00:00:00** REVISIONS **
  
  
 REDLINED E-304 LT IN CLOSET IS SHOWN TOO
 CLOSE/OR ABOVE SHELVINGDOES NOT MEET
 410.8
  
 REDLINED ALL MEDIA BOXES NOW MOVED TO
 CLOTHES CLOSET WHICH SHALL BE VERIFIED
 IN FEILD

Review Stop E ELECTRICAL
Rev No 7 Status F Date 2006-05-14 Cont ID  
Sent By dpalmer Date 2006-05-14 Time 16:59 Rev Time 0.00
Received By dpalmer Date 2006-05-14 Time 16:33 Sent To  
Notes
2006-05-14 00:00:00** UNSAT ** REV'S #4 AND 5
 SUBMITTED 3/30/06
  
  
 1) NOTE: PLEASE SEE RESPONSE FROM
 ENGINEER DOES NOT MENTION REVISION OF
 LOADS TO GEN AND EM MSBE.
 PLEASE CORRELATE ALL LOADS AND PLEASE
 REVISED.
 PLEASE ALSO SEE TOTAL NOW AS SHOWN SEEMS
 TO EXCEED RATING OF SAID GENERATOR AS
 INDICATED IN CALCS.
 PLEASE SEE ONE SET WAS REDLINED AT
 LOCATIONS FOR ITEMS WHICH DO NOT
 CORRELATE.
 PLEASE SEE 4.01, AND 5.02
  
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 6 Status P Date 2006-02-10 Cont ID  
Sent By dpalmer Date 2006-02-10 Time 22:30 Rev Time 0.00
Received By dpalmer Date 2006-02-10 Time 21:21 Sent To  
Notes
2006-02-10 00:00:00***** REVISIONS STAMPED FOR THE
 FOLLOWING SHEETS.
  
 E- 1.01,2.01,2.03,2.05,2.07,2.12,3.01,
 3.03,5.01,5.02.***
  
 REVISED FIXTURE TYES,
 PANEL LOCATIONS IN UNITS,
 CIRCUITS FOR STORAGE RM LTS,
 ETC.

Review Stop E ELECTRICAL
Rev No 5 Status N Date 2006-01-18 Cont ID  
Sent By jleahy Date 2006-01-18 Time 06:50 Rev Time 0.30
Received By jleahy Date 2006-01-18 Time 06:50 Sent To  
Notes
2006-02-10 00:00:00THIS REVISION SHOULD HAVE BEEN UNDER
 05100575 TEMP CONST SERVICE.
 THIS REVISION IS NOT PART OF BASE BLDG

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2005-08-29 Cont ID  
Sent By dpalmer Date 2005-08-29 Time 19:05 Rev Time 0.00
Received By dpalmer Date 2005-08-26 Time 20:25 Sent To  
Notes
2005-08-29 00:00:00*********** PROVISO ************
  
 1)NOTE: ALLMAIN ELECTRICAL ROOMS AND
 THE FIRE COMMAND ROOM WILL BE REQUIRED
 TO HAVE A BATTERY BACK UP TYPE OF
 FIXTURE IN ADDITION TO LTS ON EM
 CIRCUIT(S).
  
 2)NOTE: PLEASE SEE CIRCUITING FOR
 ELEVATOR RMS/HOISTWAYS, 620.23,620.24
 THIS IS MINOR ADJUSTMEN IN CIRCUITING.
  
 3)NOTE: PLEASE SEE CIRCUTING OF
 EMERGENCY CIRCUITS WILL STILL NEED TO BE
 ADDRESSED.
 AT THIS TIME, THE TRIPPING OF A SINGLE
 BRKR ON EMERGENCY POWER WOULD LEAVE
 EGRESS HALLWAYS,STAIRWAYS IN TOTAL
 DARKNESS, EVEN ON GENERATOR BACK-UP.
  
 PLEASE KNOW A MEETING EITHER VIA PHONE
 OR IN PERSON MAY BE NEEDED TO GO OVER
 THIS COMMENT FURTHER.
2005-08-26 00:00:00MEP PLANS IN ELECTRICAL FOR REVIEW.
 REVIEW STARTED.
 PLANS WILL BE THE "P"(PASSED STATUS ON
 MONDAY 8/29/05 WITH A PROVISO FOR TWO
 ITEMS MENTIONED ON PREVIOUS REVIEW.
 ALL OTHER COMMENTS OK.
 ELECTRICAL PLANS TO BE STAMPED 8/29

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2005-06-28 Cont ID  
Sent By dpalmer Date 2005-06-28 Time 18:57 Rev Time 10.00
Received By dpalmer Date 2005-06-27 Time 14:47 Sent To  
Notes
2005-06-28 00:00:00******** UNSAT 3RD REVIEW *********
  
 PLEASE SEE SOME NOTES FROM PREVIOUS
 REVIEWS.
 PLEASE SEE SOME NEW NOTES DUE TO CHANGES
 ON PLANS.
 PLEASE SEE SOME NEW NOTES.
  
  
 1)NOTE: PLEASE SEE NOTE #2 PREVIOUS
 REVIEW.
 PLEASE SEE MANY UNITS STILL SHOW DINING
 AREA RECEPTS ON GEN LT/RECEPTS CIRCUITS.
  
 210.11C1,210.52B1
 SOME OF THESE WERE CORRECTED.
  
 2)NOTE: PLEASE SEE NOTE # 9 FROM
 PREVIOUS REVIEW.
 PLEASE SEE SOME TRANSFORMER SHOWN ON
 RISER W/OUT GROUNDING/LINE DIAGRAM SHOWN
 FOR ATTACHMENT? TRANSFORMER DETAIL
 MENTIONS TO NEAREST GRND ELECTRODE?
 250.30,250.50 ETC.
  
 3)NOTE: PLEASE SEE #11, FEEDER SCHEDULE
 WAS UPDATED, HOWEVER F-11, F-12 IS STILL
 SHOWN? , HOWEVER SOME OF THE ELECTRICAL
 FOR WHICH THESE FED, HAVE BEEN DELETED.
  
 4)NOTE: PLEASE SEE NOTE #27 FROM FIRST
 REVIEW. CORRECTIONS WERE MADE TO PLANS
 ON SECOND REVIEWSET TO MEET FIRST
 REVIEW COMMENT, HOWEVER DESIGN CHANGES
 HAVE NOW CHANGED THE NOTE BACK TO
 PREVIOUS NOTE #27.
 PLEASE SEE THE MCB WHICH WILL BE
 REQUIRED IN EDPH WAS REMOVED.
 PLEASE SEE THE MANUAL MEANS OF DISC IS
 NOT PROVIDED WITH TRANSFER SWITCH.
 225.32,225.34. 230.72
  
 5)NOTE: PLEASE SEE NOTE #30 FROM
 PREVIOUS REVIEW. IT WAS NOTTHE
 INTENTION OF THIS OFFICE TO ADD GF
 PROTECTION TO MAINS MSBA AND MSBB. THESE
 ARE BOTH 120/208V SYSTEMS AND NOT
 277/480V. PLEASE SEE RESPONSE LETTER
 MENTIONS ADDED TO THESE. PLEASE SEE
 RESPONSE ALSO MENTIONS "EDPH DOES NOT
 EXCEED 1000'S". PLEASE SEE 230.95, THIS
 GF PROTECTION IS FOR DEVICES RATED
 1000'S OR MORE.
 PLEASE SEE EDP MENTIONS A GF MAIN BRKR.
  
 6)NOTE: PLEASE SEE NOTE #48 FROM
 PREVIOUS REVIEW, THIS WAS OK, HOWEVER
 PLEASE SEE SOME UNITS NOW DO NOT CONTAIN
 ROOM DESIGNATIONS ???
 PLEASE ADJUST.
  
 7)NOTE: PLEASE SEE NOTE #1 FROM PREVIOUS
 REVIEW. PLEASE SEE MSBA AND MSBB IS
 NOTED AS BEING SHUNT TRIP,AND A NOTE
 WAS ADDED FOR MAIN REQUIRED ON OUTSIDE
 OF EQUIIPMENT, HOWEVER PLEASE SEE
 EQUIPMENT PANEL SCHEDULE WAS NOTE
 CHANGED TO INDICATE MCB? ONLY MENTIONS
 SHUNT TRIP?
 230.76,230.79 ETC.
 PLEASE ALSO SEE RISER "KEYNOTES" STILL
 MENTIONS ALL MAINS TO HAVE SHUNT TRIPS
 IN FIRE COMMAND ROOM, HOWEVER PLANS DO
 NOT REFLECT THIS. MSBE, ALSO FIRE COMM
 RM, AND RM LAYOUT.
  
 8)NOTE: PLEASE SEE COPY OF FS
 553.80(2)(B) ATTACHED WITH RESPECT TO
 DESIGN PROFESSIONAL. THIS IS ONLY A NOTE
 GIVEN AT THIS TIME. THIS IS NOTED PER
 STATE STATUES.
  
  
 PLEASE SEE THE FOLLOWING TWO NOTES;
 THESE ARE NEW NOTES FOR ITEMS NOT NOTED
 IN EITHER PREVIOUS REVIEWS. PLAN REVIEW
 WAS NOT AWARE OF THESE REQUIREMENTS AT
 THE PREVIOUS REVIEW TIMES.
  
 1)NOTE: PLEASE SEE 620.23,24 FOR
 CIRCUITING OF LTS AND RECEPTS ON
 ELEVATOR MACHINE RMS.
  
 2)NOTE: PLEASE SEE EGRESS AREAS IN
 COMMON AREA HALLWAYS AND STAIRWELLS WILL
 REQUIRE ALL EM LT CIRCUITS TO BE
 ALTERNATING. THIS REQUIREMENT
 ALLEAVIATES THE AREA(S) BEING LEFT IN
 TOTAL DARKNESS AT THE SWICTH OF BRKR OR
 TRIP OF A SINGLE BRKR/OCP DEVICE.
 LS NFPA-101 7-9
  
  
 PLEASE SEE TWO NEW NOTES MAY BE ABLE TO
 BE ENCOMPASED IN A "PROVISO" BEFORE ANY
 SLAB INSPECTION.
  
 PLEASE SEE NOTES #1-8 SHOULD BE
 ADDRESSED AT THIS TIME.
 PLEASE SEE POSSIBLE NOTES FROM OTHER
 REVIEWER(S) IN WHICH PLANS MAY BE COMING
 BACK FOR CORRECTIONS.
  
 PLEASE SEE SOME AREAS ARE REDLINED ON
 PLANS.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]
2005-06-27 00:00:00MEP ROLL IN ELEC FOR REV.

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2005-02-22 Cont ID  
Sent By dpalmer Date 2005-02-22 Time 11:36 Rev Time 10.00
Received By dpalmer Date 2005-02-17 Time 16:08 Sent To  
Notes
2005-02-22 00:00:00************** UNSAT 2ND REVIEW *******
  
 PLEASE SEE SOME NOTES FROM PREVIOUS
 REVIEW STILL NEED TO BE ADDRESSED.
  
 1)NOTE: NOTE #1, OK.
  
 2)NOTE: NOTE #2 NO, PLEASE SEE UNIT(S)
 TH-1,D1 (SD BR#2) ALSO UNIT "G".
 PLEASE SEE CIRCUITING OF HALL/FOYER AREA
 RECEPTS SHOWN ONSMALL APPLIANCE
 CIRCUITS? THESE ARE NOT PERMITTED.D2, G,
 B ETC.
  
 3)NOTE: NOTE #3 OK, TREADMILL EQUIPMENT
 CIRCUITS TO BE SIZED AND ADJUSTED FOR
 LOAD.
  
 4)NOTE: NOTE#4 OK.
  
 5)NOTE: NOTE#5 OK.
  
 6)NOTE: NOTE #6 OK.
  
 7)NOTE: NOTE #7 OK. PHASE II TO HAVE
 "FIRE RATED SEPARATION"DUE TO SEPARATE
 SERVICE FEEDING PHASE II.
  
 8)NOTE: NOTE #8 NO, PLEASE SEE MSBB,
 MSBA ON E3.00
  
 9)NOTE: NOTE #9 NO, PLEASE SEE SOME
 TRANSFORMERS ARE SHOWN WITH CONNECTION
 TO BLDG GROUNDING ELECTRODE SYSTEM,
 HOWEVER MANY ARE NOT.
 REPLY MENTIONS TO SEE TRANSFORMER
 SCHEDULE, HOWEVER THESE ARE FOR THE
 SIZING OF EQUIPMENT GROUNDS AND DOES NOT
 INCDICATE ATTACHMENT POINT.
 PLEASE SEE REDLINED AREAS ON RISER.
 250.30,215.5
  
 10)NOTE: NOTE #10 OK.
  
 11)NOTE: NOTE #11, ??, FEEDER SCHEDULE
 UPDATED. HOWEVER, PLEASE SEE EQUIPMENT
 GROUNDING CONDUCTORS HAVE NOW BEEN ADDED
 FROM METER/FPL TO FIRST MEANS OF DISC.
 PLEASE SEE 250.6,250.24, NO EQUIPMENT
 GROUNDING FROM METER.
  
 12)NOTE: NOTE #12 NO, PLEASE A-SHEET
 INDICATES 307 UNITS, YET SCHEDULEON
 ELECTRICAL METER CENT SUMMARY ADDS UP TO
 312? PLEASE CLARIFY,
  
 13)NOTE : NOTE# 13 N, PLEASE SEE SPECS
 FOR FOR PUMP ETC WERE SUBMITTED, HOWEVER
 COULD NOT FIND ANY INDICATION OF MANUAL
 MEANS OF DISCONNECT LOCATED ON OUTSIDE
 OF EQUIPMENT. PLEASE EITHER SHOW OR
 PROVIDE NOTE. 230.76,230.79,110.27
  
 14)NOTE: NOTE #14 NO, PLEASE SEE RISER
 AND CONDUCTORS SHOWN FOR GDP;(F-9) TO
 EDPH. PLEASE CORRELATE GDP AND RISER
 FEEDER SCHEDULE.
 215.5,240.4
  
 15)NOTE: NOTE #15 OK,HOWEVER, PLEASE
 SEE RATING OF GENERATOR AND LOAD ON
 NOTES TO FOLLOW.
  
 16)NOTE: NOTE #16 OK.
  
 17)NOTE: NOTE #17 OK, DETAIL LOCATED ON
 6.02. REPLY MENTIONS, 6.01
  
 18)NOTE: NOTE #18 OK.
  
 19)NOTE: NOTE #19 NO,NOTES ON 6.01
 STILL MENTIONS THE USE OF ALUM OK.
 PLEASE ALSO SEE REFERENCE TO WRONG CODE
 IN NOTES ON 6.01 AND 3.00 FROM 1999.
 PLEASE SEE WE ARE UNDER 2001 AMENDMENTS
 AND 2002 NEC.
 COULD NOT LOCATE COLOR CODING.
  
 20)NOTE: NOTE #20 OK.
  
 21)NOTE: NOTE #21 OK.
  
 22)NOTE: NOTE #22 OK.
  
 23)NOTE: NOTE #23 OK.
  
 24)NOTE: NOTE #24 OK.
  
 25)NOTE: NOTE #25 OK.
  
 26)NOTE: NOTE #26 OK, HOWEVER NOW
 EQUIPMENT GROUNDS HAVE BEEN ADDED TO
 SEC'S. PLEASE SEE 250.6,250.24.
  
 27)NOTE: NOTE #27 OK.
  
 28)NOTE: NOTE #28 NO/, NOTE ADDED TO
 4.01, YET NOTE FOR LAYOUT FOR MAINS,
 DISC'S, LOCATIONS ETC TO BE IN FIRE
 COMMAND RM.
 PLEASE ALSO SEE NOTE #13.
  
 29)NOTE: NOTE #29 NO, PLEASE SEE PLANS
 MENTIONS LOAD SHEDDING , HOWEVER NO
 EQUIPMENT FOR LOAD SHEDDING ETC WAS
 PROVIDED. PLEASE SEE LOAD SUMMARY
 INDICATES ELEVATORSBEING SHEDDED.
 PLEASE VERIFY/NOTE ONE STRECHER
 ACCESSIBLE ELEVATOR TO REMAIN.
 PLEASE ALSO SEE LSC 101, SECTION
 11.8.4.2.AS PER CONVERSATION WITH MIKE
 CARSILLO, ONE ELEVATOR (MIN) WILL BE
 REQUIRED TO BE ON GENERATOR POWER EVEN
 WITH RUNNING OF OTHER REQUIRED SYSTEMS.
 *** PLEASE SEE LOAD ON GDP INDICATES
 LOAD ON EDPH AS 552A'S, YET EDPH SHOWS
 LOAD AT 782A'S??
 PLEASE CORRELATE.
 PLEASE ALSO SEE LOAD SHOWN ON GDP IS
 SHOWN AS 1214 A'S YET GEN IS ONLY RATED
 FOR 1205A'S?
 PLEASE VERIFY LOAD, SIZE ETC.
  
 30)NOTE: NOTE #30, NO, PLEASE STILL SEE
 MSBB,MSBA.OTHERS ARE NOTED FOR GROUND
 FAULT PROTECTION. 230.95,240.13 ETC
  
 31)NOTE: NOTE #31 OK.
  
 32)NOTE: NOTE #32 OK?
  
 33)NOTE: NOTE #33 NO, RESPONSE MENTIONS
 THAT GENERATOR IS A SEPARATELY DERIVED
 SUYSTEM, HOWEVER ATS IS SHOWN AS A
 3-POLE UNIT, THERE IS NO GROUNDING
 ELECTRODE SYSTEM SHOWN ON RISER FOR
 GENERATOR. 250.30
 PLEASE ALSO SEE EQUIPMENT GROUNDS SHOWN
 FROM GEN TO GDP? PLEASE SEE
 250.6,250.24.
  
 34)NOTE: NOTE #34, OK. PLEASE SEE
 PREVIOUS NOTES FOR LOAD, LOAD SHEDDING
 ETC.
  
 35)NOTE: NOTE #35. OK, NOTES ON PREVIOUS
 NOTE THIS REVIEW.
  
 36)NOTE: NOTE #36 NO.
  
 37)NOTE: NOTE: #37 OK.
  
 38)NOTE: NOTE #38 OK.
  
 39)NOTE: NOTE #39 OK.
  
 40)NOTE: NOTE #40 OK.
  
 41)NOTE: NOTE #41 NO, PLEASE SEE SOME
 CIRCUITING AS NOTED ON REVIEW NOTE #2.
 SOME OF THESE HAVE BEEN REDLINED ON ONE
 SET.
  
 42)NOTE: NOTE #42 NO, NOTE COULD NOT BE
 LOCATED TO INCLUDE EXCEPTIONS.
 PER NFPA-72 8-1.4.2
  
 43)NOTE: NOTE #43 OK.
  
 44)NOTE: NOTE #44 OK.
  
 45)NOTE: NOTE #45 NO, PLEASE SEE SOME
 UNITS(D1,G, B ) GFI'S REQUIRED W/IN 3'
 OF SINK EDGE. PLEASE EITHER ADD ONE, OR
 MOVE GFI TO CENTER BETWEEN SINKS.
 210.52D
  
 46)NOTE: NOTE #46 OK.
  
 47)NOTE: NOTE #47 OK, PLEASE SEE
 PREVIOUS NOTES WITH REFERENCE TO
 CIRCUITING OF HALL/FOYER RECEPTS.
  
 48)NOTE: NOTE #48 OK.
  
 NEW NOTES>
  
 1)NOTE: PLEASE SEE DRAWING "KEYNOTES" #7
 MENTIONS ALL MAINS TO HAVE "SHUNT TRIPS"
 LOCATED IN FIRE COMMAND RM.
 PLEASE SEE MSBA, MSBB, ARE THE ONLY
 "MIANS" NOTED AS HAVING "SHUNT TRIP
 MAINS" PLEASE VERIFY OTHERS.
 PLEASE ALSO SEE MSBB AND MSBB, SHUNT
 TRIP TYPE BREAKER TO BE SELECTED MUST
 ALSO HAVE A MANUAL MEANS OF DISCAND
 MUST BE EXTERNAL.
 230.76,230.79,110.27
  
 2)NOTE: PLEASE SEE GENERATOR SUBMITTALS:
  
 FUEL TANK CHECKED FOR USE INDICATES A
 600KW GEN? PLEASE SEE SPEC BOOKS AND
 PLEASE ADJUST.
  
  
 PLEASE SEE MANY OF THESE ABOVE ITEMS
 HAVE BEEN REDLINED ON ONE SET OF PLANS
 FOR REFERENCE.
  
 PLEASE SEE ANY POSSIBLE NOTES FROM OTHER
 REVIEWERS WHICH MAY AFFECT ELECTRICAL
 PLANS.
  
 PLEASE BE SURE TO REMOVED ALL OLD/
 VOIDED SHEETS AND INSERT NEW REVISED
 SHEETS INTO COMPLETE SETS FOR REVIEW AND
 STAMPING.
 ONE SET OF ALL OLD/VOIDED SHEETS SHOULD
 BE SUBMITTED FOR REFERENCE WHEN
 RESUBMITTING PLANS.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2004-12-08 Cont ID  
Sent By dpalmer Date 2004-12-08 Time 09:34 Rev Time 12.00
Received By dpalmer Date 2004-12-07 Time 09:49 Sent To  
Notes
2004-12-08 00:00:00*************** UNSAT******************
  
 ** PLEASE SEE THIS PLANS ARE IN FOR
 "PLAN REVIEW" ONLY AND NOT FOR PERMIT
 APPLICATION.
  
  
 1)NOTE: PLEASE SEE FS 471.025,471.023
 FAC 61G15-23.002. PLEASE SEE MISSING
 LICENSE INFORMATION ON TITLE BLOCK FOR
 ENGINEERING FIRM. PLEASE ALSO SEE ALL
 PLANS/SETS AND SHEETS ARE REQUIRED TO
 BE
 "SIGNED" DATED AND SEALED WHEN
 SUBMITTING FOR PERMIT.
 THIS COMMENT IS FOR ALL TRADES WHEATHER
 OR NOT COMMENT IS MADE BY OTHER
 REVIEWER(S).
  
 2)NOTE: PLEASE SHOW ALL CIRCUITING ON
 PLANS AND CORRELATE WITH THE SUBMITTED
 PANEL SCHEDULES. PLEASE SEE 2.01,2.10
 PLEASE SEE TOWNHOUSE, APT UNITS ARE
 SHOWN W/OUT ANY CIRCUIT #'S SHOWN.
  
 3)NOTE: PLEASE VERIFY LOAD ON SOME
 EXERCISE EQUIPMENT. SHOWS 4 TREADMILLS
 ON ONE CIRCUIT.
  
 4)NOTE: PLEASE SEE NOTE FOR LIGHTNING
 PROTECTION ON E 2.14. PLEASE SEE
 REFERENCE SHOULD BE MADE TO NFPA-780.
 PLEASE NOTE: LIGHTNING PROTECTION IS
 REQUIRED UNDER SEPARATE PERMIT UNLESS
 PLANS AND SPECS ARE SUBMITTED WITH MAIN
 BLDG PERMIT. PLEASE SEE THIS WOULD ALSO
 INCLUDE THE MAIN ELECTRICAL CONTRACTOR
 BEING RESPONSIBLE FOR PERMIT.
  
 5)NOTE: PLEASE SEE 2.14 FOR SOME
 MISSING
 CIRCUITING FOR SLA FIXTURES.
  
 6)NOTE: PLEASE SEE 3.00 WHICH
 IDENTIFIES
 TWO "TOWER ELECTRICAL RMMS. PLEASE
 PROVIDE IDENTIFICATION FOR EACH.
  
 7)NOTE: PLEASE VERIFY IF PHASE II IS
 GOING TO BE A "SEPARATE BLDG" SHOWS
 CONDUIT F-1 FROM FPL VAULT TO STUB OUT
 INTO FUTURE LOCATION HOWEVER GENERATOR
 AND EQUIPMENT FOR PHASE #I IS ALSO
 SHOWN
 AS FEEDING FUTURE PHASE II???
 PLEASE VERIFY TRANSFER OF POWER.
 BLDG-ONE LOSES POWER AND GEN COMES
 ONLINE, BLDG-TWO WHICH HAS NOT LOST
 POWER WILL NOW BE FED FROM GEN WHICH
 HAS
 JUST COME ONLINE? PLEASE REVIEW THIS
 SCENARIO.
  
 8)NOTE: PLEASE CORRELATE IDENTIFICATION
 OF ALL EQUIPMENT AS SHOWN ON ELECTRICAL
 ROOM LAYOUT AND RISER DIAGRAM.
 EDPH/EDP,
 EHA/EH , ME-TH/ MAIN #4, NOT SHOWN. ETC
 215.5
  
 9)NOTE: PLEASE SHOW GRONDING
 ATTACHMENTS
 FOR TRANSFORMER. A SEPARATELY DERIVED
 AC
 SYSTEM THAT IS GROUNDED SHALL COMPLY
 WITH 250.30(A)(1) THROUGH (6).
  
 10)NOTE: PLEASE SEE 4.01 WHICH SHOWS A
 MC#13? PLEASE VERIFY THIS SHOWN AT TWO
 LOCATIONS REDLINED. WOULD THIS BE #14?
  
 11)NOTE: PLEASE SEE LOAD SUMMARY FOR
 MSBH WHICH IS SHOWN AS 1600A, YET
 FEEDER
 SCHEDULE INDICATES A 1200A FEEDERS?
 PLEASE ALSO SEE FEEDER SCHEDULE
 MENTIONS
 1200A FEEDERS, YET NO CONDUIT OR
 CONDUCTOR SIZES ARE SHOWN?? 215.5
 PLEASE SEE 310.16, 240.4C,
 DEVICES RATED OVER 800 AMPERES. WHERE
 THE OVERCURRENT DEVICE IS RATED OVER
 800
 AMPERES, THE AMPACITY OF THE CONDUCTORS
 IT PROTECTS SHALL BE EQUAL TO OR
 GREATER
 THAN THE RATING OF THE OVERCURRENT
 DEVICE DEFINED IN 240.6.
 PLEASE SEE THIS EQUIPMENT IS SHOWN AS
 MLO WHEN A MCB IS REQUIRED IF THIS IS
 GOING TO BE "MAIN #1"
 230.70
  
 12)NOTE: PLEASE SEE CORRELATE THE # OF
 UNTIS WITH #'S OIF UNITS SHOWN ON
 A-SHEETS. PLEASE ADJUST ANY
 RISERS/PANELS AND LOAD CALCULATIONS.
 215.5
  
 13)NOTE: PLEASE SEE RISER INDICATES A
 MAIN DISCONNECT FOR FIRE PUMP
 CONTROLLER
 YET NO INFORMATION IS GIVEN. 215.5
  
 14)NOTE:: PLEASE SEE 240.4 WHERE THE
 OVERCURRENT DEVICE IS RATED OVER 800
 AMPERES, THE AMPACITY OF THE CONDUCTORS
 IT PROTECTS SHALL BE EQUAL TO OR
 GREATER
 THAN THE RATING OF THE OVERCURRENT
 DEVICE DEFINED IN 240.6. THIS NEEDS TO
 BE ADDRESSED IN A COUPLE LOACTIONS.
  
 15)NOTE: PLEASE CORELATE KW RATING OF
 GENERATOR SHOWN ON PLANS AND SPEC
 SHEETS
 SUBMITTED.
 215.5
  
 16)NOTE: PLEASE SEE PANEL RBH IS SHOWN
 AS 225A RATED, YET THIS PANEL IS FED
 FROM MSBH WITH A 250A BRKR. PLEASE
 CORRELATE AND ADJUST.
 215.5
  
 17)NOTE:PLEASE PROVIDE NOTE: FOR RATING
 OF BUS-DUCT.
 PLEASE ALSO SEE 368.6 FOR PENETRATION
 THROUGH WALLS AND FLOORS.
 (1) BUSWAYS SHALL BE PERMITTED TO BE
 EXTENDED VERTICALLY THROUGH DRY FLOORS
 IF TOTALLY ENCLOSED (UNVENTILATED)
 WHERE
 PASSING THROUGH AND FOR A MINIMUM
 DISTANCE OF 1.8 M (6 FT) ABOVE THE
 FLOOR
 TO PROVIDE ADEQUATE PROTECTION FROM
 PHYSICAL DAMAGE.
 (2) IN OTHER THAN INDUSTRIAL
 ESTABLISHMENTS, WHERE A VERTICAL RISER
 PENETRATES TWO OR MORE DRY FLOORS, A
 MINIMUM 100 MM (4 IN.) HIGH CURB SHALL
 BE INSTALLED AROUND ALL FLOOR OPENINGS
 FOR RISER BUSWAYS TO PREVENT LIQUIDS
 FROM ENTERING THE OPENING. THE CURB
 SHALL BE INSTALLED WITHIN 300 MM (12
 IN.) OF THE FLOOR OPENING. ELECTRICAL
 EQUIPMENT SHALL BE LOCATED SO THAT IT
 WILL NOT BE DAMAGED BY LIQUIDS THAT ARE
 RETAINED BY THE CURB.
 PLEASE PROVIDE NOTE FOR REQUIRED
 CURBING.
  
 18)NOTE: PLEASE SEE RISER MENTIONS TO
 PROVIDE "ALTERNATE PRICE" FOR
 CONDUCTORS
 AND CONDUIT TO BUS-TAP BOX LOCATIONS.
 PLEASE PROVIDE CONDUIT/CONDUCTOR SIZES
 ON PLANS AT THIS TIME TO MEET MIN
 REQUIREMENTS. 240.4,310.16
  
 19)NOTE: PLEASE SEE LOCAL
 AMENDMENTS,250.62 NO EQUIPMENT
 GROUNDING
 MAY BE ALUM.
 PLEASE ALSO SEE 310.2 FOR SIZING OF MIN
 ALUM CONDUCTORS.
 PLEASE PROVIDE NOTE FOR COLOR CODING OF
 CONDUCTORS PER LOCAL AMEND. 215.
  
 20)NOTE: PLEASE SEE RTU32, SHOWN WITH
 #12 AWG ON A 100A3P BRKR. PLEASE SEE
 310.16, 240.4 FOR SIZING.CONDUCTORS,
 OTHER THAN FLEXIBLE CORDS, FLEXIBLE
 CABLES, AND FIXTURE WIRES, SHALL BE
 PROTECTED AGAINST OVERCURRENT IN
 ACCORDANCE WITH THEIR AMPACITIES
 SPECIFIED IN 310.15, UNLESS OTHERWISE
 PERMITTED OR REQUIRED IN 240.4(A)
 THROUGH (G).
  
 21)NOTE:PLEASE SEE DISCONNECT SHOWN ON
 RISER DIAGRAM FOR PANEL "P", PLEASE
 PROVIDE INFORMATION FOR DISC SHOWN.
 SIZE, OCP, ETC 215.5
  
 22)NOTE: PLEASE SEE OCP/ AWG FOR FEED
 TO
 ERL FROM ERH. #12, W/ 30A OCP.
  
 23)NOTE: PLEASE SEE SEE MAX
 OVER-CURRENT
 PROTECTION FOR TRANSFORMERS IS 125%.
 PLEASE SEE NUMEROUS TRASNFROMERS SHOWN
 EXCEEDING 125% OCP.
 ERH< E3H/E3L, EH/EL ETC.450.3A
  
 24)NOTE: PLEASE SEE FC PANEL, SHOWN AS
 10A, WITH 100A FEED ?? MISPRINT?
 310.15,240.4 ETC
  
 25)NOTE: PLEASE SEE FEEDERS FOR MC-TH
 SHOWN AS OVERHEAD TO EQUIPMENT. PLEASE
 SEE 230.70 OF LOCAL AMENDMENTS WHICH
 REQUIRE CONCRETE ENCASEMENT FOR
 MORE-THAN 8' OF UNPROTECTED CONDUCTOR
 "INSIDE" THE BLDG.
 PLEASE SEE FEEDER SCHEDULE MENTIONS
 1200A FEEDER, YET NO INFORMATION IS
 GIVEN FOR SIZE AND TYPE.
  
 26)NOTE: PLEASE COMPLETE FEEDER
 SCHEDULE. SHOWS AMERAGE OF WHAT FEEDERS
 NEED TO BE , BUT NO SIZES ARE GIVEN FOR
 CONDUITS, CONDUCTORS, EQUIPMENT
 GROUNDING ETC
 215.5,215.24,250.122,310.16 ETC
  
 27)NOTE:PLEASE SEE EDPH REQUIRED TO
 HAVE
 A MCB FOR DISCONNECTING MENS FROM
 GENERATOR DP/ GEN.
 230.72,230.70 ETC.
 GEN DP LOCATION IS OVER 300' AWAY.
  
 28)NOTE: PLEASE VERFIY THE MAIN SINGLE
 OCP FOR FIRE PUMP. PLEASE SEE FIRE PUMP
 CONTROLLER SPECS MENTIONS, FACTORY SET
 AT LRC.(6X). YET, RISER SHOWS
 DISC(PREVIOUS COMMENT) AND GEN DP SHOWS
 OCP ALSO? VERIFY OF THERE IS OCP ON GEN
 TO GEN DP.
 THE OVERCURRENT PROTECTIVE DEVICE(S)
 SHALL BE SELECTED OR SET TO CARRY
 INDEFINITELY THE SUM OF THE
 LOCKED-ROTOR
 CURRENT OF THE FIRE PUMP MOTOR(S) AND
 THE PRESSURE MAINTENANCE PUMP MOTOR(S)
 AND THE FULL-LOAD CURRENT OF THE
 ASSOCIATED FIRE PUMP ACCESSORY
 EQUIPMENT
 WHEN CONNECTED TO THIS POWER SUPPLY.
 THE DISCONNECTING MEANS SHALL BE MARKED
 ?FIRE PUMP DISCONNECTING MEANS.? THE
 LETTERS SHALL BE AT LEAST 25 MM (1 IN.)
 IN HEIGHT, AND THEY SHALL BE VISIBLE
 WITHOUT OPENING ENCLOSURE DOORS OR
 COVERS.
 PLEASE SEE 695 FOR FIRE PUMP.
  
 29)NOTE: PLEASE SEE LOAD ON GENERATOR.
 PLANS INDICATE 1000KW AND 600KW, PLEASE
 CLARIFY WHICH ONE IS GOING TO BE
 INSTALLED.
 GEN LOAD IS NOW SHOWN EXCEEDING RATING
 OF GENERATOR. PLEASE
 PROVIDE INFORMATION ON MEANS OF
 AUTOMATIC SHEDDING.
 N EMERGENCY SYSTEM SHALL HAVE ADEQUATE
 CAPACITY AND RATING FOR ALL LOADS TO BE
 OPERATED SIMULTANEOUSLY. THE EMERGENCY
 SYSTEM EQUIPMENT SHALL BE SUITABLE FOR
 THE MAXIMUM AVAILABLE FAULT CURRENT AT
 ITS TERMINALS.
 THE EMERGENCY SYSTEM MUST BE DESIGNED
 WITH ADEQUATE CAPACITY AND RATING TO
 SAFELY CARRY THE ENTIRE LOAD CONNECTED
 TO THE EMERGENCY SYSTEM AT ONE TIME. IT
 MUST BE CAPABLE OF RESTARTING EMERGENCY
 LOADS, SUCH AS MOTORS, THAT MAY HAVE
 STOPPED, AND IT MUST BE SUITABLE FOR
 THE
 AVAILABLE FAULT CURRENT. USING DEVICES
 THAT LIMIT THE AVAILABLE FAULT CURRENT
 IS ONE METHOD OF ACHIEVING SUITABILITY.
  
 THE ALTERNATE POWER SOURCE SHALL BE
 PERMITTED TO SUPPLY EMERGENCY, LEGALLY
 REQUIRED STANDBY, AND OPTIONAL STANDBY
 SYSTEM LOADS WHERE AUTOMATIC SELECTIVE
 LOAD PICKUP AND LOAD SHEDDING IS
 PROVIDED AS NEEDED TO ENSURE ADEQUATE
 POWER TO (1) THE EMERGENCY CIRCUITS,
 (2)
 THE LEGALLY REQUIRED STANDBY CIRCUITS,
 AND (3) THE OPTIONAL STANDBY CIRCUITS,
 IN THAT ORDER OF PRIORITY. THE
 ALTERNATE
 POWER SOURCE SHALL BE PERMITTED TO BE
 USED FOR PEAK LOAD SHAVING, PROVIDED
 THE
 ABOVE CONDITIONS ARE MET.
 PLEASE ALSO SEE ALL OF 702.5 OPTIONAL
 STANDBY SYSTEM SHALL HAVE ADEQUATE
 CAPACITY AND RATING FOR THE SUPPLY OF
 ALL EQUIPMENT INTENDED TO BE OPERATED
 AT
 ONE TIME. OPTIONAL STANDBY SYSTEM
 EQUIPMENT SHALL BE SUITABLE FOR THE
 MAXIMUM AVAILABLE FAULT CURRENT AT ITS
 TERMINALS. THE USER OF THE OPTIONAL
 STANDBY SYSTEM SHALL BE PERMITTED TO
 SELECT THE LOAD CONNECTED TO THE
 SYSTEM.
 PROVIDE INFORMATION ON AUTO SHEDDING
 FOR
 ELEVATORS.
  
 30)NOTE: PLEASE SEE
 230.95,240.13,700.7D
 FOR MSBH, MSBE, EDPH,ETC.GROUND-FAULT
 PROTECTION OF EQUIPMENT SHALL BE
 PROVIDED FOR SOLIDLY GROUNDED WYE
 ELECTRICAL SERVICES OF MORE THAN 150
 VOLTS TO GROUND BUT NOT EXCEEDING 600
 VOLTS PHASE-TO-PHASE FOR EACH SERVICE
 DISCONNECT RATED 1000 AMPERES OR MORE..
 TO INDICATE A GROUND FAULT IN SOLIDLY
 GROUNDED WYE EMERGENCY SYSTEMS OF MORE
 THAN 150 VOLTS TO GROUND AND
 CIRCUIT-PROTECTIVE DEVICES RATED 1000
 AMPERES OR MORE. THE SENSOR FOR THE
 GROUND-FAULT SIGNAL DEVICES SHALL BE
 LOCATED AT, OR AHEAD OF, THE MAIN
 SYSTEM
 DISCONNECTING MEANS FOR THE EMERGENCY
 SOURCE, AND THE MAXIMUM SETTING OF THE
 SIGNAL DEVICES SHALL BE FOR A
 GROUND-FAULT CURRENT OF 1200 AMPERES.
 INSTRUCTIONS ON THE COURSE OF ACTION TO
 BE TAKEN IN EVENT OF INDICATED GROUND
 FAULT SHALL BE LOCATED AT OR NEAR THE
 SENSOR LOCATION.
  
 31)NOTE: PLEASE SEE "MAIN" EQUIPMENT
 SHOWN WITH MORE THAN 6-SPACES AS MLO.
 PLEASE ALSO SEE SOME OTHER EQUIPMENT
 NOT
 CLARIFIED WITH # OF SPACES AND SHOWN AS
 MLO. MSBH, EDPH, MSBE, HE SERVICE
 DISCONNECTING MEANS FOR EACH SERVICE
 PERMITTED BY 230.2, OR FOR EACH SET OF
 SERVICE-ENTRANCE CONDUCTORS PERMITTED
 BY
 230.40, EXCEPTION NOS. 1, 3, 4, OR 5,
 SHALL CONSIST OF NOT MORE THAN SIX
 SWITCHES OR SETS OF CIRCUIT BREAKERS,
 OR
 A COMBINATION OF NOT MORE THAN SIX
 SWITCHES AND SETS OF CIRCUIT BREAKERS,
 MOUNTED IN A SINGLE ENCLOSURE, IN A
 GROUP OF SEPARATE ENCLOSURES, OR IN OR
 ON A SWITCHBOARD. THERE SHALL BE NO
 MORE
 THAN SIX SETS OF DISCONNECTS PER
 SERVICE
 GROUPED IN ANY ONE LOCATION. FOR THE
 PURPOSE OF THIS SECTION, DISCONNECTING
 MEANS USED SOLELY FOR POWER MONITORING
 EQUIPMENT, OR THE CONTROL CIRCUIT OF
 THE
 GROUND-FAULT PROTECTION SYSTEM OR
 POWER-OPERABLE SERVICE DISCONNECTING
 MEANS, INSTALLED AS PART OF THE LISTED
 EQUIPMENT, SHALL NOT BE CONSIDERED A
 SERVICE DISCONNECTING MEANS.
  
 32)NOTE: PLEASE SEE 700.9D1 EMERGENCY
 SYSTEMS SHALL MEET THE FOLLOWING
 ADDITIONAL REQUIREMENTS IN ASSEMBLY
 OCCUPANCIES FOR NOT LESS THAN 1000
 PERSONS OR IN BUILDINGS ABOVE 23 M (75
 FT) IN HEIGHT WITH ANY OF THE FOLLOWING
 OCCUPANCY CLASSES: ASSEMBLY,
 EDUCATIONAL, RESIDENTIAL, DETENTION AND
 CORRECTIONAL, BUSINESS, AND MERCANTILE.
 PLEASE SEE RISER.
  
 33)NOTE: PLEASE PROVIDE NOTE FOR
 INFORMATION ON GENERATOR TO WHEATHER
 THIS IS A SEP DERIVED GEN.
 250.30,702.8A
 SIGN SHALL BE PLACED AT THE
 SERVICE-ENTRANCE EQUIPMENT THAT
 INDICATES THE TYPE AND LOCATION OF
 ON-SITE OPTIONAL STANDBY POWER SOURCES.
 A SIGN SHALL NOT BE REQUIRED FOR
 INDIVIDUAL UNIT EQUIPMENT FOR STANDBY
 ILLUMINATION.
 PLEASE SEE WHERE THE GROUNDED CIRCUIT
 CONDUCTOR CONNECTED TO THE OPTIONAL
 STANDBY POWER SOURCE IS CONNECTED TO A
 GROUNDING ELECTRODE CONDUCTOR AT A
 LOCATION REMOTE FROM THE OPTIONAL
 STANDBY POWER SOURCE, THERE SHALL BE A
 SIGN AT THE GROUNDING LOCATION THAT
 SHALL IDENTIFY ALL OPTIONAL STANDBY
 POWER AND NORMAL SOURCES CONNECTED AT
 THAT LOCATION. PLANS WILL NEED TO
 SPECIFY IF SEP DERIVED OR NOT.
  
 34)NOTE: PLEASE SEE 445.13 FOR FEEDER
 FROM GEN TO GDP. THE AMPACITY OF THE
 CONDUCTORS FROM THE GENERATOR TERMINALS
 TO THE FIRST DISTRIBUTION DEVICE(S)
 CONTAINING OVERCURRENT PROTECTION SHALL
 NOT BE LESS THAN 115 PERCENT OF THE
 NAMEPLATE CURRENT RATING OF THE
 GENERATOR.
  
 35)NOTE: PLEASE CORRELATE FEEDER
 SCHEDULE AND GDP. ONE SHOWS 4/0'S 225A
 FEED, AND FEEDER SCHEDULE INDICATES
 400A
 FEEDER? (F-11). PLEASE SEE PREVIOUS
 NOTE
 ON THIS REVIEW FOR CONDUCTORS/CONDUITS
 TO BE ON FEEDER SCHEDULE.
  
 36)NOTE:PLEASE PROVIDE NOTE ON PLANS
 FOR
 EELECTRICAL CONTRACTOR TO PROVIDE
 SIGNAGE FOR ALL DISC MEANS, LOCATIONS
 FIRE-PUMP ETC. A "MAP" "LAYOUT" OF BLDG
 WILL BE REQUIRED IN FIRE COMMAND RMM
 FOR
 ALL LOCATIONS AS WELL AS EACH LOCATION
 OF THESE DISC'S ETC.
 230.2E, 695,700.2,700 ETC
  
 37)NOTE: PLEASE SEE NUMEROUS AREAS ON
 SOME PANEL SCHEDUL WHERE THE OCP
 EXCEEDS
 RATING OF AWG. PLEASE SEE 240.4 FOR
 EXCEPTIONS WHERE OCP MAY EXCEED AWG
 RATING FOR NEXT SIZE UP AND SOME MOTOR
 LOADS. SOME OF THESE HAVE BEEN REDLINED
 AT AREAS OF CONCERN.
  
 38)NOTE: PLEASE SEE NOTE#5 ON UNIT
 "PANEL SCHEDULE NOTES" MENTIONS TO BE
 LOCAK OFF DEVICE, HOWEVER THIS COULD
 NOT
 BE LOCATED ON PANEL SCHEDULES?
 PLEASE NOTE: ANY PROPOSED LOCK-OFF TYPE
 DEVICES/ BRKRS WILL BE REQUIRED TO BE
 REVIEWED AND APPROVED FOR USE AS
 DISCONNECTING MEANS BYAHJ BEFORE
 INSTALLATION.
  
 39)NOTE: PLEASE PROVIDE WIND-LOADING
 FOR
 PROPOSED LIGHT-POLES AND LT-ING
 FIXTURES. THIS IS REQUIRED AT THIS
 TIME.
 PLEASE ALSO PROVIDE NOTE AR LIGHTING
 DETAIL FOR FBC 140 MPH.
  
 40)NOTE: PLEASE SEE POOL IS REQUIRED TO
 BE UNDER SEPARATE PERMIT. IF THERE IS
 GOING TO BE ANY "NIGHT-TIME" (AFTER
 DUSK) SWIMMING, PHOTOMETRICS WILL BE
 REQUIRED TO BE SUBMITTED TO PALM BEACH
 COUNTY HEALTH DEPT FOR REVIEW BEFORE
 SUBMITTING TO THE CITY OF WEST PALM
 BEACH. THIS IS ONLY A NOTE GIVEN AT
 THIS
 TIME.
  
 41)NOTE:PLEASE SHOW CIRCUTING ON PLANS
 FOR ALL UNITS. THESE ARE SHOWN W/OUT
 CIRCUITING AT THIS TIME AND CAN NOT BE
 REVIEWED FOR CODE COMPLIANCE.
 215.5
  
 42)NOTE:PLEASE PROVIDE NOTE ON PLANS
 FOR
 REQUIRED SD PLACEMENT> PLEASE SEE
 NFPA-72 8-1.4.2 FOR SD'S TO BE A MIN OF
 3' FROM BATH DRS, KITCHEN DRS AND 20'
 FROM COOKING APPLIANCES WITH
 EXCEPTIONS.
  
  
 43)NOTE: SMOKE DETECTORS ARE REQUIRED
 INSIDE AND OUTSIDE ALL SLEEPING ROOMS.
 ON EACH LEVEL OF A MULTI-LEVEL DWELLING
 UNIT.
 IN CLOSE PROXIMITY OF STAIRWAYS LEADING
 TO FLOORS ABOVE AND IN THE VICINITY OF
 BEDROOMS.
 PLEASE ALSO NOTE, SD'S ARE REQ'D TO BE
 A MIN OF 3' FROM BATHROOM DOORS AND
 KITCHENS.
 ABOVE PER:FBC 905.2, NFPA-72 8-1.4
 PLEASE SEE THERE ARE A COUPLE MISSING.
  
 44)NOTE: PLEASE SEE 240.24E FOR PANEL
 LOCATIONS IN DWELLING UNITS AND GUEST
 ROOMS OF HOTELS AND MOTELS, OVERCURRENT
 DEVICES, OTHER THAN SUPPLEMENTARY
 OVERCURRENT PROTECTION, SHALL NOT BE
 LOCATED IN BATHROOMS
  
 45)NOTE:PLEASE SEE 210.52D, 210.11C3
 FOR
 REQUIRED LOCATIONS OF GFI IN BATHRMS.
 THESE ARE REQUIRED TO BE WITHIN 3' OF
 LAV/SINK EDGE. IT IS NOT PERMITED TO
 CROSS OVER ONE SINK TO MEET THE
 REQUIREMNTS OF SECOND LAV. PLEASE
 EITHER
 ADD AN ADDITIONAL GFI OR MOVE EXISTING
 SHOWN TO BE IN CENTER OF THE TWO.
  
 46)NOTE: PLEASE CLARIFY REQUIREMENST OF
 210.70 FOR UNITS WHICH HAVE GRADE LEVEL
 ACCESS.FOR DWELLING UNITS, ATTACHED
 GARAGES, AND DETACHED GARAGES WITH
 ELECTRIC POWER, AT LEAST ONE WALL
 SWITCH?CONTROLLED LIGHTING OUTLET SHALL
 BE INSTALLED TO PROVIDE ILLUMINATION ON
 THE EXTERIOR SIDE OF OUTDOOR ENTRANCES
 OR EXITS WITH GRADE LEVEL ACCESS.
  
 47)NOTE: PLEASE SEE SOME UNIT LAYOUT
 COULD NOT BE LOCATED ON PLANS. THESE
 UNITS ARE SHOWN FOR UNIT TYPE,(B-2,
 P-1,
 P-3 ETC) BUT DI NOT SEEM TO HAVE ANY
 ELECTRICAL SHOWN. THEY APPEAR TO BE
 BLANK? 215.5
  
 48)NOTE: PLEASE PROVIDE ROOM
 DESIGNATION
 ON PLANS.
  
 **** PLEASE SEE ONE SET OF PLANS HAVE
 BEEN REDLINED WITH MOST OF THE AREAS
 WHICH HAVE BEEN NOTED ON THE ABOVE
 COMMENTS. THESE REDLINES MAY HELP WITH
 SOME OF THE NOTES.
  
 **PLEASE SEE ANY POSSIBLE NOTES FROM
 OTHER REVIEWER(S) WHICH MAY AFFECT
 ELECTRICAL PLANS.
  
 **PLEASE REMOVE ALL OLD/VOIDED SHEETS
 FROM SETS AND INSERT ONLY NEW REVISED
 SHEETS INTO THREE COMPLETE SETS FOR
 REVIEW AND STMAPING. ONE SET OF OLD
 SHEETS SHOULD BE SUBMITTED FOR
 REFERENCE
 ONLY.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE DO NOT HESITATE TO CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 CITY OF WEST PALM BEACH
 CONSTUCTION SERVICES DEPT.
 561-805-6717
 [email protected]
2004-12-07 00:00:00ONE SET IN ELEC FOR REVIEW.
 NOTES TO FOLLOW.

Review Stop ENG ENGINEERING CSD
Rev No 8 Status P Date 2007-07-11 Cont ID  
Sent By rchokshi Date 2007-07-11 Time 09:38 Rev Time 0.00
Received By rchokshi Date 2007-07-11 Time 09:37 Sent To  
Notes
2007-07-11 09:40:44DWG C-6B & C-10 APPROVED .

Review Stop ENG ENGINEERING CSD
Rev No 7 Status F Date 2007-06-29 Cont ID  
Sent By rchokshi Date 2007-06-29 Time 08:35 Rev Time 0.00
Received By rchokshi Date 2007-06-29 Time 08:28 Sent To  
Notes
2007-06-29 08:34:53FAILED
  
 PLAN/PERMIT REVISION & SUBMITTALS FORM,COMMENTS SAYS
 SHEET C-6B, C-10, C-1, C-3 SUBMITTED.HOWEVER, DID NOT
 FIND C-1, C-3.PLEASE SUBMIT C-1, & C-3 FOR REVIEW.
 SHEET C-6B & C-10 ARE APPROVED.
  
 RASIK CHOKSHI805-6723

Review Stop ENG ENGINEERING CSD
Rev No 6 Status P Date 2007-06-28 Cont ID  
Sent By rchokshi Date 2007-06-28 Time 09:31 Rev Time 0.00
Received By rchokshi Date 2007-06-28 Time 09:31 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 5 Status F Date 2007-06-27 Cont ID  
Sent By rchokshi Date 2007-06-27 Time 11:35 Rev Time 0.00
Received By rchokshi Date 2007-06-27 Time 11:32 Sent To  
Notes
2007-06-27 11:35:40** FAILED **
  
  
 PLEASE DESCRIBE IN DETAIL WHAT EXACTLY CHANGES YOU MADE
 FROM THE LAST REVISION 4, DATE 4/19/07 ??
  
 RASIK CHOKSHI 805-6723

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2007-04-19 Cont ID  
Sent By rchokshi Date 2007-04-19 Time 13:51 Rev Time 0.00
Received By rchokshi Date 2007-04-19 Time 13:51 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status F Date 2007-03-15 Cont ID  
Sent By rchokshi Date 2007-03-15 Time 09:51 Rev Time 0.00
Received By rchokshi Date 2007-03-15 Time 09:38 Sent To  
Notes
2007-03-15 09:51:22PLEASE PROVIDE:
  
 1. PLEASE SHOWDUMPSTER ENCLOSURE LOCATION ON PLAN.
 LOCATION MUST BE ACCESSIBLE FOR CITY PICKUP TRUCK
 2. PLEASE DO NOT PROVIDE ALL LOOSE DRAWINGS. PLEASE
 MAKE A SET OF DRAWINGS IN ORDER OF DRAWING NUMBERS &
 RESUBMIT.
 3. WHAT OTHER CHANGES YOU MADE AS FAR AS STORM WATER,
 DRAINAGE, DRIVEWAY, APPROACHES, SIDEWALK ETC. CONCERNED
 FROM PREVIOUS REVISION AFTER WE PASSED?? PLEASE EXPLAIN
 THOSE CHANGES.
  
 RASIK CHOKSHI 805-6723

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2007-01-12 Cont ID  
Sent By rchokshi Date 2007-01-12 Time 15:57 Rev Time 0.00
Received By rchokshi Date 2007-01-12 Time 15:49 Sent To  
Notes
2007-01-12 15:57:28ACCORDING TO E-MAIL FROM PETERAQUART OF CRAVEN
 THOMPSON DATED 1/12/2007 AT 1:42 PM (E-MAIL IS IN LOTUS
 WPB SYSTEM), NOTHING IS CHANGED FOR ENG REVIEW SINCE
 LAST ENG REVIEW OF 11/22/2004. THEREFORE, NO FURTHER
 ENG REVIEW NECESSARY.
  
 RASIK CHOKSHI 805-6723

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2004-11-22 Cont ID  
Sent By mamini Date 2004-11-22 Time 08:44 Rev Time 0.50
Received By mamini Date 2004-11-22 Time 08:44 Sent To  
Notes
2004-11-22 00:00:00PASSED:
  
 1. SEE PERMIT # 04110964 AND 04120339
 FOR UNDERGROUND UTILITIES AND SITE
 WORK.
  
 IF ANY QUESTION PLEASE CONTACT 805-6723
 MOHAMMAD R. AMINI

Review Stop FIRE FIRE DEPARTMENT
Rev No 12 Status F Date 2007-07-27 Cont ID  
Sent By mwennerg Date 2007-07-27 Time 15:53 Rev Time 0.00
Received By mwennerg Date 2007-07-27 Time 15:53 Sent To  
Notes
2007-07-27 15:55:47***DENIED***
  
 1) REVISIONS MADE TO THE FIRE ALARM SYSTEM TO BE
 SUBMITTED UNDER FIRE ALARM PERMIT. PLEASE RESUBMIT
 UNDER APPROPRIATE PERMIT.
  
  
 MIKE WENNERGREN, ASSISTANT FIRE MARSHAL
 FIRE PLAN REVIEW
 FIRE PREVENTION (561) 804-4756

Review Stop FIRE FIRE DEPARTMENT
Rev No 11 Status P Date 2007-07-03 Cont ID  
Sent By mwennerg Date 2007-07-03 Time 14:42 Rev Time 0.00
Received By mwennerg Date 2007-07-03 Time 14:42 Sent To  
Notes
2007-07-03 14:43:14REVISION DATED 6/19/07 KNOX BOX NOTE DELETED.

Review Stop FIRE FIRE DEPARTMENT
Rev No 10 Status P Date 2007-06-25 Cont ID  
Sent By mawillia Date 2007-06-25 Time 10:50 Rev Time 0.00
Received By mawillia Date 2007-06-25 Time 09:38 Sent To  
Notes
2007-06-25 10:49:00*****REVISION OF 05/29/2007 APPROVED*****
  
  
 REVISED PLAN SHEET FA2.14 STAMPED, INITIALED, AND
 DATED.

Review Stop FIRE FIRE DEPARTMENT
Rev No 9 Status P Date 2007-04-26 Cont ID  
Sent By mawillia Date 2007-04-26 Time 18:58 Rev Time 0.00
Received By mawillia Date 2007-04-26 Time 18:47 Sent To  
Notes
2007-04-26 18:47:47*****REVISION APPROVED*****
  
  
 PLAN SKETCH FOR TYPICAL ELEVATOR LOBBY IN REFERENCE TO
 LIGHTING CHANGES AND THE RELOCATION OF FIRE STROBE WAS
 STAMPED, INITIALED, AND DATED.

Review Stop FIRE FIRE DEPARTMENT
Rev No 8 Status P Date 2007-03-07 Cont ID  
Sent By mwennerg Date 2007-03-07 Time 11:02 Rev Time 0.00
Received By mwennerg Date 2007-03-07 Time 11:02 Sent To  
Notes
2007-03-07 11:04:08*** SUBMITAL ON FIRE RATED EXPANSION JOINT AND REVISION
 DATED 2/16/07

Review Stop FIRE FIRE DEPARTMENT
Rev No 7 Status P Date 2006-09-06 Cont ID  
Sent By mwennerg Date 2006-09-06 Time 09:33 Rev Time 0.00
Received By mwennerg Date 2006-09-06 Time 09:33 Sent To  
Notes
2006-09-06 00:00:00REVISION TO LIFE SAFETY PLAN DATED
 6/15/06.

Review Stop FIRE FIRE DEPARTMENT
Rev No 6 Status P Date 2006-06-15 Cont ID  
Sent By mwennerg Date 2006-06-15 Time 10:28 Rev Time 0.00
Received By mwennerg Date 2006-06-15 Time 10:28 Sent To  
Notes
2006-06-15 00:00:00***PROVISO***
  
  
 NO FIRE PROTECTION OR LIFE SAFETY SHEETS
 REVISED. PLEASE REFER TO ELECTRICAL
 REVIEW COMMENT REGARDING RATING OF
 GENERATOR.
  
  
 MIKE WENNERGREN, CAPTAIN/WPBFR
 FIRE PLAN REVIEW (561) 805-6722

Review Stop FIRE FIRE DEPARTMENT
Rev No 5 Status P Date 2006-03-07 Cont ID  
Sent By mwennerg Date 2006-03-07 Time 14:42 Rev Time 0.00
Received By mwennerg Date 2006-03-07 Time 14:42 Sent To  
Notes
2006-03-07 00:00:00NEW FIRE PROTECTION SHEETS IN (2) SETS
 OF PLANS

Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 2005-09-06 Cont ID  
Sent By mwennerg Date 2005-09-06 Time 10:23 Rev Time 0.00
Received By mwennerg Date 2005-09-06 Time 10:23 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status F Date 2005-07-08 Cont ID  
Sent By mwennerg Date 2005-07-08 Time 10:31 Rev Time 0.00
Received By mwennerg Date 2005-07-08 Time 10:31 Sent To  
Notes
2005-07-08 00:00:00******DENIED******
  
 1) 1) THE EXIT SIGN ON SHEET AO-3 STILL
 APPEARS TO BE TOO FAR FROM THE EXIT
 DOOR.
  
 2) THE TURN AROUND ILLUSTRATES 52' FROM
 THE CENTER TO THE OUTSIDE OF THE LANE.
 IT WOULD APPEAR THAT THIS MEASUREMENT
 DOES NOT COMPLY WITH NFPA-1. PLEASE
 CLARIFY.
  
 3) NEW FIRE ALARM SYSTEM MONITORING
 SHALL BE CERTIFIED FOR CENTRAL STATION
 SERVICE.
  
 4) FIRE ALARM SYSTEMS IN HIGHRISE
 STRUCTURES SHALL MEET THE NFPA-72
 REQUIREMENT FOR SURVIVABILITY.
  
 5) IN ACCORDANCE WITH LOCAL
 REQUIREMENTS, SMOKE DUCT DETECTORS WHERE
 PROVIDED SHALL BE WIRED INTO THE FIRE
 ALARM SYSTEM TO INITIATE A GENERAL FIRE
 ALARM WHEN ACTIVATED.
  
 6) IN ADDITION TO THE FIRE SPRINKLER
 DETAIL PROVIDED FOR THE COOLING TOWER,
 COMPLIANCE WITH NFPA-214 WILL BE
 REQUIRED.
  
 7) THE LAST FIRE REVIEW COMMENT #6
 REFERS TO THE AREA NEXT TO THE MAIN
 LOBBY IN REGARDS TO FIRE APPARATUS
 TURN-AROUND. PLEASE EXPLAIN.
  
 8) REFERENCE HAS BEEN MADE TO REVISIONS
 ON SHEETS #2.02 AND #2.14 REGARDING
 SMOKE DETECTORS. NO REVISION CAN BE
 FOUND ON THE DRAWINGS OR TITLE BLOCK.
  
  
 MIKE WENNERGREN, A/CAPTAIN
 WPBFR(561) 805-6722 OR 835-2951

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 2005-02-16 Cont ID  
Sent By mcarsill Date 2005-02-16 Time 11:12 Rev Time 0.00
Received By mcarsill Date 2005-02-16 Time 11:11 Sent To  
Notes
2005-02-16 00:00:001. SINCE THE PHASE I TOWER IS
 CONSIDERED A HIGH-RISE BUILDING,
 TWO DEPARTMENT CONNECTIONS WILL BE
 REQUIRED. ONLY ONE IS SHOWN ON
 PAGE A0-3.
  
 2. SOME EXIT SIGNS ON PAGE A0-3 SHOULD
 BE POSITIONED ABOVE EXIT DOORS.
  
 3. PLANS STILL DISPLAY THE WORD
 RAMP IN AREAS OF THE PARKING GARAGE.
 PLAN REVIEW COMMENTS USES THE WORD
 SLOPE. PLEASE REVISE.
  
 4. PLEASE EXPLAIN "LOADING" NEAR
 EXIT ON PAGES A0-5, A0-5A.
  
 5. PLEASE CLEARLY ILLUSTRATE FIRE
 RESCUE VEHICLE AREAS FOR PHASE ONE
 AND PHASE TWO BUILDINGS.
  
 6. HOW DOES FIRE APPARATUS TURN-AROUND
 NEAR THE MAIN LOBBY AREA.
  
 7. YOUR PLAN REVIEW RESPONSE REGARDING
 MIXED OCCUPANCY APPEARS TO BE INCORRECT.
 THERE APPEARS TO BE RESIDENTIAL AND
 STORAGE OCCUPANCIES PRESENT AND
 CO-MINGLED IN PHASE ONE. PLEASE EXPLAIN.
  
 8. COLUMNS PRESENT IN FRONT OR NEARBY
 EXIT DOORS IN GARAGE AREA. WILL THIS
 POSE SIGHTLINE PROBLEMS IN LOCATING
 EXIT DOORS.
  
 9. STAIR # 1 SHOWS A STANDPIPE SYSTEM
 BUT STAIR # 4 DOES NOT. ALL REQUIRED
 STAIRS ARE REQUIRED TO HAVE STANDPIPES
 IN THEM.
  
 10. SINCE THE GARAGES APPEAR TO BE
 CONNECTED IN THE FUTURE HOW WILL THE
 EXITING WORK. SOME ILLUSTRATION APPEARS
 TO BE NECESSARY.
  
 11. PLEASE PROVIDE DETAILS ON COOLING
 TOWER. COMPLIANCE WITH NFPA 214 WILL
 BE REQUIRED.
  
 12. WHY IS THE IRRIGATION PUMP LOCATED
 NEXT TO THE FIRE COMMAND CENTER AND
 THE FIRE PUMP ROOM LOCATED ON THE
 OPPOSITE SIDE OF THE BUILDING. IT WOULD
 ONLY MAKE SENSE TO HAVE THESE TWO ROOMS
 NEARBY.
  
 13. NO SOFFITS SHALL INTERFERE WITH
 THE PROPER OPERATION OF ANY FIRE
 SPRINKLER HEADS.
  
 14. COULD NOT LOCATE FIRE SAFETY PROGRAM
 MANUAL.
  
 15. THE PROPOSED 1000 GPM FIRE PUMP
 IS ONLY FOR PHASE ONE CONSTRUCTION
 CORRECT. PLEASE INDICATE WHAT IS
 PROPSOED FOR PHASE TWO CONSTRUCTION.
  
 16. PANIC HARDWARE REQUIRED ON ALL
 EXIT DOORS IN ASSEMLY AREAS SUBJECT
 TO 100 OR MORE PERSONS.
  
 17. IS THERE A CONFLICT BETWEEN THE
 TRASH CHUTE DOOR AND THE CORRIDOR
 WIDTH NEAR STAIR # 3.
  
 18. THE FIRE DEPARTMENT CONNECTION
 DETAIL SHOWN ON PAGE A7-1 DOES NOT
 SHOW THE REQUIRED 1 1/2 REDUCER.
  
 19. SMOKE DETECTORS FOUND TO BE MISSING
 IN SEVERAL OF THE SERVICE ROOMS.
 EXAMPLES INCLUDE MECHANICAL AND
 ELECTRICAL ROOMS.
  
 20. THE FIRE ALARM VOICE MESSAGE SHALL
 HAVE AN ALERT TONE, MESSAGE, FOLLOWED
 AGAIN BY AN ALERT TONE.
  
 21. FP2.01 AND C-18 DO NOT APPEAR TO
 CORRESPOND WITH REGARDS TO THE LOCATION
 OF A FIRE DEPARTMENT CONNECTION. PLEASE
 REVISE.
  
 22. A REVIEW OF THE CIVIL PLANS
 INDICATES ONLY ONE NEW FIRE HYDRANT
 IS BEING PROPOSED FOR THIS LARGE
 DEVELOPMENT. PLEASE EXPLAIN.
  
 23. PLEASE INDICATE HOW ALL PORTIONS
 OF THE BUILDING CAN BE REACHED BY
 THE STANDPIPE SYSTEM. ALL AREAS
 SHOULD BE REACHABLE BY 200 FEET OF
 FIRE HOSE.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 835-2910
  
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2004-12-23 Cont ID  
Sent By mcarsill Date 2004-12-23 Time 15:23 Rev Time 0.00
Received By mcarsill Date 2004-12-23 Time 15:22 Sent To  
Notes
2004-12-23 00:00:001. SITE PLAN DOES NOT DISPLAY ANY
 EXISTING OR NEW FIRE HYDRANTS.
  
 2. NO INFORMATION PROVIDED WITH
 REGARDS TO EXISTING OR NEW UNDERGROUND
 FIRE MAINS.
  
 3. IT APPEARS THAT THE SECOND PHASE
 BUILDINGS ARE CONNECTED TO THE PHASE
 ONE BUILDINGS. PLEASE EXPLAIN
 OWNERSHIP AND UTILITY ARRANGEMENTS.
  
 4. PLEASE EXPLAIN USE OF RAMPS FOR
 EXIT ACCESS IN THE GARAGE.
  
 5. PLEASE INDICATE EXIT ROUTES FROM
 GARAGE SECOND LEVEL PLAN.
  
 6. PARKING STRUCTURE TO COMPLY WITH
 NFPA 88A.
  
 7. EXIT SIGN PLACEMENT SHALL NOT
 EXCEED 100 FEET.
  
 8. NO DOOR PRESENT ADJACENT TO UNIT H,
 SECOND FLOOR LEVEL, OPPOSITE OF THE
 GARAGE EXIT DOOR.
  
 9. PLEASE INDICATE HOW STAIR # 1 CAN
 ACCOMODATE EXIT LOADS FROM BOTH THE
 RESIDENTIAL AND PARKING PORTIONS OF THE
 BUILDING.
  
 10. PLEASE INDICATE THE OCCUPANT LOAD
 FOR THE POOL AND RECREATION DECK.
  
 11. ALL STAIRS AND RAMPS SHALL HAVE
 HANDRAILS ON BOTH SIDES.
  
 12. ALL STAIRS SHALL BE SLIP RESISTANT.
  
 13. THE BUILDING IS TO COMPLY WITH
 THE FLORIDA BUILDING CODE SECTION 412
 AND SECTION 11-8 OF THE LIFE SAFETY
 CODE 2000 EDITION.
  
 14. KNOX-BOXES WILL BE REQUIRED FOR
 THE PROJECT.
  
 15. THE FIRE COMMAND ROOM SHALL CONTAIN
 ALL OF THE REQUIRED EQUIPMENT PER
 412 OF THE FLORIDA BUILDING CODE AND
 SECTION 11-8 OF THE LIFE SAFETY CODE,
 2000 EDITION.
  
 16. PLEASE PROVIDE PRESCRIPTIVE
 STRENGTH
 REQUIREMENTS FOR ALL HANDRAILS AND
 GUARDRAILS.
  
 17. PLEASE EXPLAIN TEMPORARY 42" HIGH
 ALUMINUM PICKET RAILING ON PAGE A1-9.
  
 18. CURVED STAIRS OPPOSITE OF THE
 FITNESS ROOM AND PLANTER ON PAGE A1-9
 APPEARS TO BE MISSING HANDRAILS.
  
 19. BUILDING ADDRESS IS REQUIRED. A
 MINIMUM OF 6" HIGH NUMBERS ARE
 REQUIRED.
  
 20. KNOX-BOX LOCKING CAPS ARE REQUIRED
 ON THE TWO FIRE DEPARTMENT CONNECTIONS.
  
 21. EXIT SIGNS APPEAR TO OPPOSE ONE
 ANOTHER IN SEVERAL LOCALES.
  
 22. NO FIRE ALARM AUDIBILITY DEVICES
 IN GROUND LEVEL PLAN (SOUTH) FIRE
 ALARM PLAN. THE MANUAL PULL STATION
 AND SPEAKER STROBE APPEAR TO BE
 LOCATED OUTSIDE OF EXIT DOOR.
  
 23. NO FIRE ALARM EQUIPMENT SHOWN TO
 ALERT PERSONS ABOUT AN EMERGENCY WHO
 ARE ON THE POOL DECK.
  
 24. PLEASE NOTE ON THE PLANS THAT ALL
 SMOKE DETECTORS SHALL BE PLACED A
 MINIMUM OF THREE FEET FROM AIR
 CONDITIONER DIFFUSERS.
  
 25. ELECTRIC POWERED SMOKE DETECTORS
 ARE REQUIRED ON EVERY LEVEL OF THE
 RESIDENTIAL UNITS.
  
 26. PLEASE INDICATE WHAT THE SMOKE
 CONTROL PANEL WILL LOOK LIKE. A GRAPHIC
 REPRESENTATION OF THE BUILDING SHALL
 BE DISPLAYED ON THE SMOKE CONTROL
 PANEL.
  
 27. PLEASE VERIFY ALL EXIT DOOR SWINGS.
  
  
 28. PLEASE EXPLAIN EMPTY CONDUIT
 FOR FUTURE PHASE II EMERGENCY
 SERVICE.
  
 29. WHERE DO PERSONS GO AFTER LEAVING
 STAIR # 4 GROUND FLOOR EXIT DOOR.
  
 30. MORE DETAILS NEEDED ON THE PRESSURE
 REGULATING VALVES PLANNED FOR THE
 FIRE PROTECTION SYSTEM.
  
 31. WHAT WILL BE THE PROPOSED FIRE
 ACCESS LOCATIONS FOR PHASE I AND PHASE
 II BE WHEN THE CONPLEX IS COMPLETE.
  
 32. PLEASE INDICATE ON THE PLANS THAT
 THE PROPOSED GENERATOR SYSTEM COMPLIES
 WITH ALL OF THE REQUIREMENTS OF
 11.8.4 OF THE LIFE SAFETY CODE,
 2000 EDITION.
  
 33. SINCE THE PROPOSED PROJECT IS
 OF THE MIXED OCCUPANCY TYPE THE
 MOST STRINGENT OF THE OCCUPANCY
 TYPES WILL PREVAIL.
  
 34. THE RESIDENTIAL PORTION SHALL
 BE CONSIDERED ORDINARY HAZARD FOR
 DESIGN PURPOSES.
  
 35. EMERGENCY INSTRUCTIONS SHALL
 BE PROVIDED TO THE RESIDENTS EVERY
 YEAR.
  
 36. THE FIRE SPRINKLER HEADS PLANNED
 FOR USE SHALL BE QUICK RESPONSE OR
 OF THE RESIDENTIAL TYPE.
  
 37. ALL ELEVATORS SHALL COMPLY WITH
 SECTION 9.4. OF THE LIFE SAFETY CODE,
 2000 EDITION. PLEASE NOTE THIS ON THE
 PLANS.
  
 38. PLEASE INDICATE WHICH UNITS
 ARE EQUIPPPED WITH HEARING IMPAIRED
 VISIBILITY DEVICES.
  
 39. SEPARATE PLANS AND PERMITS
 REQUIRED FOR FIRE SPRINKLER SYSTEM.
  
 40. PLEASE INDICATE ON THE PLANS THE
 REQUIRED WATER COLUMN REQUIREMENTS
 FOR THE STAIRWELL PRESSURIZATION
 SYSTEMS.
  
 41. WILL THE GARAGE AND THE TOWER
 BE CONSTRUCTED AT THE SAME TIME.
  
 42. NO CUTTING OR WELDING OPERATIONS
 CAN BE PERFORMED WITHOUT THE APPROVAL
 OF THE BUREAU OF FIRE PREVENTION INSIDE
 THE BUILDINGS AND SAID OPERATIONS ARE
 TO COMPLY WITH NFPA 51B, THE STANDARD
 FOR CUTTING AND WELDING OPERATIONS.
  
 43. CHAPTER 7 OF NFPA 241 REQUIRES
 A FIRE SAFETY PROGRAM BE IMPLEMENTED
 FOR BUILDINGS UNDER CONSTRUCTION,
 RENOVATION AND DEMOLITION. PLEASE
 PROVIDE A COPY OF THIS PLAN FOR REVIEW.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 835-2910

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2006-10-31 Cont ID  
Sent By kstevens Date 2006-10-31 Time 06:57 Rev Time 0.00
Received By kstevens Date 2006-10-31 Time 06:56 Sent To  
Notes
2006-10-31 07:01:09GAS SUBMITTALS DENIED
  
 REFERENCE FBC-2001 FUEL GAS
  
 ALL SUBMITTALS FOR THE GAS APPLIANCES SHALL BE
 SUBMITTED WITH THE GAS APPLICATION. ALL GAS APPLIANCES
 ARE APPROVED, BUT THE METHOD OF SUBMITTING ARE
 INCORRECT. TWO COPIES OF THE FIREPLACE SUBMITTALS ARE
 REQUIRED. THE REGULATOR IS NOT APPROVED AS THERE IS NO
 LISTING FOR THE REGULATOR.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2006-08-17 Cont ID  
Sent By kstevens Date 2006-08-17 Time 18:57 Rev Time 0.00
Received By kstevens Date 2006-08-17 Time 18:57 Sent To  
Notes
2006-08-17 00:00:00REVISION DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
  
 FROM PLUMBING REVIEW:
  
 1. SHT P2.08 NO GAS PIPING SHOWN TO NEW
 SPA HEATER. - SHOWS WATER PIPING FOR
 HOSE BIBB CONNECTING TO STORM DRAINAGE
 AT UNIT F2. PLEASE CLARIFY. SECTION
 104.2.1.
  
 2. SHT P2.09 EMERGENCY DRAINS AT B1
 UNITS SHALL BE MINIMUM 5". ONE DRAINS
 2340SF AND THE OTHER DRAINS 2510SF AND
 BOTH SHOW 4". TABLE 1106.3.
  
 3. SHT P2.10 REVISIO #6 NOT FOUND.
 PLEASE INDICATE WHERE REVISION CAN BE
 LOCATED. SECTION 104.2.1.
  
 4. SHT P3.13 RISER DIAGRAM DOES NOT
 REFLECT THE FLOOR PLAN. PLEASE INDICATE
 WHERE THE OFFSETS FOR THE "A" SECTION
 CAN BE LOCATED ON THE FLOOR PLANS. THE
 FIRST FLOOR DOES NOT REFLECT THE FLOOR
 PLAN NOR DOES THE SECOND FLOOR.
  
 5. SHT P3.15 THE FOLLOWING INFORMATION
 IS REQUIRED FOR THE GAS PERMIT:
  
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE. **** NOT ALL CUTSECTIONS
 SHOW THE CORRESPONDING LENGTHS.
  
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED. **** INDICATE IF THE 3" PIPE
 WILL BE SCREW PIPE OR WELDED.
  
 C. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33). **** #13 INDICATES 1,050,000
 BTU'S BUT SUBMITTAL INDICATES 1,260,000
 BTU'S. CORRELATE SUBMITTALS AND RISER
 DIAGRAM INFORMATION. SECTION 104.2.1.
  
 D. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2004 FUEL
 GAS CODE SECTION 304.
  
 E. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2. ****
 MANUF. SPECIFICATION SHEETS FOR POOL
 HEATERIN SUBMITTAL BOOK INDICATES A
 DIFFERENT POOL HEATER AND DIFFERENT
 BTU'S THAN SHOWN ON THE RISER DIAGRAM. -
 SUBMIT THE MANUF. SPEC'S FOR THE SPA
 HEATER. THE MANUF. SPEC'S FOR THE
 FIREPLACE SHOWS NO LISTING. SUBMIT
 MANUF. SPEC'S FOR THE MECH. GAS BOILER
 (#8). SUBMIT MANUF. SPECIFICATION SHEETS
 FOR BBQ GRILLS.
  
 F. SUBMIT THE MANUF. SPECIFICATION
 SHEETS FOR EACH GAS REGULATOR. SHOW
 LISTING FOR REGULATOR. INDICATE MODEL
 NUMBER.
  
 G. INDICATE MATERIAL FOR REGULATOR VENT
 LINES.
  
 H. GAS CODE REFERENCE IS FBC-2201.
 PLEASE CORRECT TO FBC-2001 FUEL GAS
 CODE.
  
 I. SHUT OFF VALVE REQUIRED UPSTREAM OF
 THE REGULATORS. (SEE BBQ GRILLS).
 SECTION 410.2(5). A UNION IS REQUIRED
 BETWEEN SHUT OFF VALVE AND REGULATOR FOR
 THE POOL HEATERS.
  
 6. THREE SETS OF REVISIONS REQUIRED FOR
 REVIEW. (ONLY 2 SETS SUBMITTED).
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 168 Status N Date 2007-08-09 Cont ID  
Sent By dpalmer Date 2007-08-09 Time 08:17 Rev Time 0.00
Received By dpalmer Date 2007-08-09 Time 08:17 Sent To B
Notes
2007-08-09 08:17:54TO RB'S INCOMING BOX.

Review Stop I INCOMING/PROCESSING
Rev No 167 Status N Date 2007-07-06 Cont ID  
Sent By adarroug Date 2007-07-06 Time 15:37 Rev Time 0.00
Received By adarroug Date 2007-07-06 Time 15:37 Sent To ENG
Notes
2007-07-06 15:37:58TO "ENG" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 166 Status N Date 2007-07-03 Cont ID  
Sent By adarroug Date 2007-07-03 Time 12:02 Rev Time 0.00
Received By adarroug Date 2007-07-03 Time 12:02 Sent To FIRE
Notes
2007-07-03 12:03:16TO "MWENNERGREN" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 165 Status N Date 2007-07-01 Cont ID  
Sent By rbrown Date 2007-07-01 Time 13:03 Rev Time 0.00
Received By rbrown Date 2007-07-01 Time 13:03 Sent To  
Notes
2007-07-12 14:46:49TO "COMM" BD#33
2007-07-01 13:04:25WAITING FOR COMM BOARD.ARCHITECTURAL REVISION ALREADY
 REVIEWED BY BUILDING BUT NEEDS ZONING AND FIRE REVIEW.

Review Stop I INCOMING/PROCESSING
Rev No 164 Status N Date 2007-06-28 Cont ID  
Sent By shill Date 2007-06-28 Time 13:15 Rev Time 0.00
Received By shill Date 2007-06-28 Time 13:15 Sent To ENG
Notes
2007-06-28 13:16:01TO "ENG' BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 163 Status N Date 2007-06-27 Cont ID  
Sent By adarroug Date 2007-06-27 Time 15:48 Rev Time 0.00
Received By adarroug Date 2007-06-27 Time 15:48 Sent To ENG
Notes
2007-06-27 15:48:39TO "ENG' BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 162 Status N Date 2007-06-26 Cont ID  
Sent By rregueir Date 2007-06-26 Time 18:12 Rev Time 0.00
Received By rregueir Date 2007-06-26 Time 18:12 Sent To M
Notes
2007-06-26 18:12:54SENT TO RON REGUEIRO
 T AND B REPORT

Review Stop I INCOMING/PROCESSING
Rev No 161 Status N Date 2007-06-26 Cont ID  
Sent By rregueir Date 2007-06-26 Time 18:09 Rev Time 0.00
Received By rregueir Date 2007-06-26 Time 18:08 Sent To M
Notes
2007-06-26 18:08:56SENT TO RON REGUEIRO
 REVISION M2.02 AND M2.08

Review Stop I INCOMING/PROCESSING
Rev No 160 Status N Date 2007-06-24 Cont ID  
Sent By adarroug Date 2007-06-24 Time 15:06 Rev Time 0.00
Received By adarroug Date 2007-06-24 Time 15:06 Sent To P
Notes
2007-06-24 15:06:51TO "G" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 159 Status N Date 2007-06-24 Cont ID  
Sent By adarroug Date 2007-06-24 Time 13:14 Rev Time 0.00
Received By adarroug Date 2007-06-24 Time 13:14 Sent To M
Notes
2007-06-24 13:14:32TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 158 Status N Date 2007-06-24 Cont ID  
Sent By adarroug Date 2007-06-24 Time 13:12 Rev Time 0.00
Received By adarroug Date 2007-06-24 Time 13:12 Sent To ENG
Notes
2007-06-24 13:12:36TO "ENG" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 157 Status N Date 2007-06-24 Cont ID  
Sent By adarroug Date 2007-06-24 Time 13:01 Rev Time 0.00
Received By adarroug Date 2007-06-24 Time 13:01 Sent To M
Notes
2007-06-24 13:01:46TO "M" BOX/3 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 156 Status N Date 2007-06-24 Cont ID  
Sent By adarroug Date 2007-06-24 Time 12:41 Rev Time 0.00
Received By adarroug Date 2007-06-24 Time 12:41 Sent To Z
Notes
2007-06-24 12:41:54TO "Z" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 155 Status N Date 2007-06-24 Cont ID  
Sent By adarroug Date 2007-06-24 Time 12:38 Rev Time 0.00
Received By adarroug Date 2007-06-24 Time 12:38 Sent To P
Notes
2007-06-24 12:38:44TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 154 Status N Date 2007-06-24 Cont ID  
Sent By adarroug Date 2007-06-24 Time 12:19 Rev Time 0.00
Received By adarroug Date 2007-06-24 Time 12:19 Sent To E
Notes
2007-06-24 12:19:58TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 153 Status N Date 2007-06-20 Cont ID  
Sent By adarroug Date 2007-06-20 Time 10:38 Rev Time 0.00
Received By adarroug Date 2007-06-20 Time 10:38 Sent To E
Notes
2007-06-20 10:38:40TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 152 Status N Date 2007-06-13 Cont ID  
Sent By adarroug Date 2007-06-13 Time 16:44 Rev Time 0.00
Received By adarroug Date 2007-06-13 Time 16:44 Sent To M
Notes
2007-06-13 16:44:35TO "M" BOX/1 REV AND 1 SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 151 Status N Date 2007-06-12 Cont ID  
Sent By adarroug Date 2007-06-12 Time 09:35 Rev Time 0.00
Received By adarroug Date 2007-06-12 Time 09:35 Sent To M
Notes
2007-06-12 09:36:09TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 150 Status N Date 2007-06-11 Cont ID  
Sent By adarroug Date 2007-06-11 Time 09:50 Rev Time 0.00
Received By adarroug Date 2007-06-11 Time 09:50 Sent To B
Notes
2007-06-11 09:50:53TO "RBROWN" DESK/3 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 149 Status N Date 2007-06-11 Cont ID  
Sent By adarroug Date 2007-06-11 Time 09:46 Rev Time 0.00
Received By adarroug Date 2007-06-11 Time 09:46 Sent To M
Notes
2007-06-11 09:46:25TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 148 Status N Date 2007-06-11 Cont ID  
Sent By adarroug Date 2007-06-11 Time 09:30 Rev Time 0.00
Received By adarroug Date 2007-06-11 Time 09:30 Sent To E
Notes
2007-06-11 09:30:46TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 147 Status N Date 2007-06-01 Cont ID  
Sent By adarroug Date 2007-06-01 Time 13:42 Rev Time 0.00
Received By adarroug Date 2007-06-01 Time 13:42 Sent To FIRE
Notes
2007-06-01 13:42:33TO "F" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 146 Status N Date 2007-05-31 Cont ID  
Sent By adarroug Date 2007-05-31 Time 16:03 Rev Time 0.00
Received By adarroug Date 2007-05-31 Time 16:03 Sent To E
Notes
2007-05-31 16:04:35TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 145 Status N Date 2007-05-25 Cont ID  
Sent By adarroug Date 2007-05-25 Time 10:00 Rev Time 0.00
Received By adarroug Date 2007-05-25 Time 10:00 Sent To M
Notes
2007-05-25 10:01:25TO "RREGUIERO" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 144 Status N Date 2007-05-21 Cont ID  
Sent By shill Date 2007-05-21 Time 16:21 Rev Time 0.00
Received By shill Date 2007-05-21 Time 16:21 Sent To P
Notes
2007-05-21 16:22:24TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 143 Status N Date 2007-05-21 Cont ID  
Sent By adarroug Date 2007-05-21 Time 13:47 Rev Time 0.00
Received By adarroug Date 2007-05-21 Time 13:47 Sent To M
Notes
2007-05-21 13:48:04TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 142 Status N Date 2007-05-18 Cont ID  
Sent By adarroug Date 2007-05-18 Time 09:14 Rev Time 0.00
Received By adarroug Date 2007-05-18 Time 09:14 Sent To E
Notes
2007-05-18 09:15:14TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 141 Status N Date 2007-05-14 Cont ID  
Sent By adarroug Date 2007-05-14 Time 15:25 Rev Time 0.00
Received By adarroug Date 2007-05-14 Time 15:25 Sent To M
Notes
2007-05-14 15:25:44TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 140 Status N Date 2007-05-11 Cont ID  
Sent By adarroug Date 2007-05-11 Time 10:54 Rev Time 0.00
Received By adarroug Date 2007-05-11 Time 10:53 Sent To  
Notes
2007-05-11 10:54:58TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 139 Status N Date 2007-05-08 Cont ID  
Sent By adarroug Date 2007-05-08 Time 09:12 Rev Time 0.00
Received By adarroug Date 2007-05-08 Time 09:12 Sent To M
Notes
2007-05-08 09:13:00TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 138 Status N Date 2007-05-04 Cont ID  
Sent By adarroug Date 2007-05-04 Time 14:09 Rev Time 0.00
Received By adarroug Date 2007-05-04 Time 14:09 Sent To B
Notes
2007-05-04 14:09:44TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 137 Status N Date 2007-05-04 Cont ID  
Sent By adarroug Date 2007-05-04 Time 14:06 Rev Time 0.00
Received By adarroug Date 2007-05-04 Time 14:06 Sent To P
Notes
2007-05-04 14:06:44TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 136 Status N Date 2007-04-24 Cont ID  
Sent By adarroug Date 2007-04-24 Time 16:14 Rev Time 0.00
Received By adarroug Date 2007-04-24 Time 16:14 Sent To  
Notes
2007-05-04 09:08:03TO "COMM" BD#63
2007-04-24 16:14:25WAITING FOR "COMM" BD

Review Stop I INCOMING/PROCESSING
Rev No 135 Status N Date 2007-04-24 Cont ID  
Sent By adarroug Date 2007-04-24 Time 16:08 Rev Time 0.00
Received By adarroug Date 2007-04-24 Time 16:08 Sent To B
Notes
2007-04-24 16:09:05TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 134 Status N Date 2007-04-23 Cont ID  
Sent By adarroug Date 2007-04-23 Time 11:22 Rev Time 0.00
Received By adarroug Date 2007-04-23 Time 11:22 Sent To  
Notes
2007-04-23 11:23:07TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 133 Status N Date 2007-04-23 Cont ID  
Sent By adarroug Date 2007-04-23 Time 11:19 Rev Time 0.00
Received By adarroug Date 2007-04-23 Time 11:19 Sent To M
Notes
2007-04-23 11:19:41TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 132 Status N Date 2007-04-19 Cont ID  
Sent By adarroug Date 2007-04-19 Time 11:12 Rev Time 0.00
Received By adarroug Date 2007-04-19 Time 11:12 Sent To P
Notes
2007-04-19 11:13:20TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 131 Status N Date 2007-04-17 Cont ID  
Sent By adarroug Date 2007-04-17 Time 13:46 Rev Time 0.00
Received By adarroug Date 2007-04-17 Time 13:46 Sent To E
Notes
2007-04-17 13:46:48TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 130 Status N Date 2007-04-17 Cont ID  
Sent By adarroug Date 2007-04-17 Time 11:36 Rev Time 0.00
Received By adarroug Date 2007-04-17 Time 11:36 Sent To M
Notes
2007-04-17 11:36:55TO "M" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 129 Status N Date 2007-04-12 Cont ID  
Sent By adarroug Date 2007-04-12 Time 13:39 Rev Time 0.00
Received By adarroug Date 2007-04-12 Time 13:39 Sent To  
Notes
2007-04-12 13:39:51TO "COMM" BD#9

Review Stop I INCOMING/PROCESSING
Rev No 128 Status N Date 2007-04-11 Cont ID  
Sent By adarroug Date 2007-04-11 Time 11:21 Rev Time 0.00
Received By adarroug Date 2007-04-11 Time 11:21 Sent To M
Notes
2007-04-11 11:21:41TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 127 Status N Date 2007-04-09 Cont ID  
Sent By adarroug Date 2007-04-09 Time 14:54 Rev Time 0.00
Received By adarroug Date 2007-04-09 Time 14:54 Sent To M
Notes
2007-04-09 14:54:40TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 126 Status N Date 2007-04-03 Cont ID  
Sent By spalmer Date 2007-04-03 Time 18:12 Rev Time 0.00
Received By spalmer Date 2007-04-03 Time 18:12 Sent To M
Notes
2007-04-03 18:12:28TO RON REGUEIRO

Review Stop I INCOMING/PROCESSING
Rev No 125 Status N Date 2007-03-27 Cont ID  
Sent By spalmer Date 2007-03-27 Time 18:41 Rev Time 0.00
Received By spalmer Date 2007-03-27 Time 18:41 Sent To E
Notes
2007-03-27 18:42:00TO DEWEY PALMER

Review Stop I INCOMING/PROCESSING
Rev No 124 Status N Date 2007-03-25 Cont ID  
Sent By adarroug Date 2007-03-25 Time 12:32 Rev Time 0.00
Received By adarroug Date 2007-03-25 Time 12:32 Sent To M
Notes
2007-03-25 12:32:38TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 123 Status N Date 2007-03-20 Cont ID  
Sent By adarroug Date 2007-03-20 Time 08:46 Rev Time 0.00
Received By adarroug Date 2007-03-20 Time 08:46 Sent To M
Notes
2007-03-20 08:46:35TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 122 Status N Date 2007-03-19 Cont ID  
Sent By adarroug Date 2007-03-19 Time 09:14 Rev Time 0.00
Received By adarroug Date 2007-03-19 Time 09:14 Sent To P
Notes
2007-03-19 09:14:41TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 121 Status N Date 2007-03-09 Cont ID  
Sent By adarroug Date 2007-03-09 Time 13:39 Rev Time 0.00
Received By adarroug Date 2007-03-09 Time 13:39 Sent To ENG
Notes
2007-03-09 13:40:13TO "ENG" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 120 Status N Date 2007-03-03 Cont ID  
Sent By adarroug Date 2007-03-03 Time 17:52 Rev Time 0.00
Received By adarroug Date 2007-03-03 Time 17:52 Sent To P
Notes
2007-03-03 17:53:14TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 119 Status N Date 2007-03-03 Cont ID  
Sent By adarroug Date 2007-03-03 Time 17:50 Rev Time 0.00
Received By adarroug Date 2007-03-03 Time 17:50 Sent To M
Notes
2007-03-03 17:50:46TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 118 Status N Date 2007-02-27 Cont ID  
Sent By adarroug Date 2007-02-27 Time 11:22 Rev Time 0.00
Received By adarroug Date 2007-02-27 Time 11:22 Sent To B
Notes
2007-02-27 11:23:08TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 117 Status N Date 2007-02-26 Cont ID  
Sent By adarroug Date 2007-02-26 Time 09:42 Rev Time 0.00
Received By adarroug Date 2007-02-26 Time 09:42 Sent To B
Notes
2007-02-26 09:42:48TO "F" BOX/REVW/FIRE SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 116 Status N Date 2007-02-26 Cont ID  
Sent By adarroug Date 2007-02-26 Time 09:41 Rev Time 0.00
Received By adarroug Date 2007-02-26 Time 09:41 Sent To FIRE
Notes
2007-02-26 09:41:51TO "F" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 115 Status N Date 2007-02-15 Cont ID  
Sent By adarroug Date 2007-02-15 Time 15:03 Rev Time 0.00
Received By adarroug Date 2007-02-15 Time 15:03 Sent To P
Notes
2007-02-15 15:04:01TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 114 Status N Date 2007-02-12 Cont ID  
Sent By adarroug Date 2007-02-12 Time 16:31 Rev Time 0.00
Received By adarroug Date 2007-02-12 Time 16:31 Sent To B
Notes
2007-02-12 16:32:15TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 113 Status N Date 2007-02-12 Cont ID  
Sent By adarroug Date 2007-02-12 Time 15:55 Rev Time 0.00
Received By adarroug Date 2007-02-12 Time 15:55 Sent To M
Notes
2007-02-12 15:55:57TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 112 Status N Date 2007-02-12 Cont ID  
Sent By adarroug Date 2007-02-12 Time 15:29 Rev Time 0.00
Received By adarroug Date 2007-02-12 Time 15:29 Sent To P
Notes
2007-02-12 15:29:30TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 111 Status N Date 2007-02-12 Cont ID  
Sent By adarroug Date 2007-02-12 Time 10:11 Rev Time 0.00
Received By adarroug Date 2007-02-12 Time 10:11 Sent To M
Notes
2007-02-12 10:11:22TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 110 Status N Date 2007-02-05 Cont ID  
Sent By adarroug Date 2007-02-05 Time 16:01 Rev Time 0.00
Received By adarroug Date 2007-02-05 Time 16:01 Sent To B
Notes
2007-02-05 16:02:00TO "RBROWN" DESK/ 2 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 109 Status N Date 2007-01-29 Cont ID  
Sent By adarroug Date 2007-01-29 Time 15:07 Rev Time 0.00
Received By adarroug Date 2007-01-29 Time 15:05 Sent To M
Notes
2007-01-29 15:05:35TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 108 Status N Date 2007-01-24 Cont ID  
Sent By adarroug Date 2007-01-24 Time 11:20 Rev Time 0.00
Received By adarroug Date 2007-01-24 Time 11:20 Sent To M
Notes
2007-01-24 11:20:34TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 107 Status N Date 2007-01-16 Cont ID  
Sent By adarroug Date 2007-01-16 Time 16:04 Rev Time 0.00
Received By adarroug Date 2007-01-16 Time 16:04 Sent To P
Notes
2007-01-16 16:04:58TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 106 Status N Date 2007-01-16 Cont ID  
Sent By adarroug Date 2007-01-16 Time 15:20 Rev Time 0.00
Received By adarroug Date 2007-01-16 Time 15:20 Sent To M
Notes
2007-01-16 15:21:56TO "HMOSER" DESK/SUBMITTAL--SUBMITTAL REQUESTED BY
 "DBOWMAN" IN THE FIELD

Review Stop I INCOMING/PROCESSING
Rev No 105 Status N Date 2007-01-09 Cont ID  
Sent By adarroug Date 2007-01-09 Time 18:19 Rev Time 0.00
Received By adarroug Date 2007-01-09 Time 18:19 Sent To ENG
Notes
2007-01-09 18:20:03TO "ENG" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 104 Status N Date 2007-01-09 Cont ID  
Sent By adarroug Date 2007-01-09 Time 18:17 Rev Time 0.00
Received By adarroug Date 2007-01-09 Time 18:17 Sent To M
Notes
2007-01-09 18:17:45TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 103 Status N Date 2007-01-03 Cont ID  
Sent By adarroug Date 2007-01-03 Time 16:29 Rev Time 0.00
Received By adarroug Date 2007-01-03 Time 16:29 Sent To M
Notes
2007-01-03 16:29:59TO "M" BOX/2 REV

Review Stop I INCOMING/PROCESSING
Rev No 102 Status N Date 2006-12-22 Cont ID  
Sent By adarroug Date 2006-12-22 Time 15:51 Rev Time 0.00
Received By adarroug Date 2006-12-22 Time 15:51 Sent To M
Notes
2006-12-22 15:51:22TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 101 Status N Date 2006-12-05 Cont ID  
Sent By adarroug Date 2006-12-05 Time 11:03 Rev Time 0.00
Received By adarroug Date 2006-12-05 Time 11:03 Sent To B
Notes
2006-12-05 11:04:02TO "RBROWN" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 100 Status N Date 2006-12-01 Cont ID  
Sent By adarroug Date 2006-12-01 Time 09:40 Rev Time 0.00
Received By adarroug Date 2006-12-01 Time 09:40 Sent To B
Notes
2006-12-01 09:40:39TO "RBROWN" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 99 Status N Date 2006-11-30 Cont ID  
Sent By adarroug Date 2006-11-30 Time 14:27 Rev Time 0.00
Received By adarroug Date 2006-11-30 Time 14:27 Sent To M
Notes
2006-11-30 14:27:51TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 98 Status N Date 2006-11-20 Cont ID  
Sent By adarroug Date 2006-11-20 Time 11:09 Rev Time 0.00
Received By adarroug Date 2006-11-20 Time 11:09 Sent To B
Notes
2006-11-20 11:09:29TO "P" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 97 Status N Date 2006-11-20 Cont ID  
Sent By adarroug Date 2006-11-20 Time 11:08 Rev Time 0.00
Received By adarroug Date 2006-11-20 Time 11:08 Sent To P
Notes
2006-11-20 11:08:25TO "P" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 96 Status N Date 2006-11-17 Cont ID  
Sent By adarroug Date 2006-11-17 Time 10:24 Rev Time 0.00
Received By adarroug Date 2006-11-17 Time 10:24 Sent To B
Notes
2006-11-17 10:24:41TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 95 Status N Date 2006-11-16 Cont ID  
Sent By adarroug Date 2006-11-16 Time 16:14 Rev Time 0.00
Received By adarroug Date 2006-11-16 Time 16:14 Sent To M
Notes
2006-11-16 16:15:07TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 94 Status N Date 2006-11-15 Cont ID  
Sent By adarroug Date 2006-11-15 Time 13:05 Rev Time 0.00
Received By adarroug Date 2006-11-15 Time 13:05 Sent To B
Notes
2006-11-15 13:05:41TO "RBROWN" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 93 Status N Date 2006-11-08 Cont ID  
Sent By adarroug Date 2006-11-08 Time 16:37 Rev Time 0.00
Received By adarroug Date 2006-11-08 Time 16:37 Sent To M
Notes
2006-11-08 16:38:02TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 92 Status N Date 2006-11-02 Cont ID  
Sent By adarroug Date 2006-11-02 Time 16:14 Rev Time 0.00
Received By adarroug Date 2006-11-02 Time 16:14 Sent To M
Notes
2006-11-02 16:14:45TO "M" BOX/2 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 91 Status N Date 2006-10-30 Cont ID  
Sent By adarroug Date 2006-10-30 Time 16:30 Rev Time 0.00
Received By adarroug Date 2006-10-30 Time 16:30 Sent To M
Notes
2006-10-30 16:30:23TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 90 Status N Date 2006-10-30 Cont ID  
Sent By adarroug Date 2006-10-30 Time 16:26 Rev Time 0.00
Received By adarroug Date 2006-10-30 Time 16:26 Sent To P
Notes
2006-10-30 16:26:49TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 89 Status N Date 2006-10-28 Cont ID  
Sent By adarroug Date 2006-10-28 Time 16:03 Rev Time 0.00
Received By adarroug Date 2006-10-28 Time 16:03 Sent To B
Notes
2006-10-28 16:04:56TO "RBROWN" DESK/ 6 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 88 Status N Date 2006-10-24 Cont ID  
Sent By adarroug Date 2006-10-24 Time 11:05 Rev Time 0.00
Received By adarroug Date 2006-10-24 Time 11:05 Sent To B
Notes
2006-10-24 11:05:50TO "RBROWN" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 87 Status N Date 2006-10-24 Cont ID  
Sent By adarroug Date 2006-10-24 Time 10:30 Rev Time 0.00
Received By adarroug Date 2006-10-24 Time 10:30 Sent To M
Notes
2006-10-24 10:31:10TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 86 Status N Date 2006-10-16 Cont ID  
Sent By adarroug Date 2006-10-16 Time 09:15 Rev Time 0.00
Received By adarroug Date 2006-10-16 Time 09:15 Sent To B
Notes
2006-10-16 09:15:38TO "RBROWN" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 85 Status N Date 2006-10-16 Cont ID  
Sent By adarroug Date 2006-10-16 Time 08:17 Rev Time 0.00
Received By adarroug Date 2006-10-16 Time 08:17 Sent To M
Notes
2006-10-16 08:17:49TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 84 Status N Date 2006-10-12 Cont ID  
Sent By adarroug Date 2006-10-12 Time 18:25 Rev Time 0.00
Received By adarroug Date 2006-10-12 Time 18:25 Sent To P
Notes
2006-10-12 18:29:41TO "P" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 83 Status N Date 2006-10-06 Cont ID  
Sent By adarroug Date 2006-10-06 Time 10:57 Rev Time 0.00
Received By adarroug Date 2006-10-06 Time 10:57 Sent To B
Notes
2006-10-06 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 82 Status N Date 2006-10-05 Cont ID  
Sent By adarroug Date 2006-10-05 Time 10:02 Rev Time 0.00
Received By adarroug Date 2006-10-05 Time 10:02 Sent To M
Notes
2006-10-05 00:00:00TO "M" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 81 Status N Date 2006-10-05 Cont ID  
Sent By adarroug Date 2006-10-05 Time 09:40 Rev Time 0.00
Received By adarroug Date 2006-10-05 Time 09:40 Sent To B
Notes
2006-10-05 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 80 Status N Date 2006-10-03 Cont ID  
Sent By adarroug Date 2006-10-03 Time 12:16 Rev Time 0.00
Received By adarroug Date 2006-10-03 Time 12:16 Sent To B
Notes
2006-10-03 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 79 Status N Date 2006-09-28 Cont ID  
Sent By adarroug Date 2006-09-28 Time 16:31 Rev Time 0.00
Received By adarroug Date 2006-09-28 Time 16:31 Sent To P
Notes
2006-09-28 00:00:00TO "P" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 78 Status N Date 2006-09-28 Cont ID  
Sent By adarroug Date 2006-09-28 Time 16:27 Rev Time 0.00
Received By adarroug Date 2006-09-28 Time 15:52 Sent To B
Notes
2006-09-28 00:00:00TO "RBROWN" DESK/2 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 77 Status N Date 2006-09-27 Cont ID  
Sent By adarroug Date 2006-09-27 Time 13:07 Rev Time 0.00
Received By adarroug Date 2006-09-27 Time 13:07 Sent To M
Notes
2006-09-27 00:00:00TO "M" BOX/REV-FOR "HMOSER"

Review Stop I INCOMING/PROCESSING
Rev No 76 Status N Date 2006-09-26 Cont ID  
Sent By adarroug Date 2006-09-26 Time 16:02 Rev Time 0.00
Received By adarroug Date 2006-09-26 Time 16:02 Sent To B
Notes
2006-09-26 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 75 Status N Date 2006-09-23 Cont ID  
Sent By adarroug Date 2006-09-23 Time 16:35 Rev Time 0.00
Received By adarroug Date 2006-09-23 Time 16:35 Sent To B
Notes
2006-09-23 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 74 Status N Date 2006-09-15 Cont ID  
Sent By adarroug Date 2006-09-15 Time 10:19 Rev Time 0.00
Received By adarroug Date 2006-09-15 Time 10:19 Sent To B
Notes
2006-09-15 00:00:00TO "RBROWN" DESK/2 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 73 Status N Date 2006-09-13 Cont ID  
Sent By adarroug Date 2006-09-13 Time 16:24 Rev Time 0.00
Received By adarroug Date 2006-09-13 Time 16:24 Sent To M
Notes
2006-09-13 00:00:00TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 72 Status N Date 2006-09-01 Cont ID  
Sent By adarroug Date 2006-09-01 Time 11:38 Rev Time 0.00
Received By adarroug Date 2006-09-01 Time 11:38 Sent To M
Notes
2006-09-01 00:00:00TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 71 Status N Date 2006-09-01 Cont ID  
Sent By adarroug Date 2006-09-01 Time 11:19 Rev Time 0.00
Received By adarroug Date 2006-09-01 Time 11:19 Sent To B
Notes
2006-09-01 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 70 Status N Date 2006-09-01 Cont ID  
Sent By adarroug Date 2006-09-01 Time 11:12 Rev Time 0.00
Received By adarroug Date 2006-09-01 Time 11:12 Sent To M
Notes
2006-09-01 00:00:00TO "M" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 69 Status N Date 2006-08-26 Cont ID  
Sent By adarroug Date 2006-08-26 Time 14:01 Rev Time 0.00
Received By adarroug Date 2006-08-26 Time 14:01 Sent To B
Notes
2006-08-26 00:00:00TO "RBROWN" DESK/2 SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 68 Status N Date 2006-08-26 Cont ID  
Sent By adarroug Date 2006-08-26 Time 13:59 Rev Time 0.00
Received By adarroug Date 2006-08-26 Time 13:59 Sent To P
Notes
2006-08-26 00:00:00TO "P" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 67 Status N Date 2006-08-26 Cont ID  
Sent By adarroug Date 2006-08-26 Time 12:55 Rev Time 0.00
Received By adarroug Date 2006-08-26 Time 12:55 Sent To B
Notes
2006-08-26 00:00:00TO "RBROWN" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 66 Status N Date 2006-08-24 Cont ID  
Sent By adarroug Date 2006-08-24 Time 10:34 Rev Time 0.00
Received By adarroug Date 2006-08-24 Time 10:34 Sent To B
Notes
2006-08-24 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 65 Status N Date 2006-08-18 Cont ID  
Sent By adarroug Date 2006-08-18 Time 14:01 Rev Time 0.00
Received By adarroug Date 2006-08-18 Time 14:01 Sent To P
Notes
2006-08-18 00:00:00TO "P" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 64 Status N Date 2006-08-15 Cont ID  
Sent By adarroug Date 2006-08-15 Time 13:42 Rev Time 0.00
Received By adarroug Date 2006-08-15 Time 13:42 Sent To B
Notes
2006-08-15 00:00:00TO "RBROWN" DESK/4 SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 63 Status N Date 2006-08-14 Cont ID  
Sent By adarroug Date 2006-08-14 Time 13:01 Rev Time 0.00
Received By adarroug Date 2006-08-14 Time 13:01 Sent To E
Notes
2006-08-14 00:00:00TO "DPALMER" DESK/REV

Review Stop I INCOMING/PROCESSING
Rev No 62 Status N Date 2006-08-09 Cont ID  
Sent By adarroug Date 2006-08-09 Time 16:46 Rev Time 0.00
Received By adarroug Date 2006-08-09 Time 16:46 Sent To B
Notes
2006-08-09 00:00:00TO "RBROWN" DESK/2 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 61 Status N Date 2006-08-01 Cont ID  
Sent By adarroug Date 2006-08-01 Time 16:19 Rev Time 0.00
Received By adarroug Date 2006-08-01 Time 16:19 Sent To B
Notes
2006-08-01 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 60 Status N Date 2006-07-31 Cont ID  
Sent By adarroug Date 2006-07-31 Time 18:13 Rev Time 0.00
Received By adarroug Date 2006-07-31 Time 18:13 Sent To B
Notes
2006-07-31 00:00:00TO KEN CONRAD / SUBMIT

Review Stop I INCOMING/PROCESSING
Rev No 59 Status N Date 2006-07-31 Cont ID  
Sent By adarroug Date 2006-07-31 Time 14:51 Rev Time 0.00
Received By adarroug Date 2006-07-31 Time 14:51 Sent To B
Notes
2006-07-31 00:00:00TO "KCONRAD" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 58 Status N Date 2006-07-31 Cont ID  
Sent By adarroug Date 2006-07-31 Time 13:40 Rev Time 0.00
Received By adarroug Date 2006-07-31 Time 13:40 Sent To P
Notes
2006-07-31 00:00:00TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 57 Status N Date 2006-07-27 Cont ID  
Sent By adarroug Date 2006-07-27 Time 14:42 Rev Time 0.00
Received By adarroug Date 2006-07-27 Time 14:42 Sent To B
Notes
2006-07-27 00:00:00TO "KCONRAD" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 56 Status N Date 2006-07-26 Cont ID  
Sent By adarroug Date 2006-07-26 Time 16:00 Rev Time 0.00
Received By adarroug Date 2006-07-26 Time 16:00 Sent To B
Notes
2006-07-26 00:00:00TO "KCONRAD" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 55 Status N Date 2006-07-22 Cont ID  
Sent By adarroug Date 2006-07-22 Time 15:04 Rev Time 0.00
Received By adarroug Date 2006-07-22 Time 15:04 Sent To B
Notes
2006-07-22 00:00:00TO "RBROWN" DESK/4 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 54 Status N Date 2006-07-17 Cont ID  
Sent By adarroug Date 2006-07-17 Time 09:56 Rev Time 0.00
Received By adarroug Date 2006-07-17 Time 09:56 Sent To B
Notes
2006-07-17 00:00:00TO "RBROWN' DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 53 Status N Date 2006-07-14 Cont ID  
Sent By adarroug Date 2006-07-14 Time 10:25 Rev Time 0.00
Received By adarroug Date 2006-07-14 Time 10:25 Sent To B
Notes
2006-07-14 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 52 Status N Date 2006-07-12 Cont ID  
Sent By adarroug Date 2006-07-12 Time 16:37 Rev Time 0.00
Received By adarroug Date 2006-07-12 Time 16:37 Sent To M
Notes
2006-07-12 00:00:00TO "M" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 51 Status N Date 2006-07-07 Cont ID  
Sent By adarroug Date 2006-07-07 Time 14:48 Rev Time 0.00
Received By adarroug Date 2006-07-07 Time 14:48 Sent To B
Notes
2006-07-07 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 50 Status N Date 2006-07-05 Cont ID  
Sent By adarroug Date 2006-07-05 Time 09:50 Rev Time 0.00
Received By adarroug Date 2006-07-05 Time 09:50 Sent To B
Notes
2006-07-05 00:00:00TO "RBROWN" DESK/2 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 49 Status N Date 2006-06-30 Cont ID  
Sent By adarroug Date 2006-06-30 Time 14:29 Rev Time 0.00
Received By adarroug Date 2006-06-30 Time 14:29 Sent To  
Notes
2006-07-05 00:00:00TO "COMM" BD#39
2006-06-30 00:00:00WAITING FOR "COMM" BD-REV

Review Stop I INCOMING/PROCESSING
Rev No 48 Status N Date 2006-06-27 Cont ID  
Sent By adarroug Date 2006-06-27 Time 14:41 Rev Time 0.00
Received By adarroug Date 2006-06-27 Time 14:41 Sent To B
Notes
2006-06-27 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 47 Status N Date 2006-06-26 Cont ID  
Sent By adarroug Date 2006-06-26 Time 11:02 Rev Time 0.00
Received By adarroug Date 2006-06-26 Time 11:02 Sent To B
Notes
2006-06-26 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 46 Status N Date 2006-06-25 Cont ID  
Sent By adarroug Date 2006-06-25 Time 18:33 Rev Time 0.00
Received By adarroug Date 2006-06-25 Time 18:33 Sent To B
Notes
2006-06-25 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 45 Status N Date 2006-06-21 Cont ID  
Sent By adarroug Date 2006-06-21 Time 14:51 Rev Time 0.00
Received By adarroug Date 2006-06-21 Time 14:51 Sent To B
Notes
2006-06-21 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 44 Status N Date 2006-06-21 Cont ID  
Sent By adarroug Date 2006-06-21 Time 12:31 Rev Time 0.00
Received By adarroug Date 2006-06-21 Time 12:31 Sent To B
Notes
2006-06-21 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 43 Status N Date 2006-06-20 Cont ID  
Sent By adarroug Date 2006-06-20 Time 08:03 Rev Time 0.00
Received By adarroug Date 2006-06-20 Time 08:03 Sent To B
Notes
2006-06-20 00:00:00TO "RBROWN" DESK/8 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 42 Status N Date 2006-06-19 Cont ID  
Sent By adarroug Date 2006-06-19 Time 14:04 Rev Time 0.00
Received By adarroug Date 2006-06-19 Time 14:04 Sent To B
Notes
2006-06-19 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 41 Status N Date 2006-06-07 Cont ID  
Sent By adarroug Date 2006-06-07 Time 17:41 Rev Time 0.00
Received By adarroug Date 2006-06-07 Time 17:41 Sent To B
Notes
2006-06-07 00:00:00TO "RBROWN" DESK/2 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 40 Status N Date 2006-06-05 Cont ID  
Sent By adarroug Date 2006-06-05 Time 08:07 Rev Time 0.00
Received By adarroug Date 2006-06-05 Time 08:07 Sent To B
Notes
2006-06-05 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 39 Status N Date 2006-05-26 Cont ID  
Sent By ssherman Date 2006-05-26 Time 08:56 Rev Time 0.00
Received By ssherman Date 2006-05-26 Time 08:55 Sent To  
Notes
2006-05-26 00:00:00BLDG SUBMITTAL GIVEN TO KEN CONRAD

Review Stop I INCOMING/PROCESSING
Rev No 38 Status N Date 2006-05-23 Cont ID  
Sent By adarroug Date 2006-05-23 Time 15:31 Rev Time 0.00
Received By adarroug Date 2006-05-23 Time 15:31 Sent To B
Notes
2006-05-23 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 37 Status N Date 2006-05-22 Cont ID  
Sent By adarroug Date 2006-05-22 Time 15:01 Rev Time 0.00
Received By adarroug Date 2006-05-22 Time 15:01 Sent To B
Notes
2006-05-22 00:00:00TO "RBROWN "DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 36 Status N Date 2006-05-08 Cont ID  
Sent By adarroug Date 2006-05-08 Time 10:26 Rev Time 0.00
Received By adarroug Date 2006-05-08 Time 10:25 Sent To B
Notes
2006-05-08 00:00:00TO "RBROWN" DESK/6 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 35 Status N Date 2006-05-02 Cont ID  
Sent By adarroug Date 2006-05-02 Time 12:46 Rev Time 0.00
Received By adarroug Date 2006-05-02 Time 12:46 Sent To B
Notes
2006-05-02 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 34 Status N Date 2006-04-27 Cont ID  
Sent By adarroug Date 2006-04-27 Time 16:42 Rev Time 0.00
Received By adarroug Date 2006-04-27 Time 16:42 Sent To B
Notes
2006-04-27 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 33 Status N Date 2006-04-24 Cont ID  
Sent By adarroug Date 2006-04-24 Time 11:52 Rev Time 0.00
Received By adarroug Date 2006-04-24 Time 11:52 Sent To B
Notes
2006-04-24 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 32 Status N Date 2006-04-21 Cont ID  
Sent By adarroug Date 2006-04-21 Time 12:58 Rev Time 0.00
Received By adarroug Date 2006-04-21 Time 12:58 Sent To B
Notes
2006-04-21 00:00:00TO "RBROWN" DESK/2 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 31 Status N Date 2006-04-14 Cont ID  
Sent By adarroug Date 2006-04-14 Time 14:29 Rev Time 0.00
Received By adarroug Date 2006-04-14 Time 14:29 Sent To B
Notes
2006-04-14 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 30 Status N Date 2006-04-12 Cont ID  
Sent By adarroug Date 2006-04-12 Time 10:59 Rev Time 0.00
Received By adarroug Date 2006-04-12 Time 10:59 Sent To B
Notes
2006-04-12 00:00:00TO "MARTINEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 29 Status N Date 2006-04-12 Cont ID  
Sent By adarroug Date 2006-04-12 Time 10:17 Rev Time 0.00
Received By adarroug Date 2006-04-12 Time 10:17 Sent To B
Notes
2006-04-12 00:00:00TO "LMARTINEZ" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 28 Status N Date 2006-04-10 Cont ID  
Sent By adarroug Date 2006-04-10 Time 15:01 Rev Time 0.00
Received By adarroug Date 2006-04-10 Time 15:01 Sent To B
Notes
2006-04-10 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 27 Status N Date 2006-04-05 Cont ID  
Sent By adarroug Date 2006-04-05 Time 14:29 Rev Time 0.00
Received By adarroug Date 2006-04-05 Time 14:29 Sent To B
Notes
2006-04-05 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 26 Status N Date 2006-04-04 Cont ID  
Sent By adarroug Date 2006-04-04 Time 12:59 Rev Time 0.00
Received By adarroug Date 2006-04-04 Time 12:59 Sent To B
Notes
2006-04-04 00:00:00TO "RBROWN" DESK/2 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 25 Status N Date 2006-03-14 Cont ID  
Sent By adarroug Date 2006-03-14 Time 14:32 Rev Time 0.00
Received By adarroug Date 2006-03-14 Time 14:32 Sent To B
Notes
2006-03-14 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 24 Status N Date 2006-03-08 Cont ID  
Sent By adarroug Date 2006-03-08 Time 15:06 Rev Time 0.00
Received By adarroug Date 2006-03-08 Time 15:06 Sent To B
Notes
2006-03-08 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 23 Status N Date 2006-03-02 Cont ID  
Sent By adarroug Date 2006-03-02 Time 14:57 Rev Time 0.00
Received By adarroug Date 2006-03-02 Time 14:57 Sent To B
Notes
2006-03-02 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 22 Status N Date 2006-02-24 Cont ID  
Sent By adarroug Date 2006-02-24 Time 12:45 Rev Time 0.00
Received By adarroug Date 2006-02-24 Time 12:45 Sent To B
Notes
2006-02-24 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 21 Status N Date 2006-02-21 Cont ID  
Sent By adarroug Date 2006-02-21 Time 16:33 Rev Time 0.00
Received By adarroug Date 2006-02-21 Time 16:33 Sent To P
Notes
2006-02-21 00:00:00TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 20 Status N Date 2006-02-16 Cont ID  
Sent By adarroug Date 2006-02-16 Time 16:52 Rev Time 0.00
Received By adarroug Date 2006-02-16 Time 16:52 Sent To B
Notes
2006-02-16 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 19 Status N Date 2006-02-15 Cont ID  
Sent By adarroug Date 2006-02-15 Time 11:24 Rev Time 0.00
Received By adarroug Date 2006-02-15 Time 11:24 Sent To B
Notes
2006-02-15 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 18 Status N Date 2006-02-03 Cont ID  
Sent By adarroug Date 2006-02-03 Time 16:52 Rev Time 0.00
Received By adarroug Date 2006-02-03 Time 16:52 Sent To B
Notes
2006-02-03 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 17 Status N Date 2006-01-30 Cont ID  
Sent By adarroug Date 2006-01-30 Time 11:46 Rev Time 0.00
Received By adarroug Date 2006-01-30 Time 11:46 Sent To B
Notes
2006-01-30 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 16 Status N Date 2006-01-13 Cont ID  
Sent By adarroug Date 2006-01-13 Time 10:54 Rev Time 0.00
Received By adarroug Date 2006-01-13 Time 10:54 Sent To B
Notes
2006-01-13 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 15 Status N Date 2006-01-09 Cont ID  
Sent By adarroug Date 2006-01-09 Time 16:47 Rev Time 0.00
Received By adarroug Date 2006-01-09 Time 16:47 Sent To B
Notes
2006-01-09 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 14 Status N Date 2005-12-30 Cont ID  
Sent By adarroug Date 2005-12-30 Time 15:42 Rev Time 0.00
Received By adarroug Date 2005-12-30 Time 15:42 Sent To B
Notes
2005-12-30 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 13 Status N Date 2005-12-28 Cont ID  
Sent By adarroug Date 2005-12-28 Time 09:50 Rev Time 0.00
Received By adarroug Date 2005-12-28 Time 09:50 Sent To  
Notes
2006-01-26 00:00:00TO "COMM" BD#3/PLANS ON RACK
2005-12-28 00:00:00WAITING FOR "COMM" BD

Review Stop I INCOMING/PROCESSING
Rev No 12 Status N Date 2005-11-22 Cont ID  
Sent By adarroug Date 2005-11-22 Time 16:47 Rev Time 0.00
Received By adarroug Date 2005-11-22 Time 16:47 Sent To P
Notes
2005-11-22 00:00:00TO "P" BOX/REV

Review Stop I INCOMING/PROCESSING
Rev No 11 Status N Date 2005-10-14 Cont ID  
Sent By adarroug Date 2005-10-03 Time 15:54 Rev Time 0.00
Received By adarroug Date 2005-10-03 Time 15:54 Sent To  
Notes
2005-10-14 00:00:00TO "COMM" BD#7

Review Stop I INCOMING/PROCESSING
Rev No 10 Status N Date 2005-10-12 Cont ID  
Sent By adarroug Date 2005-10-12 Time 10:36 Rev Time 0.00
Received By adarroug Date 2005-10-12 Time 10:36 Sent To B
Notes
2005-10-12 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 9 Status N Date 2005-10-07 Cont ID  
Sent By adarroug Date 2005-10-07 Time 14:48 Rev Time 0.00
Received By adarroug Date 2005-10-07 Time 14:48 Sent To Z
Notes
2005-10-07 00:00:00TO "Z" BOX/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2005-10-06 Cont ID  
Sent By adarroug Date 2005-10-06 Time 12:15 Rev Time 0.00
Received By adarroug Date 2005-10-06 Time 12:15 Sent To B
Notes
2005-10-06 00:00:00TO "RBROWN" DESK/SUBMITTAL

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2005-10-04 Cont ID  
Sent By adarroug Date 2005-10-04 Time 11:46 Rev Time 0.00
Received By adarroug Date 2005-10-04 Time 11:46 Sent To  
Notes
2005-10-07 00:00:00TO "COMM" BD#58/PLANS ON RACK
2005-10-04 00:00:00WAITING FOR "COMM" BD

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2005-09-26 Cont ID  
Sent By adarroug Date 2005-09-26 Time 08:40 Rev Time 0.00
Received By adarroug Date 2005-09-26 Time 08:40 Sent To B
Notes
2005-09-26 00:00:00TO "RBROWN" DESK/3 SUBMITTALS

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2005-08-15 Cont ID  
Sent By adarroug Date 2005-08-15 Time 13:30 Rev Time 0.00
Received By adarroug Date 2005-08-15 Time 13:30 Sent To  
Notes
2005-08-15 00:00:00TO "COMM" BD#44/PLANS ON RACK/8 ROLLS
 AND 1 BOX

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2005-05-31 Cont ID  
Sent By adarroug Date 2005-05-31 Time 08:59 Rev Time 0.00
Received By adarroug Date 2005-05-31 Time 08:59 Sent To  
Notes
2005-05-31 00:00:00IN INCOMING AWAITING SPACE ON "COMM" BD

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2005-02-24 Cont ID  
Sent By adarroug Date 2005-02-24 Time 14:55 Rev Time 0.00
Received By adarroug Date 2005-02-24 Time 14:55 Sent To Z
Notes
2005-02-24 00:00:00TAKEN OFF BD#8,
 TO "Z" BOX, PLANS ON RACK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2005-01-21 Cont ID  
Sent By mjacobs Date 2005-01-21 Time 09:58 Rev Time 0.00
Received By mjacobs Date 2005-01-21 Time 09:58 Sent To  
Notes
2005-01-21 00:00:00TO "COMM BD#8 PLANS ON RACK.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2005-01-11 Cont ID  
Sent By mjacobs Date 2004-11-19 Time 16:38 Rev Time  
Received By rbrown Date 2004-11-19 Time 16:38 Sent To  
Notes
2004-11-19 00:00:00SENT TO COMM BD#1 ON SHELF NEXT TO ALANG

Review Stop M MECHANICAL (A/C)
Rev No 55 Status P Date 2007-06-26 Cont ID  
Sent By rregueir Date 2007-06-26 Time 18:22 Rev Time 0.00
Received By rregueir Date 2007-06-26 Time 18:21 Sent To  
Notes
2007-06-26 18:22:52THREE LETTERS FROM ENGINEER.
 1. AIRFLOW AT LOUVER FOR GENERATOR
 2. PIPE MATERIALS COMPATIBLE ON ROOF
 3. SMOKE DETECTOR ON BARD UNIT AT ELEVATOR MACHINE ROOM

Review Stop M MECHANICAL (A/C)
Rev No 54 Status P Date 2007-06-26 Cont ID  
Sent By rregueir Date 2007-06-26 Time 18:14 Rev Time 0.00
Received By rregueir Date 2007-06-26 Time 18:13 Sent To PC
Notes
2007-06-26 18:14:23TEST AND BALANCE REPORT

Review Stop M MECHANICAL (A/C)
Rev No 53 Status P Date 2007-06-26 Cont ID  
Sent By rregueir Date 2007-06-26 Time 18:13 Rev Time 0.00
Received By rregueir Date 2007-06-26 Time 18:13 Sent To PC
Notes
2007-06-26 18:13:32REVISED M2.02 AND M2.08

Review Stop M MECHANICAL (A/C)
Rev No 52 Status F Date 2007-06-26 Cont ID  
Sent By rregueir Date 2007-06-26 Time 18:08 Rev Time 0.00
Received By rregueir Date 2007-06-26 Time 18:07 Sent To PC
Notes
2007-06-26 18:07:56MECH REV M2.01 REV #15

Review Stop M MECHANICAL (A/C)
Rev No 51 Status P Date 2007-06-23 Cont ID  
Sent By rregueir Date 2007-06-23 Time 13:36 Rev Time 0.00
Received By rregueir Date 2007-06-23 Time 10:41 Sent To  
Notes
2007-06-23 13:36:32MECH REVS PAGES M0.01, M1.01A, M2.06A, M2.10, M2.14,
 M4.06, M4.07 M6.01, M6.02, M8.01

Review Stop M MECHANICAL (A/C)
Rev No 50 Status P Date 2007-06-16 Cont ID  
Sent By rregueir Date 2007-06-16 Time 08:34 Rev Time 0.00
Received By rregueir Date 2007-06-16 Time 08:34 Sent To  
Notes
2007-06-16 08:34:45REVISED M1.01A FUEL TANK IN FIRE PUMP ROOM.

Review Stop M MECHANICAL (A/C)
Rev No 49 Status P Date 2007-06-15 Cont ID  
Sent By rregueir Date 2007-06-15 Time 11:19 Rev Time 0.00
Received By rregueir Date 2007-06-15 Time 11:18 Sent To  
Notes
2007-06-15 11:19:07REVISED PAGES M2.01 AND M2.08

Review Stop M MECHANICAL (A/C)
Rev No 48 Status P Date 2007-06-15 Cont ID  
Sent By rregueir Date 2007-06-15 Time 09:58 Rev Time 0.00
Received By rregueir Date 2007-06-15 Time 09:36 Sent To  
Notes
2007-06-15 10:00:07REVISED PAGES M7.01 AND M8.01 DATED 6/11/07

Review Stop M MECHANICAL (A/C)
Rev No 47 Status F Date 2007-06-15 Cont ID  
Sent By rregueir Date 2007-06-15 Time 09:28 Rev Time 0.00
Received By rregueir Date 2007-06-15 Time 07:43 Sent To  
Notes
2007-06-15 09:23:51TEST AND BALANCE REPORT:
  
 TWO OF THE READINGS ON THE REPORT ARE OUTSIDE OF THE
 10% ACCEPTABLE RANGE OF VARIANCE FROM DESIGN CFM. ONE
 IS ON PG.29 AND THE OTHER IS ON PG. 51. THE ITEMS HAVE
 BEEN HIGHLIGHTED IN ONE OF THE COPIES OF THE REPORT FOR
 YOUR CONVENIENCE. ONCE THE CORRECTIONS HAVE BEEN MADE
 AND THE REPORT IS RE-CERTIFIED, IT MAY BE GIVEN TO THE
 INSPECTOR IN THE FIELD.
  
 RONALD J REGUEIRO
 561.805.6719
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 46 Status P Date 2007-06-15 Cont ID  
Sent By rregueir Date 2007-06-09 Time 09:35 Rev Time 0.00
Received By rregueir Date 2007-06-06 Time 10:25 Sent To  
Notes
2007-06-06 11:19:34MECH REVISION PP M0.01, M1.01A, M2.01, M2.02, M2.04,
 M2.06, M2.06A, M2.07, M2.08, M2.09, M2.10, M2.13,
 M2.14, M2.14A, M3.01, M3.01A, M3.01B, M3.02, M3.03,
 M3.04, M3.05, M3.06, M3.07, M3.08, M3.09, M3.10, M3.11,
 M3.12, M3.13, M3.14, M3.15. M4.01, M4.06, M6.01, M6.02,
 M7.01
  
 RJR

Review Stop M MECHANICAL (A/C)
Rev No 45 Status P Date 2007-05-16 Cont ID  
Sent By rregueir Date 2007-05-16 Time 10:07 Rev Time 0.00
Received By rregueir Date 2007-05-15 Time 09:40 Sent To  
Notes
2007-05-16 10:07:36MECH REV M2.01, M2.02, M2.08, M2.09, M2.10, M2.14,
 M3.01, M4.06, M6.01, M6.02 REV6, M6.02 REV7, M7.01

Review Stop M MECHANICAL (A/C)
Rev No 44 Status P Date 2007-05-09 Cont ID  
Sent By rregueir Date 2007-05-09 Time 07:50 Rev Time 0.00
Received By rregueir Date 2007-05-08 Time 14:18 Sent To  
Notes
2007-05-09 07:50:38SUBMITTED 5/4/07 REVISED PAGES:
 M1.01A, M2.04, M2.05, M2.06, M2.06A, M2.08, M2.13.
 M4.05, M5.01

Review Stop M MECHANICAL (A/C)
Rev No 43 Status F Date 2007-05-09 Cont ID  
Sent By rregueir Date 2007-05-09 Time 07:45 Rev Time 0.00
Received By rregueir Date 2007-05-08 Time 13:43 Sent To  
Notes
2007-05-09 07:45:41------------------DENIED-------------------
  
 PG M2.10: RTU HAS BEEN RENAMED 'RTU-C1' BUT THE ROOFTOP
 SCHEDULE ON M6.01 DOES NOT REFLECT THIS CHANGE. PLEASE
 COORDINATE FLOOR PLANS AND EQUIPMENT SCHEDULES.

Review Stop M MECHANICAL (A/C)
Rev No 42 Status P Date 2007-05-08 Cont ID  
Sent By rregueir Date 2007-05-08 Time 13:34 Rev Time 0.00
Received By rregueir Date 2007-05-08 Time 11:01 Sent To PC
Notes
2007-05-08 13:35:39REVISION SUBMITTED 5/4/07. PG SKM-1 ONLY

Review Stop M MECHANICAL (A/C)
Rev No 41 Status P Date 2007-04-26 Cont ID  
Sent By rregueir Date 2007-04-26 Time 08:52 Rev Time 0.00
Received By rregueir Date 2007-04-25 Time 18:20 Sent To PC
Notes
2007-04-26 08:52:21ALTERNATE RAG SILENCER SUBMITTAL WITH ENGINEER LETTER.

Review Stop M MECHANICAL (A/C)
Rev No 40 Status P Date 2007-04-25 Cont ID  
Sent By rregueir Date 2007-04-25 Time 18:10 Rev Time 0.00
Received By rregueir Date 2007-04-25 Time 18:09 Sent To PC
Notes
2007-04-25 18:10:05REVISED M7.01 SMOKE CONTROL SEQUENCE.

Review Stop M MECHANICAL (A/C)
Rev No 39 Status P Date 2007-04-12 Cont ID  
Sent By rregueir Date 2007-04-12 Time 08:32 Rev Time 0.00
Received By rregueir Date 2007-04-12 Time 08:31 Sent To  
Notes
2007-04-12 08:32:11REVISED PAGE M2.06
 NEW PAGE M2.06A

Review Stop M MECHANICAL (A/C)
Rev No 38 Status P Date 2007-04-12 Cont ID  
Sent By rregueir Date 2007-04-12 Time 07:53 Rev Time 0.00
Received By rregueir Date 2007-04-11 Time 19:30 Sent To  
Notes
2007-04-12 07:52:28REVISED PAGES:
 M0.01, M1.01A, M2.01, M2.03, M2.05, M2.07, M2.07A,
 M2.08, M2.08A, M2.09, M2.10, M2.11, M2.12, M2.13,
 M2.14, M2.14A, M2.01, M3.01A, M3.02, M3.03, M3.04,
 M3.05, M3.06, M3.08, M3.09, M3.11, M3.12, M3.14, M3.15,
 M4.02, M4.03, M4.04, M4.06, M4.07, M6.01, M6.02, M7.01
  
 NEW PAGE:
 M8.01
  
  
 RONALD J REGUEIRO
 561.805.6719
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 37 Status P Date 2007-04-10 Cont ID  
Sent By rregueir Date 2007-04-10 Time 08:05 Rev Time 0.00
Received By rregueir Date 2007-04-10 Time 08:00 Sent To  
Notes
2007-04-10 08:05:06REVISED PG M5.04 SUBMITTED 4/3/07

Review Stop M MECHANICAL (A/C)
Rev No 36 Status P Date 2007-03-27 Cont ID  
Sent By rregueir Date 2007-03-27 Time 17:30 Rev Time 0.00
Received By rregueir Date 2007-03-27 Time 16:43 Sent To  
Notes
2007-03-27 17:30:11REVISED M3.01

Review Stop M MECHANICAL (A/C)
Rev No 35 Status P Date 2007-03-26 Cont ID  
Sent By rregueir Date 2007-03-26 Time 15:55 Rev Time 0.00
Received By rregueir Date 2007-03-26 Time 15:31 Sent To  
Notes
2007-03-26 15:56:06REVISED PAGES M2.14 AND M5.02

Review Stop M MECHANICAL (A/C)
Rev No 34 Status F Date 2007-03-26 Cont ID  
Sent By rregueir Date 2007-03-26 Time 14:46 Rev Time 0.00
Received By rregueir Date 2007-03-24 Time 15:47 Sent To PC
Notes
2007-03-26 14:46:09SOME PAGES APPROVED, OTHERS DENIED AS LISTED BELOW:
  
 M1.01A: SEF-LR2 ON EXHAUST FAN SCHEDULE, M6.02 DATED
 10/5/06, SHOWS 4200 CFM. RISER DIAGRAM SHOWS 1400 CFM,
 BRANCH SIZES ON THIS PAGE DO NOT MATCH SIZES ON RISER
 DETAIL ON M4.06 DATED 3/1/07
  
 M2.06: BRANCH DUCT SIZES FOR OUTSIDE AIR AND EXHAUST
 FROM OAR-5 AND EAR-4A & 4B DO NOT MATCH SIZES ON RISER
 DETAIL AT PAGES M4.06 AND M4.07 DATED 3/1/07
  
 M2.06A: SEF-LR1 ON EXHAUST FAN SCHEDULE, PG M6.02 DATED
 10/5/06, SHOWS 1400 CFM. RISER DETAIL ON M4.06 SHOWS
 2100 CFM, BUT SHOWS 6 INTAKES FOR A TOTAL OF 4200 CFM.
 OA-G5 SHOWS A 26X8 DUCT FEEDING OAR-5, RISER DIAGRAM ON
 M4.07 DATED 3/1/07 SHOWS A 20X12 FEEDING THE RISER.
 RISER BRANCH DUCTS ARE ALSO IN CONFLICT WITH THE
 PREVIOUSLY MENTIONED RISER DETAILS.
  
 M2.08: BRANCH DUCTS NOT SIZED PER RISER DETAIL (SEE
 ABOVE COMMENTS).
 POOL EQUIPMENT ROOM: LOUVER CALCULATIONS DO NOT
 CORRESPOND WITH THE METHOD USED FOR COMBUSTION AIR. ONE
 OPENING COMMUNICATING DIRECTLY TO THE OUTDOORS SHOULD
 BE DESIGNED PER FBC,FG 304.3.2(2A). PLANS SHOW TWO
 40X40 GRILLS IN ROOM FOR COMBUSTION. IF TWO OPENINGS
 ARE TO BE USED, EACH OPENING SHALL HAVE AN INDEPENDENT
 DUCT COMMUNICATING DIRECTLY WITH THE OUTDOORS PER
 FBC,FG 304.7(4). PLEASE CLARIFY METHOD TO BE USED AND
 ENSURE DESIGN IS IN COMPLIANCE WITH ALL RELEVANT
 PORTIONS OF FBC,FG 304.
  
 M2.10: OK
  
 M2.14A: OK
  
 M 5.04: FLAMEBAR/DAMPER ASSEMBLY DETAIL IS NOT LEGIBLE.
 PLEASE CORRECT AND RESUBMIT PER FBC 106.1.1.
  
 REVIEWED BY:
 RONALD J REGUEIRO
 561.805.6719
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 33 Status P Date 2007-03-06 Cont ID  
Sent By rregueir Date 2007-03-06 Time 09:23 Rev Time 0.00
Received By rregueir Date 2007-03-06 Time 08:41 Sent To PC
Notes
2007-03-06 09:24:17REVISED PAGES M2.10, M4.02, M4.04, M4.06, M4.07
 SUBMITTED 3/5/07

Review Stop M MECHANICAL (A/C)
Rev No 32 Status P Date 2007-03-06 Cont ID  
Sent By rregueir Date 2007-03-06 Time 08:39 Rev Time 0.00
Received By rregueir Date 2007-03-06 Time 07:41 Sent To PC
Notes
2007-03-06 08:32:07REVISED PAGES M2.14A, M4.03, M4.05, M6.01 SUBMITTED
 3/1/07

Review Stop M MECHANICAL (A/C)
Rev No 31 Status P Date 2007-03-05 Cont ID  
Sent By rregueir Date 2007-03-05 Time 13:31 Rev Time 0.00
Received By rregueir Date 2007-03-05 Time 13:31 Sent To  
Notes
2007-03-05 13:31:44REVISED PAGE M3.01 SUBMITTED 2/9/07

Review Stop M MECHANICAL (A/C)
Rev No 30 Status P Date 2007-03-05 Cont ID  
Sent By rregueir Date 2007-03-05 Time 13:29 Rev Time 0.00
Received By rregueir Date 2007-03-05 Time 13:29 Sent To  
Notes
2007-03-05 13:30:47REVISED PAGES M2.01, 2.02, 4.02 SUBMITTED 2/8/07

Review Stop M MECHANICAL (A/C)
Rev No 29 Status F Date 2007-02-06 Cont ID  
Sent By rregueir Date 2007-02-06 Time 14:16 Rev Time 0.00
Received By rregueir Date 2007-02-06 Time 11:10 Sent To PC
Notes
2007-02-06 14:28:23REVISIONS:
  
 M2.09 DELTA6 - OK
  
 M2.14A NEW SHEET - OK
  
 M3.01 DENIED - REVISIONS APPEAR OUT OF ORDER OR HAVE
 REGRESSED TO A PREVIOUS STATE. APARTMENTS 'H' AND 'I'
 HAVE BEEN DELETED FROM PAGE.
  
 M4.02 DENIED - THIS REVISION MARKED DELTA4 1/23/07.
 CLOUDS SHOW NO CHANGES FROM PREVIOUS REVISION OTHER
 THAN DELTA2 HAS BECOME DELTA4. THERE ARE OTHER CHANGES
 ON PAGE BUT THEY ARE NOT MARKED AS REVISED (NOT
 CLOUDED).
  
 M4.03 DENIED - UNABLE TO DETERMINE NATURE OF CHANGES
 (IF ANY) TO REVISED PLAN. PREVIOUS REVISION DATED
 6/23/06
  
 M4.04 DENIED - SAME AS ABOVE
  
 M4.05 DENIED - SAME.
  
 RONALD J REGUEIRO
 561-805-6734
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 28 Status P Date 2007-02-06 Cont ID  
Sent By rregueir Date 2007-02-06 Time 11:08 Rev Time 0.00
Received By rregueir Date 2007-02-06 Time 10:28 Sent To PC
Notes
2007-02-06 11:09:34REVISIONS M2.01-M2.02 DELTA8

Review Stop M MECHANICAL (A/C)
Rev No 27 Status P Date 2007-01-27 Cont ID  
Sent By hmoser Date 2007-01-27 Time 12:56 Rev Time 0.00
Received By hmoser Date 2007-01-27 Time 12:56 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 26 Status P Date 2007-01-19 Cont ID  
Sent By rregueir Date 2007-01-19 Time 14:51 Rev Time 0.00
Received By rregueir Date 2007-01-19 Time 14:51 Sent To PC
Notes
2007-01-19 14:52:191 SHEET 8X11 REF PAGE M3.15 CHANGE SIZE OF FLEX TO 4"

Review Stop M MECHANICAL (A/C)
Rev No 25 Status F Date 2007-01-18 Cont ID  
Sent By rregueir Date 2007-01-18 Time 15:36 Rev Time 0.00
Received By rregueir Date 2007-01-18 Time 13:32 Sent To PC
Notes
2007-01-18 15:43:57-----------------------DENIED-----------------------
  
 1) M2.08 FBC,FG SECTION 304.3.2 (METHOD 1B) IS SHOWN
 FOR PROVIDING COMBUSTION AIR TO THE POOL EQUIPMENT
 ROOM. THIS METHOD IS ONLY APPLICABLE WHEN COMMUNICATING
 DIRECTLY WITH THE OUTDOORS. THE LOUVERS AS SHOWN ON
 REVISED PLAN ARE COMMUNICATING WITH AN ENCLOSED PARKING
 GARAGE. THIS IS NOT OUTDOORS. THESE OPENINGS MUST
 COMMUNICATE DIRECTLY WITH THE OUTDOORS TO COMPLY WITH
 THIS METHOD.
  
 2) M5.02 VERTICAL HEAT PUMP UNIT DETAIL: USE OF THE
 EMERGENCY DRAIN PAN UNDER THE WATER HEATER IS NOT IN
 COMPLIANCE WITH THE AUXILIARY/SECONDARY DRAIN
 REQUIREMENTS OF FBC,M 307.2.3 OR 307.2.4.
  
 RONALD J REGUEIRO
 561.805.6734
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 24 Status F Date 2007-01-06 Cont ID  
Sent By hmoser Date 2007-01-06 Time 09:16 Rev Time 0.00
Received By hmoser Date 2007-01-06 Time 08:09 Sent To  
Notes
2007-01-06 09:26:39REVISONS FAIL
 TWO PAGES OF EACH REVISON WAS SUBMITED. PLEASE PROVIDE
 THREE PAGES
 PLAN REVIEW BY HAROLD MOSER 561-805-6732

Review Stop M MECHANICAL (A/C)
Rev No 23 Status P Date 2006-12-04 Cont ID  
Sent By rregueir Date 2006-12-04 Time 17:58 Rev Time 0.00
Received By rregueir Date 2006-12-04 Time 17:26 Sent To  
Notes
2006-12-04 17:58:44PAGE M3.15 AND ENGINEER LETTER.

Review Stop M MECHANICAL (A/C)
Rev No 22 Status P Date 2006-11-21 Cont ID  
Sent By rregueir Date 2006-11-21 Time 17:06 Rev Time 0.00
Received By rregueir Date 2006-11-21 Time 17:05 Sent To  
Notes
2006-11-21 17:14:02---------------PROVISO----------------
 EXHAUST DUCTS UNDER POSITIVE PRESSURE SHALL NOT EXTEND
 INTO OR PASS THROUGH PLENUMS PER FBC,M 601.3.
 THERE IS NO PROVISION IN THE CODE FOR AN "AIR TIGHT
 SEAL" AROUND EXHAUST DUCTS IN PLENUMS. THIS SYSTEM WILL
 NEED TO BE SUBMITTED TO THE BUILDING OFFICIAL FOR
 APPROVAL UNDER FBC SEC.104.11 ALTERNATIVE MATERIALS,
 DESIGN AND METHODS.

Review Stop M MECHANICAL (A/C)
Rev No 21 Status F Date 2006-11-13 Cont ID  
Sent By rregueir Date 2006-11-13 Time 19:16 Rev Time 0.00
Received By rregueir Date 2006-11-13 Time 19:16 Sent To  
Notes
2006-11-13 19:21:20----------------DENIED--------------------
 PG M3.13 SUPPLY AIR DUCT SIZE IS MISSING - UNIT 'C'
 LEAVING THE AC CLOSET. PLEASE SHOW DUCT SIZE AS BEING
 LARGE ENOUGH TO CARRY THE AIR FOR BOTH THE 14X8 AND 8X8
 BRANCHES WHICH ARE FED BY THIS DUCT.
  
 PG M3.15 UNIT P2 BATH AND DRYER EXHAUST ARE ROUTED
 THROUGH A RETURN AIR PLENUM. EXHAUST DUCTS UNDER
 POSITIVE PRESSURE SHALL NOT EXTEND INTO OR PASS THROUGH
 PLENUMS PER FBC,M 601.3.
  
 RONALD J REGUEIRO
 561.805.6734
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 20 Status P Date 2006-11-13 Cont ID  
Sent By rregueir Date 2006-11-13 Time 19:14 Rev Time 0.00
Received By rregueir Date 2006-11-13 Time 16:30 Sent To  
Notes
2006-11-13 19:13:00ONLY PAGES 3.12 AND 3.14 PASSED THIS REVIEW WITH THE
 FOLLOWING PROVISO:
  
 ----------------PROVISO------------------
 M3.12 THROUGH 3.14 BEDROOM AIR TRANSFERS ARE NOT
 DESIGNED TO MEET THE EXCEPTIONS FOR BALANCED RETURN.
 PRESSURE DIFFERENTIALS ACROSS CLOSED DOORS WHERE
 RETURNS ARE CENTRALLY LOCATED SHALL BE LIMITED TO
 0.01INCH WC OR LESS PER FBC,M 601.4.A FIELD TEST WILL
 BE REQUIRED AT FINAL INSPECTION TO VERIFY BALANCED
 RETURN HAS BEEN ACHIEVED WITH THESE DESIGNS UNLESS THEY
 ARE REDESIGNED TO MEET AT LEAST ONE OF THE EXCEPTIONS
 UNDER THIS SECTION.

Review Stop M MECHANICAL (A/C)
Rev No 19 Status P Date 2006-11-04 Cont ID  
Sent By rregueir Date 2006-11-04 Time 08:26 Rev Time 0.00
Received By rregueir Date 2006-11-04 Time 08:26 Sent To  
Notes
2006-11-04 08:57:56ONE LETTER- CLARIFICATION OF R/A DUCT SIZES IN UNITS
 A2,B2,G AND G1
  
 ONE REVISION- 8.5X11 SHEET REVISING EXHAUST DETAIL ON
 PG M5.03

Review Stop M MECHANICAL (A/C)
Rev No 18 Status F Date 2006-11-01 Cont ID  
Sent By rregueir Date 2006-11-01 Time 19:07 Rev Time 0.00
Received By rregueir Date 2006-11-01 Time 18:39 Sent To  
Notes
2006-11-01 19:15:17-------------DENIED-------------
  
 1. M3.12 THERE ARE SEVERAL AREAS WHICH SHOW CHANGES
 FROM THE PREVIOUS PLAN DATED 8/16/06 BUT ARE NOT MARKED
 AS CHANGES ON THIS PLAN. IS THE INTENT TO MAKE THESE
 CHANGES BUT THEY WERE NOT CLOUDED? IT SEEMS LIKELY THAT
 THESE AREAS HAVE INADVERTANTLY REVERTED TO A PREVIOUS
 DESIGN. PLEASE CORRECT BY EITHER CLOUDING ALL RELEVANT
 CHANGES FOR REVISION 7 OR CORRECT AREAS WHICH ARE
 INTENDED TO BE UNCHANGED FROM PREVIOUS APPROVED PLAN
 (8/16/06).
  
 2. M3.13 SAME SITUATION AS ABOVE. SEVERAL AREAS ARE
 CHANGED FROM PREVIOUS PLAN DATED 8/16/06 BUT ARE NOT
 SHOWN AS BEING REVISED. PLEASE CLARIFY OR CORRECT.
  
 3. M3.14 UNIT F DUCT SIZE AND ROUTING HAS CHANGED FROM
 PREVIOUS PLAN (8/16/06) AND IS NOT SHOWN AS BEING
 REVISED ON THIS PAGE. PLEASE CLARIFY OR CORRECT.
  
 4. M3.18 HAS BEEN SUBMITTED AS REV 5. THERE ARE NO
 PREVIOUS VERSIONS OF THIS PAGE IN THE PERMIT SET OF
 PLANS. WE ALSO APPEAR TO BE MISSING PAGES M3.15,3.16
 AND 3.17.
  
 RONALD J REGUEIRO
 561.805.6734
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 17 Status P Date 2006-10-26 Cont ID  
Sent By rregueir Date 2006-10-26 Time 19:21 Rev Time 0.00
Received By rregueir Date 2006-10-26 Time 19:20 Sent To  
Notes
2006-10-26 19:22:50REVISIONS:
 M3.03, M3.04, M3.05, M3.06, M3.07, M3.08 M3.09, M3.10,
 M3.11

Review Stop M MECHANICAL (A/C)
Rev No 16 Status P Date 2006-10-17 Cont ID  
Sent By rregueir Date 2006-10-17 Time 17:10 Rev Time 0.00
Received By rregueir Date 2006-10-16 Time 19:03 Sent To  
Notes
2006-10-17 17:12:15MECH REVISIONS PAGES:
  
 M3.06, M3.07, M3.08, M5.01, M5.03, M6.02

Review Stop M MECHANICAL (A/C)
Rev No 15 Status F Date 2006-10-03 Cont ID  
Sent By rregueir Date 2006-10-03 Time 16:18 Rev Time 0.00
Received By rregueir Date 2006-10-03 Time 16:18 Sent To  
Notes
2006-10-03 00:00:00------------------DENIED----------------
 1.PAGE M3.07 UNIT 'D1' SHOWS ONE 20X6 'C
 TYPE' R/A GRILL PROVIDING ALL RETURN
 INTO A/C CLOSET. ACCORDING TO SCHEDULE
 ON M6.01, HP-D PRODUCES 1030 CFM.
 ACCORDING TO GRILL SCHEDULE ON M6.02, A
 20X6 'C' GRILL ALLOWS APPROX. 250 CFM.
 PLEASE SHOW HOW BALANCED RETURN IS TO BE
 ACHIEVED IN COMPLIANCE WITH FBC,M 601.4
  
 2.PAGE M6.02 AIR DISTRIBUTION SCHEDULE:
 REMARK #2 STATES "DUCT RUNOUT TO THE
 DIFFUSER/REGISTER SHALL BE THE SAME SIZE
 AS THE DIFFUSER'S NECK." THIS CONDITION
 IS NOT REFLECTED ON DRAWINGS IN SEVERAL
 AREAS.
  
 3.PER DRYER MANUFACTURER'S INSTALLATION
 INSTRUCTIONS, DRYER EXHAUST DUCT LENGTHS
 CAN BE IMPACTED BY THE TYPE OF EXHAUST
 HOOD (WALL CAP) USED. PAGE M5.03 EXT.
 WALL EXHAUST DETAIL DOES NOT SHOW WHAT
 TYPE OF EXHAUST HOOD IS TO BE USED.
 PLEASE PROVIDE SUBMITTAL DATA WITH
 DIMENSIONS AND CHECK DRYER INSTRUCTIONS
 FOR POTENTIAL IMPACT ON ALLOWABLE DRYER
 DUCT LENGTH.
  
 4.RELATING TO DRYER EXHAUST SCHEDULE ON
 PG M6.02, UNIT 'I' ON PG M3.01 SHOWS
 DRYER EXHAUST DUCT ROUTED THROUGH R/A
 PLENUM. EXHAUST DUCTS UNDER POSITIVE
 PRESSURE MAY NOT BE ROUTED THROUGH
 PLENUMS PER FBC,M 601.3. IF DUCT IS
 RE-ROUTED DO NOT EXCEED MAXIMUM
 ALLOWABLE DUCT LENGTH AND NUMBER OF
 ELBOWS ALLOWED PER MANUFACTURER'S
 INSTRUCTIONS.
  
 5.DRYER EXHAUST SCHEDULE PG M6.02 DOES
 NOT REFLECT CONDITIONS AS DRAWN IN
 APARTMENT LAYOUTS IN SEVERAL AREAS. SOME
 APARTMENTS SHOW MORE ELBOWS THAN ARE
 ALLOWED BY DRYER MANUFACTURER'S
 INSTRUCTIONS. EXAMPLE: UNIT 'A3' ON PG
 M3.08 HAS A TOTAL OF 4.5 90 DEGREE
 ELBOWS. DRYER SCHEDULE (M6.02) SHOWS
 ONLY 2.
  
 6.ALL M3.XX PAGES: DETAIL SHOWS RUSKIN
 MODEL GSV SILENCER ON THRU-WALL RETURNS
 INTO A/C CLOSETS. IS THIS ONLY FOR USE
 IN A/C CLOSETS OR ALSO FOR BEDROOMS? IN
 A/C CLOSETS, SOME R/A GRILLS AS
 CURRENTLY SIZED WILL CAUSE THE AIR
 VELOCITY (FPM) TO EXCEED MAX.
 RECOMMENDED VELOCITY OF 500 FPM (UNIT
 'E' FOR EXAMPLE) PER MANUFACTURER'S
 SPECS. HAVE THE R/A GRILLS WHERE
 SILENCERS ARE TO BE USED BEEN SIZED TO
 COMPENSATE FOR AIRFLOW PRESSURE DROP?
  
 7.SPEC BOOK NEEDS TO BE UPDATED TO
 REFLECT CHANGES IN CLOTHES DRYER
 EQUIPMENT TO BE USED. PROVIDE
 MANUFACTURER'S SPECS AND INSTALLATION
 INSTRUCTIONS.
  
 RONALD J REGUEIRO
 561.805.6734
 [email protected]

Review Stop M MECHANICAL (A/C)
Rev No 14 Status P Date 2006-09-21 Cont ID  
Sent By hmoser Date 2006-09-21 Time 14:46 Rev Time 0.00
Received By hmoser Date 2006-09-21 Time 14:46 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 13 Status P Date 2006-09-21 Cont ID  
Sent By hmoser Date 2006-09-21 Time 14:17 Rev Time 0.00
Received By hmoser Date 2006-09-21 Time 14:17 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 12 Status N Date 2006-09-19 Cont ID  
Sent By hmoser Date 2006-09-19 Time 07:36 Rev Time 0.00
Received By hmoser Date 2006-09-19 Time 07:39 Sent To B
Notes
2006-09-19 00:00:009/19/06 NO PLANS FOR MECHANICAL ALL
 BUILDING.
 PLAN REVIEW BY HAROLD MOSER 561-805-6732

Review Stop M MECHANICAL (A/C)
Rev No 11 Status P Date 2006-09-05 Cont ID  
Sent By hmoser Date 2006-09-05 Time 14:57 Rev Time 0.00
Received By hmoser Date 2006-09-05 Time 14:57 Sent To  
Notes
2006-09-05 00:00:00PAGE M2.01 REVISON #6.PLEASE THE SIZE OF
 DIFFUSER ON THE PLANS.
 PAGE M3.04 MARKED REVISON #5. ON THE
 MASTER PLAN WE ARE UP TO REVISON #9.
 PAGE M3.05 IS ON REVISON #5. MASTER IS
 ON REVISON # 8
 PAGE M6.01 CAN NOT FIND REVISON #5 ON
 PLANS.
 PLAN REVIEW BY HAROLD MOSER 561-805-6732

Review Stop M MECHANICAL (A/C)
Rev No 10 Status P Date 2006-08-22 Cont ID  
Sent By hmoser Date 2006-08-22 Time 16:37 Rev Time 0.00
Received By hmoser Date 2006-08-22 Time 16:37 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 9 Status P Date 2006-08-22 Cont ID  
Sent By hmoser Date 2006-08-22 Time 15:12 Rev Time 0.00
Received By hmoser Date 2006-08-22 Time 15:12 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 8 Status P Date 2006-08-16 Cont ID  
Sent By hmoser Date 2006-08-16 Time 16:04 Rev Time 0.00
Received By hmoser Date 2006-08-16 Time 16:04 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 7 Status P Date 2006-08-03 Cont ID  
Sent By hmoser Date 2006-08-03 Time 14:51 Rev Time 0.00
Received By hmoser Date 2006-08-03 Time 14:52 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 6 Status P Date 2006-07-18 Cont ID  
Sent By tgordon Date 2006-07-18 Time 08:27 Rev Time 1.00
Received By tgordon Date 2006-07-18 Time 08:27 Sent To  
Notes
2006-07-18 00:00:00REVISION TO MECH. PLANS PAGES M3.03,
 M3.04, AND M3.05 .

Review Stop M MECHANICAL (A/C)
Rev No 5 Status F Date 2006-05-17 Cont ID  
Sent By hmoser Date 2006-05-17 Time 14:43 Rev Time 0.00
Received By hmoser Date 2006-05-17 Time 14:42 Sent To  
Notes
2006-05-17 00:00:00PLAN DENIED
 1) PLEASE REFER TO SECTION 510 HAZARDOUS
 EXHAUST.AND 510.4 INDEPENDENT
 SYSTEM.FBC(M) PAGE M2.01,M2.08 ON PLANS
 2) PLEASE REFER TO SECTION 610.1.ABC.3.7
 MECHANICAL CLOSETS.FLORIDA ENERGY CODE
 PAGE M3.01 REVISION #4.
 PLAN REVIEW BY HAROLD MOSER 561-805-6732

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2006-02-15 Cont ID  
Sent By hmoser Date 2006-02-15 Time 10:22 Rev Time 0.00
Received By hmoser Date 2006-02-15 Time 10:22 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2005-07-11 Cont ID  
Sent By hmoser Date 2005-07-11 Time 14:45 Rev Time 0.00
Received By hmoser Date 2005-07-11 Time 14:46 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2005-02-17 Cont ID  
Sent By pkrauss Date 2005-02-17 Time 16:25 Rev Time 0.00
Received By pkrauss Date 2005-02-17 Time 16:25 Sent To  
Notes
2005-02-17 00:00:00DENIED:
 1.PLEASE IDENTIFY AND CORRELATE O.A.,
 EXHAUST RISERS, LOUVERS, HEATPUMPS,
 EXHUAST AND SUPPLY FANS.
  
 2.PLANS INDICATE CO SENSORS, PER 2001
 FBC(M)403.4 AND 502.10, INDICATE THE
 OPTION FOR THE CO SENSORS IN A "PUBLIC"
 GARAGE.THIS IS A PRIVATE GARAGE AND
 SHALL COMPLY WITH 2001 FBC(M) TABLE
 403.3 & 411.4.2.
  
 3.PLANS INDICATE THE INSTALLATION OF
 BOOSTER FANS ON THE DRYER EXHUAST.THIS
 WILL BE CONSIDERED ALTERNATE METHODS AND
 MATERIALS UNDER FBC CHAPTER 1 SECTION
 103.7.PLEASE PROVIDE THE FOLLOWING
 INFORMATION FOR REVIEW BY THE BUILDING
 OFFICAL.
 - SUBMITTAL FOR THE DRYER.
 - PROVIDE MANUFACTURER'S APPROVAL FOR
 THE INSTALLATION OF THE BOOSTER FAN.
  
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2004-12-23 Cont ID  
Sent By pkrauss Date 2004-12-22 Time 13:31 Rev Time 0.00
Received By pkrauss Date 2004-12-08 Time 17:00 Sent To  
Notes
2004-12-21 00:00:00DENIED:
 1.PLAN SHEET M1.01, INDICATES THE
 GENERATOR ROOM TO THE SOUTH SIDE OF THE
 BUILDING.PLANS DO NOT INDICATE INTENT
 FOR THE MUFFLER EXHAUST, AIR INTAKE OR
 VENTILATION FOR THIS ROOM.PROVIDE
 DISTANCES TO THE PROPERTY LINES AND OR
 ADJACENT BUILDINGS.PLEASE NOTE WHEN
 TERMINATING NOXIOUS FUMES IT SHALL BE
 DONE IN A MANNER AS TO NOT RECIRCULATE
 FUMES INTO TO AIR INTAKES, WINDOWS,
 DOORS, ETC.
  
 2.PLAN SHEET M2.02, PLEASE CLARIFY
 THE
 TERMINATION OF SEF-GL-1 & 2. WHEN
 COMPARED TO PLAN SHEET M1.01 THE
 TERMINATION IS INTO THE GARAGE NOT TO
 THE EXTERIOR.
  
 3.PLAN SHEET M2.02, TRANSFER FROM THE
 MECHANICAL ROOM INTO THE GARAGE AREA?
 WILL A BACKDRAFT DAMPER BE INSTALLED TO
 PREVENT AIR FROM INFILTRATING BACK INTO
 MECHANICAL ROOM?
  
 4.PLAN SHEET M2.02, PLEASE NOTE OA
 RISER SHALL BE LOCATED AS NOT TO
 RECEIVE
 DAMAGE FROM PARKED VECHILES PER 2001
 FBC(M)303.4.
  
 5.PLAN SHEET M2.04, OAU-4 SHOW
 COMPLIANCE WITH 2001 FBC(M)401.5 &
 401.5.1.
  
 6.PLEASE NOTE, EXHAUST SHALL NOT
 TERMINATE ONTO WALKWAYS OR IN SUCH A
 MANNER THAT IT WILL NOT BE RECIRCULATED
 INTO FRESH AIR INTAKES OR CREATE A
 NUISANCE. 2001 FBC(M)401.5, 401.5.1 &
 501.3.
  
 7.PLAN SHEET M3.01, TH1 & TH2,
 DUCTWORK AND GRILLES ARE NOT SIZED.
 PROVIDE DIMENSION FOR THE R/A TRANSFER
 GRILLES ALSO.
  
 8.PLAN SHEET M3.01 UNIT I DOES NOT
 INDICATE R/A FROM THE MASTERBEDROOM.
  
 9.PLEASE NOTE, RETURN AIR JUMPERS
 SHALL BE SIZED IN ACCORDANCE WITH 2001
 FBC(M)601.4 EXCEPTIONS 1 THROUGH 3.
  
 10. CERTAIN UNITS INDICATE RETURN AIR
 PLENUMS, PER 2001 FBC(M)602.2.1, NO
 COMBUSTIBLES ALLOWED IN THE RETURN AIR
 PLENUM.
  
 11.PROVIDE OUTSIDE AIR CALUCALTIONS
 IN
 ACCORDANCE WITH 2001 FBC(M)402.2.1 OR
 TABLE 403.3.THIS IS REQUIRED FOR
 RESIDENCE AS WELL AS ALL COMMON AREAS.
  
 12.PROVIDE SEQUENCE OF OPERATION FOR
 SMOKE CONTROL/EVAC IN ACCORDANCE WITH
 2001 FBC 412.5.
  
 13.PLEASE INDICATE ALL SYSTEMS THAT
 WILL BE SUPPLIED BY EMERGENCY POWER PER
 2001 FBC 412.7.PLEASE NOTE, GARAGE
 VENTILATION WILL BE REQUIRED TO BE ON
 STAND-BY POWER AS WELL.
  
 14.PROVIDE ADDITIONAL INFORMATION ON
 FUEL FOR THE GENERATOR AND FILL PIPING.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561)805-6719.
  

Review Stop P PLUMBING
Rev No 21 Status F Date 2007-06-21 Cont ID  
Sent By kstevens Date 2007-06-21 Time 07:41 Rev Time 0.00
Received By kstevens Date 2007-06-21 Time 07:41 Sent To  
Notes
2007-06-21 07:43:17DENIED
 REVISION FOR SHT P3.15 SHALL BE SUBMITTED UNDER THE GAS
 PERMIT NUMBER AS THIS SHEET HAS BEEN DELETED FROM THE
 BLD-COM SET OF PLANS.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 20 Status P Date 2007-06-20 Cont ID  
Sent By kstevens Date 2007-06-20 Time 18:57 Rev Time 0.00
Received By kstevens Date 2007-06-20 Time 18:57 Sent To  
Notes
2007-06-20 18:57:57REVISIONS OK--SHTS P1.01, P3.07, P4.01 & P4.02

Review Stop P PLUMBING
Rev No 19 Status P Date 2007-06-14 Cont ID  
Sent By kstevens Date 2007-06-14 Time 07:23 Rev Time 0.00
Received By kstevens Date 2007-06-13 Time 17:28 Sent To  
Notes
2007-06-14 07:23:48REVISION OK - SHT P3.16 CONDENSATE CHANGES

Review Stop P PLUMBING
Rev No 18 Status P Date 2007-06-04 Cont ID  
Sent By kstevens Date 2007-06-04 Time 11:31 Rev Time 0.00
Received By kstevens Date 2007-06-02 Time 16:46 Sent To  
Notes
2007-06-04 11:36:15REVISIONS OK - SHTS P2.01A, P2.08, P2.09, P2.15, P3.30,
 P3.07, P3.12, P4.02.--SHT A1.14 REVIEWED FOR
 COMPLIANCE FOR STORM DRAINAGE THEN ROUTED TO RBROWN FOR
 BUILDING REVIEW.--SHT P3.15 REVIEWED FOR COMPLIANCE
 FOR THE GAS REVISION AND FILED UNDER THE GAS PERMIT
 NUMBER 05100386. ALL FUTURE GAS REVISIONS SHALL BE
 SUBMITTED UNDER THE GAS PERMIT NUMBER, NOT THE BLD-COM
 NUMBER.

Review Stop P PLUMBING
Rev No 17 Status F Date 2007-04-03 Cont ID  
Sent By kstevens Date 2007-04-03 Time 12:55 Rev Time 0.00
Received By kstevens Date 2007-04-03 Time 12:55 Sent To  
Notes
2007-04-03 12:57:14REVISION FOR SHEET P2.02 DENIED.REVISION IS FOR THE
 REMOTE FUEL PORTS FOR THE GENERATOR AND FIRE PUMP @
 EXTERIOR OF GARAGE. THIS IS A MECHANICAL REVISION AND
 SHALL BE SUBMITTED UNDER THE MECHANICAL SHEETS.

Review Stop P PLUMBING
Rev No 16 Status P Date 2007-03-16 Cont ID  
Sent By kstevens Date 2007-03-16 Time 17:29 Rev Time 0.00
Received By kstevens Date 2007-03-16 Time 17:29 Sent To  
Notes
2007-03-16 17:30:37REVISIONS OK - - SHTS P2.02A & P2.14.

Review Stop P PLUMBING
Rev No 15 Status F Date 2007-03-16 Cont ID  
Sent By kstevens Date 2007-03-16 Time 17:26 Rev Time 0.00
Received By kstevens Date 2007-03-16 Time 17:26 Sent To  
Notes
2007-03-16 17:29:39DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1. SHT P2.15 UPPER ROOF SECTIONS. SOME ROOF SECTIONS DO
 NOT HAVE SECONDARY ROOF DRAINS AS REQUIRED BY SECTION
 1107.1. PLEASE INDICATE THE LOCATION OF THE SECONDARY
 ROOF DRAINS.(SEE RED LINE MARKINGS ONE SHEET P2.15).
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 14 Status P Date 2007-03-16 Cont ID  
Sent By kstevens Date 2007-03-16 Time 07:48 Rev Time 0.00
Received By kstevens Date 2007-03-16 Time 07:48 Sent To  
Notes
2007-03-16 07:51:10REVISIONS APPROVED.-SHTS P2.01A, P2.02, P2.02A,
 P2.08, P2.10, P3.12, P3.13, P3.14, P4.01.

Review Stop P PLUMBING
Rev No 13 Status F Date 2007-03-16 Cont ID  
Sent By kstevens Date 2007-03-16 Time 07:14 Rev Time 0.00
Received By kstevens Date 2007-03-12 Time 18:57 Sent To  
Notes
2007-03-16 07:48:32DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1. SHT P2.09 MAXIMUM SQUARE FOOTAGE OF A 4" EMERGENCY
 SECONDARY DRAIN IS 2044SF ON THE VERTICAL AND 800SF ON
 THE HORIZONTAL PER TABLE 1106.3. TWO SECONDARY ROOF
 DRAINS EXCEED THIS LIMIT AND SHALL BE A MINIMUM 5".
  
 2. SHT P3.03 THE TWO 4" HUB DRAINS FOR THE POOL
 EQUIPMENT ROOM ARE NOT VENTED AS REQUIRED IN SECTION
 901.2.1.
  
 3. SHT P3.03 THE CHANGED PIPE SIZE IN THE BUILDING
 DRAIN SHOWING 4"@18"/FT IS NOT APPROVED AS THE 8" IS
 SLOPED AT 1/16"/FT. PER SECTION 704.1, HORIZONTAL
 DRAINAGE PIPING SHALL BE IN UNIFORM ALIGNMENT AT
 UNIFORM SLOPES.
  
 4. SHT P3.07 REVISIONS 3, 4, & 6 WERE NOT FOUND. SOME
 CHANGES FOUND ON THE PLAN HAVE NO CLOUDS OR REVISION
 NUMBERS. PLEASE CLOUD AND NUMBER ALL REVISIONS NOT
 PREVIOUSLY APPROVED AND SHUT OFF ALL REVISIONS
 PREVIOUSLY APPROVED TO AVOID CONFUSION AND HELP
 EXPEDITE THE REVIEW PROCESS.--WATER HAMMER
 ARRESTORS SHALL BE LOCATED NEAR THE FIXTURE IN AN
 "EFFECTIVE RANGE" NOT IN THE CEILING. PDI-WH 201 AND
 MANUF. INSTALLATION INSTRUCTIONS.--AIR CHAMBERS ARE
 NOT APPROVED. DELETE FROM THE SYSTEM. SECTION 604.9. --
 INFORMATIONAL: THE COOLING TOWERS USUALLY HAVE AN AIR
 GAP ON THE WATER SUPPLY AND THE BACKFLOW PREVENTORS,
 (4), ARE PROBABLY NOT REQUIRED. ALSO THE IRRIGATION
 LINE SHOULD BE LABELED AS SUCH SO AS TO PREVENT FUTURE
 CONNECTIONS FOR POTABLE WATER USE.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 12 Status P Date 2007-01-23 Cont ID  
Sent By kstevens Date 2007-01-23 Time 09:19 Rev Time 0.00
Received By kstevens Date 2007-01-23 Time 09:19 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 11 Status F Date 2006-11-01 Cont ID  
Sent By kstevens Date 2006-11-01 Time 06:19 Rev Time 0.00
Received By kstevens Date 2006-10-31 Time 13:51 Sent To  
Notes
2006-11-01 06:34:37DENIED
 REFERENCE:
 FBC-2001 PLUMBING
 FBC-2001 CHAPTER 1
 FBC-2001 FUEL GAS
  
 1. SHT P2.08 A CROSS CONNECTION IS SHOWN. KEY NOTES #8
 COLD WATER TO HOSE BIBB IN UNIT 'F2' CONNECTED TO THE
 STORM LINE. (INDICATED ON PREVIOUS REVIEW). - IDENTIFY
 NEW RWL RISERS AT COL. LINE P-20/P.H, BETWEEN COL. LINE
 P-20 BETWEEN COL. LINES P.G & P.H, COL LINE P-25 BELOW
 P.G, AND BETWEEN COL. LINES P-24/P-25& P.C/P.D.
 SECTION 104.2.1.
  
 2. SHT P2.10 FITNESS SINK SHOWN IN CABINET, BUT THE
 SANITARY PIPING HAS BEEN DELETED ON THE RISER DIAGRAM
 AND FLOOR PLAN. PLEASE CLARIFY. - KEY NOTES #18 ADD
 THIS REVISION WAS NOT FOUND. PLEASE CLARIFY. SECTION
 104.2.1.
  
 3. SHT P3.03 REVISION 4 NOT APPROVED AT THE BUILDING
 DRAIN, (8" 1/16"/FT SLOPE). OTHER SECTIONS OF THE
 BUILDING DRAIN SHOW 4" 1/4"/FT SLOPE, AND HORIZONTAL
 DRAINAGE PIPING SHALL BE INSTALLED IN UNIFORM ALIGNMENT
 AT UNIFORM SLOPES. SECTION 704.1.
  
 4. SHT P3.15 THIS SHEET WAS VOIDED IN ORDER TO ISSUE
 THE PERMIT FOR THE BUILDING. THE GAS PLANS WERE TO BE
 SUBMITTED SEPARATELY UNDER A SEPARATE GAS PERMIT. ALL
 REVISIONS TO THE GAS PLANS SHALL BE SUBMITTED UNDER THE
 GAS PERMIT NUMBER. (TO THIS DATE NO GAS PERMIT HAS BEEN
 ISSUED. THE GAS PERMIT HAS BEEN DENIED ON 4-12-06 AND
 HAS NOT BEEN PICKED UP BY THE CONTRACTOR TO ADDRESS
 COMMENTS. CONTRACTORS HAS BEEN CALLED 10-30-6 FOR
 P/U).
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 10 Status F Date 2006-10-30 Cont ID  
Sent By kstevens Date 2006-10-30 Time 18:54 Rev Time 0.00
Received By kstevens Date 2006-10-30 Time 18:54 Sent To  
Notes
2006-10-30 18:58:58 
 DENIED
  
 SUBMITTAL FOR GAS REGULATOR NOT APPROVED. NO LISTING
 SHOWN FOR REGULATOR. SECTION 410.1.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 9 Status P Date 2006-10-30 Cont ID  
Sent By kstevens Date 2006-10-30 Time 18:25 Rev Time 0.00
Received By kstevens Date 2006-10-30 Time 18:25 Sent To  
Notes
2006-10-30 18:41:18SUBMITTALS OK - POOL & SPA HEATERS. - ALL GAS
 APPLIANCES, REGULATORS ETC SHALL BE SUBMITTED WITH THE
 GAS APPLICATION.

Review Stop P PLUMBING
Rev No 8 Status F Date 2006-08-17 Cont ID  
Sent By kstevens Date 2006-08-17 Time 18:21 Rev Time 0.00
Received By kstevens Date 2006-08-17 Time 18:21 Sent To  
Notes
2006-08-17 00:00:00REVISION DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
  
 1. SHT P2.08 NO GAS PIPING SHOWN TO NEW
 SPA HEATER. - SHOWS WATER PIPING FOR
 HOSE BIBB CONNECTING TO STORM DRAINAGE
 AT UNIT F2. PLEASE CLARIFY. SECTION
 104.2.1.
  
 2. SHT P2.09 EMERGENCY DRAINS AT B1
 UNITS SHALL BE MINIMUM 5". ONE DRAINS
 2340SF AND THE OTHER DRAINS 2510SF AND
 BOTH SHOW 4". TABLE 1106.3.
  
 3. SHT P2.10 REVISION #6 NOT FOUND.
 PLEASE INDICATE WHERE REVISION CAN BE
 LOCATED. SECTION 104.2.1.
  
 4. SHT P3.13 RISER DIAGRAM DOES NOT
 REFLECT THE FLOOR PLAN. PLEASE INDICATE
 WHERE THE OFFSETS FOR THE "A" SECTION
 CAN BE LOCATED ON THE FLOOR PLANS. THE
 FIRST FLOOR DOES NOT REFLECT THE FLOOR
 PLAN NOR DOES THE SECOND FLOOR.
  
 5. SHT P3.15 THE FOLLOWING INFORMATION
 IS REQUIRED FOR THE GAS PERMIT:
  
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2004
 FUEL GAS CODE. **** NOT ALL CUT SECTIONS
 SHOW THE CORRESPONDING LENGTHS.
  
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED. **** INDICATE IF THE 3" PIPE
 WILL BE SCREW PIPE OR WELDED.
  
 C. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2004 FUEL GAS CODE SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU
 402.4(33). **** #13 INDICATES 1,050,000
 BTU'S BUT SUBMITTAL INDICATES 1,260,000
 BTU'S. CORRELATE SUBMITTALS AND RISER
 DIAGRAM INFORMATION. SECTION 104.2.1.
  
 D. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2004 FUEL
 GAS CODE SECTION 304.
  
 E. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2004 FUEL GAS CODE SEC 402.2. ****
 MANUF. SPECIFICATION SHEETS FOR POOL
 HEATERIN SUBMITTAL BOOK INDICATES A
 DIFFERENT POOL HEATER AND DIFFERENT
 BTU'S THAN SHOWN ON THE RISER DIAGRAM. -
 SUBMIT THE MANUF. SPEC'S FOR THE SPA
 HEATER. THE MANUF. SPEC'S FOR THE
 FIREPLACE SHOWS NO LISTING. SUBMIT
 MANUF. SPEC'S FOR THE MECH. GAS BOILER
 (#8). SUBMIT MANUF. SPECIFICATION SHEETS
 FOR BBQ GRILLS.
  
 F. SUBMIT THE MANUF. SPECIFICATION
 SHEETS FOR EACH GAS REGULATOR. SHOW
 LISTING FOR REGULATOR. INDICATE MODEL
 NUMBER.
  
 G. INDICATE MATERIAL FOR REGULATOR VENT
 LINES. NFPA 54 SECTION 5.6.4.
 5.6.4 PLASTIC PIPE, TUBING, AND
 FITTINGS. PLASTIC PIPE, TUBING, AND
 FITTINGS SHALL BE USED OUTSIDE
 UNDERGROUND ONLY .
  
 H. GAS CODE REFERENCE IS INFICATED AS
 FBC-2201 ON PLANS. PLEASE CORRECT TO
 FBC-2001 FUEL GAS CODE.
  
 I. SHUT OFF VALVE REQUIRED UPSTREAM OF
 THE REGULATORS. (SEE BBQ GRILLS).
 SECTION 410.2(5). A UNION IS REQUIRED
 BETWEEN SHUT OFF VALVE AND REGULATOR FOR
 THE POOL HEATERS.
  
 6. THREE SETS OF REVISIONS REQUIRED FOR
 REVIEW. (ONLY 2 SETS SUBMITTED).
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 805-6731
 E-MAIL [email protected]
  

Review Stop P PLUMBING
Rev No 7 Status N Date 2006-03-08 Cont ID  
Sent By kstevens Date 2006-03-08 Time 11:11 Rev Time 0.00
Received By kstevens Date 2006-03-08 Time 11:11 Sent To  
Notes
2006-03-08 00:00:00NO PLUMBING SHEETS SUBMITTED THIS
 REVISION.

Review Stop P PLUMBING
Rev No 6 Status P Date 2006-03-08 Cont ID  
Sent By kstevens Date 2006-03-08 Time 07:27 Rev Time 0.00
Received By kstevens Date 2006-03-04 Time 10:27 Sent To  
Notes
2006-03-08 00:00:00REFERENCE FBC-2001 PLUMBING
  
  
 REVISION OK
 SHTS
 P2.01, P2.01A, P2.02, P2.02A, P2.03 THRU
 P2.14, P3.01 THRU P3.06 P3.06A, P3.06B,
 P3.09 THRU P3.11 P3.13, P3.14 & P4.03
  
 REVISION DENIED
 SHT P3.12 OVERFLOW DRAIN PIPING NOT
 CORRECT IN SOME AREAS. PLEASE RECHECK
 PIPE SIZING AND RESUBMIT.
  
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 5 Status P Date 2005-12-06 Cont ID  
Sent By pschmitz Date 2005-12-06 Time 14:37 Rev Time 0.00
Received By pschmitz Date 2005-12-06 Time 14:36 Sent To  
Notes
2005-12-06 00:00:00REVISION
 SHTS
 P2.02,P2.02A,P2.04,P2.06,P2.08,P3.01,
 P3.02,P3.03,P3.14

Review Stop P PLUMBING
Rev No 4 Status P Date 2005-09-09 Cont ID  
Sent By kstevens Date 2005-09-09 Time 17:18 Rev Time 10.00
Received By kstevens Date 2005-09-08 Time 19:03 Sent To  
Notes
2005-09-09 00:00:00PASSED/PROVISO
  
 SHT AI-303 REVISION REQUIRED FOR
 ELEVATION #3 SHOWING THE FOLLOWING:
 11-4.24.2 HEIGHT
 11-4.24.4 SINK DEPTH
 11-4.24.5 CLEAR FLOOR SPACE - FORWARD
 APPROACH REQUIRED.
 11-4.24.6 EXPOSED PIPES & SURFACES
 11-4.24.7 FAUCETS
 SHT P2.10 REVISION REQUIRED FOR
 EMERGENCY (SECONDARY) STORM DRAINS.
 DRAINS SHALL SHOW THE S.F. FOR THE TOTAL
 AREA DRAINED TO EACH SECONDARY STORM
 DRAIN. (SEE RED LINE CORRECTIONS) -
 PRIMARY AND SECONDARY ROOF DRAINS
 REQUIRED FOR THE RECREATION DECK. ALSO
 SUBMIT STORM RISER DIAGRAMS AND STORM
 DRAIN ISOMETRIC.
 SHT P3.12 EMERGENCY STORM DRAIN
 COLLECTION ISOMETRIC. REVISION REQUIRED
 SHOWING CORRECT S.F. FOR EACH DRAIN AND
 CORRECT PIPE SIZING. (SEE RED LINE
 CORRECTIONS ON SET).
 SHT P3.15 VOIDED - SEPARATE GAS PLANS &
 PERMIT REQUIRED. MANUF. SPECIFICATION
 SHEETS REQUIRED FOR THE FIREPLACE (#5)
 AND THE BOILER (#8).
 SHT P4.03 REVISION REQUIRED, SOVENT
 SYSTEM SHALL BE DESIGNED PER DESIGN
 MANUAL #802 PER ENGINEER. (9-1-5)

Review Stop P PLUMBING
Rev No 3 Status F Date 2005-07-06 Cont ID  
Sent By kstevens Date 2005-07-06 Time 16:00 Rev Time 6.80
Received By kstevens Date 2005-07-06 Time 16:00 Sent To  
Notes
2005-07-06 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 BUILDING
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
 FHA-98 DESIGN MANUAL
 DESIGN MANUAL NO 101/0
 CITY CODE
  
 A. FROM PREVIOUS REVIEWS: COMMENT NUMBER
 TO REMAIN THE SAME TO AVOID CONFUSION.
  
 2. SHT A1-8 SHOW THE LOCATIONS FOR THE
 SECONDARY DRAINS PER SECTION 1107 AND
 ALL SUBSECTIONS. SHT A1.9 ALSO. THE
 INNER ROOF DRAINS THAT CAN NOT TRANSFER
 TO THE OUTER DRAINS THAT HAVE SECONDARY
 ROOF DRAINS SHALL HAVE SECONDARY ROOF
 DRAINS.
 18. SUBMIT CALCULATIONS SHOWING
 COMPLIANCE WITH SECTIONS
 11-4.26.3(2)(3)(4). CALCULATIONS SHALL
 BE SIGNED, SEALED, AND DATED, AND THE
 TITLE BLOCK SHALL INCLUDE THE PRINTED
 NAME AND LICENSE NUMBER OF THE ENGINEER
 SEALING THE DOCUMENT, AND THE
 CERTIFICATE OF AUTHROIZATION NUMBER OF
 THE ENGINEERING BUSINESS ON EACH SHEET.
 FAC 61G15-23.002(1)(2) & FS 471.025. NOT
 ALL INFORMATION REQUIRED IS ON EACH
 SHEET.
 25. SHT P2-10 INDICATE LOCATIONS FOR
 SECONDARY DRAINS/SCUPPERS FOR DECK AREA
 AROUND THE POOL. SECTION 1107. - THIS IS
 FOR THE ROOF DRAINS THAT CAN NOT
 TRANSFER TO THE OUTER DRAIN LOCATIONS
 WITH SCUPPERS, OR HAVE GUARD RAILS THAT
 LET THE DECK AREA DRAIN.
 33. SHT P3-15 THE FOLLOWING INFORMATION
 IS REQUIRED FOR THE GAS PERMIT:
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE. - SOME LENGTHS FROM THE
 METER TO THE FIRST RISER AFTER THE SLEVE
 STILL ARE NOT SHOWN. - ALSO THE NEW
 ISOMETRIC IS ONLY SHOWING 1 POOL HEATER,
 AND THE BTUS ONLY ADD UP TO 2,281,000,
 BUT THE NOTE STILL INDICATES A TOTAL OF
 4,550,000 BTUS. PLEASE CLARIFY. PLEASE
 CORRELATE ISOMETRIC WITH TOTAL BTUS
 INDICATED ON NOTES.
 E. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2001 FUEL
 CODE. NO RESPONSE NOTED FOR THE
 FIREPLACE. - ALSO CUT SHEET FOR BOILER
 NOT SUBMITTED.
 G. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2001 SECTIONS 502 THRU
 506. RESPONSE NOTED, BUT NO DETAIL FOR
 THE FIREPLACE HAS BEEN SUBMITTED.
 H. SUBMIT MANUF. SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, AND THE FBC-2001 FUEL
 GAS CODE SECTION 402.2. RESPONSE NOTED,
 BUT NO SUBMITTAL FOR THE BOILER FOUND IN
 SUBMITTALS, AND THE FIREPLACE SHOW NO
 LISTING FROM A RECOGNIZED TESTING
 AGENCY.
 7B. SHT P2-14 CALCULATIONS FOR ROOF
 DRAIN AREAS ADJACENT TO THE UPPER ROOFS
 OF THE MECHANICAL ROOM, STAIRWAYS, &
 ELEVATORS ARE NOT SHOWN AS BEING ADDED
 TO THE SF FOR THE SIZING OF PRIMARY ROOF
 DRAINS. PLEASE CLARIFY. SECTIONS 1104 &
 1107. RESPONSE NOTES ADDED CALCULATIONS
 ON SHEETS P2-14 & P2-15. NO P2-15 SHEETS
 WERE SUBMITTED. PLEASE CLARIFY.
 ***************NEW COMMENTS*************
 1C. SHT A2.3 DOOR SHALL NOT OPEN INTO
 THE CLEAR FLOOR SPACE OF ANY FIXTURE.
 SECTION 11-4.22.2
 2C. SHTS A0-7 & A2-3 A DRINKING FOUNTAIN
 IS REQUIRED PER TABLE 403.1.
 3C. SHT A2-11B SINK SHALL BE COMPLIANT
 WITH SECTION 11-4.24 AND "ALL
 SUBSECTIONS". PLEASE PROVIDE A DETAIL.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2005-02-19 Cont ID  
Sent By kstevens Date 2005-02-19 Time 06:16 Rev Time 16.78
Received By kstevens Date 2005-02-18 Time 18:55 Sent To  
Notes
2005-02-19 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 BUILDING
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
 FHA-98 DESIGN MANUAL
 DESIGN MANUAL NO 101/0
 CITY CODE
  
 A) FROM PREVIOUS REVIEW: THE COMMENT
 NUMBER WILL STAY THE SAME TO AVOID
 CONFUSION.
 2) SHT A1-8 SHOW THE LOCATIONS FOR THE
 SECONDARY DRAINS PER SECTION 1107 AND
 ALL SUBSECTIONS. NO RESPONSE NOTED
 3) SHTS A1-9, A1.13, & A1-14 SUBMIT
 CALCULATIONS FOR PRIMARY AND SECONDARY
 ROOF DRAINS PER SECTIONS 1106 & 1107 AND
 ALL SUBSECTIONS. SHOW SF FOR EACH AREA,
 1/2 AREA OF ALL VERTICAL WALLS,
 INCLUDING PARAPETS, AND ALL AREAS OF
 ROOFS DRAININ ON TO THE ROOF AREA FROM
 ABOVE. RESPONSE NOTED, BUT THE ROOF
 AREAS FROM THE MECHANICAL ROOM, STAIRWAY
 ROOFS, AND ELEVATOR ROOFS ARE NOT SHOWN
 ON THE AREAS WHERE THEY DRAIN.
 4) ALL UNITS SHALL BE DESIGNATED
 SPECIFICATION "A" OR "B" PER FHA DESIGN
 MANUAL PAGES 7.34 & 7.35. SHT A9-1 UNIT
 "I", AND SHT P-9-7 UNITS "P1", "P2", &
 "P3" DO NOT INDICATE SPECIFICATION "A"
 OR "B".
 10) SUBMIT CALCULATIONS FOR MIMIMUM
 FACILITIES FOR THE FIXTURE COUNT PER
 TABLE 403.1. SHOW THE SF FOR EACH AREA
 OF THE COMMON AREA. NOT ALL AREAS OF THE
 COMMON AREA ARE SHOWING THE SF AND THE
 CALCULATIONS WERE NOT FOUND. PLEASE
 CLARIFY. SECTION 104.2.1.
 11) SHT A2-11 MENS AND WOMENS TOILET
 ROOM. THE ACCESSIBLE STALL SHALL COMPLY
 WITH THE CONFIGURATION SHOWN ON FIG. "E"
 TOILET STALL NEW CONSTRUCTION. STALL
 SHALL HAVE A LAV LOCATED IN IT. "IF
 TOILET ROOMS ARE PROVIDED, THEN EACH
 PUBLIC AND COMMON USE TOILET ROOM SHALL
 COMPLY WITH 11-4.22. (SECTIONS
 11-4.1.3(11), 11-4.22.4, 11-4.17.3, AND
 FIG. 30E PAGE 11.77.
 12) SHT A2-11 SHOW CLEAR FLOOR SPACE FOR
 W/C'S, URINAL, LAVS, AND DRINKING
 FOUNTAIN PER SECTIONS 11-4.15, 11-4.16,
 11-4.18, & 11-4.19. RESPONSE NOTED, BUT
 NO CLEAR FLOOR SPACE SHOWN.
 13) THE FLOOR PLAN FOR THE 6TH FLOOR IS
 NOT COMPLETE. ONLY ONE SECTION OF THE
 FLOOR IS SUBMITTED. SECTION 104.2.1.
 RESPONSE NOTED, BUT A 1/4" SCALE SHOWING
 CLEAR FLOOR SPACE FOR THE AMMENITIES IS
 NOT FOUND. PLEASE CLARIFY.
 17) SHT A5-7 PLANS SHALL BE ROUTED TO
 THE PBC HEALTH UNIT FOR REVIEW. (SEE THE
 BAR) SECTION 101.4.7. RESPONSE NOTED,
 BUT THE PLANS SHALL BE STAMPED PRIOR TO
 RESUBMITTING TO WPB FOR PLAN REVIEW.
 18) SUBMIT CALCULATIONS SHOWING
 COMPLIANCE WITH SECTIONS
 11-4.26.3(2)(3)(4). RESPONSE NOTED, BUT
 CALCULATIONS SHALL BE
 SIGNED/SEALED/DATED AND THE TITLE BLOCK
 SHALL INCLUDE THE PRINTED NAME AND
 LICENSE NUMBER OF THE ENGINEER SEALING
 THE DOCUMENT, AND THE CERTIFICATE OF
 AUTHORIZATION NUMBER OF THE ENGINEERING
 BUSINESS ON EACH SHEET.
 FAC 61G15-23.002(1)(2) & FS 471.025
 25) SHT P2-10 INDICATE LOCATIONS FOR
 SECONDARY DRAINS/SCUPPERS FOR DECK AREA
 AROUND THE POOL. SECTION 1107. RESPONSE
 NOTED, BUT THESE ARE NOT SHOWN BY THE
 ARCHITECT ON SHT A1-9 (I WILL MAKE NEW
 COMMENT FOR SHT A1-9).
 26) SHT P3.09 ALL UNITS, KEY NOTES #4.
 CONDENSATE SHALL DRAIN SEPARATELY OUT OF
 THE BUILDING TO THE STORM LINES, CATCH
 BASIN, OR APPROVED DRYWELL, NOT INTO THE
 SANITARY SYSTEM. CITY CODE SECTION
 90-125(B)(5). RESPONSE NOTED, BUT THE
 P/T, PAN DRAIN AND THE THERMAL EXPANSION
 VALVE DISCHARGE SHALL DRAIN TO SANITARY,
 AND THE CONDENSATE SHALL DISCHARGE
 SEPARATELY TO THE PROPER DISPOSAL SITE.
 33) SHT P3-13 THE FOLLOWING INFORMATION
 IS REQUIRED FOR THE GAS PERMIT:
 A) SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGHTS PER FBC-2001
 FUEL GAS CODE. RESPONSE NOTED, BUT SOME
 LENGTHS FROM THE METER TO THE FIRST
 RISER AFTER THE SLEEVE ARE NOT SHOWN.
 ALSO 3" PIPE IS REQUIRED UP TO THE FIRST
 BOILER FOR THE POOL. (SEE RED LINE
 CORRECTIONS ON ISOMETRIC ONE SET OF
 PLANS).
 E) SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE ) PER FBC-2001 FUEL
 GAS CODE SECTION 304. NO RESPONSE NOTED.
 G) SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2001 FUEL GAS CODE
 SECTS. 502 THRU 506. NO RESPONSE NOTED.
 H) SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, AND THE FBC-2001 FUEL
 GAS CODE SECTION 402.2. NO RESPONSE
 NOTED.
 34)SHT P3.13, (CHANGED TO P3.15) KEY
 NOTES #5. GAS APPLIANCE NOT SHOWN PLANS.
 PLEASE CLARIFY. SECTION 104.2.1.
 RESPONSE NOTED, BUT IT SEEMS AS IF THE
 PIPING FOR THIS APPLIANCE IS ATTACHED TO
 THE VENT FOR THE BOILERS FOR THE POOL.
 PLEASE CLARIFY.
 35) SHT P4.01 GENERAL NOTES #'S 5 & 6,
 CLARIFY WHAT KITCHEN AND LAUNDRY AND
 WHAT THESE ARE FOR? SECTION 104.2.1.
 RESPONSE NOTED, BUT WHERE ARE THE
 KITCHEN AND LAUNDRY REFERED TO? ARE THEY
 COMMON USE OR IN A UNIT? PLEASE CLARIFY.
 *****************NEW COMMENTS***********
 1B)SHT A9.2 UNITS "C" AND "E" CLEAR
 FLOOR SPACE IS REQUIRED FOR BOTH LAVS
 AND BOTH LAVS SHALL BE CENTERED ON THE
 CLEAR FLOOR SPACE 48" DIMENSION IN EACH
 UNIT. SPECIFICATION "A" IS FOR ALL
 FIXTURES. PAGE 7.35 FHA-98 DESIGN MANUAL
 2B) SHT A9.3UNIT "D1" SHOW CLEAR FLOOR
 SPACE FOR THE SHOWER. ALL CFS FOR
 SHOWERS SHALL BE PARALLEL TO THE SHOWER
 AND FLUSH WITH THE CONTROL WALL PER PAGE
 7.56 PARAGRAPH #2. BOTH LAVS SHALL SHOW
 THE CLEAR FLOOR SPACE AND BE CENTERED ON
 THE 48" DIM. OF THE CFS. SPEC. "A"
 3B) SHT A9.4 UNIT "F2" BOTH LAVS TO SHOW
 CLEAR FLOOR SPACE & BE CENTERED ON THE
 48" DIMENSION. SPECIFICATION "A" - UNIT
 "B" WHICH BATHROOM SHALL COMPLY? BOTH
 SHOW CLEAR FLOOR SPACE. SPECIFICATION
 "B".
 4B) SHT A9.5 UNIT "H" WHICH BATHROOM
 SHALL COMPLY? BOTH SHOW CLEAR FLOOR
 SPACE. - UNIT "G' BOTH LAVS SHALL SHOW
 THE CLEAR FLOOR SPACE AND BE CENTERED ON
 THE 48" DIMENSION. SPECIFICATION "A".
 THE CLEAR FLOOR SPACE FOR THE SHOWER
 SHALL BE PARALLEL TO THE SHOWER AND BE
 FLUSH WITH THE CONTROL WALL. PAGE 7.56
 PARAGRAPH #2
 5B) SHT P9.7 SHOWER CLEAR FLOOR SPACE
 SHALL BE PARALLEL AND BE FLUSH WITH THE
 CONTROL WALL. PAGE 7.56 PARA. #2
 6B) SHT P2.01A IS NOT INSERTED IN ORDER.
 AFTER P2.02. SECTION 104.2.1.
 7B) SHT P2.14 CALCULATIONS FOR ROOF
 DRAIN AREAS ADJACENT TO THE UPPER ROOFS
 OF THE MECHANICAL ROOM, STAIRWAYS, &
 ELEVATORS ARE NOT SHOWN AS BEING ADDED
 TO THE SF FOR SIZING PRIMARY ROOF
 DRAINS. PLEASE CLARIFY. SECTIONS 1106 &
 1107.
 8B) SHT P2.14 ALL (25) INTERNAL ROOF
 AREAS HAVE NO SECONDARY ROOF DRAINS AS
 REQUIRED IN SECTION 1107. PLEASE CLARIFY
 9B) SHT P3.13 DRAINAGE FITTINGS SHALL BE
 INSTALLED TO GUIDE STORM WATER IN THE
 DIRECTION OF FLOW. SECTION 706.3. A
 COUPLE FITTINGS FROM BRANCH LINES TO
 BLDG STORM DRAIN ARE SHOWN INCORRECTLY.
 10B) SHT P3.15 GAS PIPING, IF THE 3" GAS
 PIPE IS WELD PIPE, THE CERTIFICATION AND
 PICTURE I.D. OF THE PERSON WELDING THE
 PIPE, AND THE WELD PROCEEDURE ARE
 REQUIRED AT THE TIME OF APPLICATION.
 PLEASE INDICATE IF THE PIPE WILL BE WELD
 PIPE OR THREADED PIPE. SECTION 104.2.1.
 11B) SHT P3.02 BUILDING SANITARY DRAIN
 ISOMETRIC SHOWS 8" PIPE, REDUCING TO 6"
 UPSTREAM OF RISER "C", THEN INCREASING
 BACK TO 8" THRU DOWNSTREAM OF RISER "H",
 ONLY TO REDUCE TO 6". THEN INCREASING TO
 8" PRIOR TO CHANGING DIRECTION ONLY TO
 REDUCE TO 6" THERE AFTER. PLEASE
 CLARIFY. PIPING SHALL NOT REDUCE IN SIZE
 IN THE DIRECT OF FLOW. SECTION 704.2.
 12B) ALL SOVENT FITTINGS SHALL BE
 APPROVED BY AN APPROVED TESTING AGENCY
 AND WILL BE INSPECTED FOR THIS AT THE
 TIME OF INSTALLATION.
 13B) PLANS HAVE CHANGED SO THAT
 INFORMATION ON ONE SHEET 1ST REVIEW IS
 LOCATED ON ANOTHE SHEET 2ND REVIEW. THE
 ORIGINAL SHEETS WERE NOT RESUBMITTED FOR
 COMPAIRSON SO MORE COMMENTS MAY FOLLOW.
 WHEN RESUBMITTING FOR THE 3RD REVIEW,
 SUBMIT A COPY OF ORIGINAL PLANS AND A
 COPY OF PLANS SUBMITTED FOR 2ND REVIEW
 TO HELP EXPEDITE THE REVIEW PROCESS.
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. THANK
 YOU FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2004-12-21 Cont ID  
Sent By kstevens Date 2004-12-21 Time 11:20 Rev Time 22.00
Received By kstevens Date 2004-12-18 Time 14:58 Sent To  
Notes
2004-12-21 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
 FBC-2001 CHAPTER 11
 FLORIDA ADMINISTRATIVE CODE
 FLORIDA STATUTES
 FHA-98 DESIGN MANUAL
 DESIGN MANUAL NO. 101/0
 CITY CODE
  
 1) PLANS SHALL BE SIGNED, SEALED, &
 DATED AS REQUIRED BY FAC 61G1-16.003, &
 FAC 61G15-23.002. FS 481.2055 & FS
 471.025. THIS IS REQUIRED FOR ALL
 SHEETS
 SUBMITTED FOR PUBLIC RECORD, SECTION
 104.2.2.
 2) SHT A1-8 SHOW THE LOCATIONS FOR THE
 SEDCONDARY DRAINS PER SECTION 1107 AND
 ALL SUBSECTIONS.
 3) SHTS A1.9, A1-13, & A1-14 SUBMIT
 CALCULATIONS FOR PRIMARY AND SECONDARY
 ROOF DRAINS PER SECTIONS 1106, & 1107
 AND ALL SUBSECTIONS. SHOW SQUARE
 FOOTAGE
 FOR EACH AREA AND SHOW 1/2 AREA OF ALL
 VERTICAL WALLS, INCLUDING PARAPETS, AND
 ALL AREAS OF ROOFS DRAINING ON TO THE
 ROOF FROM ABOVE.
 4) ALL UNITS SHALL BE DESIGNATED
 SPECIFICATION "A" OR "B" PER FHA DESIGN
 MANUAL PAGES 7.34 & 7.35.
 5) SHT A2.0 UNIT G NO CLEAR FLOOR SPACE
 SHOWN IN THE BATHROOM. SEE PAGE 7.43
 PARAGRAPH 1.
 6) SHT A2.1 UNIT TH-2 NO CLEAR FLOOR
 SPACE SHOWN IN THE POWDER ROOM. PAGE
 7.43.
 7) SHT A2.2 ALL UNITS NO CLEAR FLOOR
 SPACE SHOWN IN THE POWDER ROOM. SEE
 PAGE
 7.43.
 8) SHT A2.3 UNIT B1 CLEAR NO FLOOR
 SPACE
 FOR THE KITCHEN SHOWN ON PLANS. SEE
 PAGES 7.3, 7.4, 7.5, & 7.6.
 9) SHT A2.3 NO CLEAR FLOOR SAPCE AND
 TURNING AREA ARE SHOWN IN THE MENS AND
 WOMENS TOILET ROOMS. SECTION 11-4.22.3
 10) SUBMIT CALCULATIONS FOR MINIMUM
 FACILITIES FOR THE FIXTURE COUNT PER
 TABLE 403.1 SHOW THE SQUARE FOOTAGE FOR
 EACH AREA OF THE COMMON AREA. (ADMIN,
 RECPTION DESK, MAIR ROOM, PACKAGE ROOM
 ECT.).
 11) SHT A2-11 MENS & WOMENS TOILET
 ROOM,
 THE ACCESSIBLE STALL SHALL COMPLY WITH
 THE CONFIGURATION SHOWN ON FIG "E"
 "TOILET STALL NEW CONSTRUCTION". STALL
 MUST HAVE A LAV LOCATED IN IT.
 12) SHT A2-11 SHOW CLEAR FLOOR SPACE
 FOR
 THE W/C'S, URINAL, AND LAVS PER
 SECTIONS
 11-4.16.2, 11-4.18.3, & 11-4.19.3.
 13) THE FLOOR PLAN FOR THE 6TH FLOOR IS
 NOT COMPLETE. ONLY ONE SECTION ON THE
 FLOOR IS SUBMITTED. SECTION 104.2.1.
 14) SHT A2-12 UNIT B1 CLEAR FLOOR SPACE
 FOR THE KITCHEN NOT SHOWN. PAGES 7.3,
 7.4, 7.5, & 7.6.
 15) SHTS A-2.14 THRU A2-17, SHOW
 SECONDARY DRAINS FOR THE TERRACES PER
 SECTION 1107.
 16) SHT A2-17 SHOW CLEAR FLOOR SPACE
 FOR
 KITCHEN FIXTURES. PAGES 7.3 THRU 7.6.
 17) SHT A5-7 PLANS SHALL BE ROUTED TO
 THE PBC HEALTH UNIT FOR REVIEW. (SEE
 THE
 BAR) SECTION 101.4.7.
 18) SHTS A8-3 & A9-0 PLEASE CLARIFY -
 BACKING GUAGE FOR TYPICAL GRAB BAR &
 UNIT PLAN NOTES (A9-0) INDICATES 16
 GUAGE, BUT TYPICAL ACCESSIBLE TOILET
 DETAIL INDICATES 20 GUAGE. - SUBMIT
 CALCULATIONS SHOWING COMPLIANCE WITH
 SECTIONS 11-4.26.3(2)(3)(4).
 19) SHT P1.01 PLUMBING DRAWING INDEX
 DRAWING #P1.01 STATES "ELECTRIC PLAN.
 PLEASE CLARIFY. SECTION 104.2.1
 20) SHT P2.01 SHOWER NEAR S/3 NOT
 VENTED. - THE TUB NEAR S7 NOT VENTED. -
 SHOWER NEAR S/6 BIT VEBTED. SECTION
 901.2.1.
 21) SHT P2.01 KITCHEN SINK NOT APPROVED
 IN THE WET VENT. SECTION 909.1 UNIT I
 22) SHT P2.01NO BRANCH LINE TO D/7
 ON
 THE PLANS. SECTION 104.2.1.
 23) SHT P2.01 WATER CLOSET NOT APPROVED
 UPSTREAM OF STACK S/31. DESIGN MANUAL
 101/0.
 24) SHT P2.02 4" PAD TO DRAIN INTO
 STORM, NOT CONDENSATE SYSTEM.
 25) SHT P2.10 INDICATE LOCATIONS FOR
 SECONDARY DRAINS/SCUPPERS FOR DECK AREA
 AROUND POOL. SECTION 1107.
 26) SHT P3.09 ALL UNITS, KEY NOTES #4
 CONDENSATE SHALL DRAIN SEPARATELY OUT
 OF
 THE BUILDING TO THE STORM LINES, CATCH
 BASIN, OR APPROVED DRYWELL, NOT INTO
 THE
 SANITARY SYSTEM. CITY CODE SECTION
 90-125(B)(5).
 27) SHT P3.08 UNIT "H" WATER ISOMETRIC,
 NO UNIT "H" FLOOR PLAN LOCATED. PLEASE
 CLARIFY. SECTION 104.2.1. KEY NOTES #4
 CITY CODE SECTION 90-125(B)(5)
 CONDENSATE SHALL NOT DRAIN INTO THE
 SANITARY SYSTEM.
 28) SHT P3.09 UNIT "E"W/C MISSING. -
 UNIT "D2" NO WASH MACHINE, AND AN EXTRA
 SHOWER. - UNIT "D1" SHOWER MARKED AS
 THB
 AND EXTRA LAV. MISSING A LAV IN TUB
 BATH
 SECTION 104.2.1.
 29) SHT P3.10 KEY NOTES #4 CONDENSATE
 SHALL NOT DRAIN INTO THE SANITARY. CITY
 CODE SECTION 90-125(B)(5).
 30) SHT P3.11 8" REQUIRED ON BRANCH
 LINE
 DOWNSTREAM OF THE 8" 9040 SF AND
 UPSTREAM OF THE 10" 14707SF. TABLE
 1106.3.
 31) SHT P3.11 WHERE DOES RWL #2 CONNECT
 TO THE SYSTEM? SECTION 104.2.1.
 32) SHT P3.11 AT THE BASE OF RWL #15,
 UPSTREAM OF 12" BUILDING STORM DRAIN
 LINE 12" (18360 SF) SHOWS 10"
 DOWNSTREAM
 OF 12" (16940 SF). PLEASE CLARIFY.
 SECTION 104.2.1 & SECTION 704.2.
 33)SHT P3.13 THE FOLLOWING INFORMATION
 IS REQUIRED FOR THE REQUIRED GAS
 PERMIT:
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE IF BEING
 USED.
 C. TYPE OF GAS, (LP OR NATURAL)
 D. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34).
 E. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2001 FUEL
 GAS CODE SECTION 304.
 F. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 G. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2001 FUEL GAS CODE
 SECS. 502 THRU 506.
 H. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 I. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 J. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 34) SHT P3.13 KEY NOTES #5 NOT SHOWN ON
 PLANS. PLSEAS CLARIFY. SECTION 104.2.1.
 35) SHT P3.13 NFPA 54 NOT ADOPTED. PIPES
 SHALL BE SIZED BY FBC-2001 FUEL GAS CODE
 TABLES.
 36) SHT P4.01 GENERAL NOTES #'S 5 & 6,
 CLARIFY WHAT KITCHEN AND LAUNDRY, AND
 WHAT THESE ARE FOR? SECTION 104.2.1.
 37) SHTS P3.01 & P3.02 INDICATE ALL PIPE
 SIZES AND SHOW DFU'S AS THEY ACCUMULATE
 IN THE BLDG DRAIN. SECTION 104.2.1 AND
 TABLE 710.1(1).
 38) SHT P3.02 FIRST RISER AND LAST RISER
 (I), INDICATE WHERE THEY CONNECT TO THE
 BUILDING DRAIN. SECTION 104.2.1.
 39) SHT P3.03 IDENTIFY ALL RISERS AND
 SHOW WHERE THEY CONNECT TO THE BUILDING
 DRAIN. SECTION 104.2.1.
 40) SHT P3.04 SANITARY RISERS ARE
 MISSING. PLEASE SUBMIT A SANT. RISER FOR
 EACH NUMBER SHOWN ON THE SANT. BLDG.
 DRAIN ISOMETRIC SHOWN ON SHT P3.01.
 41) AN RPZ BACKFLOW IS REQUIRED ON THE
 WATER SERVICE TO THE BLDG. SECTION
 608.13.2.
 42) THERMAL EXPANSION CONTROL IS
 REQUIRED PER SECTION 607.3.2.
 43) SUBMIT A CONDENSATE RISER DIAGRAM.
 SECTION 104.2.1.
 44) SEPARATE PERMITS ARE REQUIRED FOR
 THE GAS SYSTEM AND THE IRRIGATION
 SYSTEM
 45) PLANS DO NOT APPEAR TO BE COMPLETE
 AT THIS TIME, AND MORE COMMENTS MAY
 FOLLOW AFTER THE RESPONSES FROM THESE
 COMMENTS ARE ADDRESSED.
 WHEN RESUBMITTING PLANS PLEASE INDICATE
 THE REVISION & REMOVE & REPLACE ANY
 PAGES AS NECESSARY. A TRANSMITTAL LETTER
 LISTING THE ORIGINAL REVIEW COMMENT NUM-
 BER, WITH A DESCRIPTION OF THE REVISION
 MADE, IDENTIFYING THE SHEET OR SPECIFICA
 TION PAGE WHERE THE CHANGES CAN BE FOUND
 WILL HELP TO EXPEDITE YOUR PERMIT. THANK
 YOU FOR YOUR ANTICIPATED COOPERATION.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop Z ZONING
Rev No 8 Status P Date 2007-07-03 Cont ID  
Sent By mflis Date 2007-07-03 Time 11:53 Rev Time 0.00
Received By mflis Date 2007-07-03 Time 11:53 Sent To  
Notes
2007-07-03 11:54:25ZONING REVIEW: PASSED
  
 * REVISION TO SITE PLAN - ADDITIONAL DRIVE
 * REVISIONS TO PLANS TO REMOVE / RESTRIPE SOME PARKING
 SPACES
 * ARCH REVISIONS TO STOOPS/STAIRS AT WALK-UPS
  
 MATT FLIS - 822-1445

Review Stop Z ZONING
Rev No 7 Status P Date 2007-06-28 Cont ID  
Sent By mflis Date 2007-06-28 Time 11:39 Rev Time 0.00
Received By mflis Date 2007-06-28 Time 11:39 Sent To  
Notes
2007-06-28 11:40:10ZONING REVIEW: PASSED
  
 * REVIEW INCLUDES HANDWRITTEN MODIFICATION BY LANDSCAPE
 ARCHITECT
  
 MATT FLIS - 822-1445

Review Stop Z ZONING
Rev No 6 Status N Date 2007-05-10 Cont ID  
Sent By mflis Date 2007-05-10 Time 08:47 Rev Time 0.00
Received By mflis Date 2007-05-10 Time 08:47 Sent To  
Notes
2007-05-10 08:47:50ZONING REVIEW: NOT REQUIRED
  
 * INTERIOR WORK ONLY / RCP; NO ZONING CHECK REQ'D
  
 MATT FLIS - 822-1445

Review Stop Z ZONING
Rev No 5 Status F Date 2007-04-25 Cont ID  
Sent By aaponte Date 2007-04-25 Time 08:48 Rev Time 0.00
Received By aaponte Date 2007-04-25 Time 08:48 Sent To  
Notes
2007-04-25 08:58:01TRASH ENCLOSURE SHALL MEET CITY STANDARDS. ZONING AND
 LAND DEVELOPMENT REGULATIONS, ARTICLE XIV SECTION
 94-444-FIGURE XIV-3.

Review Stop Z ZONING
Rev No 4 Status P Date 2006-06-30 Cont ID  
Sent By aaponte Date 2006-06-29 Time 14:43 Rev Time 0.00
Received By aaponte Date 2006-06-29 Time 14:43 Sent To  
Notes
2006-06-30 00:00:00PROVISO:
 FINAL CO SHALL NOT BE ISSUED UNTIL STAIR
 ENCROACHINGLANDSCAPE TREATMENT AREA IS
 RELOCATED OF VARIANCE APPROVAL IS
 GRANTED BY DAC.

Review Stop Z ZONING
Rev No 3 Status P Date 2005-07-22 Cont ID  
Sent By aaponte Date 2005-07-22 Time 14:28 Rev Time 0.00
Received By aaponte Date 2005-07-20 Time 14:49 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2005-02-28 Cont ID  
Sent By aaponte Date 2005-02-28 Time 12:00 Rev Time 0.00
Received By aaponte Date 2005-02-28 Time 12:00 Sent To  
Notes
2005-02-28 00:00:001. FIRST FLOOR RESIDENTIAL UNITS SHALL
 BE RAISED 18" ABOVE SIDEWALK LEVEL.
 2. THE SPECIAL LANDSCAPE TREATMENT AREA
 (SLTA) SHALL BE MINIMUM 25' CLEAR FROM
 THE CURB. AN INTRUSION OF4' IS ALLOWED
 ACCORDING TO DRAWINGS APPROVED BY DAC.
 3. ALL SIDEWALKS SHALL BE 8' CLEAR.
 PLEASE ADJUST SIDEWALK ON CLEARLAKE
 DRIVE AND THE SIDEWALK LEADING TO THE
 BUILDING ENTRANCE.
 4.PARKING GARAGE ELEVATION SHALL BE
 DETAILED CONSISTENT WITH THE OVERALL
 BUILDING DESIGN (PROPORTIONS).
 5.PLEASE PROVIDE A TABLE SHOWING THE
 AMOUNT OF GLAZED AREA ON EACH FACADE TO
 CONFIRM COMPLIANCE WITH DAC APPROVAL.
 6.LIVE OAKS ON THE BUILDING ENTRANCE
 WILL BLOCK THE VIEW. WE RECOMMEND
 CHANGING THE SPECIE TO DAHOON HOLLY
 (SMALLER TREE).

Review Stop Z ZONING
Rev No 1 Status P Date 2006-11-13 Cont ID  
Sent By aaponte Date 2004-12-22 Time 12:12 Rev Time 0.00
Received By aaponte Date 2004-12-22 Time 12:12 Sent To  
Notes
2004-12-22 00:00:001. FIRST FLOOR RESIDENTIAL USE SHALL BE
 RAISED ABOVE SIDEWALK LEVEL A MINIMUM OF
 18 INCHES.
 2. THE SPECIAL LANDSCAPE TREATMENT AREA
 (SLTA) SHALL BE MINIMUM 25 FEET WITH A 4
 FEET INTRUSION ACCORDING WITH DAC
 APPROVAL. THE SUBMITTED DRAWINGS ARE
 SHOWNING SOME AREAS WITH LESS THAN 21
 FEET OF SLTA.
 3.PARKING GARAGE ELEVATION SHALL BE
 DETAILED CONSISTENT WITH THE OVERALL
 BUILDING DESIGN. PLEASE UTILIZE VERTICAL
 ELEMENTS AND DECORATIVE FEATURES ON THE
 AUSTRALIAN AVENUE ELEVATION.
 4. PLEASE PROVIDE A TABLE SHOWING THE
 AMOUNT OF GLAZED AREA ON EACH FACADE TO
 CONFIRM COMPLIANCE WITH DAC APPROVAL.
 5.THE FIVE STORY BUILDING SHALL
 MAINTAINS THE RECESSED ELEVATION
 APPROVED BY DAC.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved