| Miscellaneous Information / Notes |
| NEW SINGLE FAMILY RESIDENCE |
| |
| |
| |
| |
| |
| 11-18-08 DAVID MAC DONALD PICKUP BLDG REV (DATED |
| 11-7-08) WL |
| 11/13/2008 CALLED CUSTOMER LEFT MESSAGE APPROVED |
| BLDG REVISION THAT WAS SBUMITTED ON 11/07/2008 IS |
| READY FOR P/U FILED UNDER "D" MMILLER |
| 11/13/8 TO MM DESK SMH |
| 11/7/08 BLDG REV PRODUCT APPROVAL THAT WERE NEVER |
| SUBMITTED $60 SEW |
| 10/30/08 DAVID MACDONALD P/U BLDG SUBMITTAL DATED |
| 10-24-08 & PLUMB REV DATED 10-29-08 & DENIED BLDG |
| SUMBITTAL DATED (10-29-08) WL |
| 10/30/08 RECIEVED SITE SPECIFIC BACK FROM ROBERT |
| BROWN AM |
| 10/30/08 BUILDING SUBMITTAL FROM 10/24/08 TO |
| ROBERT BROWN FOR SITE SPECIFIC DETERMINATION AM |
| 10/30/8 TO MM DESK SMH |
| 10-30-08 CALLED FOR P/U OF PLMG REVISION AND |
| TALKED TO DAVE M. INDICATING THAT THE REVISION WAS |
| APPROVED AND THAT THE SUBMITTAL FOR THE DRAINS |
| WERE DENIED. INFORMED DAVE THAT THE BLUE CARD OR |
| RECIEPT WAS REQUIRED TO RETRIEVE THE REVISION. "D" |
| KSTEVENS |
| 10/29/09 PLUMBING REV $60 ROUTED TO |
| MPERSON/KSTEVENS SEW |
| 10/24/08 BLDG SUBMITTAL ADDRESSING PREVIOUS DENIED |
| COMMENT (NO FEE PER RREGUEIRO) SEW |
| 10-20-08 DAVID MAC DONALD PICKUP BLDG REV (DATED |
| 10-10-08) WL |
| 10/17/08 CALLED P/U REVISION UNDER "D" AM |
| 10-14-08 DAVID MAC DONALD PICKUP LANDSCAPING |
| SUBMITTAL (DATED 7-29-08) WL |
| 10-14-08 DAVID MAC DONALD PICKUP RESTAMP WL |
| 10/11/08 CALLED P/U RESTAMP UNDER "D" ****LARGE |
| BINS**** AM |
| 10/10/08 GAS REV # 13 PU BY MARK UNDER PERMIT # |
| 07080307 SEW |
| 10/10/2008 BLDG REVISION # 15 FEES $ 70.00 MMILLER |
| 10/10/2008 BLDG REVISION #14 FEES $ 70.00 MMILLER |
| 10/07/2008 GAS REVISION # 13 FEES $ 70.00 MMILLER |
| 10/6/08 PLANS FOR RESTAMP/AMM |
| 8/14/08 PLBG/REV P/U BY DAVID, MRPERSON. |
| 8/12/08 PLBG/REV DENIED, FEES OWED $60.00, CALLED |
| CONTR. FOR P/U UNDER "D" SPOKE TO DAVID, |
| MRPERSON. |
| 8/7/08 PLUMBING SUBMITTAL REQUESTED BY DAVID |
| BISHIP SEW |
| 8/7/08 PU BY DAVID SEW |
| 8/5/08 - LANDSCAPE PLAN PASSED. CALLED CUSTOMER |
| FOR P/U. FILED UNDER D. ~MC |
| 7/29/08 - LANDSCAPE PLANNER FAILED, CALLED |
| CUSTOMER FOR P/U. FILED UNDER D. ~MC |
| 07/23/08 SENT TO MC---RAK |
| 07/18/2008 APPROVED BUILDING SUBMITTAL THAT WAS |
| SUBMITTED ON 07/15/2008 WAS P/U BY DAVID |
| 7/17/08 CALLED P/U REVISION UNDER "D" AM |
| 7/14/08 BLDG/ZONING SUBMITTAL NO FEE SLS |
| 07/10/2008 DENIED BLDG REVISION THAT WAS SUBMITTED |
| ON 06/2008 WAS P/U BY DAVID BLDG MMILLER |
| 07/10/2008 DENIED ZONING REVISION THAT WAS |
| SUBMITTED ON 06/20/2008 WAS P/U BY RICK MMILLER |
| 07/10/2008 APPROVED RESTAMP THAT WAS SUBMITTED ON |
| 06/20/2008 WAS P/U BY RICK MMILLER |
| 6/28/08 CALLED P/U RESTAMP AND REVISION UNDER "D" |
| AM |
| 6/24/08 - L/S REV. FAILED AGAIN, CALLED DAVID TO |
| P/U. FILED UNDER "D". CJH |
| 6/20/08 BLDG REVISION PRODUCT APPROVALS $80 SLS |
| 6/20/08 RESTAMP OF PLANS $25 SLS |
| 6/20/08 LANDSCAPE REVISION SUBMITTED $70 SLS |
| 6/12/08 LANDSCAPE REVISION P/U BY ASHLEY SLS |
| 6/10/08 - L/S REV. FAILED, CALLED DAVID TO P/U, |
| FILED UNDER "D". CJH |
| 6/6/08 DUPLICATE PERMIT CARD SUBMITTAL $25 SLS |
| 6/5/08 LANDSCAPE REV $60 SEW |
| 2-20-08 DAVID MAC DONALD PICKUP MECH REV WL |
| 2-15-08 P MECH/REV. LEFT MSG. P/U "D" TG. |
| 2/14/08 MECH REV ADDRESSED DENIED REVISION |
| COMMENTS $80 SEW |
| 2/7/08 PU BY DAVID SEW |
| 2-6-08 F MECH/REV. TO PLAN CALLED FRED P/U "D" |
| TG. |
| 2/6/08 PAID FEES OVER PHONE E-CAL'S REV PU BY |
| DAVID SEW |
| 2/5/08 P REV. TO E-CAL'S. CALLED DAVID P/U "D" |
| OWES $45 SPALMER |
| 2/5/08 MECH REV $80 SPALMER |
| 2/5/08 RESTAMP ENERGY CALCS $25 SPALMER |
| 12/3/07 DENIED MECH REV #5 P/U BY FRED AJP |
| 11-30-07 F MECH/REV. CALLED FRED P/U "A" TG. |
| 11-2107 REV #5 $80 MECH "DUCTWORK LOCATION & EQUIP |
| RELOCATE" WL |
| 11/13/07 APPROVED REV (BLDG/EL/PLB/MECH) P/U BY |
| TIM AJP |
| 11-7-07 P BUILD/ELECT. REV. LEFT MSG. P'U "D" TG. |
| 10/17/07 BLDG ELEC PLUMB AS BUILTS REV $110 |
| SPALMER |
| 10/01/07 APPROVED BLDG REV. P/U BY TIM AJP 9/25/07 |
| SUBMITTAL IS REVISION OF ORIGINAL PRODUCT APPROVAL |
| FEE OF $60.00 DUE/CALLED P/U UNDER "D" |
| AM |
| 9/24/07 SUBMITTAL OF PRODUCT APPROVAL NO FEE |
| SPALMER |
| 9/11/07 RE-STAMPED PLANS P/U BY TIM(UNAABLE TO |
| REPRINT PERMIT CARD, CHANGE OF MECH. CONTRACTOR IN |
| PROGRESS, CHANGE OF CONTRACOR APP.ENCLOSED W/ |
| PLANS) AJP |
| 9/11/07 CALLED P/U RESTAMP UNDER "D" **LARGE BIN** |
| AM |
| 9/5/07 PLANS TO BE RE-STAMPED & DUPLICATE PERMIT |
| CARD $25 SEW |
| 8/20/07 RE-STAMP SUBMITTAL AND FLOOD ZONE |
| ELEVATION CERT. SUBMITTAL P/U BY MARK AJP |
| 8/18/07 CALLED P/U RESTAMP UNDER "D" AM 8/18/07 |
| CALLED P/U ELEVATION CERTIFICATE UNDER |
| "D" AM |
| 8-13-07 RESTAMP $25 "LOST PLANS" WL |
| 8/10/07 BLDG SUBMITTAL FLOOD ZONE ELEVEVATION CERT |
| & TIE IN SURVEY SEW |
| 7/18/07 DENIED BLDG SUBMITTAL P/U BY TIM AJP |
| 4/6/07 CALLED/PICK UP **LARGE BINS** "D" AM |
| 1/9/07 BLDG SUBMITTAL PAGE MISSING FROM PRODUCT |
| APPROVAL SEW |
| 12/21/06 DENIED PLANS P/U BY MICHAEL MMILLER |
| 10-12-6 CALLED TO PICKUP, "D" ALANGE |
| 10/03/06 BLDG REV WINDOW PRODUCT APPROVALS $60 SEW |
| 4/13/06 BLDG REV(TRUSS DRWNGS)P/U BY MICHAEL AJP |
| 4-12-06 CALLED TO P/U SUBMITTAL, "D" ALANGE 4/4/06 |
| SUBMITTAL NO FEE SPALMER |
| 3/30/06 PLANS/APP P/U BY MICHAEL AJP |
| 3-29-06 CALLED TO P/U REV. "D" ALANGE |
| ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ |
| ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ |
| 3/10/04 $4083.68 BZ238517 SPALMER |
| 4-19-04 CALLED TO PICK UP PLANS, TOLD FEES ARE DUE |
| CORRECTIONS ARE NEEDED, FILED UNDER "D" ALANGE |
| 4/19/04 PLANS + APP P/U BY SEAN SULLIVAN (GAVE |
| BZ239983 $543.38) DID NOT POST PT |
| 6/2/04 1ST RESUB NO FEE SPALMER |
| 6-9-04 PERMIT PICKED UP BY SEAN ALANGE |
| 3/17/06 REV $60 FEE FG |