| Miscellaneous Information / Notes |
| EIGHT STORY 304 UNIT CONDOMINIUM |
| W/5-STORY PARKING GARAGE |
| |
| |
| |
| |
| TCO ISSUED 1/13/06 HHP |
| CALLED LEFT MESSAGE TO PICK UP LETTERS.LETTERS IN |
| BOX(C) 05/13/04 H.M. |
| 12/23/03 SHOP DWGS CALLED CONT FILED "C" HHP |
| APPLIED 2/13/03 FOR BLDG PERMIT. FOUNDATION PERMIT |
| #02091504 |
| SENT TO BLDG, SEND TO ZONING LAST SG 8-7-02 |
| CALLED FOR P/U 3-12-3 "C" KSTEVENS |
| 1ST RESUB PLAN REVIEW BZ 210582 $100 09/17/020 |
| DENIED 2ND TIME PLANS ON RACK NEXT TO LIBARY FOR |
| PU,CALLED CHRISTINA.10/9/02 DV PALMER. |
| 2ND PLAN CHECK - $100. BZ #216058 12-11-02 KAM |
| 3/27/03 FIRST RESUB, NO FEE LM |
| RESUB PU/BRAD 5-29-03 KAM |
| 4-15-03 LEFT MSGE FOR BRIAN REVERE TO P/U.PLANS AT |
| SYLVIA'S DESK. SHERNANDEZ |
| 4/16/03 RESUB SHEET AND PACKAGE UP FRONT IN BIN |
| MARKED "CURRENT 600 S DIXIE", ROLLED PLANS BY |
| CONFERENCE ROOM - ST |
| PLANS PU/JOHN 4-24-03 KAM |
| 5/1/03 SUBMITTAL NO CHG MM |
| 5/9/3 SUBMITTAL DENIED HP (PERMIT NOT ISSUED YET) |
| PICKED UP BY ERIC - ST |
| SUBMITTAL - NO FEE 5-20-03 KAM |
| 5/23/03 PD BZ225132 $61,494.83 INCLUDES APPROACH |
| PERMIT #03051574 PT |
| 5/23/03 SUB/BLDG NC PT |
| 5/23/03 PERMIT P/U BY ERIC HERLIHY PT |
| SUBMIT 2 NO FEE PROD APPROVALS DATED 6-11-03 WL |
| BRAD THORNBROUGH PICK UP NO FEE PROD DATED 6-11-03 |
| & LTRS 6-18-03 WL |
| 6-25-03 SUBMITTAL NFL |
| 6-25-03 SUBMITTAL TO DON NFL |
| 6-25-03 REVISIONS BZ 226942 $220 NFL |
| 6-25-03 REVISION BZ 226943 $60 NFL |
| SUBMITTAL NO FEE BLDG 7/1/03 SPALMER |
| 7-1-03 SUBMITTAL TO DON NEELY NFL |
| |
| 7-8-03 SUBMITTAL TO DON'S DESK NFL |
| SUBMITTAL - NO FEE 7-10-03 KAM |
| 2 SUBMITTALS PU/BRAD 7-10-03 KAM |
| BRAD PICK UP SUBMITTAL DATED 7-8-03 ON 7-17-03 WL |
| 7-22-03 BRAD P/U SUBMITTALS NFL |
| 7-29-03 SUBMITTAL NFL |
| 7/30/03 SUBMITTAL NO FEE FOR BLDG.SH |
| 8/6/03 SUB/BLDG N/C PT |
| 8/6/03 SUB/BLDG/PRODUCT APPROVALS & SHOP DRAWINGS |
| P/U BY BRAD THORNBROUGH PT |
| 8/6/03 SUB/TRUSS DRAWINGS P/U BY BRAD THORNBROUGH |
| PT |
| 8/6/03 SUB/BLDG PRODUCT APPROVALS P/U BY BRAD |
| THORNBROUGH PT |
| 8/6/03 SUB/ENG P/U BY BRAD THORNBROUGH PT |
| 8/7/03 NOA'S FILED C HHP |
| SUBMITTALS TO DON NEELY 8-8-03 KAM |
| 8/13/03 3RD REV BZ#229075 $200. SH |
| REVISONS CALLED 8/15/03 HHP FILED "C" |
| 8/18/03 SUBMITTAL DATED 8-6 & 8-8 P/U BY ERIC H |
| 8/18/03 REVISION DATED 8/13/03 P/U BY ERIC |
| 8-21-03 SUBMITTAL ON DON'S DESK NFL |
| 8/26/3 LETTER FROM CURRENT REGARDING PERMIT |
| APPLICATION FOR NOA SUBMITTAL, ST DESK |
| 9/3/03 SUBMITTAL OF SHOP DRAWINGS TO HP.SH |
| 9/3/03 REV/BLDG/$80/BZ#230349.SH |
| 9/4/03 SUBMITTAL SHOP DRAWINGS TO DON N PSMITH |
| 9/8/03 WINDOWS CONT CALLED FILED "C" HHP |
| BLDG REV (STUCCO)-BLD REV (SHOP DRAW) & LTR |
| FROM DON N PU/MIKE 9-9-03 KAM |
| 9/9/03 ASA SHOP DWG CONT CALLED 9/9/03 FILED "C" |
| HHP |
| 9/10/03 SUBMITTAL/BLDG/NO FEE.SH |
| 9/10/03 5TH REV/PLUMB/$150/BZ#230754.SH |
| 9/10/03 MIKE P/U SUBMITTAL OF 9/5/03.SH |
| 9/29/03 BARRIER CABLE FILED "C" HHP |
| 9/29/03 SUBMITTAL FOR ZONING/SITE PLAN/NO FEE.SH |
| 9-30-03 MIKE NETHERCOTE PICKUP NO FEE SUBMITTAL WL |
| 10-7-3 CALLED FOR P/U (PLBG REV) "C" KSTEVENS |
| 10/7/03MIKE P/U REV.SH |
| 10/23/03 REV BLDG $850 BZ232344 SPALMER |
| 10/31/03 BLDG SUBMITTAL NO FEE SPALMER |
| 11/12/03 MIKE P/.U SUBMITTAL.SH |
| 11-24-03 SUBMITTAL NFL |
| 12/01/03 SUB/SHORING P/U BY MIKE NETHERCOTE PT |
| 12/5/03 SUBMITTAL SHORING 4TH FLR NO FEE PSMITH |
| 12/5/03 SUBMITTAL PU MIKE PMSITH |
| 12-5-3 CALLED FOR P/U "C" KSTEVENS |
| 12-8-03 MIKE NETHERCOTE PICKUP REVISION WL |
| 12-12-03 MIKE NETHERCOTE NO FEE BLDG SUBMITTAL WL |
| 12/16/03 BLD REV BZ235062 PSMITH |
| 12/16/03 PLUMB REV BZ235062 PSMITH |
| 12/18/03 SUBMITTAL /BLDG/NO FEE.SH |
| 12-29-03 MIKE NETHERCOTE PICKUP NO FEE SUBMIT WL |
| 12-29-3 CALLED FOR P/U OF PLMG REV. "C" KSTEVENS |
| 12-30-03 MIKE NETHERCOTE PICKUP PLUMB REV/PLUS |
| SUBMITTED NO FEE BLDG SUBMITTAL WL |
| 12-31-3 SUBMITTAL TO DON NEELY - KAM |
| 1/12/4 RESHORE SUBMITTAL OK, CALLED CONTR 'C'SMH |
| 1/12/4 CORR (RAILING SUBMITTAL), 'C' SMH |
| 1/14/04 MIKE P/U 2 SUBMITTALS.SH |
| 1-23-03 CALLED TO P/U 'C' ALANGE |
| 1-27-04 MIKE P/U REV NFL |
| 2/5/04 BLDG SUMBMITTALS PAINT/FOAM (2) NO FEE PS |
| 2/5/04 PLUMB REV $80 BZ236923 PSMITH |
| 2/5/04 BLD REV $130 BZ236923 PSMITH |
| 2/5/04 ELEC REV $590 BZ236923 PSMITH |
| 2/5/04 BLDG REV $80 BZ236923 PSMITH |
| 2/12/04 SUBMITTAL P/U BY MIKE.SH |
| 2/12/04 2 SUBMITTALS FOR BLDG. 1 SUBMITTAL FOR DON |
| NEELY.SH |
| 2-17-04 REVISION BZ 237105 $260 NFL |
| 2-17-4 CALLED FOR P/U PLMB REV. "C" KSTEVENS |
| 2/18/4 SUBMITTAL CORR, CALLED CONTR L/M, 'C' SMH |
| 2/19/04 SUB/NC SHOP DRAWINGS PT |
| 2/19/04 REV/BLDG BZ237644 $60 PT |
| 2/19/04 REV/PLUMB P/U BY MIKE NETHERCOTE PT |
| 2/19/04 SUB/BLDG (FIRE RATED FOAM SUBMITTALS) P/U |
| BY MIKE NETHERCOTE PT |
| 2/19/4 SUBMITTAL OK, CALLED CONTR L/M, 'C' SMH |
| 2/20/4 CORR SUBMITTAL, CALLED CONTR, 'C' SMH |
| 2/21/4 SUBMITTAL OK, CALLED CONTR L/M, 'C' SMH |
| 2/23/04 BLDG SUBMITTAL NO FEE PSMITH |
| 2/23/04 BLDG SUBMITAL (3) P/U MIKE PSMITH |
| 2/24/4 SHORING OK, SUBMITTED & P/U BY MIKE SMH |
| 2/24/4 CORR (REVISION), CALLED CONTR L/M, 'C' SMH |
| 2-25-04 CALLED FOR P/U UNDER C PHK 2/26/04 |
| REV/BLDG P/U BY MIKE NETHERCOTE PT |
| 2/26/04 SUB/BLDG N/C PT |
| 2/26/4 SUBMITTALS OK, CALLED CONTR, 'C' SMH 3/2/04 |
| ELEC/MECH/FIRE SUBMITTAL P/U MIKE PSMITH 3/2/04 |
| SUBMITTAL ALUM RAILS P/U MIKE PSMITH |
| 3/4/4 CORR SUBMITTAL, CALLED CONTR L/M, 'C' SMH |
| 3/5/4 REV OK, CALLED CONTR L/M, 'C' SMH |
| 3-9-04 MIKE P/U SUBMITTALS AND REVISIONS NFL |
| 3/10/04 BLDG SUBMITTAL SHORIN/PT LTRS PSMITH |
| 3/10/04 BLDG REV $80 BZ238373 PSMITH |
| 3/16/4 CORR REV, CALLED CONTR, 'C' SMH |
| 3-16-04 MIKE P/U REV NFL |
| 3-18-4 SUBMITTAL TO DON NEELY - KAM |
| 3-18-4 SUBMITTAL PU/ERIC - KAM |
| 3/22/4 REV OK, CALLED CONTR L/M, 'C' SMH |
| 3/25/04 GIVEN TO SHIRLEY TO REVIEW LANDSCAPE |
| 659-8031 MM |
| 3-26-4 SUBMITTAL - NO FEE - KAM |
| 3-26-4 B,E REV PU/MIKE - KAM |
| 3/30/04 ANA APONTE APPROVED, PASS ON TO INCOMING M |
| 4-1-4 ELEC REV $810 BZ#239403 - KAM |
| 4-1-4 PLUMB REV $80 BZ#239404 - KAM |
| 4/5/4 REV OK, CALLED CONTR, 'C' SMH |
| 4/5/4 SHORING PLAN OK, CALLED CONTR, 'C' SMH |
| 4/6/04 MIKE P/U SUBMITTALS SPALMER |
| 4/6/04 SUBMITTALS NO FEE SPALMER |
| 4-9-4 CALLED FOR P/U "C" KSTEVENS |
| 4/12/04 MECH REV BZ 239802 PSMITH |
| 4/12/04 BLDG REV BZ 239802 PSMITH |
| 4/12/04 PLUMB REV P/U MIKE PSMITH |
| 4/15/4 SUBMITTAL OK, CALLED CONTR, 'C' SMH 4/19/4 |
| SUBMITTAL & REV OK,CALLED CONTR 'C' SMH 4-21-4 |
| SUBMITTAL - NO FEE - KAM |
| 4-21-4 BLDG REV $90 BZ#240204 - KAM |
| 4-21-4 2 BLDG SUMITTALS & 1 B,P REV PU/MIKE - KAM |
| 4/23/04 ELECTRICAL REVISIONS FILED UNDER 'C' LM |
| 4/23/4 SUBMITTAL OK, CALLED CONTR L/M, 'C' SMH |
| 4-26-04 MIKE P/U SUBMITTALS NFL |
| 4-26-04 MECHREV BZ239802CALLED FOR P/U UNDER C PK |
| 5-4-04 SUBMITTALS N/C NFL |
| 5/4/4 REV OK, CALLED CONTR L/M, 'C' SMH |
| CALLED FOR P/U OF SUBMITTALS UNDER "C" 5-05-04 |
| 5-10-04 MIKE P/U SUBMITTALS NFL |
| 5/13/04 BLDG SUMBITTAL OVERHEAD DOORS PSMITH |
| 5/13/04 BLDG & MECH REV P/U MIKE PSMITH |
| 5/20/04 REV/ELEC & MECH BZ $180 PT |
| 6/2/4 SUBMITTALS, CALLED CONTR L/M, 'C' SMH 6/3/04 |
| SUB/BLDG N/C PT |
| 6/3/04 SUB/BLDG ENG N/C PT |
| 6/3/04 SUB/BLDG P/U BY MIKE PT |
| 6/3/04 SUB/BLDG ROOF TP ANCORS P/U BY MIKE PT |
| 6/3/04 SUB/BLDG OVERHEAD DOOR SHOPS P/U BY MIKE PT |
| 6-4-04 REV #22 $700 BZ 241876 BLDG/ELEC/MECH 3 SET |
| OF ROLLED PLANS WL |
| 6/14/04 SUBMITTAL NO FEE SPALMER |
| 6/15/4 SUBMITTAL 'C', CALLED CONTR L/M SMH 6/17/4 |
| COR REV, CALLED CONTR, 'C' SMH |
| 6/17/4 REV/SUB P/U BY MIKE SMH |
| 7/9/04 2 BLDG SUBMITTALS INSULATION PROD & ROOFING |
| SHOP DRAWINGS PSMITH |
| 7/9/04 BLD SUBMITTAL P/U MIKE PSMITH |
| 7/9/04 BLDG/ELEC/MECH REV P/U MIKE PSMITH |
| 7/14/04 REV MECH $60 BZ243648 SPALMER |
| 7/14/04 REV ELEC $250 BZ243649 SPALMER |
| 7/14/04 REV ELEC $110 BZ243650 SPALMER |
| 7/19/4 SUBMITTALS, CALLED CONTR, 'C' SMH |
| 7/27/04 SUBMITTALS NO FEE SPALMER |
| 7/27/04 REV MECH $90 BZ244282 SPALMER |
| 7-27-04 CALLED TO P/U REV. CORRECTIONS NEEDED |
| 2 ROLL PLANS FILED ON BOTTOM RACK, ALANGE |
| 7/28/4 SUBMITTAL OK, PUT BOTTOM RACK, CALLED SMH |
| 7/29/04 BLDG SUBMITTALS SHORING LTRS NO FEE PSMITH |
| 7/29/04 3 BLDG SUBMITTALS P/U MIKE INSULATION/RFG |
| GARAGE DOOR PSMITH |
| 8-2-04 MECH REV (2) CALLED FOR P/U UNDER C PHK |
| 8-4-04 SUBMITTAL NFL |
| 8-4-04 MIKE P/U REV NFL |
| 8/4/4 CORR SUBMITTAL, CALLED CONTR, 'C' SMH 8/5/04 |
| SUB/BLDG P/U BY MIKE NETHERCOTE PT |
| 8/10/4 ROOF CALCS SUB, P/U BY MIKE N SMH |
| 8/10/4 REVISION P/U BY MIKE N SMH |
| 8/16/4 DENIED FP REV 'C', CALLED CONTR SMH 8-24-04 |
| REVISION BZ 245266 $190 NFL |
| 9/17/04 REV/BLDG BZ245700 $60 PT |
| 9/17/04 REV/ELEC MECH & FIRE P/U BY MIKE PT |
| 9/14/4 SUBMITTAL OK, P/U MIKE SMH |
| 9/23/4 BLDG REV OK, CALLED CONTR, 'C' SMH 9/23/04 |
| 2 BLDG SUBMITTALS POOL DECK TEMP PWR |
| NO FEE PSMITH |
| 9/23/04 BLDG REV P/U BRAD PSMITH |
| 9-23-4 CALLED FOR P/U OF REV. "C" KSTEVENS |
| 9/30/04 BLDG/FIRE/PLUMB/MECH REV P/U MIKE PSMITH |
| 10/13/4 SUBMITTAL OK, CALLED CONTR 'C' SMH |
| 10/29/04 SUBMITTAL BLDG NO FEE SPALMER |
| 10/29/04 REV BLDG $100 BZ247537 SPALMER |
| 11/16/4 REV OK, CALLED CONTR, 'C' SMH |
| 11-17-04 MIKE P/U REVISION NFL |
| 11/23/04 PARKING CONRTOL GATES SUB P/Y MIKE |
| PSMITH |
| 12/01/04 BLDG REV $70 SPALMER |
| 12/3/4 REV OK, CALLED CONTR, 'C' SMH |
| 12/14/04 ELEC REV E-10.3 CLUB HOUSE $60 PSMITH |
| 12/14/04 ELEC/FIRE REV $70 E-206&E-207 PSMITH |
| 12/14/04 BLDG REV WIND TUNNEL P/U BRAD PSMITH |
| 12/23/04 ELEC REV UNDER "C"FOR PU,CALLED. DV |
| PALMER.1/14/05 REV/ELEC P/U BY MIKE PT |
| 1/20/05 REVISIONS FILED UNDER 'C' LM |
| 2-7-05 MIKE N PICKUP REVISION WL |
| 3/4/05 ELEC REV EMERGENCY GENERATOR REV $110 |
| SPALMER |
| 3/16/05 ELEC REV UNDER"C"FORPU,CALLED MIKE. DVP. |
| 3-24-05 REV #34 MECH $520 WL |
| 3-24-05 LARRY FITZGERALD PICKUP EMERGENCY |
| GENERATOR REV WL |
| 3/25/05 REV MECH $60 SPALMER |
| 3-30-05 CALLED FOR P/U.PLANS IN BOX (C) HM. |
| 3/31/05 REV/MECH P/U BY LARRY PT |
| 5-03-05 REV MECH $70 DA CUST DIDN'T PAY THERE IS A |
| BALANCE ON ACCT & FORWARDED TO DEAN DA |
| 5/9/5 MECH REV $120 FG |
| 5-12-05 REV #38 MECH $2120 WL |
| 5-16-05 CALLED CONTACT NUMBER WENT TO FAX.COULD |
| NOT GET THROUGH ON OTHER NUMBER PLANS IN BOX (C) |
| HM. |
| 5-16-5 2 MECH REV PU/MIKE S - KAM |
| 5/18/05 MECH REV $540 SPALMER |
| 5/19/5 MECH AS-BUILTS DR |
| 5-24-05 REV #40 ELEC $70 WL |
| 5-24-5 ELEC REV $60 - KAM |
| 5-24-05 CALLED LEFT MESSAGE TO P/U PLANS.PLANS IN |
| BOX (C) HM. |
| 5-24-05 CALLED LEFT MESSAGE TO P/U PLANS.PLANS IN |
| BOX (C) HM. |
| 5/24/05 CALLED LEFT MESSAGE TO P/U PLANS. PLANS IN |
| BOX (C) HM. |
| 5-25-05 JOHN P/U REV NFL |
| 6-1-05 CALLED LEFT MESSAGE TO P/U PLANS.PL |
| 6-2-05 FRANK P/U PLANS NFL |
| ANS IN BOX (C) HM. |
| 6-2-05 FRANK P/U REV NFL |
| 6/8/05 REV/PLUMB $60 PT |
| 6-20-05 REV # 44 MECH WL |
| 6-20-05 DAVID CRAIN PICKUP MECH REV # 44 WL |
| 6-26-5 CALLED FOR P/U PLMG/REV "C" KSTEVENS |
| 6-28-05 LARRY P/U REV NFL |
| 6/30/5 SPECIAL INSPECTIONS $ 200 FEE FG |
| 7-7-05 SPECIAL INSPECTION $ 200 NFL |
| 7-14-5 OVERTIME INSPECTION $200 - KAM |
| 7-20-05 REV ELEC DA |
| 7-26-05 REVISION $60 PR L MARTINEZ NFL |
| 8/3/05 ELEC REV UNSAT, UNDER "C" FOR PU, CALLEED |
| PER JAKE LEAHY. DV PALMER |
| 8/4/5 REV P/U BY PRATTFERD PAID FEE BAL $440 FG |
| 8-12-05 SUBMITTAL NFL |
| 8-22-05 PRATT P/U SUBMITTAL NFL |
| 8/23/05 MECHANICAL REV $80 SMH |
| |
| 9/7/05 MECH. REV. A/C-4.0 A/C-5.0 |
| O/K CAL. P/U PR OUT IN FRONT (C). |
| 8-27-05 SENT TO FIRE JW |
| 8/31/05 CALLED FOR P/U "C" MWENNERGREN |
| 9-8-05 MIKE P/U REV SPECS NFL |
| 9-14-05 CALLED FOR P/U.LETTERS IN BOX (C)HM. |
| 9-16-5 OVERTIME INSPEC $400 - KAM |
| 9-22-05 REV (ELEC) 14PGS DA |
| 9-27-05 REV BLDG $70 DA |
| 9/28/5 OVERTIME INSPECTION $300 FEE GIVEN TO H |
| PISKURA FG |
| |
| PUT PLANS OUT FRONT 3 ROLLS AND SMALL PACKET OF |
| SPECS IN BINS UNDER "P" JAKE 10/3/05 |
| 10/3/5 OVERTIME INSPECTION $300 FEE FG |
| 10/04/05 PRATTFERD P/U REV SPALMER |
| 10/5/05 GIVEN TO MATTHEW//AMY/ANA 822-1435 MM |
| 10-6-05 SPECIAL MECH INSPECTION $200 LETTTER FROM |
| CONTRACTOR SUBMITTED TO H MOSER'S DESK NFL |
| 10-13-5 MECH REV $120 - KAM |
| 10-13-5 MECH REV $80 - KAM |
| 10/17/05 CALLED FOR P/U.PLANS IN BOX (C)HM. |
| 10/17/05 CALLED FOR P/U.PLANS IN BOX (C) HM |
| 11/08/05 MIKE P/U REV FG |
| 12/5/05 CALL FOR P/U FILE C MM |
| 12/09/05 MIKE P/U LANDSCAPE REV SPALEMR |
| 12/16/05 TCO FEE $500 FG |