| Miscellaneous Information / Notes |
| HAS NOC GLASS ATRIUM PLAZA LEVEL |
| RETURN TO CONTRACTOR WITH COMMENTS 7/26/00 LS |
| CALLED CHUCK CONGOON % WEITZ 686-5511 |
| RESUB APPLICATION AND PLANS 8-28-00 AN |
| PD IMPACT $8682.18 PR 00031881 |
| RESUB 8/28/00 REVIEWED GC CALLED 10/4/00 DR |
| RESUB 10-20NL BZ#173945 FOR $117.66 |
| THE FULL 10% RE-SUB FEE WAS NOT APPLIED. |
| OWES $1058.94 FOR FEE AND $35.00 FOR RADON.BZ# |
| 175058 |
| SUBMITTAL 2-6-06 NFL |
| PLANS ARE IN ZONING 11/14/00 DR |
| PD $1093.94 BZ 175058 REVISION |
| PLEASE NOTE $11766.00 FEE PD ON BZ 167080 NOT ON |
| BZ 167060!!!!!!!!!!!!!!!!!!!!!!!! |
| PROD APPROVAL/SHOP DRAWINGS/LTRS NO FEE CHARGED... |
| SUBMITTED 1-31-2001 WL |
| SUBMITTAL (SHOP DRAWINGS) NO FEE 02/15/01 MM |
| BRIAN SHAW PICKED UP SUBMITTAL (LTR/PROD APPR/SHOP |
| DRAWINGS 02/15/01 MM |
| BRIAN SHAW PICKED UP SUBMITTAL (LTRS/DRAWINGS/PLAN |
| 02/15/01 MM |
| SUBMITTAL OF SHOP DRAWINGS (NO FEES) 03/08/01 MM |
| SUBMITTAL 3-13-01 BRIAN PU AN |
| SUBMITTALS P/U BRIAN SHAW 3/23/01 SJOHNSON |
| 4/6/01 SUBMITTAL FOR BLDG NO FEE YD |
| 04-23-2001 STRUCTURAL STEEL DRAWINGS/ERECTION DRAW |
| SUBMITTED NO FEE CHGD WL |
| PU BY BRIAN SHAW SHOP DRAWING SUBMITTAL 5-16-01 AN |
| REV FOR BUILD 6-1-01 TJ |
| REVISION PU BY MIKE 6-8-01 AN |
| SUBMITTAL FOR BUILD 6-26-01 TJ |
| 7/10/01 REVISION BZ187809 $120 YD |
| 7/10/01 BRAIN PU REVISION YD |
| REV PU BY BRIAN 7-16-01 TJ |
| 8/31/01 REVISION BZ189825 $60 FOR MECH YD |
| 8/31/01 REVISION FOR ELEC $110 BZ189824 YD |
| 8/31/01 REVISION FOR BLDG &620 BZ189826 YD |
| 9/4/01 REVISION BZ189844 $60 YD |
| 9/4/01 REVISION BZ189845 $60 YD |
| ELEC REV FROM 8/31 OK UNDER "T",CALLED 9/10/01 DVP |
| MECH REV BZ189825 & 189845 CALLED FOR P/U |
| 9-10-01 UNDER "W" PHK. |
| REV P/U BRIAN SHAW 9/11/01 SJOHNSON |
| REV MECH BZ190018 9/12/01 $80 SJOHNSON |
| SUBMITTAL FOR BUILD 9-13-01 TJ |
| REV P/U BRIAN SHAW 9/6/01 SJOHNSON |
| REV ELEC PLUMB MECH $110 BZ191235 10/4/01 SJOHNSON |
| CALLED FOR P/U 10-4-01 UNDER "W" PHK |
| 10/10/01 SUBMITTAL NO FEE YD |
| 10/10/01 BRIAN PU REVISION YD |
| 10-25-01 BLDG REV #10 BZ 192429 $210.00 WL |
| BRIAN SHAW PICK UP REV 9 BZ191235 & NO FEE RAILING |
| SUBMITTAL 10-25-01 WL |
| SUBMITTAL FOR BUILD 10-30-01 TJ |
| REV PU BY BRIAN 11-13-01 TJ |
| SUBMITTAL PU BY BRIAN 11-13-01 TJ |
| 11-13-01 SUBMITTAL FOR BUILD TJ |
| 11-20-01 REV FOR BUILD TJ |
| REV CALLED FOR P/U 12-01-01 UNDER "W" PHK |
| PU SUBMITTAL AND REVISION STACKS BY BRIAN 12-03-01 |
| AN |
| 12/7/01 REVISION FOR ELEC & MECH BZ 194692 $80 YD |
| SUBMITTAL NO FEE 12/01 SJOHNSON |
| 12/11/01 CALLED CONT PLANS FILED UNDER"W" JW |
| MECH & ELEC REV CALLED FOR P/U 12-11-01 UNDER T PK |
| SUBMITTAL BLDG LTR NO FEE 12/13/01 SJOHNSON |
| SUBMITTAL PU 1-3-02 TJ |
| 1/8/01 REVISION BZ196770 $70 FOR PLUMB YD |
| NEW UPDATED NOC 1/11/01 SJOHNSON |
| SUBMITTAL LETTER NO FEE 1/14/02 SJOHNSON |
| REV ELEC $80 BZ196997 1/14/02 SJOHNSON |
| SUBMITTALS P/U BRIAN SHAW 1/14/02 SJOHNSON |
| 1/14/02 BRIAN PU REVISION FOR PLUMB YD |
| 1/18/02 PASSED ELEC REVISION,CALLED BRIAN PU. WRT. |
| 1-22-02 REV PU BY BRIAN TJ |
| 1/25/2002 SPECIAL INSPECTION BZ# 197674 $600 MM |