2022-08-23 14:03:47 | Z22080028 - 15TH AND LA KIRKSEY REZONING REVIEW 8.22.22 |
| COMMENTS FOR CIVIL SUBMITTAL FROM RICK ROSSANO, SR. |
| PROJECT COORDINATOR, ENGINEERING SERVICES AT |
| 561-494-1098 [email protected] |
| GENERAL: |
| O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND |
| INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER |
| (Z-XXXXXXXX). |
| O THE CITY OF WEST PALM BEACH HAS A NUMBER OF |
| REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY |
| AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND |
| WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE |
| DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK |
| BELOW: |
| A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP |
| B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL |
| L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97 |
| B1960045731D3658206F27451722716EF |
| B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE |
| FOUND HERE: |
| HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| MS,-PERMITS-APPLICATIONS |
| C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM |
| BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, |
| ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18) |
| CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, |
| SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER |
| SERVICE FACILITIES OF THE CITY. |
| THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE |
| CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY |
| BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, |
| BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. |
| O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH |
| CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR |
| MORE INFORMATION, REFER TO THE LINK BELOW: |
| A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU |
| BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL |
| O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY |
| OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC |
| RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF |
| YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE |
| MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL |
| IN THE WPB ENGINEERING SERVICES DEPARTMENT AT |
| [email protected] OR 561-494-1079 FOR FURTHER |
| ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION |
| ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD |
| SURVEY, POT-HOLING, SOFT DIGS ETC. |
| O PROVIDE EXISTING AND PROPOSED PERVIOUS AND IMPERVIOUS |
| DATA. |
| |
| BACKFLOW ASSEMBLY AND METERS: |
| O SHOW AND LABEL ANY EXISTING OR PROPOSED WATER |
| SERVICES AND WATER METERS, ALONG WITH WHAT IS HAPPENING |
| TO THEM. |
| O SHOW EXISTING AND PROPOSED DEDICATED UTILITY |
| EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO |
| PROPOSED UTILITY WATER METERS. VERIFY THAT THERE ARE NO |
| STRUCTURES WITHIN EASEMENT. |
| O PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED LOCATION |
| OF WATER METER AND BACKFLOW |
| PREVENTION. |
| O BACKFLOWS SHALL BE INSTALLED ON PRIVATE PROPERTY |
| OUTSIDE OF EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER |
| METERS SHALL BE INSTALLED IMMEDIATELY ADJACENT TO |
| PROPERTY LINE. 3 INCH AND LARGER WATER METERS SHALL BE |
| INSTALLED ABOVE-GROUND ONLY. |
| O CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA (MAKE |
| NOTE USC APPROVED) AND FIRE BACKFLOW PREVENTER AS DCDA. |
| |
| WATER/WASTEWATER PLAN: |
| O PROVIDE VERTICAL DATUM AND DATUM CONVERSION |
| INFORMATION (NAVD 1988 AND NGVD 1929). |
| O SHOW PROJECT ADDRESS ON ALL PLAN SHEETS. |
| O PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE |
| STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC. |
| O PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND |
| DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND |
| SEWER LINES AND CLEANOUTS, INCLUDING STUBS TO EACH |
| PROPERTY LINE FOR WATER AND SANITARY SEWERS, THE MAKE |
| AND MODEL OF ALL VALVES, POTABLE AND IRRIGATION METERS, |
| BACKFLOWS, FIRE HYDRANTS AND FDCS, AND OTHER DEVICES TO |
| BE INSTALLED ON THE SYSTEM, CATCH BASINS, CULVERTS, |
| DITCHES INCLUDING GRADES, PIPES SIZES, MATERIALS, |
| ELEVATIONS, ASSUMPTIONS, CALCULATIONS, INVERT |
| ELEVATIONS FOR ALL INLETS AND MANHOLES AND PROFILES OF |
| SANITARY SEWER LINES. |
| O GATE VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR |
| SIDEWALK. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE |
| PROFILE VIEW. |
| O DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN |
| VIEW FOR ALL SANITARY AND STORM SEWERS. |
| O SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT |
| MATERIAL. |
| O PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED |
| UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, |
| ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION |
| FACILITIES INCLUDING PIPE SIZE AND MATERIAL LOCATED IN |
| THE RIGHT-OF-WAY. |
| O PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER |
| AND STORM LINES PER CITY OF WEST PALM BEACH STANDARD |
| DETAIL GN-2 SERIES, AT ALL UTILITY CROSSINGS. PLEASE |
| INCLUDE FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION & |
| TELECOMMUNICATION FACILITIES INCLUDING PIPE SIZE AND |
| MATERIAL LOCATED IN THE RIGHT-OF-WAY. |
| O SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY |
| TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT |
| APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING |
| AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, |
| MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS |
| SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 |
| FOR WATER. |
| O PROVIDE FIRE FLOW TEST DATA. |
| O PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND |
| STORMWATER INFRASTRUCTURE ALONG ENTIRE PROJECT FRONTAGE |
| (CONDITION OF SITE PLAN APPROVAL). |
| O CUT AND CAP UTILITIES NOT IN USE AND REMOVE ANY |
| ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY |
| ROW. |
| O WHEN PROPOSED, WATER MAINS IN CITY RIGHT OF WAY SHALL |
| BE MADE OF DUCTILE IRON PIPE (NOT PVC) AND SPECIFY |
| PROPOSED LENGTH IN FEET. |
| O CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY |
| SEWER ARE REQUIRED. |
| O PROVIDE CLEANOUTS FOR PROPOSED SANITARY LINE ONSITE |
| JUST INSIDE PROPERTY LINE, AT JOINTS AND EVERY 75 FEET. |
| O ADD NOTE TO PLANS SPECIFYING CITY?S DOWNSTREAM LIFT |
| STATION NUMBER. |
| O PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR |
| PROPOSED SANITARY LATERALS. |
| O LABEL WATER LINES AS PRIVATE WHERE APPLICABLE. |
| O PLEASE SHOW AND LABEL EXISTING AND PROPOSED GREASE |
| TRAPS (IF ANY). |
| O PER CITY STANDARDS MAINTAIN MINIMUM DISTANCE BETWEEN |
| OUTSIDE DIAMETER OF CITY PIPE AND ROOT BARRIER. |
| |
| FORMAL ENGINEERING REVIEW: |
| O FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND NPDES |
| NOI REQUIREMENTS WILL BE ENFORCED. |
| - AN NOI IS REQUIRED FOR PROJECTS THAT: |
| - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS |
| THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF |
| DEVELOPMENT OR SALE; |
| - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE |
| STATE OR TO SURFACE WATERS OF THE STATE THROUGH A |
| MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4). |
| - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF |
| CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION |
| THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL |
| SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT |
| OF THE 10-2 CERTIFICATION. |
| O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS. |
| O FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF |
| WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. |
| O FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING |
| APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT |
| SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING |
| SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED |
| LEAD-FREE DESIGN. |
| O FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES |
| ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY |
| LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT |
| PARCELS. |
| O FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE |
| BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES. |
| O FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO PROVIDE |
| 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF |
| PROPOSED TRENCH IN CITY MAINTAINED ROADWAY AREAS PER |
| CITY OF WPB STANDARD DETAIL GC-8. |
| O FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| CALCULATIONS OF PERVIOUS AND IMPERVIOUS AREAS FOR |
| PROPOSED IMPROVED AREAS. |
| |
| QUESTIONS AND COORDINATION CONTACTS: |
| O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH |
| CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF |
| BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT |
| 561-822-2262 OR [email protected] |
| O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES |
| DEPARTMENT AT 561-494-1047 OR [email protected] |
| O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING |
| SERVICES DEPT. AT 561-494-1120 OR [email protected] |
| |
|