2021-05-08 05:49:37THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE APRIL
 2021 CIVIL PLANS.
  
 1. [SATISFIED] THE CITY'S VERTICAL DATUM IS NATIONAL
 GEODETIC VERTICAL DATUM OF 1929. THE CITY HAS ALLOWED
 THE USE OF NAVD1988 PROVIDED THE CONVERSION TO NGVD1929
 IS PROVIDED. ADD THE CONVERSION EQUATION TO THE SURVEY.
  
 2. [NOT SATISFIED] EACH SHEET WITH ELEVATION
 INFORMATION SHALL LIST THE VERTICAL DATUM AND THE
 CONVERSION EQUATION TO NGVD1929. ADD TO SHEET 5.
  
 3. [SATISFIED] REMOVE THE NORTH DRIVEWAY APRON ON
 ELECTRONICS WAY. GRADE THE SWALE TO DRAIN FROM THE
 SOUTH DRIVEWAY APRON TO THE CATCH BASIN ON THE CORNER.
 THE SOUTH DRIVEWAY APRON MAY REQUIRE TO HAVE SWALE
 SECTION.
  
 4. [SATISFIED] REMOVE THE CURB LINES ON EITHER SIDE OF
 THE SIDEWALK ACROSS THE SOUTH DRIVEWAY.
  
 5. [SATISFIED] PROVIDE CROSS SECTIONS FROM THE PHASE 2
 LINE TO THE WEST BUILDING FACE AND FROM THE NORTH,
 SOUTH AND EAST PROPERTY LINES TO THE BUILDING FACE.
  
 6. [SATISFIED] IT'S NOT CLEAR BY THE PROPOSED GRADES
 HOW THE SOUTH PARKING SPACES WILL DRAIN TO THE SWALE.
  
 7. [SATISFIED] ON THE ENGINEERING PLANS, CHANGE THE
 NAME OF THE STREET NORTH OF THE SITE FROM 27TH PLACE TO
 27TH STREET.
  
 8. [COMMENT ACKNOWLEDGED. SFHA WAS NOT DELINEATED AND
 THE BFE WAS NOT PROVIDED ON SURVEY OR ENGINEERING
 PLAN.] THE SITE IS WITHIN A SPECIAL FLOOD HAZARD AREA
 AND THE FINISHED FLOOR ELEVATION AND MECHANICAL
 EQUIPMENT WILL REQUIRE A MINIMUM OF 2 FEET OF FREEBOARD
 ABOVE THE BASE FLOOD ELEVATION.
  
 9. [SATISFIED] CONSIDER REDUCING THE DEPTH OF THE
 PARKING SPACES BY 2 FEET AND PROVIDE 2 FEET OF GRASS
 OVERHANG.
  
 10. [SATISFIED] CHANGE DRY RETENTION AREA TO DRY
 DETENTION AREA.
  
 11. [SATISFIED - COMMENT NO LONGER APPLICABLE] SHOULD
 THE PHASE 2 LINE INCLUDE THE DRY DETENTION AREA?
  
 12. [SATISFIED] INCLUDE FLOATING TURBIDITY BARRIER
 AROUND THE OUTFALL IN THE CANAL.
  
 13. [COMMENT ACKNOWLEDGED] THE STORMWATER MANAGEMENT
 SYSTEM IS TO BE DESIGNED TO MEET SFWMD ERP CRITERIA FOR
 WATER QUALITY TREATMENT AND PEAK FLOW ATTENUATION.
  
 14. [COMMENT ACKNOWLEDGED] RECOMMEND DOING A CONDITION
 ASSESSMENT ON THE OUTFALL PIPE TO THE CANAL, ESPECIALLY
 IF THE PIPE MATERIAL IS CMP.
  
 NEW COMMENTS:
 15. SHEET 3 PRELMINARY EROSION AND DEMOLITION SHEET
 A. SHOW FLOATING TURBIDITY BARRIER AT OUTFALL AND
 PROVIDE DETAIL.
 B. PROVIDE DETAIL FOR TRENCHING IN THE SILT FENCE.
 C. RELOCATE EXISTING FENCE OUT OF THE RIGHT-OF-WAY AT
 THE CUL-DE-SAC.
  
 16. SHEET 4 PRELIMINARY ENGINEERING PLAN
 A. INDICATE IF THE EXISTING FENCE ALONG THE PROPERTY
 LINES IS TO REMAIN OR BE REMOVED.
 B. INDICATE IF THE 13.10 SPOT GRADE NORTH OF THE SOUTH
 DRIVEWAY IS TO BE AT THE EDGE OF THE NEW DRIVEWAY OR
 EXISTING DRIVEWAY THAT IS BEING REMOVED.
 C. SHOW SIDEWALK REPLACEMENT WHERE WATER AND/OR SEWER
 SERVICES CROSS THE SIDEWALK. REPLACEMENT SHALL BE TO
 NEAREST JOINT.
 D. LABEL THE DRAINAGE CONTROL STRUCTURE, WEIR
 ELEVATION, BLEEDER INVERT ELEVATION.
 E. SHOW LOCATION OF PERIMETER BERM.
  
 17. SHEET 5 CROSS SECTIONS
 A. SECTION A-A - LABEL THE ITEM ON THE LEFT SIDE OF THE
 SECTION. IF A FENCE, SHOW IT ON THE ENGINEERING PLAN.
 B. SECTION C-C - SWALE ADJACENT TO THE BUILDING IS
 SHOWN ABOVE THE FFE.
 C. SECTION D-D - PARKING STALL ON THE RIGHT IS
 DIMENSIONED AS 18' WITH 2' OVERHANG. ENGINEERING PLAN
 SHOWS 16' PARKING STALL AND 2' OVERHANG. WHEEL STOP IS
 NOT REQUIRED IF CURB IS PROVIDED FOR 16' PARKING
 STALLS.
 D. SECTION E-E - IT APPEARS THE ASPHALT DRIVEWAY WILL
 EXTEND INTO THE RIGHT-OF-WAY. THE CONCRETE SIDEWALK
 SHOULD BE AT THE RIGHT OF WAY LINE/PROPERTY LINE.
 E. SECTION E-E - CLARIFY IF THE ENTIRE 5' WIDE SIDEWALK
 IS TO BE AT 2% SLOPE.
 F. SECTION E-E - CHECK TO SEE IF THE DRIVEWAY APRON
 SLOPES OF 5% WILL CAUSE CARS TO DRAG THEIR BUMPERS.
 G. SHOW AND LABEL PERIMETER BERMS ON THE SECTIONS IF
 APPLICABLE.
 H. DIMENSION LOCATION OF FENCE FROM THE PROPERTY LINE
 ON THE SECTIONS.
  
 18. SHEET 6 DETAILS
 A. PROVIDE DETAIL OF CONTROL BAFFLE (PRB).
 B. CONTROL STRUCTURE DETAIL SHOWS TWO PIPES CONNECTED
 TO THE STRUCTURE. THE ENGINEERING PLAN SHOWS ONE PIPE.
 C. ON THE CONTROL STRUCTURE DETAIL, PROVIDE THE
 ELEVATIONS FOR THE GRATE, WEIR, PIPE INVERT AND
 STRUCTURE BOTTOM.
 D. DRAINAGE INLET DETAIL - PROVIDE THE TABLE(S)
 REFERENCED ON THE DETAIL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved