Text |
2021-03-10 22:36:19 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| APPLICATION PROCESSES. |
| |
| THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| PLAN APPROVAL: |
| |
| 1. THE CITY'S VERTICAL DATUM IS NATIONAL GEODETIC |
| VERTICAL DATUM OF 1929. THE CITY HAS ALLOWED THE USE OF |
| NAVD1988 PROVIDED THE CONVERSION TO NGVD1929 IS |
| PROVIDED. ADD THE CONVERSION EQUATION TO THE SURVEY. |
| |
| 2. EACH SHEET WITH ELEVATION INFORMATION SHALL LIST THE |
| VERTICAL DATUM AND THE CONVERSION EQUATION TO NGVD1929. |
| ADD TO SHEET 5. |
| |
| 3. REMOVE THE NORTH DRIVEWAY APRON ON ELECTRONICS WAY. |
| GRADE THE SWALE TO DRAIN FROM THE SOUTH DRIVEWAY APRON |
| TO THE CATCH BASIN ON THE CORNER. THE SOUTH DRIVEWAY |
| APRON MAY REQUIRE TO HAVE SWALE SECTION. |
| |
| 4. REMOVE THE CURB LINES ON EITHER SIDE OF THE SIDEWALK |
| ACROSS THE SOUTH DRIVEWAY. |
| |
| 5. PROVIDE CROSS SECTIONS FROM THE PHASE 2 LINE TO THE |
| WEST BUILDING FACE AND FROM THE NORTH, SOUTH AND EAST |
| PROPERTY LINES TO THE BUILDING FACE. |
| |
| 6. IT'S NOT CLEAR BY THE PROPOSED GRADES HOW THE SOUTH |
| PARKING SPACES WILL DRAIN TO THE SWALE. |
| |
| 7. ON THE ENGINEERING PLANS, CHANGE THE NAME OF THE |
| STREET NORTH OF THE SITE FROM 27TH PLACE TO 27TH |
| STREET. |
| |
| 8. THE SITE IS WITHIN A SPECIAL FLOOD HAZARD AREA AND |
| THE FINISHED FLOOR ELEVATION AND MECHANICAL EQUIPMENT |
| WILL REQUIRE A MINIMUM OF 2 FEET OF FREEBOARD ABOVE THE |
| BASE FLOOD ELEVATION. |
| |
| 9. CONSIDER REDUCING THE DEPTH OF THE PARKING SPACES BY |
| 2 FEET AND PROVIDE 2 FEET OF GRASS OVERHANG. |
| |
| 10. CHANGE DRY RETENTION AREA TO DRY DETENTION AREA. |
| |
| 11. SHOULD THE PHASE 2 LINE INCLUDE THE DRY DETENTION |
| AREA? |
| |
| 12. INCLUDE FLOATING TURBIDITY BARRIER AROUND THE |
| OUTFALL IN THE CANAL. |
| |
| 13. THE STORMWATER MANAGEMENT SYSTEM IS TO BE DESIGNED |
| TO MEET SFWMD ERP CRITERIA FOR WATER QUALITY TREATMENT |
| AND PEAK FLOW ATTENUATION. |
| |
| 14. RECOMMEND DOING A CONDITION ASSESSMENT ON THE |
| OUTFALL PIPE TO THE CANAL, ESPECIALLY IF THE PIPE |
| MATERIAL IS CMP. |
| |
| THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| |
| 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| |
| 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| WITH THE ENGINEERING PERMIT APPLICATION. |
| |
| 3. DRAINAGE CALCULATIONS WILL BE REVIEWED WITH THE |
| ENGINEERING PERMIT APPLICATION. |
| |
| TRACY WARD, PE |
| SENIOR STORMWATER ENGINEER |
| ENGINEERING SERVICES DEPARTMENT |
| 561-494-1120 (O) |
| 561-351-0510 (M) |
| [email protected] |
| |
|