Plan Review Notes For Project Z20110013 |
Project Number |
Z20110013 |
|
Review Stop |
PW |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2020-12-21 08:50:37 | PLEASE PROVIDE: | | 1- REVISED SHEET A1.2 TO REFELCT DUMPSTER ENCDOSRE SPEC | | THAT COMPLIES WITH OUR LATEST SPECIFICATION. FOR A | | FREESTANDING SITE DUMPSTER ENCLOSURE, THE ENCLOSURE | | SHALL COMPLY WITH THE LATEST REVISION OF CITY OF WEST | | PALM BEACH GENERAL CONSTRUCTION-GARBAGE ENCLOSURE | | STANDARD, GC-7. | | 2- AUTO TURN (DYNAMIC ENVELOPE AND THE TIRES PATH) FOR | | THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE | | FOLLOWING SPECS: | | - TRUCK LENGTH: 35 FT | | - TRUCK WIDTH: 11 FT | | - TURNING RADIUS: | | - SAE TURNING RADIUS: 32.5 FT | | - CURB-TO-CURB DIAMETER: 74 FT | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | MATT HEJAZI | | DEPT. OF PUBLIC WORKS | | [email protected] | | 561-822-2045 | | |
|
Print |
|