2020-08-02 21:52:06THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 4/21/2020 SUBMITTAL PACKAGE:
  
  
  
 1. THE TWO CATCH BASINS AT THE WEST END OF THE SIDE BY
 SIDE EXFILTRATION TRENCH APPEAR TO FALL WITHIN THE AREA
 LABELED "LUGGAGE 100 SF" ON THE CONTEXT SITE PLAN
 SHEET.
  
 2. PROVIDE CROSS SECTIONS FROM EXISTING BACK OF CURB TO
 BUILDING FACE FOR WEST, SOUTH AND EAST SIDES OF
 BUILDING AND FROM NORTH R/W OF ALLEY TO BUILDING FACE
 FOR THE NORTH SIDE OF THE BUILDING. DIMENSION LANDSCAPE
 AREAS, SIDEWALK WIDTHS, PAVEMENT WIDTHS, PROPERTY
 LINES, CURBS, ETC. AND SHOW HOW EACH SLOPES.
  
 3. WHEN ESTIMATING THE CAPACITY OF THE SIDE BY SIDE
 EXFILTRATION TRENCHES, FLOW OUT OF THE COMMON SIDE
 SHOULD NOT BE BE INCLUDED.
  
 4. INSUFFICIENT FLOW ARROWS PROVIDED TO SHOW HOW THE
 ALLEY IS TO DRAIN. IT APPEARS THE STORMWATER RUNOFF
 FROM THE ALLEY IS BEING ROUTED THROUGH THE ONSITE
 DRAINAGE SYSTEM. THIS MAY NEED TO BE MEMORALIZED WITH A
 DRAINAGE EASEMENT OR OTHER ACKNOWLEDGEMENT.
  
 5. NO PIPE INVERTS WERE PROVIDED TO CHECK FOR CONFLICTS
 BETWEEN UTILITIES.
  
 6. LIST THE TOP AND BOTTOM ELEVATIONS FOR THE
 EXFILTRATION TRENCH ON THE EXFILTRATION DETAIL. THIS
 CAN BE PROVIDED WITH THE ENGINEERING PERMIT SUBMITTAL.
  
 7. SHOW AND LABEL MILL AND RESURFACE LIMITS ON THE
 CONCEPTUAL ENGINEERING PLAN. CURB RAMPS NEXT TO AREAS
 THAT ARE RESURFACED ARE TO BE RECONSTRUCTED TO CURRENT
 ADA STANDARDS.
  
 8. THERE APPEARS TO BE A TRENCH DRAIN ACROSS THE
 DRIVEWAY TO GARDENIA ST. AND THE DRIVEWAY IS SHOWN
 SLOPED TO DRAIN TOWARD THE INTERIOR CATCH BASIN.
  
 9. THE DRAINAGE SYSTEM ON THE LANDSCAPE PLAN DOES NOT
 APPEAR TO MATCH WHAT IS SHOWN ON THE CONCEPTUAL
 ENGINEERING PLAN.