Date |
Text |
2018-12-10 05:54:00 | THE FOLLOWING COMMENTS, FROM THE REVIEW OF THE NOVEMBER |
| 29, 2018 SUBMITTAL PACKAGE, MAY BE CONDITIONS OF SITE |
| PLAN APPROVAL: |
| 1. VERTICAL DATUM ON THE CONCEPTUAL PAVING, GRADING AND |
| DRAINAGE PLAN (NGVD1929) DOES NOT MATCH THE VERTICAL |
| DATUM SHOWN ON THE SURVEY (NAVD1988). BOTH SHOULD USE |
| THE SAME VERTICAL DATUMAND PROVIDE A CONVERSION |
| EQUATION TO NGVD1929 IF NGVD1929 IS NOT THE REFERENCED |
| VERTICAL DATUM. THE CITY'S OFFICIAL VERTICAL DATUM IS |
| NGVD1929. |
| |
| 2. MOVE THE HIGH POINT (ELEVATION 12.50) OF DRIVEWAY |
| NEXT TO PICKUP WINDOW CLOSER TO NORTH PROPERTY LINE SO |
| THAT THE PAVEMENT AREA UNDER A VEHICLE WAITING AT THE |
| PICKUP WINDOW WILL DRAIN TO THE ONSITE DRAINAGE SYSTEM |
| INSTEAD OF TO THE SOUTHERN BLVD R/W. |
| |
| 3. PG&D PLAN DOES NOT INCLUDE GRADING FOR THE DRIVEWAY |
| TO THE ADJACENT LOT AS DEPICTED ON THE ALTERNATIVE SITE |
| PLAN. PROPOSED GRADING FOR THE DRIVEWAY CONNECTION AS |
| WELL AS SPOT GRADES ALONG THE SHARED PROPERTY LINE AND |
| 25 FEET INTO THE ADJACENT PROPERTY WILL BE NEEDED |
| BEFORE STAFF CAN APPROVE THE ALTERNATIVE SITE PLAN. |
| |
| 4. COORDINATE THE STORM PIPE SIZE SHOWN ON THE SHEET |
| C1.1 CONCEPTUAL PG&D PLAN (12" HDPE) WITH THE ON-SITE |
| EXFILTRATION TRENCH DETAIL (18" HDPE) AMD POLLUTION |
| REDTARDANT BAFFLE (PRB) DETAIL (18" HDPE) ON SHEET C2.1 |
| CONCEPTUAL ENGINEERING DETAILS [PREVIOUS COMMENT] |
| |
| 5. THE MILL AND OVERLAY LIMITS ON MALVERNE ROAD MAY |
| NEED TO BE EXPANDED INTO THE EASTBOUND LANE DEPENDING |
| ON THE TRENCH CUT NEEDED TO INSTALL THE SANITARY WYE |
| [PREVIOUS COMMENT] |
| |
| TRACY WARD, PE |
| SENIOR STORMWATER ENGINEER |
| ENGINEERING SERVICES DEPARTMENT |
| 561-494-1120 |
| [email protected] |
| |
|
Print |