Plan Review Notes For Project Z18050028 |
Project Number |
Z18050028 |
|
Review Stop |
TRAFFIC |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2018-08-30 16:11:39 | Z18050028 BIG DADDY SOUTHERN DIXIE (SUBMITTED ON AUGUST | | 14, 2018) | | 1) PROVIDE RAISE CURB FOR THE RIGHT-TURN CHANNELIZATION | | ISLAND ON THE DRIVEWAY ON SOUTH DIXIE HIGHWAY | | 2) SHOW THE APPROXIMATE LOCATIONS OF CURB LINES AND | | DRIVEWAYS FROM ADJACENT PROPERTY AND ACROSS THE STREET | | FOR SITE PLAN REVIEW PURPOSE. THIS IS A REQUIREMENT IN | | THE SITE PLAN CHECKLIST. WE ARE UNABLE TO PROVIDE A | | COMPLETE REVIEW UNTIL THE SITE PLAN MEETS THE CHECKLIST | | REQUIREMENTS. | | 3) WHY IS THE PARKING LOT DRIVE AISLE 30' WIDE? UTILIZE | | 24' STANDARD WIDTH. | | 4) THE SIDEWALK AT CURB RETURN MALVERNE AND SOUTH DIXIE | | (SW PROPERTY CORNER) IS EXTREMELY NARROW AND DOESN?T | | APPEAR TO MEET CITY MINIMUM WIDTH REQUIREMENTS. WIDEN | | THE SIDEWALK IN THIS AREA. | | 5) CIVIL PLANS - INDICATE CURB RAMP TYPE AT | | INTERSECTION OF MALVERNE AND SOUTH DIXIE. | | ERIK D. FERGUSON, PE | | CITY TRANSPORTATION ENGINEER | | 561-494-1092 | | [email protected] | | |
|
Print |
|