Plan Review Notes
Plan Review Notes For Project E22080036
Project Number E22080036
Review Stop ENG-A
Sequence Number 2
Notes
Date Text
2023-06-09 15:49:24E22080036 506 DATURA ST 4.25.23 RESUB REVIEW
  
 NO COMMENTS FROM LINDA QUI??ONES-CINTRON, PROJECT
 COORDINATOR, ENGINEERING SERVICES DEPT., 561-494-1085
 [email protected] :
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
 -RESPONSE DOES NOT RESOLVE COMMENT 5 FROM PRIOR
 RESPONSE LETTER. [COMMENT 5: CHECK THE FIRELINE PROFILE
 ON SHEET C07. SOME SIZES STILL LOOK INCONSISTENT VS
 PLAN VIEW) RESPONSE LABELS AND DEPICTIONS OF THE
 PROPOSED & EXISTING WATER MAINS WERE ADDED TO THE CROSS
 SECTION VIEWS ON SHEET C-07.] THE FIRELINE PROFILE
 SHOWS 10 IN PIPE AND GATE VALVE FROM WATER MAIN, BUT
 PLAN AND BLOWUP PLAN SHOW 8 INCH FITTINGS, 8 INCH TEE,
 6 INCH TEE, AND 6 INCH PIPE. PLEASE REVIEW AND UPDATE
 SO CONTRACTORS WILL BE ABLE TO CONSTRUCT WATER LINE AND
 UTILITY DEPARTMENT CAN BILL PROPERLY. ON THE BLOWUP
 DETAIL ALSO ADD SIZE TO THE LABELS OF THE GATE VALVES
 FOR THE FIRELINE AND FIRE HYDRANT. FOR A 10 INCH DCDA
 WOULD EXPECT 10 INCH GATE VALVE IMMEDIATELY UPSTREAM OF
 IT.
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
 1. SHEET C-04
 A. REVISE THE PIPE MATERIAL FROM CMP TO RCP FOR THE
 STORM PIPE EAST OF STRUCTURE EX S-1.
 B. REVISE THE PIPE MATERIAL FROM VCP TO DIP FOR THE
 EXISTING TWO STORMPIPES BETWEEN EXISTING STRUCTURES
 CB-5 AND CB-6.
 2. SHEET C-05
 A. VERIFY THE DIMENSIONS SHOWN ON SECTION B-B. REVISE
 THE DIMENSION OF THE DRIVEWAY APRON TO THE BACK OF THE
 VALLEY GUTTER.
 3. SHEET C-06
 A. COORDINATE PLACEMENT OF THE WEIR AND PRB IN THE PLAN
 VIEW AND SECTION VIEW OF THE CS-1 CONTROL STRUCTURE
 DETAIL.
 B. COORDINATE THE DIAMETER OF THE CONTROL STRUCTURE AS
 SHOWN IN THE CS-1 CONTROL STRUCTURE PLAN VIEW AND THE
 CALL OUT ON THE DRAINAGE PLAN.
 C. REVISE THE PIPE MATERIAL FROM VCP TO DIP FOR THE
 EXISTING TWO STORMPIPES BETWEEN EXISTING STRUCTURES
 CB-5 AND CB-6.
 4. SHEET C-07
 A. CONFLICT #6 WILL BE WITH THE EXISTING 24-INCH VCP OR
 THE PROPOSED 24-INCH RCP.
 5. STORMWATER MANAGEMENT CALCULATIONS
 A. INCORRECT RAINFALL DEPTHS USED IN THE EXISTING
 CONDITIONS CALCULATIONS.
  
 COMMENTS FROM RICKY ELIZONDO, PUB. UTILITIES PLANS
 EXAMINER, [email protected] , 561-494-1101:
 -COMMENT 8 NOT FULLY ADDRESSED. PER GIS, THERE ARE TWO
 EXISTING LATERALS LOCATED TO THE WEST OF THE MANHOLE,
 ONE OF WHICH APPEARS TO SERVE 524 DATURA. THERE ALSO
 APPEAR TO BE TWO EXISTING WATER SERVICES TO THE WEST OF
 THE EXISTING 6??? DIP FIRE LINE (BOTH OF WHICH SERVE
 524 DATURA)
 -COMMENT 15 NOT FULLY ADDRESSED, ADD THE LANGUAGE GIVEN
 IN THE COMMENT RESPONSE TO THE PLANS
 -POINTS OF SERVICE ARE NOT DENOTED FOR ALL
 SERVICE/LATERAL CONNECTIONS. PLEASE REFLECT ON PLANS.
 -PER STANDARDS, 8??? LATERALS REQUIRE MANHOLE
 CONNECTIONS.
 -SEWER CONNECTIONS WOULD BE PREFERRED ON QUADRILLE
 PLAZA DR. IN ORDER TO ALLOW FUTURE ABANDONMENT OF
 UTILITIES IN THE ALLEY.
 -12??? WATER MAIN SHOWN AS CAST IRON ON DEMO, BUT
 REFLECTED AS DIP ON UTILITY SHEET
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
  