Plan Review Details - Project Z11090008
Plan Review Stops For Project Z11090008
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 10-12-2011 Cont ID  
Sent By lmartine Date 10-12-2011 Time 09:04 Rev Time 0.00
Received By lmartine Date 10-11-2011 Time 16:35 Sent To  
Notes
2011-10-12 09:10:24BUILDING REVIEW COMMENTS
  
  
  
 ACCESSIBLE PARKING WILL BE REQUIRED FOR EACH PARKING
 LOT, SEE 11-4.6.2 OF THE FLORIDA ACCESSIBILITY CODE.
  
  
  
  
 LUIS MARTINEZ
 561-805-6710

Review Stop PARK PARKING
Rev No 1 Status F Date 10-12-2011 Cont ID  
Sent By ssamuels Date 10-12-2011 Time 09:36 Rev Time 0.00
Received By ssamuels Date 10-12-2011 Time 09:34 Sent To  
Notes
2011-10-12 09:41:03SHOW ALL PARKING DATA FOR PLAN INCLUDED SYMBOLS, SIGNS
 .
 SHOW BICYCLE PARKING SPACES PER CITY CODE.
 ACCEAAIBLE PARKING WILL BE REQIURED FOR EACH PARKING
 LOT.
  

Review Stop POLICE POLICE
Rev No 1 Status F Date 10-04-2011 Cont ID  
Sent By   Date 10-04-2011 Time 10:30 Rev Time 30.00
Received By   Date 10-04-2011 Time 10:00 Sent To  
Notes
2011-10-04 10:17:05IN REVIEWING THE PLANS, I SEE NO LIGHTING SHOWN, THE
 TYPE OF LIGHTING TO BE USED AND WILL IT BE AFFECTED BY
 THE PLANNED LANDSCAPING?

Review Stop STORM STORMWATER
Rev No 1 Status F Date 10-03-2011 Cont ID  
Sent By tward Date 10-03-2011 Time 15:44 Rev Time 0.00
Received By tward Date   Time   Sent To  
Notes
2011-10-03 16:38:29PROJECT TO PROVIDE ON-SITE STORMWATER RUNOFF WATER
 QUALITY TREATMENT PER SFWMD CRITERIA. TREES IN EAST
 PART OF NORTH LOT MAY CONFLICT WITH EXISTING SANITARY
 SEWER.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 561-494-1120

Review Stop SURVEY SURVEYING
Rev No 1 Status F Date 10-11-2011 Cont ID  
Sent By vnoel Date 10-11-2011 Time 10:31 Rev Time 0.00
Received By vnoel Date   Time   Sent To  
Notes
2011-10-11 10:51:10NORTH LOT:
  
 1. NEED SIGN-OFF FROM FPL FOR PROPOSED LANDSCAPING.
 2. NEED SIGN-OFF FROM PD AND FIRE FOR EMERGENCY ACCESS
 EASEMENT.
 3. NEED SIGN-OFF FOR 24' ACCESS EASEMENT TO BE
 RELOCATED.
 4. PROVIDE PLAN SHOWING EXISTING WATER AND SEWER.
 ADDITIONAL EASEMENTS MAY BE REQUIRED IF OUTSIDE OF
 EXISTING 10 UE.
  
  
 SOUTH LOT:
  
 1. PROVIDE COPY OF QUIT CLAIM DEED IN ORB 2754/1790.

Review Stop TRAFFIC TRAFFIC ENGINEERING
Rev No 1 Status F Date   Cont ID  
Sent By   Date 10-11-2011 Time   Rev Time 0.00
Received By bcollins Date 10-11-2011 Time 14:19 Sent To  
Notes
2011-10-11 14:22:11PROVIDE STRIPING PLAN FOR ACACIA ROAD AND CURRIE
 CRESCENT. REMOVE EASTERNMOST PARKING SPACE ON SOUTH
 SIDE OF ACACIA ROAD.

Review Stop Z ZONING
Rev No 1 Status F Date 10-10-2011 Cont ID  
Sent By ajones Date 10-10-2011 Time 10:30 Rev Time 0.00
Received By ajones Date 10-10-2011 Time 10:30 Sent To  
Notes
2011-10-10 10:30:07NORTH LOT
  
 1. WHAT IS THE PURPOSE OF THE CURB CUT ON THE EAST SIDE
 OF THE NORTH LOT? THE CURB CUT LEADS INTO THE PARKING
 LOT FOR 1201 S. FLAGLER DRIVE. HOW WILL THE CIRCULATION
 WORK?
 2. WHEN THE PARKING LOT IS BUILT IS WILL ELIMINATE THE
 INGRESS AND EGRESS FOR 1201 S. FLAGLER FROM ACACIA
 ROAD. HOW WILL 1201 S. FLAGLER ENTER THEIR PROPERTY?
 3. MANEUVERING SPACE NEEDS TO BE PROVIDED FOR THE 2
 DEAD END ISLES.
  
 EAST LOT
 1. MANUEVERING SPACES NEED TO BE AT MINIMUM THE SIZE OF
 A STANDARD PARKING SPACE. THIS CAN BE ACHEIVED BY USING
 ONLY 1 SIDE OF THE PARKING LOT.
  
 BOTH LOTS
 1. 4 BICYCLE PARKING SPACES NEED TO BE PROVIDED BETWEEN
 BOTH LOTS.