Plan Review Details - Project E22080036
Plan Review Stops For Project E22080036
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 2 Status F Date 06-09-2023 Cont ID  
Sent By lquinone Date 06-09-2023 Time 15:48 Rev Time 0.00
Received By lquinone Date 06-09-2023 Time 15:48 Sent To  
Notes
2023-06-09 15:49:24E22080036 506 DATURA ST 4.25.23 RESUB REVIEW
  
 NO COMMENTS FROM LINDA QUI??ONES-CINTRON, PROJECT
 COORDINATOR, ENGINEERING SERVICES DEPT., 561-494-1085
 [email protected] :
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
 -RESPONSE DOES NOT RESOLVE COMMENT 5 FROM PRIOR
 RESPONSE LETTER. [COMMENT 5: CHECK THE FIRELINE PROFILE
 ON SHEET C07. SOME SIZES STILL LOOK INCONSISTENT VS
 PLAN VIEW) RESPONSE LABELS AND DEPICTIONS OF THE
 PROPOSED & EXISTING WATER MAINS WERE ADDED TO THE CROSS
 SECTION VIEWS ON SHEET C-07.] THE FIRELINE PROFILE
 SHOWS 10 IN PIPE AND GATE VALVE FROM WATER MAIN, BUT
 PLAN AND BLOWUP PLAN SHOW 8 INCH FITTINGS, 8 INCH TEE,
 6 INCH TEE, AND 6 INCH PIPE. PLEASE REVIEW AND UPDATE
 SO CONTRACTORS WILL BE ABLE TO CONSTRUCT WATER LINE AND
 UTILITY DEPARTMENT CAN BILL PROPERLY. ON THE BLOWUP
 DETAIL ALSO ADD SIZE TO THE LABELS OF THE GATE VALVES
 FOR THE FIRELINE AND FIRE HYDRANT. FOR A 10 INCH DCDA
 WOULD EXPECT 10 INCH GATE VALVE IMMEDIATELY UPSTREAM OF
 IT.
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
 1. SHEET C-04
 A. REVISE THE PIPE MATERIAL FROM CMP TO RCP FOR THE
 STORM PIPE EAST OF STRUCTURE EX S-1.
 B. REVISE THE PIPE MATERIAL FROM VCP TO DIP FOR THE
 EXISTING TWO STORMPIPES BETWEEN EXISTING STRUCTURES
 CB-5 AND CB-6.
 2. SHEET C-05
 A. VERIFY THE DIMENSIONS SHOWN ON SECTION B-B. REVISE
 THE DIMENSION OF THE DRIVEWAY APRON TO THE BACK OF THE
 VALLEY GUTTER.
 3. SHEET C-06
 A. COORDINATE PLACEMENT OF THE WEIR AND PRB IN THE PLAN
 VIEW AND SECTION VIEW OF THE CS-1 CONTROL STRUCTURE
 DETAIL.
 B. COORDINATE THE DIAMETER OF THE CONTROL STRUCTURE AS
 SHOWN IN THE CS-1 CONTROL STRUCTURE PLAN VIEW AND THE
 CALL OUT ON THE DRAINAGE PLAN.
 C. REVISE THE PIPE MATERIAL FROM VCP TO DIP FOR THE
 EXISTING TWO STORMPIPES BETWEEN EXISTING STRUCTURES
 CB-5 AND CB-6.
 4. SHEET C-07
 A. CONFLICT #6 WILL BE WITH THE EXISTING 24-INCH VCP OR
 THE PROPOSED 24-INCH RCP.
 5. STORMWATER MANAGEMENT CALCULATIONS
 A. INCORRECT RAINFALL DEPTHS USED IN THE EXISTING
 CONDITIONS CALCULATIONS.
  
 COMMENTS FROM RICKY ELIZONDO, PUB. UTILITIES PLANS
 EXAMINER, [email protected] , 561-494-1101:
 -COMMENT 8 NOT FULLY ADDRESSED. PER GIS, THERE ARE TWO
 EXISTING LATERALS LOCATED TO THE WEST OF THE MANHOLE,
 ONE OF WHICH APPEARS TO SERVE 524 DATURA. THERE ALSO
 APPEAR TO BE TWO EXISTING WATER SERVICES TO THE WEST OF
 THE EXISTING 6??? DIP FIRE LINE (BOTH OF WHICH SERVE
 524 DATURA)
 -COMMENT 15 NOT FULLY ADDRESSED, ADD THE LANGUAGE GIVEN
 IN THE COMMENT RESPONSE TO THE PLANS
 -POINTS OF SERVICE ARE NOT DENOTED FOR ALL
 SERVICE/LATERAL CONNECTIONS. PLEASE REFLECT ON PLANS.
 -PER STANDARDS, 8??? LATERALS REQUIRE MANHOLE
 CONNECTIONS.
 -SEWER CONNECTIONS WOULD BE PREFERRED ON QUADRILLE
 PLAZA DR. IN ORDER TO ALLOW FUTURE ABANDONMENT OF
 UTILITIES IN THE ALLEY.
 -12??? WATER MAIN SHOWN AS CAST IRON ON DEMO, BUT
 REFLECTED AS DIP ON UTILITY SHEET
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
  

Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 10-06-2022 Cont ID  
Sent By rrossano Date 10-06-2022 Time   Rev Time  
Received By rrossano Date 10-06-2022 Time   Sent To  
Notes
2022-10-06 07:14:57E22080036 506 DATURA ST 8.11.22 REVIEW
  
 COMMENTS FROM RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPT., 561-494-1098
 [email protected] :
  
 1. CONFIRM THAT A COMPLETED LOS ANALYSIS SUMMARY TABLE
 HAS BEEN SUBMITTED DIRECTLY TO ENGINEERING (SHEET 33 OF
 CITY OF WPB DEVELOPMENT APPLICATION).
 2. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 3. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-8 FOR WATER AND PER FAC 64-E.008 FOR SEWER.
 4. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 5. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 6. PLANS SHALL SHOW EXISTING AND PROPOSED LOCATIONS AND
 DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND
 SEWER LINES AND CLEANOUTS, GREASE TRAPS, ETC. INCLUDING
 STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY
 SEWERS, THE MAKE AND MODEL OF ALL VALVES, POTABLE AND
 IRRIGATION METERS, BACKFLOWS, FIRE HYDRANTS AND FDCS,
 AND OTHER DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH
 BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES
 SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS,
 CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND
 MANHOLES AND PROFILES OF SANITARY SEWER LINES. GATE
 VALVE BOXES SHALL NOT BE INSTALLED IN CURB OR SIDEWALK.
 ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE
 VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON
 PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. PLEASE
 SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES INCLUDING PIPES SIZES AND
 MATERIALS, LOCATED ON THE RIGHT-OF-WAY.
 7. PLEASE CUT AND CAP UTILITIES NOT IN USE AND REMOVE
 ANY ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM
 CITY RIGHT OF WAY.
 8. PLEASE SHOW EXISTING AND PROPOSED UTILITY EASEMENTS,
 INCLUDING THOSE PROPOSED TO ALLOW ACCESS FOR CITY
 PERSONNEL TO PROPOSED UTILITY WATER METERS.
 9. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION, AND
 EXISTING METER AND BACKFLOW (TO BE REMOVED?). BACKFLOWS
 SHALL BE INSTALLED ON PRIVATE PROPERTY OUTSIDE OF
 EASEMENTS AND RIGHTS OF WAY. DOMESTIC WATER METERS
 SHALL BE INSTALLED IMMEDIATELY ADJACENT TO PROPERTY
 LINE. 3 INCH AND LARGER WATER METERS SHALL BE INSTALLED
 ABOVE-GROUND ONLY.
 10. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA
 AND FIRE BACKFLOW PREVENTER AS DCDA. SPECIFY LEAD FREE
 DESIGN ON ALL BACKFLOWS.
 11. ENGINEERING PLANS SHALL INCLUDE PIGGING, FLUSHING
 AND SAMPLE POINTS ON ANY WATER RUNS 60 FT. IN LENGTH OR
 GREATER.
 12. FOR FORMAL ENGINEERING SUBMITTAL, SFWMD ERP AND
 NPDES NOI REQUIREMENTS WILL BE ENFORCED.
 - AN NOI IS REQUIRED FOR PROJECTS THAT:
 - 1) DISTURB ONE OF MORE ACRES OF LAND OR DISTURB LESS
 THAN ON ACRE OF LAND BUT ARE PART OF A COMMON PLAN OF
 DEVELOPMENT OR SALE;
 - 2) DISCHARGE STORMWATER TO SURFACE WATERS OF THE
 STATE OR TO SURFACE WATERS OF THE STATE THROUGH A
 MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4).
 - THE SFWMD ERP CAN BE OBTAINED THROUGH A 10-2 SELF
 CERTIFICATION THROUGH FDEP OR AN ERP APPLICATION
 THROUGH SFWMD. EITHER WAY, THE DEVELOPER/ENGINEER SHALL
 SUBMIT A COPY OF THE ERP PERMIT OR FDEP ACKNOWLEDGEMENT
 OF THE 10-2 CERTIFICATION.
 13. PROVIDE PROFILE AND CLEARANCES BETWEEN WATER, SEWER
 AND STORM LINES AT ALL UTILITY CROSSINGS WITHIN ROW PER
 CITY OF WEST PALM BEACH STANDARD DETAIL GN-2 SERIES.
 14. WHEN SUBMITTING APPROVED MATERIALS LIST, PLEASE
 PROVIDE MATERIAL/CUT SHEETS FOR ALL PROPOSED BACKFLOW
 DEVICES SHOWING SPECIFIC MODEL NUMBER AND SPECIFYING
 USC APPROVED LEAD-FREE DESIGN.
 15. PLEASE CLEARLY SHOW ROAD RIGHT OF WAY.
 16. PLEASE PROVIDE SANITARY ELEVATIONS AT MANHOLE
 TIE-IN.
 17. IF TRENCHING IN IN CITY-MAINTAINED ROADWAY AREAS
 ADD NOTE TO PROVIDE 50 FT. PAVEMENT RESTORATION
 TRANSITION ON EACH SIDE OF PROPOSED TRENCH PER CITY OF
 WPB STANDARD DETAIL GC-4.
 18. PLEASE PROVIDE LEGEND ON ALL PLAN SHEETS TO INCLUDE
 STREETLIGHT, SIGN POSTS, TRANSFORMER BOXES ETC.
 19. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND
 INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER
 (E-XXXXXXXX).
  
 CONTACT INFO:
  
 COMMENTS FROM MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPER., WPB PUBLIC UTILITIES, 561-822-2262 OR
 [email protected]:
  
 -PLANS NOT SIGNED, SEALED, AND DATED.
 -ON GENERAL NOTE 8, ADD THAT RECORD DRAWINGS MUST MEET
 ALL OF CITY OF WPB REQUIREMENTS.
 -WATER NOTE 3: PVC CANNOT BE USED FOR POTABLE WATER
 MAINS. ONLY FOR WASTEWATER.
 -ON DEMOPLAN SHOW AND LABEL ALL EXISTING METERED WATER
 SERVICES AND SEWER LATERALS.
 -ON UTILITY PLAN: ADD PIPE MATERIAL TYPE TO LABEL OF
 WATER MAIN; VERIFY SIZE OF WATER MAIN AS THE PLAN SIZE
 DOES NOT MATCH WPB GIS; CALLOUT TAPS OR TEES AT WATER
 MAIN CONNECTIONS; CALLOUT HORIZONTAL DISTANCE BETWEEN
 THE TWO CLOSE WATER MAIN CONNECTIONS.
 -THE 6 INCH WATER LINES NEED TO BE DIP INSTEAD OF PVC.
 CONFLICT TABLE WOULD NEED TO BE UPDATED ALSO.
 -ADD ALL ABBREVIATIONS TO ABBREVIATIONS LIST. WL IS NOT
 ON THERE.
 -VERIFY DID NOT WANT TO HAVE PARALLEL/DUAL DOMESTIC
 BACKFLOW ASSEMBLIES.
 -VERIFY NO AUXILIARY WATER SOURCES SUCH AS WELLS WILL
 BE CONNECTED TO PRIVATE FIRE SYSTEM.
 -THE FIRE HYDRANT DESIGN IS NONSTANDARD AND HAS ISSUES.
 NOT SURE IF THE INTENT IS A PRIVATE HYDRANT OR CITY
 HYDRANT. IF PRIVATE, IT NEEDS TO BE INSTALLED
 DOWNSTREAM OF THE DCDA. IF CITY OWNERSHIP INTENDED,
 THEN DOES NOT SEEM TO COMPLY WITH STANDARD DETAIL WITH
 RESPECT TO CONNECTION TO WATER MAIN. THE VALVING IS
 ALSO IN A PEDESTRIAN WALKWAY AND HYDRANT AT TROUBLESOME
 LOCATION.
 -ADD VISUAL SCALE MEASUREMENT ICON TO DETAIL A.
 -IRRIGATION WATER SERVICE LINE CANNOT BE PVC, BUT IT
 COULD BE POLY.
 -ADD SIZE TO THE IRRIGATION RPPA LABEL AS WELL AS
 REFERENCE TO SD WS 6
 -ADD THE APPROPRIATE STANDARD DETAIL REFERENCES TO THE
 LABELS OF THE WATER METERS AND BACKFLOW ASSEMBLIES.
 -FOR THE ALLEY SANITARY SEWER MAIN LABEL, ADD PIPE SIZE
 AND MATERIAL TYPE.
 -ADD INVERT AND RIM ELEVATIONS TO THE LABELS OF THE
 SEWER MANHOLE IN ALLEY AND AT INTERSECTION.
 -VERIFY ALL FRANCHISE UTILITIES ARE SHOWN AND LABELED
 ON DATURA AND QUADRILLE PLAZA DR.
 -ADD SIZE TO IRRIGATION METER LABEL. ALSO CAN REMOVE
 VALVE SYMBOL NEAR WATER MAIN AS ONLY CORP STOP IS USED
 PER STANDARD DETAIL.
 -SHOW AND LABEL ALL EXISTING WATER MAIN VALVES AT
 DATURA AND QUADRILLE INTERSECTION, AND ALONG DATURA, ON
 UTILITY AND DEMO PLANS.
 -IF PROJECT IS BUILDING ON 524 DATURA LOT, THEN SHOW
 AND LABEL THE EXISTING FIRELINE SERVICE.
 -LABEL ADJACENT PROPERTY ADDRESSES ON PLANS.
 -CALLOUT CROSSING OF EXFILTRATION TRENCH, 18 INCH HDPE,
 AND IRRIGATION WATER SERVICE.
 -ADD SLOPE GUIDANCE FOR SEWER LATERALS.
 -SEWER LATERALS SHOW AS 4 INCH SIZE, BUT CITY MINIMUM
 IS TYPICALLY 6 INCH SIZE.
 -ADD SIZE OF GAS MAIN.
 -ADD PROFILES FOR EACH WATER SERVICE. ON PROFILES SHOW
 NEARBY UTILITIES.
 -ADD THE FOLLOWING WPB STANDARD DETAILS TO PLAN SET:
 WS4.1, WS2, GS5, P6, P8, P11.1
 -RIM AND INVERT ELEVATIONS ARE NOT SHOWING CORRECTLY ON
 UTILITY PLAN.
 -ON DETAIL A ADD SPOT ELEVATIONS NEAR BACKFLOW
 ASSEMBLIES.
 -IF SAMPLE POINTS ARE NEEDED OR REQUIRED, SHOW AND
 LABEL ON UTILITY PLAN..
 -ADD BACKFLOW PREVENTER SYMBOL TO LEGEND.
 -LABEL OF ABOVE GROUND WATER METER SAYS SEE SHEET C800,
 BUT CANNOT FIND SHEET C800 IN PLAN SET.
 -AS DIRECTED IN NOTE 7 SD WS7, ADD FLOW CALCULATIONS TO
 UTILITY PLAN. CALCULATIONS SHOULD TAKE INTO ACCOUNT
 FACTORS SUCH AS DOMESTIC SERVICE LINE SIZING AND SHOW
 FLOW WILL BE ABLE TO MEET DEMAND.
 -AS DIRECTED IN NOTE 8 SD WS5, ADD FIRE FLOW
 CALCULATIONS TO UTILITY PLAN. CALCULATIONS SHOULD SHOW
 FLOW WILL MEET PRIVATE FIRE DEMAND AND TAKE INTO
 ACCOUNT FACTORS SUCH AS FIRE LINE SIZING.
 -SHOW AND LABEL ALL EXISTING AND PROPOSED STRIPING AND
 SIGNING IN ALLEY ON THE APPROPRIATE SHEETS.
 -HISTORIC PICTURES SHOW STORM MANHOLE NEAR BULBOUT TO
 THE WEST OF NORTHWEST PROPERTY CORNER THAT IS NOT SHOWN
 ON PLANS.
 -6 INCH METER BUILDOUT FOOT PRINT MAY BE LONGER THAN
 SHOWN ON PLAN.
 -ADD MARKUP NOTE ON WS1 THAT DUAL CHECK VALVE IS NOT
 INSTALLED IF BACKFLOW ASSEMBLY IS BEING USED.
 -ADD NOTE ON UTILITY PLAN THAT PIGGING JUMPER METERS
 AND BACKFLOW ASSEMBLIES CANNOT BE UNDERGROUND.
 -ADD NOTE ON DEMO PLAN TO RETURN ANY REMOVED CITY WATER
 METER ??? CONTACT [email protected].
 -HISTORIC PICTURES SHOW VALLEY GUTTER IN MIDDLE OF
 ALLEY BUT PLANS DO NOT DEPICT THAT WELL.
 -PLANS NOT CLEAR FOR THE INTENTION OF ALLEY. TYPICALLY
 THE WHOLE ALLEY WOULD BE RESURFACED, BUT THERE ARE SOME
 PAVER SECTIONS CALLED OUT. VERIFY WHO APPROVED PAVERS
 IN ALLEY AND MAKE PLAN INTENTION MORE CLEAR.
 -PROPOSED CURB CHANGE OUT OF ALLEY ON NORTH SIDE PUTS
 AN EXISTING SIGN IN A CURB.
 -ALLEY IS CURRENTLY RIGHT TURN ONLY ONTO QUADRILLE
 PLAZA DR.. VERIFY WITH VALERIO IF IT SHOULD REMAIN
 RIGHT TURN ONLY.
  
 COMMENTS FROM TRACY WARD, SR. STORMWATER ENG.,
 ENGINEERING SERVICES, [email protected] 561-494-1120:
  
 SURFACE WATER MANAGEMENT REPORT (PREPARED 8/10/22)
 1. REVIEW THE PROJECT OVERVIEW AND SUMMARY PAGE AND
 REMOVE INFORMATION THAT IS NOT APPLICABLE TO THIS
 PROJECT.
 2. PROJECT SITE IS LOCATION WITHIN THE C-51 BASIN.
 3. SUMMARY LISTS THE MINIMUM PAVEMENT GRADE ELEVATION
 AS 17.70 FT NAVD. IDENTIFY WHERE ON THE PAVING AND
 GRADING PLAN (SHEET C-05) THIS GRADE IS LOCATED ON
 SITE.
 4. WHAT IS THE 100-YEAR 3-DAY ZERO DISCHARGE PEAK
 STAGE?
 5. PROVIDE EXISTING CONDITIONS LAND-USE AREAS
 (BUILDING, OTHER IMPERVIOUS, PERVIOUS).
 6. PROVIDE BASIS FOR THE GROUNDWATER TABLE ELEVATION
 AND THE EXFILTRATION RATE USED IN THE EXFILTRATION
 TRENCH EQUATION.
 7. PAGE 3 ??? C. ACTUAL DETENTION/RETENTION PROVIDED
 A. INCORRECT VALUES LISTED FOR RET. BOTTOM ELEV. AND
 WATER QUALITY HEIGHT
 8. PAGE 7 CHANGE MIN. FFE) STORM EVENT FROM 1000 TO
 100.
 9. HOW IS THE DISCHARGE RATE BEING CONTROLLED TO THE
 ALLOWABLE RATE?
  
 ENGINEERING PLANS
 1. PROVIDE A COPY OF THE APPROVED SITE PLAN.
 2. SHEET C-02
 A. WATER AND SEWER NOTE #12 ??? MANHOLE COVERS FOR
 PRIVATELY MAINTAINED MANHOLES SHALL NOT HAVE ???WEST
 PALM BEACH??? INSCRIBED ON THEM.
 B. ROAD AND BRIDGE GENERAL NOTES #2 ??? RESTORATION TO
 BE IN ACCORDANCE WITH CWPB DETAILS.
 C. REVISE THE UTILITY CONTACT AND ADDRESS FOR WATER AND
 WASTEWATER SERVICE.
  
 3. ENGINEERING BASE MAP DOES NOT MATCH THE LANDSCAPE
 PLANS BASE MAP.
 4. CAN CURB RAMP ON THE NORTH SIDE OF THE ALLEY ALIGN
 BETTER WITH THE CURB RAMP ON THE SOUTH SIDE OF THE
 ALLEY?
 5. LIST SPOT GRADES FOR HARD SURFACES TO TWO DECIMAL
 POINTS.
 6. VERIFY THE PROPOSED SPOT GRADES DO NOT RESULT IN
 SIDEWALK CROSS SLOPES EXCEEDING 2 PERCENT.
 7. THE VALLEY GUTTER AND F CURB AND GUTTER ALONG
 QUADRILLE PLAZA DRIVE SCALE 14 INCHES WIDE INSTEAD OF
 24 INCHES WIDE.
 8. SECTION C-C ON SHEET C-05 CALLS OUT 10??? DROP OFF
 LANE. IT SCALES ~7 FEET IN PLAN VIEW.
 9. CONFIRM THE PROJECT WILL NOT MOVE THE WEST EDGE OF
 PAVEMENT OF QUADRILLE PLAZA DRIVE (E.G. THE TRAVEL LANE
 OF QUADRILLE PLAZA DR. WILL NOT BE NARROWED).
 10. SECTION B-B SHOWS SPOT GRADE OF 17.90 AT EDGE OF
 DATURA ST. GRADING PLAN SHOWS SPOT GRADES OF 18.3 AND
 18.1 WEST AND EAST, RESPECTIVELY, OF THE DRIVEWAY.
 WATER WILL POND IN THIS AREA.
 11. SECTION B-B SHOWS 15 FEET BETWEEN THE PROPERTY LINE
 AND FACE OF BUILDING. PLAN VIEW SHOWS THE BUILDING
 ABOUT 20 FEET FROM THE PROPERTY LINE.
 12. SHOW SWALE ON SECTION D-D TO PREVENT DIRECT RUNOFF
 TO THE ADJACENT PROPERTY.
 13. SPOT GRADES ALONG QUADRILLE PLAZA DRIVE ARE HIGHER
 THAN THE ELEVATION OF THE CENTERLINE OF THE ROAD.
 14. CONFIRM THE ALLEY WILL HAVE POSITIVE DRAINAGE TO A
 DRAINAGE STRUCTURE.
 15. LIMIT THE CROSS SLOPE TO 4% FOR ON STREET PARKING
 AND PULL OFF SPACES.
 16. REVIEW THE PROPOSED GRADING ALONG DATURA STREET TO
 ENSURE THERE WILL BE POSITIVE DRAINAGE TO DRAINAGE
 STRUCTURES.
 17. LONGITUDINAL SLOPE IS FLAT FOR THE VALLEY GUTTER
 ALONG THE PULL OFF LANE ON QUADRILLE PLAZA DRIVE.
 18. SHOW AND LABEL THE RIGHT OF WAY LINES FOR THE
 ALLEY.
 19. SHOW AND LABEL THE WEST RIGHT OF WAY LINE OF
 QUADRILLE PLAZA DRIVE SOUTH OF THE ALLEY.
 20. LABEL THE CENTERLINE OF QUADRILLE PLAZA DRIVE.
 21. CURB RETURN FOR ALLEY CUTS ACROSS THE SOUTHEAST
 PROPERTY CORNER.
 22. SHOW MILL AND RESURFACING LIMITS IN THE ALLEY FOR
 THE TRENCHING WORK.
 23. SHOW PROPOSED DOORS ALONG THE BUILDING PERIMETER.
 24. SHOW AND LABEL PROPOSED COLUMNS ALONG THE OUTSIDE
 OF THE BUILDING.
 25. SHOW THE EXISTING CLEANOUT OUTSIDE THE SOUTHEAST
 PROPERTY CORNER UNLESS THE CLEANOUT AND LATERAL ARE
 BEING REMOVED. CALLOUT REMOVAL ON THE DEMOLITION PLAN.
 26. HOW WILL RUNOFF FROM THE SIDEWALK BE COLLECTED
 BEFORE FLOWING INTO THE RIGHT OF WAY?
 27. STRUCTURE CS-1 APPEARS TO ENCROACH INTO THE RIGHT
 OF WAY.
 28. CONSIDER MOVING STRUCTURE S-2 OUT OF THE DRIVEWAY.
 DESIGN PAVERS TO HIDE THE MANHOLE COVERS LOCATED WITHIN
 THE SIDEWALK AREA.
 29. NUMBER THE EXISTING DRAINAGE STRUCTURES, PREFERABLY
 WITH THE CITY???S GIS ASSET ID NUMBER.
 30. WHAT PIPE CONNECTIONS ARE PROPOSED FOR THE EXISTING
 STORM MANHOLE EAST OF THE EXISTING POWER POLE ON DATURA
 STREET?
 31. DRAINAGE PIPE WITHIN THE RIGHT OF WAY IS LIMITED TO
 RCP PIPE, 15??? IN DIAMETER OR LARGER.
 32. JUSTIFY THE SIZE OF THE OUTFALL PIPE.
 33. DRAW THE CS-1 CONTROL STRUCTURE DETAIL ON SHEET
 C-06 TO MATCH THE PLAN VIEW. DO NOT LABEL THE WEIR AS A
 BAFFLE ON THE DETAIL.
 34. SIGNING AND STRIPING PLAN (SHEET C-08)
 A. PROVIDE STRIPING PLAN FOR MILL AND RESURFACE AREAS.
 B. CALLOUT EXISTING SIGNS TO REMAIN AND WHAT THE SIGNS
 ARE.
 C. LABEL ALL PROPOSED SIGNS AND PAVEMENT MARKINGS.
 D. STRIPING MISSING FOR PULL OFF AREA ON QUADRILLE
 PLAZA DRIVE.
 E. CHEVRON STRIPING AT EACH END OF THE ON-STREET
 PARKING SPACES SHOULD ALL BE IN THE SAME DIRECTION
 (SOUTHWEST TO NORTHEAST).
 35. LABEL THE EXFILTRATION WIDTH ON THE EXFILTRATION
 TRENCH DETAIL.
  
 COMMENTS FROM MIKE TECHNOW, PUB. UTILITIES ENGINEER,
 [email protected], 561-494-1047:
 -ADD FIRE FLOW CALCULATIONS.
 -ADD PROFILES OF WATER SERVICES, SHOWING VERTICAL
 CLEARANCE.
 -LABEL ALL WATER AND SEWER UTILITIES WITH PIPE SIZE AND
 MATERIAL TYPE,
 -ADD ELEVATION INFO TO SEWER MANHOLES/CO???S.
  
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT (561) 494-1098 [email protected]
  
  

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***