Plan Review Details - Project E10080024
Plan Review Stops For Project E10080024
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status F Date 09-29-2010 Cont ID  
Sent By   Date 09-29-2010 Time   Rev Time 2.00
Received By mgonzale Date 09-29-2010 Time 08:20 Sent To  
Notes
2010-09-29 08:34:34COMMENTS:
  
 #1 PROVIDE DUMPSTER DETAIL
 #2 ADD SEWER CLEAN-OUT AT PROPERTY LINE OR SHOW CLOSEST
 EXISTING.
 #3 SHOW ALL LOCATIONS FOR TRUNCATED DOMES AT EXISTING
 AND PROPOSED DRIVEWAY. SHEET 2 OF 9
 #4 REVISE DRIVWEWAY DETAIL TO SHOW 2'-0" WIDE TRUNCATED
 DOME PADS. SHEET 3 OF 9
 #5 ADD CORRECT STRIPING COLOR TO HANDICAP DETAIL SHEET
 3 OF 9
 #6 REVISE SHEET 6 OF 9 TO REFLECT NEW HYDRANT LOCATION
 IN THE ROW WEST OF EXISTING SIDEWALK.
 (CITY WILL AVOID EASEMENTS WHEN INFRASTRUCTURE ELEMENTS
 CAN BE PLACED IN ROW.)
 #7 REVISE BACKFLOW TAP WITH CORRECT NUMBER OF VALVES.
 #8 SUGGEST TURNING DCDA 90 DEGREES BUT NOT REQUIRED.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING

Review Stop ENG-D ENGINEERING DEFICIENCY REVIEW
Rev No 1 Status P Date 10-29-2010 Cont ID  
Sent By mgonzale Date 10-29-2010 Time 07:52 Rev Time 2.50
Received By mgonzale Date 10-29-2010 Time 07:52 Sent To  
Notes
2010-10-29 07:55:40PASSED
  
 ALL COMMENTS HAVE BEEN ADDRESSED.
  
 THE PROJECT MADE PARTIAL PAYMENT OF $ 1000.00 HOWEVER
 OWES THE REST.
  
 ENGINEER'S COST ESTIMATE SHOWS AT TOTAL OF $ 79,975.00
  
  
 *******************************************************
 *******************************
  
 PRE-CON WAS HELD 01-20-2012
  
 PLEASE BE ADVISED THAT
 #1 DRAINAGE PIPING IN CITY ROW WILL HAVE TO BE RCP
 #2 CONTRACTOR SHALL OBTAIN ROW PERMIT PRIOR TO STARTING
 PORTION OF WORK IN ROW.
  
 GORDON B PATRIE
 UTILITIES ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET
 WEST PALM BEACH, FL 33401
 PHONE: 494-1040 EXT: 1082
 FAX: 494-1117
 E-MAIL: [email protected]
 SUPERVISOR: BEADLES, MIRANDA NOEL
  
 ********************************************
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  

Review Stop ENG-E ENGINEERING ENVR. MIT. REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-M ENGINEERING MODIFICATION REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG-T ENGINEERING TRAFFIC STUDY REV
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time  
Received By   Date   Time   Sent To  
Notes
***NONE***