2001-01-08 00:00:00 | PASSED WITH PROVISOS: |
| |
| STORMWATER COMMENTS: |
| |
| 1.THE ENGINEER OF RECORD SHOULD PUT |
| TOGETHER A LIST OF EXISTING IMPERVIOUS |
| AND PERVIOUS AREAS AS WELL AS A LIST OF |
| NEW IMPERVIOUS AND IMPERVIOUS ARES, TO |
| SHOW WHAT THE NEW ERU RATE WILL BE. |
| PLEASE SUBMIT PLANS SHOWING PRIOR TO |
| DEMOLITION AND FINAL DESIGN SO WE CAN |
| COMPARE THE TWO. |
| |
| 4.THE STORMWATER SYSTEM ON THE HOSPITAL |
| PROPERTY IS ALL PRIVATE AND AS SUCH WE |
| HAVE NO COMMENTS ABOUT THE DESIGN, |
| EXCEPT WHAT IS WRITTEN ABOVE. |
| |
| WATER AND SANITARY: |
| |
| 1.ALL ON SITE PIPING IS A PRIVATE |
| DISTRIBUTION SYSTEM METERED AND |
| PROTECTED WITH BACKFLOW PREVENTERS AT |
| 45TH AND GREENWOOD AVENUES. ALL OF THE |
| GRAVITY SYSTEM FROM 45TH STREET NORTH |
| AND GREENWOOD WEST IS PRIVATE OWNED BY |
| ST. MARY'S.AS SUCH WE DO NOT NEED TO |
| REVIEW THIS DESIGN FOR COMPLIANCE TO OUR |
| STANDARDS. BUT I MAKE THE FOLLOWING |
| COMMENTS FOR ITEMS THAT I SEE AS |
| POSSIBLY INCORRECT: |
| |
| 2.A 4" METER IS SHOWN AT THE NORTHWEST |
| CORNER OF THE BUILDING, IT IS NOT |
| REQUIRED BY THE PUBLIC UTILITY |
| DEPARTMENT SINCE WE MASTER METER THE |
| SITE. |
| |
| 3.SINCE ALL OF THE SANITARY SEWER SYSTEM |
| IS A PRIVATE, ONE OWNER SYSTEM, A DEP |
| PERMIT MAY NOT BE REQUIRED.CONTACT |
| JAMES L. (DUTCH) HOLLAND, ENVIRONMENTAL |
| ENGINEER (PLAN REVIEWER), AT |
| W-561:355-4045, EX. 1134F-561:355-2442 |
| AND DISCUSS IT WITH HIM OR ONE OF THE |
| OTHER PLAN REVIEWERS. |
| |
| 4.THE FIRE LINE THAT COME OFF OF THE |
| MASTER METERED DOMESTIC DISTRIBUTION |
| MAIN DOES NOT APPEAR TO HAVE AN APPROVED |
| DOUBLE CHECK BACKFLOW PREVENTER ON IT, |
| IT SHOULD HAVE ONE TO STOP ANY WATER |
| FROM COMING INTO THE SYSTEM WHEN PUMPED |
| INTO THE FDC.PLEASE CHECK AND SEE IF |
| EXISTS AND WAS LEFT OFF THE PLAN BY |
| MISTAKE OR IF IT NEEDS TO BE ADDED. |
| |
| 5.THE REDUCED PRESSURE BACKFLOW |
| PREVENTER SHOWN IS A SINGLE DEVICE.WE |
| STRONGLY SUGGEST ON DOMESTIC, CRITICAL |
| USAGE LOCATIONS, SUCH AS THIS THAT TWO |
| DEVICES ARE INSTALLED IN PARALLEL.THIS |
| WAY IF ONE FAILS OR HAS TO BE SHUT OFF |
| TO BE WORKED ON THE HOSPITAL IS NOT |
| WITHOUT WATER. |
| |
| 6.THE TEMPORARY JUMPER CONNECTION SHOWN |
| ON PAGE C3.01 IS WRONG.TWO IN-LINE |
| VALVES ARE REQUIRED WITH AN OPEN VENT |
| BETWEEN.THIS ALLOWS WATER TO PASS THRU |
| THE PROTECTED BYPASS FOR TESTING AND |
| WITHOUT THE CHANCE OF BACKFLOW THRU THE |
| SINGLE VALVE.THIS IS A DEP REQUIREMENT |
| ALSO. |