2001-01-08 00:00:00 | PASSED WITH PROVISOS: |
| |
| SHEET P-1: |
| A CLEAN-OUT IS REQUIRED AT THE TIE-IN TO |
| THE CITY SYSTEM AT THE PROPERTY LINE. |
| THIS IS NOT SHOWN ON THE DRAWINGS. |
| |
| THE SANITARY SEWER LATERAL RUNS OUT THE |
| EAST SIDE OF THE BUILDING.THERE IS NO |
| SANITARY MAIN IN OLIVE.THE SANITARY |
| MAIN IS IN THE ALLEY ON THE NORTH SIDE |
| OF THE PROPERTY.HAVE THE PLUMBER CALL |
| 659-8079 AND HAVE THE MAINTENANCE CREW |
| CHECK TO SEE IF THERE IS AN EXISTING |
| LATERAL TO THE PROPERTY, IF THERE IS |
| THEN RUN THE SANITARY LINE OUT TO THE |
| EXISTING LATERAL (WHICH MAY BE WEST OF |
| THE PROPOSED BUILDING).IF THERE IS NO |
| EXISTING LATERAL THE CONTRACTOR WILL |
| NEED TO TIE INTO THE EXISTING MAIN WITH |
| A WYE, TWO FERNCOS USING SDR 26 PVC PIPE |
| AND FITTINGS.THE EXISTING MAIN IN THE |
| ALLEY IS 12" CLAY AND THE LATERAL WILL |
| NEED TO BE 6". |
| |
| |
| THE WATER LINE RUNS OUT THE WEST SIDE OF |
| THE BUILDING.THERE IS A 3" TRANSITE |
| WATER MAIN IN THE ALLEY THAT CAN BE USED |
| FOR THE SERVICE. |
| |
| THE PLAN DOES NOT SHOW THE SIZE OF THE |
| WATER METER REQUIRED AND IT DOES NOT |
| SHOW A REDUCED PRESSURE PRINCIPLE |
| BACKFLOW ASSEMBLY AT THE METER, ONE WILL |
| BE REQUIRED. |
| |
| IT IS SUGGESTED THAT A SEPARATE |
| IRRIGATION METER BE INSTALLED, THE |
| SAVINGS WILL BE IN WATER USED.ALL |
| WATER USED FOR THE BUILDING METER WILL |
| BE CHARGED AGAINST THE SEWER CHARGES |
| ALSO, DOUBLING THE WATER BILL FOR THE |
| WATER USED TO IRRIGATE. |
| |
| NO DUMPSTER IS SHOWN.HOW WILL GARBAGE |
| BE PICKED UP?WE HAVE INCLUDED A |
| DUMPSTER DETAIL IF ONE NEEDS TO BE |
| BUILT.THE RECYCLE SECTION IS ONLY A |
| SUGGESTION.THE ENCLOSURE WILL NEED TO |
| BE PLACED WHERE A TRUCK CAN PULL RIGHT |
| UP TO THE OPEN GATES TO PICK UP THE |
| DUMPSTER. |
| |
| A RIGHT OF WAY PERMIT APPLICATION IS |
| INCLUDED FOR THE WORK INVOLVED WITH |
| REMOVING THE SIDEWALKS AND DRIVEWAY ON |
| EIGHTH STREET AND FOR THE NEW DRIVEWAY. |
| A DRIVEWAY DETAIL DRAWING IS ALSO |
| INCLUDED.THE DRIVEWAY APPROACH DETAIL |
| MUST BE FOLLOWED. |
| |
| A FDOT PERMIT MAY BE REQUIRED TO TIE |
| INTO THE CATCH BASIN ON OLIVE.CHECK |
| WITH FDOT PRIOR TO DOING ANY WORK ON |
| THIS BOX. |