Plan Review Notes For Permit 99101324
Permit Number 99101324
Review Stop ENG
Sequence Number 1
Notes
Date Text
2001-01-08 00:00:00STORM WATER REQUIREMENTS:
 PASSED WITH PROVISOS
 PAGE 4 OF 4 UNDER POLLUTION PREVENTION
 NOTES, NOTE B, REMOVE "AS NEEDED".
 EROSION CRONTOL FENCING IS REQUIRED.
 THE POLLUTION PREVENTION PLAN SHALL BE
 KEPT ON SITE AT ALL TIMES DURING
 CONSTRUCTION. THE PLAN SHALL BE
 INSTALLED IN THE FIELD PRIOR TO ANY
 EARTHWORK. THE ENGINEER OF RECORD SHALL
 CERTIFY TO THE CITY, ON A MONTHLY BASIS,
 THAT THE PLAN IS WORKING PROPERLY AND AS
 DESIGNED. THE ENGINEER OF RECORD IS
 RESPONSIBLE TO CERTIFY IMPLEMENTATION OF
 THE PROVISIONS OF CITY ORDINANCE NO.
 3132-98 OF THE CITY CODE AT SUCH TIME
 THE PERMITTEE APPLIES FOR A CERTIFICATE
 OF OCCUPANCY FROM THE CITY BUILDING
 OFFICIAL.
 EVERY SIX MONTHS AFTER CONSTRUCTION A PE
 SHALL CERTIFY THAT THE PERMANENT
 POLLUTION PREVENTION STRUCTURES, DRY-WET
 WATER DETENTION FACILITIES, AND
 EXFILTRATION SYSTEMS ARE WORKING AS
 DESIGNED AND ARE IN GOOD OPERATING
 CONDITION. ALL CERTIFICATIONS MUST BE
 SUBMITTED TO: STORM WATER UTILITY
 ENGINEER, CITY OF WEST PALM BEACH
 PUBLIC UTILITIES DEPARTMENT, P.O. BOX
 3366, WEST PALM BEACH, FL 33402.
 THE CERTIFICATION MUST INCLUDE THE
 BUILDING PERMIT NUMBER, THE ADDRESS OF
 THE PROPERTY AND THE NAME OF THE
 ESTABLISHMENT/PROJECT CONSTRUCTED.
 ENGINEERING REQUIREMENT:
 REMOVE ALL UNUSED DRIVEWAYS ON DIXIE
 HWY. (US #1) AND REPLACE WITH REGULAR
 CURBS, GUTTERS AND SIDEWALKS PER FDOT
 STANDARDS.FDOT PERMITS WILL BE
 REQUIRED.