2001-01-08 00:00:00 | THE PLAN IS APPROVED AS NOTED: |
| SHEET 1 OF 1 OF THE POLLUTION PREVENTION |
| PLAN, CHANGE NOTE #2 TAKE OUT WHERE |
| NECESSARY, SILT FENCES WILL BE USED. |
| NOTE 4 TAKE OUT PERIODICALLY AND |
| REPLACE WITH AS EQUIPMENT AND TRUCKS |
| LEAVE THE SITE. |
| ALSO THE FOLLOWING ITEMS MUST BE MET: |
| STORM WATER REQUIREMENTS: |
| TO OBTAIN A CONSTRUCTION PERMIT THE |
| FOLLOWING MUST BE SUBMITTED SIGNED AND |
| SEALED BY A FLORIDA PROFESSIONAL |
| ENGINEER (PE). |
| 1.HYDRAULIC COMPUTATIONS AND SUPPORTING |
| DOCUMENTATION |
| 2.IMPERVIOUS AREA COMPUTATIONS |
| THE POLLUTION PREVENTION PLAN SHALL |
| BE KEPT ON SITE AT ALL TIMES DURING |
| CONSTRUCTION. THE PLAN SHALL BE |
| INSTALLED IN THE FIELD PRIOR TO ANY |
| EARTHWORK. THE ENGINEER OF RECORD SHALL |
| CERTIFY TO THE CITY, ON A MONTHLY BASIS, |
| THAT THE PLAN IS WORKING PROPERLY AND AS |
| DESIGNED. THE ENGINEER OF RECORD IS |
| RESPONSIBLE TO CERTIFY IMPLEMENTATION |
| OF THE PROVISIONS OF CITY ORDINANCE NO. |
| 3132-98 OF THE CITY CODE AT SUCH TIME |
| THE PERMITTEE APPLIES FOR A CERTIFICATE |
| OF OCCUPANCY FROM THE CITY BUILDING |
| OFFICIAL. |
| 3.EVERY SIX MONTHS AFTER CONSTRUCTION A |
| PE SHALL CERTIFY THAT THE PERMANENT |
| POLLUTION PREVENTION STRUCTURES, DRY-WET |
| WATER DETENTION FACILITIES, AND |
| EXFILTRATION SYSTEMS ARE WORKING AS |
| DESIGNED AND ARE IN GOOD OPERATING |
| CONDITION. ALL CERTIFICATIONS MUST BE |
| SUBMITTED TO: |
| STORM WATER UTILITY ENGINEER |
| CITY OF WEST PALM BEACH PUBLIC UTILITIES |
| DEPARTMENT |
| P.O. BOX 3366, WEST PALM BEACH, FL 33402 |
| THE CERTIFICATION MUST INCLUDE THE |
| BUILDING PERMIT NUMBER, THE ADDRESS OF |
| THE PROPERTY AND THE NAME OF THE |
| ESTABLISHMENT/PROJECT CONSTRUCTED. |