Plan Review Notes
Plan Review Notes For Permit 99100504
Permit Number 99100504
Review Stop ENG
Sequence Number 4
Notes
Date Text
2001-01-08 00:00:004.THE TRUCK NEEDS TO HAVE NO LESS THAN A
 16' HIGH VERTICAL CLEARANCE AREA FOR THE
 TRUCK TO PICK UP THE DUMPSTER. THE CLEAR
 AREA MUST OVER THE DUMPSTER AND WHERE
 THE TRUCK WILL BE STOPPED TO UNLOAD THE
 DUMPSTER.
  
 5.THE TRUCK NEEDS TO HAVE NO LESS THAN
 14' HIGH VERTICAL CLEARANCE AND 12'
 HORIZONTAL CLEARANCES FOR THE TRUCK TO
 DRIVE THROUGH.
  
 6.IT IS STRONGLY SUGGESTED THAT YOU ADD
 A RECYCLING CENTER TO YOUR DUMPSTER
 ENCLOSURE.
  
 7.THE GARBAGE TRUCK WILL NOT BE ABLE TO
 DRIVE INTO THE DUMPSTER AS DRAWN, IT
 SHOULD BE AT A 45 DEGREE ANGLE TO THE
 ALLEY WITH THE GATE FACING NORTHWEST.
  
 (CITY) IRRIGATION AND LANDSCAPE CONFLICT
 REQUIREMENTS:
  
 1.ANY LANDSCAPE DISRUPTED BY
 CONSTRUCTION SHALL BE REPAIRED AND OR
 REPLACED AT THE CONTRACTORS EXPENSE.
  
 2.IT IS THE CONTRACTORS RESPONSIBILITY
 TO MAINTAIN ANY CITY OWNED LANDSCAPING
 IF THE IRRIGATION SYSTEM IS DISRUPTED.
  
 3.ANY TREES NEEDING TO BE REMOVED AND OR
 RELOCATED SHALL BE AT THE DIRECTION OF
 THE GROUNDS OPERATIONS DIVISION
 SUPERINTENDENT (659-8044) AT THE
 CONTRACTORS EXPENSE.
  
 4.ANY IRRIGATION SYSTEM REPAIRED OR
 REPLACED OR ANY CONDUITS LAID FOR FUTURE
 SYSTEMS SHALL BE AT THE DIRECTION OF THE
 GROUNDS OPERATIONS DIVISION
 SUPERINTENDENT AT THE CONTRACTORS
 EXPENSE AND SHALL BE "AS-BUILT" BY THE
 CONTRACTOR THRU A PE OR LAND SURVEYOR.
 A COPY OF THE IRRIGATION AS-BUILTS WILL
 BE SUBMITTED TO ENGINEERING FOR THEIR
 RECORDS.
  
 ENG REVIEW 3 AND 4 REPLACE ENG REVIEW
 1 & 2.