Date |
Text |
2001-01-08 00:00:00 | PASSED WITH PROVISOS: |
| STORMWATER: |
| PLAN SHEET S1, STATES THAT THREE CAR |
| GARAGE WILL BE BUILT "ON GRADE" AND |
| GIVES THE GRADE OF 16.40 FOR THE GARAGE |
| FLOOR (SEE SHEET C1).THE CITY ALLEY |
| (LOOK AT SHEET C1) HAS A GRADE OF 17.33 |
| STARTING AT THE BACK OF SIDEWALK AT |
| QUADRILLE AND DROPS 1.77 FEET TO 15.56 |
| JUST EAST OF THE GARAGE.YOU NEED TO |
| INSURE THAT THE GARAGE WILL NOT BE |
| FLOODED BY RUN OFF FROM THE ALLEY, THE |
| CITY WILL NOT BE RESPONSIBLE FOR |
| CHANGING THE GRADE OF THE ALLEY AND THE |
| WEST END OF THE GRADE CAN NOT BE |
| CHANGED. ADDITIONALLY IT IS DOUBTFUL |
| THAT A CAR WILL BE ABLE TO MAKE A 90 |
| DEGREE TURN INTO THE GARAGE IN A 14' |
| WIDE ALLEY. |
| PRIOR TO THE START OF CONSTRUCTION THE |
| FOLLOWING STORM WATER REQUIREMENTS MUST |
| BE MET. |
| SUBMIT COPIES OF THE INFORMATION LISTED |
| BELOW TO BE ADDED TO DEAN LAUDERMILK FOR |
| REVIEW AND INCLUSION WITH THE BUILDING |
| PLANS.IF THIS IS NOT DONE THE CITY |
| WILL NOT ALLOW THE WORK TO PROCEED: |
| FOUR COPIES OF THE FOLLOWING MUST BE |
| SIGNED AND SEALED BY A FLORIDA |
| PROFESSIONAL ENGINEER (PE). |
| 1.CONSTRUCTION PLANS (SHEET C-3) |
| 2.DETAILS AND SPECIFICATIONS SHEET C-3), |
| 3.HYDRAULIC COMPUTATIONS AND SUPPORTING |
| DOCUMENTATION (NOT SUPPLIED) |
| 4.IMPERVIOUS AREA COMPUTATIONS (NOT |
| SUPPLIED) |
| |
| 5.POLLUTION PREVENTION PLAN.(NOT |
| SUPPLIED) THE POLLUTION PREVENTION PLAN |
| SHALL BE KEPT ON SITE AT ALL TIMES |
| DURING CONSTRUCTION. THE PLAN SHALL BE |
| INSTALLED IN THE FIELD PRIOR TO ANY |
| EARTHWORK. THE ENGINEER OF RECORD SHALL |
| CERTIFY TO THE CITY, ON A MONTHLY BASIS, |
| THAT THE PLAN IS WORKING PROPERLY AND AS |
| DESIGNED. THE ENGINEER OF RECORD IS |
| RESPONSIBLE TO CERTIFY IMPLEMENTATION OF |
| THE PROVISIONS OF CITY ORDINANCE NO. |
| 3132-98 OF THE CITY CODE AT SUCH TIME |
| THE PERMITTEE APPLIES FOR A CERTIFICATE |
| OF OCCUPANCY FROM THE CITY BUILDING |
| OFFICIAL. |
| 6.EVERY SIX MONTHS AFTER CONSTRUCTION A |
| PE SHALL CERTIFY THAT THE PERMANENT |
| POLLUTION PREVENTION STRUCTURES, DRY-WET |
| WATER DETENTION FACILITIES, AND |
| EXFILTRATION SYSTEMS ARE WORKING AS |
| DESIGNED AND ARE IN GOOD OPERATING |
| CONDITION. ALL CERTIFICATIONS MUST BE |
| SUBMITTED TO: |
| STORM WATER UTILITY ENGINEER |
| CITY OF WEST PALM BEACH PUBLIC UTILITIES |
| DEPARTMENT |
| P.O. BOX 3366, WEST PALM BEACH, FL |
| 33402. |
| THE CERTIFICATION MUST INCLUDE THE |
| BUILDING PERMIT NUMBER, THE ADDRESS OF |
| THE PROPERTY AND THE NAME OF THE |
| ESTABLISHMENT/PROJECT CONSTRUCTED. |
| WATER AND SANITARY: |
| 1.THE METERS FOR THE BUILDING (1-1/2") |
| AND IRRIGATION (1") MUST BE LOCATED IN |
| THE CITY SIDEWALK, AT THE POINT WHERE |
| THE PLUMBING EXITS THE BUILDING (SEE |
| SHEET P-1) NOT WHERE IT IS SHOWN ON C-1 |
| OR I-1. THE LOCATION AT THE EAST END OF |
| THE PROPERTY IS TOO CLOSE TO THE NEXT |
| PROPERTY LINE.THE LOCATION WEST OF THE |
| ENTRANCE CAN ALLOW FOR THE BACKFLOW |
| PREVENTERS TO BE HIDDEN WITH |
| LANDSCAPING. |
| 2. THE DETAIL ON SHEET C-3 FOR THE NEW |
| WATER LINE IS WRONG ALSO.THE TAP WILL |
| BE 1-1/2 BY 2", THE COPPER AND ANGLE |
| VALVE WILL BE 2" WHICH WILL ALLOW FOR A |
| 1-1/2" METER TO BE SET ON IT. SEE THE |
| DETAIL ON SHEET C-6. |
| 3.A CLEAN-OUT WILL NEED TO BE INSTALLED |
| IN THE SANITARY SEWER LATERAL, ON THE |
| PROPERTY, AT THE EDGE OF THE ALLEY. |
| THIS IS NOT SHOWN ON SHEET C-1 BUT THERE |
| IS A DETAIL ON SHEET C-4. |
| 4.THE DETAILS USED FROM THE UTILITIES |
| DEPARTMENT IS OLD ALL PIPE IN THE ROW ON |
| THE SANITARY MUST BE SDR 26. |
| 5.A COPY OF THE WATER AND SANITARY AS- |
| BUILTS WILL BE SUBMITTED TO ENGINEERING |
| FOR THIER RECORDS. |
| SEE NEXT REVIEW FOR REST OF COMMENTS. |