2001-01-08 00:00:00 | SUBMIT TOTAL OCCUPANT LOAD OF STRUCTURE |
| PER SPC SEC.407.1.3. |
| |
| CONFIGURATION OF WOMEN'S RESTROOM ON SHT |
| A1.5.DOESN'T CORRELATE W/SHTS.A1.2 OR |
| A6.2.CLARIFY. |
| |
| CLEARLY SHOW LENGTH AND WIDTH DIMENSIONS |
| OF HANDICAP STALLS AND TOILET ROOMS. |
| COMPLY W/FACBC SEC.4.17.3 EXCEPTION:NEW |
| CONSTRUCTION AND FIGURES 28 AND 30. |
| |
| GRAB BARS BEHIND WATER CLOSETS SHALL |
| COMPLY W/FACBC SEC.4.16.4 & 4.17.6. |
| |
| CLEAR FLOOR SPACE UNDER HANDICAP LAVS. |
| SHALL COMPLY W/FACBC SEC.4.19.2. |
| |
| SHOW MOUNTING HEIGHTS/DIMENSIONS OF ALL |
| HANDICAP FIXTURES AND APPURTENANCES. |
| COMPLY W/ALL APPLICABLE SECTIONS OF |
| FACBC. |
| |
| DRINKING FOUNTAIN BY SECURITY OFFICE |
| SHALL COMPLY W/FACBC SEC.4.1.3(10)(A) |
| |
| SUBMIT ISOMETRIC DRAWING FOR COMPLETE |
| UNDERGROUND STORM DRAINAGE PIPING FOR |
| THE BUILDING STORM DRAINAGE SYSTEM PER |
| COUNTYWIDE AMENDMENTS TO SPC SEC.104.2.1 |
| SIZING OF SYSTEM SHALL COMPLY W/SPC SEC. |
| 1108.2.1.SYSTEM DOESN'T COMPLY. |
| |
| SUBMIT CALCULATIONS/DETAILS FOR |
| PROVISIONS FOR SECONDARY DRAINAGE FOR |
| ROOF STRUCTURE PER SPC SEC.1109.SUBMIT |
| DETAILS OF SCUPPERS W/ALL DIMENSIONS. |
| |
| CLEARLY SHOW TERMINATION POINT OF STORM |
| DRAINAGE SYSTEM.(SEE 8"RISERS AND CANOPY |
| AT ROTUNDA ON A200.) |
| |
| SHT.P200-RISER #4 -4"ROOF DRAIN NOT |
| SHOWN ON SHT.P206. |
| |
| SHT.P201-RISER FOR MSB ON 2ND FLR.DOES |
| NOT CORRELATE W/ISOMETRIC ON P206.(SEE |
| AREA AT COLS.9-10 BETWEEN E-F.) |
| |
| FLOOR DRAINS IN RESTROOMS AND FAMILY |
| TOILET ROOM ARE S-TRAPPED.COMPLY W/SPC |
| SEC.901.2. |
| |
| SHOW SIZE OF CONDENSATE DRAINS ON PLANS. |
| COMPLY W/SMC SEC.304.8.4. |
| |
| SHT.P206.-2ND.FLR.MEN'S AND WOMEN'S R.R. |
| SIZING OF DRAINAGE SYSTEM SHALL COMPLY |
| W/SPC TABLE 714.2.(REFER TO 1 1/2"& 2" |
| DRAINS). |
| |
| BRANCH VENT SIZING FOR WATER CLOSETS |
| SHALL COMPLY W/SPC TABLE 902.2. |
| |
| SHT.P206-JANITOR SINK NOT SHOWN ON WATER |
| AND SANITARY RISERS. |
| |
| SHT.P201 REFERS TO SHT.P700 FOR CONTIN- |
| UATION OF SANITARY.NO SUCH SHEET IS IN |
| PLANS. |
| |
| A HEATER PAN AND PAN DRAIN ARE REQUIRED |
| FOR THE EWH.COMPLY W/COUNTYWIDE AMEND- |
| MENTS TO SPC SEC.507.8.1. |
| |
| MAX.TEMPERATURE OF WATER TO PUBLIC REST- |
| ROOMS SHALL BE 110 DEGREES PER FEC SEC. |
| 412.1.ABCD.2.3.2. |
| |
| HOSE BIBBS SHALL BE VALVED PER SPC SEC. |
| 610.4.1. |
| |
| SHT.P206-WATER SUPPLY CONTROL SHALL |
| COMPLY W/SPC SEC.610.4.1 & 610.4.2. |
| |
| VENTS THRU ROOF SHALL NOT BE INCREASED |
| IN SIZE (ONLY WHERE FROST CLOSURE IS A |
| PROBLEM.)SPC SEC.905.2,918,920.2.-SEE |
| FUTURE RESTROOM AREA,& F.D.AT PUMP ROOM. |
| |
| THE FOLLOWING JOB SPECS.DO NOT COMPLY |
| W/SPC.THEY SHALL BE CHANGED TO COMPLY |
| W/THE FOLLOWING CODE SECS.: |
| PAGE 15410-15-(H)(I)-VERT.AND HORIZONTAL |
| SUPPORTS SHALL COMPLY W/SPC SEC.310.2- |
| 310.3.6. |
| PAGE 15430-6-(3.3)-CLEANOUTS SHALL |
| COMPLY W/SPC 710.2.4. |
| PAGE 15497(1-3)SECS.3.2-3.5-SYSTEM TESTS |
| SHALL COMPLY W/SPC SECS.311.2-311.7.5. |