Notes |
Date |
Text |
2001-01-08 00:00:00 | 1- PG.ESP2 HAS A DETAIL FOR A HOUSE PAN. | | THE DIAGRAM SHOWS NO MAIN OR METER. | | A PANEL SCHEDULE IS ALSO REQUIRED,AND | | THE LIGHTING CONTACTOR HAS TO BE RATE | | FOR USE AS SERVICE EQUIPMENT!!!!!!!!! | | | | 2- PG.E-7 AS PER THE ORIGINAL NOTES FOR | | PAGE ME2 AND E-7 ATS1, AND ATS2 NEED | | TO HAVE DISCONNECTS INSTALLED UP ON | | THE MEZZ. LEVEL ON THE EMERGENCY SIDE | | OF THE TRANSFER SWITCHES! | | | | 3- TRANSFORMER "TB" HAS A COMBINED LOAD | | OF 195.2 KVA FROM THE TWO PANELS IT | | FEEDS.TRANSFORMER IS ONLY 150 KVA? | | YOU NEED TO SHOW A LOAD CALCULATION | | THAT WILL ALLOW THIS!ALL THE LIGHTS | | ATTACHED TO THESE PANELS IS DONE AT | | 100% AND NOT THE REQUIRED 125% THE | | CODE BOOK REQUIRES!!!!!! | | | | 4- STILL HAVE NEVER RECEIVED A LOAD CALC | | ON THE GENERATOR AND THE TWO 800A | | MAINS?MDP-A, AND MDP-B!!!!!!!!!!!! | | | | 5- ANY ADDITIONAL LOADS ADDED TO THESE | | PANELS AS DIRECTED ON THE DRAWINGS ON | | PG. E-6 WILL HAVE TO BE ADDED TO THE | | LOAD CALCULATION FOR THE BUILDING!!! |
|