2023-07-10 13:04:15 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| |
| 1) THERE IS AN INDICATION OF A NEW DDCV BUT NO TO |
| CONFIRM THE PROPOSED MEET CITY STANDARDS. |
| |
| NFPA |
| |
| 1.7.12 PLANS AND SPECIFICATIONS. |
| |
| 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE |
| PLANS AND |
| SPECIFICATIONS TO ENSURE COMPLIANCE WITH APPLICABLE |
| CODES AND |
| STANDARDS. |
| |
| |
| FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE PRODUCT |
| SPEC SHEETS OF THE PROPOSED DDCV. |
| |
| |
| 2) THERE ARE MANY DDCV'S SHOWN ON THE SITE PLAN. |
| |
| PLEASE HIGHLIGHT OR CLOUD THE CORRECT #'D DDCV FOR EASY |
| IDENTIFICATION OF THIS INSTALL AND ALL FUTURE INSTALLS. |
| |
| PER NFPA 1 |
| |
| 1.7.12 PLANS AND SPECIFICATIONS. |
| |
| 1.7.12.3 THE CONSTRUCTION DOCUMENTS FOR EACH PHASE |
| SHALL BE COMPLETE IN THEMSELVES, SO THAT REVIEW AND |
| INSPECTION CAN PROPERLY BE MADE. PRELIMINARY PLANS OF |
| THE TOTAL BUILDING SHALL BE SUBMITTED WITH THE |
| CONSTRUCTION DOCUMENTS, AND WITH SUFFICIENT DETAIL, SO |
| THAT PROPER EVALUATION CAN BE MADE. AREAS AND ITEMS NOT |
| INCLUDED IN THE PHASE TO BE PERMITTED SHALL BE SHOWN AS |
| NOT INCLUDED. [5000:1.7.6.3.3.3] |
| |
| PLEASE HIGHLIGHT THE PROPOSED DDCV UNDER THIS PERMIT. |
| |
| |
| 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| ABOVE. |
| |
| |
| 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| RE-SUBMITTAL OF THE ABOVE. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |