Plan Review Notes For Permit 23060432 |
Permit Number |
23060432 |
|
Review Stop |
NFIP |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2023-07-10 16:29:00 | NFIP REVIEW COMMENTS | | | | 1ST REVIEW: FBC SEVENTH EDITION (2020) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THIS BUILDING IS LOCATED IN A SPECIAL FLOOD HAZARD | | AREA. IT IS IN AN AE FLOOD ZONE WITH A BFE OF 6' NAVD | | 88. THE CIY OF WEST PALM BEACH'S FLOOD ORDINANCE | | SECTION 18-33 REQUIRES BUILDINGS AND STRUCTURES LOCATED | | IN FLOOD HAZARD AREAS TO HAVE THE LOWEST FLOOR AND | | EQUIPMENT ELEVATED TO THE BASE ELEVATION PLUS TWO FEET | | OR THE DESIGN FLOOD ELEVATION WHICHEVER IS HIGHER. | | THEREFORE, THE FINISH FLOOR OF THE HABITABLE AREA IS | | REQUIRED TO BE AT OR ABOVE 8' NAVD 88. FBC-R322 | | THE ORDINANCE ALLOWS ENCLOSED AREAS BELOW THE DESIGN | | FLOOD ELEVATION IF USED SOLELY FOR THE PARKING OF | | VEHICLES, BUILDING ACCESS OR STORAGE AND ARE DESIGNED | | WITH FLOOD OPENINGS COMPLYING WITH FBC-R 322.2.2 | | | | 2) YOU WILL BE REQUIRED TO SUBMIT THREE ELEVATION | | CERTIFICATES. THE FIRST ONE IS REQUIRED PRIOR TO PERMIT | | ISSUANCE AND IS BASED ON THE CONSTRUCTION DRAWINGS. THE | | SECOND ONE IS REQUIRED DURING CONSTRUCTION WHEN THE | | FLOOR SLAB HAS BEEN POURED. THE THIRD ONE IS AFTER THE | | JOB IS COMPLETED AND PRIOR TO RECIEVING THE CERTIFICATE | | OF OCCUPANCY. | | |
|