2023-04-18 08:47:32 | JONATHAN BROOKS JR. |
| BUILDING PLANS EXAMINER |
| WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| PHONE (561) 805-6656 |
| EMAIL: [email protected] |
| |
| 1ST REVIEW: FBC 2020 7TH EDITION |
| FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| FBC B = FBC BUILDING |
| FBC R = FBC RESIDENTIAL |
| FBC EB = FBC EXISTING BUILDING |
| FBC A = FBC ACCESSIBILITY |
| FBC EC = FBC ENERGY CONSERVATION |
| WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| RESULTS: DENIED |
| ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| |
| 1. FBC R 301 FAC9N-3 SUBMITTED FLORIDA DBPR PRODUCT |
| APPROVAL FL27499.01-R4 COVERS MULTIPLE INSTALLATION |
| OPTIONS TO MEET DESIGN UPLIFT PRESSURES. PLEASE SELECT |
| CORRECT INSTALLATION OPTION FROM PAGE #2 OF THE |
| EVALUATION REPORT THAT MEET OR EXCEED THE MINIMUM |
| DESIGN PRESSURE REQUIREMENT FOR ZONE 3 EXPOSURE |
| CATEGORY C AREAS. ALL APPLICABLE DETAILS AND |
| ATTACHMENTS MUST BE CLEARLY IDENTIFIED ON THE PRODUCT |
| APPROVAL DRAWINGS. DETAILS AND ATTACHMENTS NOT |
| SPECIFICALLY COVERED IN PRODUCT APPROVALS WILL NEED |
| SITE-SPECIFIC ENGINEERING. |
| 2. FBC B 107.2.1 FOR CLARITY PLEASE REVISE ROOF |
| DIAGRAM/SKETCH AND SHOW THE AREAS TO RECEIVE NEW |
| ROOFING CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF |
| SLOPE(S), MEAN ROOF HEIGHT(S). |
| 3. FBC B 107.2.1 SUBMITTED ROOF DIAGRAM/SKETCH APPEARS |
| TO INDICATE REROOFING LOW/FLAT SLOPE AREA; IF NOT |
| INDICATE BY PLACING AN X IN LOW/FLAT SLOPE AREAS; IF TO |
| RECEIVE NEW ROOFING PROVIDE A COMPLETE SET OF 2020 CODE |
| VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED FLAT |
| ROOF SYSTEM TO BE USED. INCLUDE COVER PAGE, EVALUATION |
| REPORTS AND INSTALLATION INSTRUCTIONS FOR SYSTEM USED. |
| ALL APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS |
| AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT |
| APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING. |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |