2023-02-06 15:00:16 | 1ST BUILDING REVIEW |
| RESULTS: CORRECTIONS NEEDED |
| |
| CHRISTOPHER S. THROOP, CBO, BN, PX, CFM |
| PLANS EXAMINER II |
| CITY OF WEST PALM BEACH |
| (561) 805-6726 |
| [email protected] |
| |
| CODES IN EFFECT: |
| 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| CHAPTER 1 ADMINISTRATION |
| NFPA 70 2017 EDITION NEC 2017 |
| |
| ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT: |
| |
| 1.PROJECT IS LOCATED IN A SPECIAL FLOOD HAZARD AREA |
| (SFHA). THE FLOOD ZONE DESIGNATION FOR THIS SITE IS AE |
| WITH A BASE FLOOD ELEVATION (BFE) OF 6'0" NAVD. |
| THE CITY OF WEST PALM BEACH (THROUGH ORDINANCE NO. |
| 4729-17) REQUIRES AN ADDITIONAL 24 INCHES OF FREEBOARD. |
| THE DESIGN FLOOD ELEVATION (DFE) SHALL BE AT OR ABOVE |
| 8'0" NAVD. |
| |
| SUBMIT PLANS AND/OR DOCUMENTS TO SHOW COMPLIANCE WITH |
| THE FBC R322.2 AND FEMA 50% RULE. |
| |
| ELEVATION CERTIFICATES REQUIRED. SEE NFIP REVIEW |
| COMMENTS. |
| |
| 2.PROVIDE A COPY OF THE MOST RECENT BOUNDARY LINE |
| SURVEY. |
| 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| 107.2.5. |
| |
| 3.PROVIDE THE DESIGN PRESSURES FOR NEW ROOFING PER |
| FIGURE R301.2(7) COMPONENT AND CLADDING PRESSURE ZONES |
| R301.2.1.1WIND DESIGN REQUIRED. |
| RE-EVALUATE THE DESIGN PRESSURES FOR ZONE 3 ROOFING PER |
| FBC RES TABLE R301.2(2). ROOF PITCH 5/12. ROOF SLOPE |
| 22.6 DEGREES. EXPOSURE C. ADJUSTMENT COEFFICIENT 1.21. |
| |
| 4.PROVIDE A ROOF SHEATHING FASTENER SCHEDULE PER THE |
| ENHANCED CALCULATED DESIGN PRESSURES OF ZONES 2 AND 3. |
| TABLE R301.2.1.2 WINDBORNE DEBRIS PROTECTION FASTENING |
| SCHEDULE FOR WOOD STRUCTURAL PANELS. |
| |
| 5. PROVIDE SHOP DRAWINGS, REVIEWED AND APPROVED FOR |
| ALUMINUM STAIRS. |
| 107.2 CONSTRUCTION DOCUMENTS SHALL BE IN ACCORDANCE |
| WITH SECTIONS107.2.1 THROUGH 107.2.5. |
| |
| 6.PROVIDE LOCATION OF ATTIC ACCESS PER R807.1.7. |
| R807.1.7 BUILDINGS WITH COMBUSTIBLE CEILING OR ROOF |
| CONSTRUCTION SHALL HAVE AN ATTIC ACCESS OPENING TO |
| ATTIC AREAS THAT HAVE A VERTICAL HEIGHT OF 30 INCHES |
| (762 MM) OR GREATER OVER AN AREA OF NOT LESS THAN 30 |
| SQUARE FEET (2.8 M2). |
| |
| 7.PROVIDE A WINDOW AND DOOR FLASHING DETAIL OR THE |
| SPEC. SHEET OF A FLUID APPLIED MEMBRANE. |
| R703.4 |
| |
| PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| |
| WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. |
| |
| |
| |
| |
| |
| |
| |
| |